Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

A distributable APSE

A distributed Ada program library is a key element in a distributed Ada Program Support Environment (APSE). To implement this successfully, the program library universe as defined by the Ada Reference Manual must be broken up into independently manageable pieces. This in turn requires the support of a distributed database system, as well as a mechanism for identifying compilation units, linkable subprograms, and Ada types in a decentralized way, to avoid falling victim to the bottlenecks of a global database and/or global unique-identifier manager. It was found that the ability to decentralize Ada program library activity is a major advantage in the management of large Ada programs. Currently, there are 18 resource-catalog revision sets, each in its own Host Interface (HIF) partition, plus 18 partitions for testing each of these, plus 11 partitions for the top-level compiler/linker/program library manager components. Compiling and other development work can proceed in parallel in each of these partitions, without suffering the performance bottlenecks of global locks or global unique-identifier generation.

Taft, Tucker, S.↗

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗

Close Range Photogrammetry in Space - Measuring the On-Orbit Clearance between Hardware on the International Space Station

When photogrammetrists read an article entitled "Photogrammetry in Space" they immediately think of terrestrial mapping using satellite imagery. However in the last 19 years the roll of close range photogrammetry in support of the manned space flight program has grown exponentially. Management and engineers have repeatedly entrusted the safety of the vehicles and their crews to the results of photogrammetric analysis. In February 2010, the Node 3 module was attached to the port side Common Berthing Mechanism (CBM) of the International Space Station (ISS). Since this was not the location at which the module was originally designed to be located on the ISS, coolant lines containing liquid ammonia, were installed externally from the US Lab to Node 3 during a spacewalk. During mission preparation I had developed a plan and a set of procedures to have the astronauts acquire stereo imagery of these coolant lines at the conclusion of the spacewalk to enable us to map their as-installed location relative to the rest of the space station. Unfortunately, the actual installation of the coolant lines took longer than expected and in an effort to wrap up the spacewalk on time, the mission director made a real-time call to drop the photography. My efforts to reschedule the photography on a later spacewalk never materialized, so rather than having an as-installed model for the location of coolant lines, the master ISS CAD database continued to display an as-designed model of the coolant lines. Fast forward to the summer of 2015, the ISS program planned to berth a Japanese cargo module to the nadir Common Berthing Mechanism (CBM), immediately adjacent to the Node 3 module. A CAD based clearance analysis revealed a negative four inch clearance between the ammonia lines and a thruster nozzle on the port side of the cargo vehicle. Recognizing that the model of the ammonia line used in the clearance analysis was "as-designed" rather than "as-installed", I was asked to determine the real clearance between the ammonia lines and expected position of the thruster bell using existing on-orbit imagery. Imagery of the area of interest, taken several years earlier from the Space Shuttle during a fly-around of the ISS, was found and used to set a stereo pair. Space Vision System Targets and Handrail bolts measured in the ISS analytical coordinate system (ISSACS) prior to launch, were used to obtain an absolute orientation so all photogrammetric measurement's would be in the ISSACS coordinate system. Coordinates for the design location of the edges of the thruster bell, when the cargo vehicle was fully berthed to the ISS, were displayed in 3-D relative to the as-installed ammonia lines. This immediately revealed a positive clearance, which was later quantified to be a minimum of 10" +/0.5". The analysis was completed over a single weekend by a single analyst. Using updated imagery, acquired from the station's robotic arm, a complete as-installed model of the coolant lines was generated from stereo photography and replaced the design model in the master ISS CAD database.

Liddle, Donn↗

Report by the International Space Station (ISS) Management and Cost Evaluation (IMCE) Task Force

The International Space Station (ISS) Management and Cost Evaluation Task Force (IMCE) was chartered to conduct an independent external review and assessment of the ISS cost, budget, and management. In addition, the Task Force was asked to provide recommendations that could provide maximum benefit to the U.S. taxpayers and the International Partners within the President's budget request. The Task Force has made the following principal findings: (1) The ISS Program's technical achievements to date, as represented by on-orbit capability, are extraordinary; (2) The Existing ISS Program Plan for executing the FY 02-06 budget is not credible; (3) The existing deficiencies in management structure, institutional culture, cost estimating, and program control must be acknowledged and corrected for the Program to move forward in a credible fashion; (4) Additional budget flexibility, from within the Office of Space Flight (OSF) must be provided for a credible core complete program; (5) The research support program is proceeding assuming the budget that was in place before the FY02 budget runout reduction of $1B; (6) There are opportunities to maximize research on the core station program with modest cost impact; (7) The U.S. Core Complete configuration (three person crew) as an end-state will not achieve the unique research potential of the ISS; (8) The cost estimates for the U.S.-funded enhancement options (e.g., permanent seven person crew) are not sufficiently developed to assess credibility. After these findings, the Task Force has formulated several primary recommendations which are published here and include: (1) Major changes must be made in how the ISS program is managed; (2) Additional cost reductions are required within the baseline program; (3) Additional funds must be identified and applied from the Human Space Flight budget; (4) A clearly defined program with a credible end-state, agreed to by all stakeholders, must be developed and implemented.

Young, A. Thomas↗

Syntax-directed documentation for PL360

PL360 is a phrase-structured programming language which provides the facilities of a symbolic machine language for the IBM 360 computers. An automatic process, syntax-directed documentation, is described which acquires programming documentation through the syntactical analysis of a program, followed by the interrogation of the originating programmer. This documentation can be dispensed through reports of file query replies when other programmers later need to know the program structure and its details. A key principle of the programming documentation process is that it is managed solely on the basis of the syntax of programs.

Mills, H. D.↗

Window Utility System Program

Window Utility System computer program provides full-featured screen-management windowing software facility incorporated easily into user application programs. Developed to provide more pleasing user interface for CLIPS, C-Language Integrated Production System expert-system-development shell program. Also used with many other application programs in VAX/VMS language. Provides pull-down menus and multiple window displays at minimal cost. Written in VAX C.

Cooper, Eric G.↗

Wind Tunnel Test Technique and Instrumentation Development at LaRC

LaRC has an aggressive test technique development program underway. This program has been developed using 3rd Generation R&D management techniques and is a closely coordinated program between suppliers and wind tunnel operators- wind tunnel customers' informal input relative to their needs has been an essential ingredient in developing the research portfolio. An attempt has been made to balance this portfolio to meet near term and long term test technique needs. Major efforts are underway to develop techniques for determining model wing twist and location of boundary layer transition in the NTF (National Transonic Facility). The foundation of all new instrumentation developments, procurements, and upgrades will be based on uncertainty analysis.

Putnam, Lawrence E.↗

Thoughts on Earned Value Assessments

This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

Pido, Kelle↗

The Current State and Future of the Former Central Nervous System Risk Managed by Space Radiation Element Part of NASA’s Human Research Program

Historically, the Space Radiation Element, as part of the NASA Human Research Program, was responsible for the scientific strategy and funding of research focused on characterizing and mitigating the effects of space radiation exposure on the central nervous system (CNS). During the past few years, there have been two major changes that have affected the management of the science associated with the CNS risk. The first major change was the integration of several related risks: CNS (C), behavioral medicine (B), and sensorimotor (S) to be managed as an integrated effort called CBS. CBS was formed to accelerate research on combined spaceflight stressors, specifically space radiation, microgravity, isolation, and confinement. CBS was managed by Human Factors and Behavioral Performance (HFBP) with support and inputs from Space Radiation as well as Human Health Countermeasures. Secondly, and more recently, the CNS risk was absorbed by the behavioral medicine risk currently also held by HFPB. As a result, the gaps associated with CNS were removed and aspects of them are represented in the BMED gaps (link). However, due to recent changes in element leadership, budget, and timeline, extensive restructuring of CBS is in progress. In addition, in an effort to harmonize datasets to be used in modeling efforts, an Animal Standardization TIM was held in June 2021 to standardize the type of behavioral and cognitive tasks as well as experimental set-ups used in animal models of future funded research. This presentation is an effort to communicate with the radiation research community concerning the strategy, management, and future of the former central nervous system risk and the role of the Space Radiation Element.

Janice A Zawaski↗

Plans and status of the NASA-Lewis Research Center wind energy project

This report describes that portion of the national five-year wind energy program that is being managed by the NASA-Lewis Research Center for the ERDA. The Lewis Research Center's Wind Power Office, its organization and plans and status are briefly described. The three major elements of the wind energy project at Lewis are the experimental 100 kW wind-turbine generator; the first generation industry-built and user-operated wind turbine generators; and the supporting research and technology tasks which are each briefly described.

Thomas, R.↗

NASA to launch third NATO communications satellite

Launching of the third NATO communications satellite is discussed. The Delta launch vehicle is briefly described along with launch operations. Management of the Delta program is considered.

Source record↗

Shuttle era waste management and biowaste monitoring

The acquisition of crew biomedical data has been an important task on manned space missions. The monitoring of biowastes from the crew to support water and mineral balance studies and endocrine studies has been a valuable part of this activity. This paper will present a review of waste management systems used in past programs. This past experience will be cited as to its influence on the Shuttle design. Finally, the Shuttle baseline waste management system and the proposed Shuttle biomedical measurement and sampling systems will be presented.

Sauer, R. L.↗

X10: A FORTRAN direct access data management system

The XIO system is a set of subroutines that provide generalized data management capability for FORTRAN programs using a direct access file. Arrays of integer, real, double precision, and character data may be stored, each logical group of data identified by a unique matrix number. A matrix may be organized and stored as batches to reduce core requirements. Batches may be accessed randomly or sequentially. The file may be checkpointed and retained, allowing for restarts with stored values. The XIO subroutines operate on either IBM 360-370/OS/VS or DEC PDP-11/RSX computing systems.

Roland, D. P.↗

Payload integration and operations

Integration and operation of Spacelab payloads presents major challenges to engineering disciplines in areas of ground operations and flight mission operations. The integration of ground operations encompasses activities performed by the instrument developers and principal investigators and by the centralized payload integration site and launch site. The payload will be operated on orbit by a payload crew trained in payload experimentation and by a payload operations control center where investigator science groups and operations personnel are prepared to provide support. The payload mission planning, control center, data processing facility and operations are developed and verified prior to realtime flight operations. The mission management approach to minimize program costs and impacts to payloads and the Space Transportation System/Spacelab accommodations is presented.

Hall, R. R.↗

Contributions to a thermodynamic model of Earth systems on rivers

A model for the chemical (ground water) erosion and physical (bed load, including sedimentation) erosion of the land was developed. The rudiments of the relation between a regulated sea level (for the past 2500 million years) and the episodic rise and erosion of continents was examined to obtain some notion of the process scalings. Major process scales of about 200 years, 100,000 years, 3 My, 40 My, 300 My were estimated. It was suggested that a program targeted at ecological management would have to become familiar with processes at the first four scales (i.e., from glaciation to the horizontal movement of continents). The study returns to the initial premise. In order to understand and manage Earth biology (life, and modern man), it is necessary minimally to pursue systems' biogeology at a considerable number of process space and time scales via their irreversible thermodynamic couplings.

Iberall, A. S.↗

Proceedings of the 12th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

The meeting gave PTTI managers, systems engineers, and program planners a transparent view of the state-of-the-art, an opportunity to express needs, a view of important future trends, and a review of relevant past accomplishments. The PTTI users were provided with new and useful applications, procedures, and techniques. Emphasis is placed on military applications and avionics.

Wardrip, S. C.↗

Proceedings of the Thirteenth Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

Proceedings of an annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting are summarized. A transparent view of the state-of-the-art, an opportunity to express needs, a view of important future trends, and a review of relevant past accomplishments were considered for PTTI managers, systems engineers, and program planner. Specific aims were: to provide PTTI users with new and useful applications, procedures, and techniques; to allow the PTTI researcher to better assess fruitful directions for research efforts.

Wardrip, S. C.↗