Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Practices”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Progress in the Development of Practical Remote Detection of Icing Conditions

The NASA Icing Remote Sensing System (NIRSS) has been under definition and development at NASA Glenn Research Center since 1997. The goal of this development activity is to produce and demonstrate the required sensing and data processing technologies required to accurately remotely detect and measure icing conditions aloft. As part of that effort NASA has teamed with NCAR to develop software to fuse data from multiple instruments into a single detected icing condition product. The multiple instrument approach utilizes a X-band vertical staring radar, a multifrequency microwave, and a lidar ceilometer. The radar data determine cloud boundaries, the radiometer determines the sub-freezing temperature heights and total liquid water content, and the ceilometer refines the lower cloud boundary. Data is post-processed with a LabVIEW program with a resultant supercooled liquid water profile and aircraft hazard depiction. Ground-based, remotely-sensed measurements and in-situ measurements from research aircraft were gathered during the international 2003-2004 Alliance Icing Research Study (AIRS II). Comparisons between the remote sensing system s fused icing product and the aircraft measurements are reviewed here. While there are areas where improvement can be made, the cases examined suggest that the fused sensor remote sensing technique appears to be a valid approach.

Reehorst, Andrew↗

Theory and Practice of Shear/Stress Strain Gage Hygrometry

Mechanical hygrometry has progressed during the last several decades from crude hygroscopes to state-of-the art strain-gage sensors. The strain-gage devices vary from different metallic beams to strain-gage sensors using cellulose crystallite elements, held in full shear restraint. This old technique is still in use but several companies are now actively pursuing development of MEMS miniaturized humidity sensors. These new sensors use polyimide thin film for water vapor adsorption and desorption. This paper will provide overview about modern humidity sensors.

Shams, Qamar A.↗

Design Methods and Practices for Fault Prevention and Management in Spacecraft

Integrated Systems Health Management (ISHM) is intended to become a critical capability for all space, lunar and planetary exploration vehicles and systems at NASA. Monitoring and managing the health state of diverse components, subsystems, and systems is a difficult task that will become more challenging when implemented for long-term, evolving deployments. A key technical challenge will be to ensure that the ISHM technologies are reliable, effective, and low cost, resulting in turn in safe, reliable, and affordable missions. To ensure safety and reliability, ISHM functionality, decisions and knowledge have to be incorporated into the product lifecycle as early as possible, and ISHM must be considered as an essential element of models developed and used in various stages during system design. During early stage design, many decisions and tasks are still open, including sensor and measurement point selection, modeling and model-checking, diagnosis, signature and data fusion schemes, presenting the best opportunity to catch and prevent potential failures and anomalies in a cost-effective way. Using appropriate formal methods during early design, the design teams can systematically explore risks without committing to design decisions too early. However, the nature of ISHM knowledge and data is detailed, relying on high-fidelity, detailed models, whereas the earlier stages of the product lifecycle utilize low-fidelity, high-level models of systems and their functionality. We currently lack the tools and processes necessary for integrating ISHM into the vehicle system/subsystem design. As a result, most existing ISHM-like technologies are retrofits that were done after the system design was completed. It is very expensive, and sometimes futile, to retrofit a system health management capability into existing systems. Last-minute retrofits result in unreliable systems, ineffective solutions, and excessive costs (e.g., Space Shuttle TPS monitoring which was considered only after 110 flights and the Columbia disaster). High false alarm or false negative rates due to substandard implementations hurt the credibility of the ISHM discipline. This paper presents an overview of the current state of ISHM design,and a review of formal design methods to make recommendations about possible approaches to enable the ISHM capabilities to be designed-in at the system-level, from the very beginning of the vehicle design process.

Tumer, Irem Y.↗

Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.

Lee, Lydia L.↗

The auditors are coming: a practical guide for engineering projects

This paper presents a description of the typical audit process, a list of do's and don'ts for projects undergoing an audit, how to design basic audit preparations into the project's design, and resources for further information on auditing issues.

audit auditors auditing↗

Practical Methods for Estimating Software Systems Fault Content and Location

Over the past several years, we have developed techniques to discriminate between fault-prone software modules and those that are not, to estimate a software system's residual fault content, to identify those portions of a software system having the highest estimated number of faults, and to estimate the effects of requirements changes on software quality.

fault-prone discriminant function↗