Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Lunar Flashlight Propulsion System Fracture Control Plan

This document is intended to replace a previously approved Fracture Control Plan (VACCO X16029-10-FCP1) for the Lunar Flashlight Propulsion System (LFPS). The current LFPS is a new design and therefore requires a new plan; however, the spacecraft interfaces have remained the same. This document describes the elements of the Marshall Space Flight Center (MSFC)Fracture Control Program and the responsibilities for managing these elements for the LFPS for the Lunar Flashlight CubeSat mission that will launch as a secondary payload on the Space Launch System (SLS). The purpose of this document is to establish a plan for the fracture control activities for MSFC’s LFPS that will be used on the Lunar Flashlight CubeSat. This plan lists all the specific activities that will be performed to satisfy fracture control for this program. The provisions of this plan shall be met to demonstrate that the parts are in compliance with NASA’s fracture control requirements for space flight hardware.

Cubesat↗

Context and future directions for integrating forest carbon into sub-national climate mitigation planning in the RGGI region of the U.S.

International frameworks for climate mitigation that build from national actions have been developed under the United National Framework Convention on Climate Change and advanced most recently through the Paris Climate Agreement. In parallel, sub-national actors have set greenhouse gas (GHG) reduction goals and developed corresponding climate mitigation plans. Within the U.S., multi-state coalitions have formed to facilitate coordination of related science and policy. Here, utilizing the forum of the NASA Carbon Monitoring System’s Multi-State Working Group, we collected and reviewed climate mitigation plans for 11 states in the Regional Greenhouse Gas Initiative region of the Eastern U.S. For each state we reviewed the (a) policy framework for climate mitigation, (b) GHG reduction goals, (c) inclusion of forest activities in the state’s climate action plan, (d) existing science used to quantify forest carbon estimates, and (e) stated needs for forest carbon monitoring science. Across the region, we found important differences across all categories. While all states have GHG reduction goals and framework documents, nearly three-quarters of all states do not account for forest carbon when planning GHG reductions; those that do account for forest carbon use a variety of scientific methods with various levels of planning detail and guidance. We suggest that a common, efficient, standardized forest carbon monitoring system would provide important benefits to states and the geographic region as a whole. In addition, such a system would allow for more effective transparency and progress tracking to support state, national, and international efforts to increase ambition and implementation of climate goals.

Rachel L Lamb↗

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗

Planning and Optimization for Multi-robot Planetary Cave Exploration under Intermittent Connectivity Constraints

Exploring subsurface structures with autonomous robots is of growing interest in the context of planetary caves studies. Communication between robots in these environments is severely degraded which complicates coordination and information distribution. In this paper we focus on planning for mobility and communication in a cave exploration scenario where the situational awareness of a static base station is critical. We propose a notion of information-consistency where a plan itself is part of the information to be shared between robots, and propose a method for generating information-consistent plans. We discuss in detail how the resulting plan can be robustly implemented with minimal communication through local mission executives that run on individual robots. We describe preliminary results on the performance of the planning algorithm and integration of the local mission executives in a high-fidelity simulation environment.

Murray, Richard M.↗

Contractor Support Building #7 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Work Plan

This Work Plan documents the proposed field sampling activities for a per- and polyfluoroalkyl substances (PFAS) Site Assessment at the Contractor Support Building (CSB) #7 at Kennedy Space Center (KSC). The Work Plan provides a background of the historical activities that occurred at CSB #7, and the limited environmental investigations performed at CSB #7. The proposed Site Assessment activities at CSB #7 include the advancement of a soil lithologic boring to 60 feet below ground surface, the installation of a staff gauge in site surface water, perform direct push groundwater sampling at eight locations, and collect four surface water samples. Sampling details, depths, and locations are presented in the Work Plan. The Work Plan was presented to the KSC Remediation Team in the form of an Advance Data Package in February 2023. Following STRIVES approval, the CSB #7 PFAS Site Assessment Work Plan will be formally submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler↗

Former SLF Fire and Rescue Building SWMU #120 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Work Plan

This Work Plan documents the proposed field sampling activities for a per- and polyfluoroalkyl substances (PFAS) Site Assessment at the Former Space Shuttle Landing Facility (SLF) Fire and Rescue Building (FRB) at Kennedy Space Center (KSC). The Work Plan provides a background of the historical activities that occurred at the SLF FRB, and the limited environmental investigations performed at the SLF FRB. The proposed Site Assessment activities at SLF FRB includes the collection of soil samples from eight locations, the advancement of a soil lithologic boring to 60 feet below ground surface, the installation of a staff gauge in site surface water, the installation of four monitoring wells, perform direct push groundwater sampling at seven locations, and collect one surface water sample. Sampling details, depths, and locations are presented in the Work Plan. The Work Plan was presented to the KSC Remediation Team in the form of an Advance Data Package in February 2023. Following STRIVES approval, the SLF FRB PFAS Site Assessment Work Plan will be formally submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler↗

Morpheus Test Area SWMU #119 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Work Plan

This Work Plan documents the proposed field sampling activities for a per- and polyfluoroalkyl substances (PFAS) Site Assessment at the Morpheus Test Area (MTA) at Kennedy Space Center (KSC). The Work Plan provides a background of the historical activities that occurred at the MTA, and the limited environmental investigations performed at the MTA. The proposed Site Assessment activities at MTA includes the collection of soil samples from seven locations, the installation of a staff gauge in site surface water, the installation of four monitoring wells, perform direct push groundwater sampling at ten locations, and collect one surface water sample. Sampling details, depths, and locations are presented in the Work Plan. The Work Plan was presented to the KSC Remediation Team in the form of an Advance Data Package in February 2023. Following STRIVES approval, the SLF FRB PFAS Site Assessment Work Plan will be formally submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler↗

Leveraging Automated Fiber Placement Computer Aided Process Planning Framework for Defect Validation and Dynamic Layup Strategies

Process planning represents an essential stage of the Automated Fiber Placement (AFP) workflow. It develops useful and efficient machine processes based upon the working material, composite design, and manufacturing resources. The current state of process planning requires a high degree of interaction from the process planner and could greatly benefit from increased automation. Therefore, a list of key steps and functions are created to identify the more difficult and time-consuming phases of process planning. Additionally, a set of metrics must exist by which to evaluate the effectiveness of the manufactured laminate from the machine code created during the Process Planning stage. Layup strategies, in addition to dog ears, stagger shifts, steering constraints, and starting points, represented the group of functions labeled as process optimization and ranked the highest in terms of priority for automation. The laminates resulting from the selected parameters are evaluated through the occurrences of principal defect metrics such as fiber gaps, overlaps, angle deviation and steering violations. This document presents an automated software solution to the layup strategy and starting point selection phase of process planning. A series of ply scenarios are generated with variations of these ply parameters and evaluated according to a set of metrics entered by the Process Planner. These metrics are generated through use of the Analytical Hierarchy Process (AHP), where relative importance between each of the fiber features are defined. The ply scenarios are selected which reduce the overall fiber feature scores based on the defects the Process Planner wishes to minimize.

HiCAM↗

Analyzing the Efficacy of Flexible Execution, Replanning, and Plan Optimization for a Planetary Lander

Plan execution in unknown environments poses a number of challenges: uncertainty in domain modeling, stochasticity at execution time, and the presence of exogenous events. These challenges motivate an integrated approach to planning and execution that is able to respond intelligently to variation. We examine this problem in the context of the Europa Lander mission concept, and evaluate a planning and execution framework that responds to feedback and task failure using two techniques: flexible execution and replanning with plan optimization. We develop a theoretical framework to estimate gains from these techniques, and we compare these predictions to empirical results generated in simulation. These results indicate that an integrated approach to planning and execution leveraging flexible execution, replanning, and utility maximization shows significant promise for future tightly-constrained space missions that must address significant uncertainty.

Chien, Steve↗

Analyzing the Efficacy of Flexible Execution, Replanning, and Plan Optimization for a Planetary Lander

Plan execution in unknown environments poses a number of challenges: uncertainty in domain modeling, stochasticity at execution time, and the presence of exogenous events. These challenges motivate an integrated approach to planning and execution that is able to respond intelligently to variation. We examine this problem in the context of the Europa Lander mission concept, and propose a planning and execution framework that responds to feedback and task failure using two techniques: flexible execution and replanning with plan optimization. We develop a theoretical framework to predict the value of each of these techniques, and we compare these predictions to empirical results generated in simulation. We demonstrate that an integrated approach to planning and execution that is grounded in flexible execution, replanning, and utility maximization will be an enabling technology for future tightly-constrained planetary surface missions.

Chien, Steve↗

Analyzing the Efficacy of Flexible Execution, Replanning, and Plan Optimization for a Planetary Lander

Plan execution in unknown environments poses a number of challenges: uncertainty in domain modeling, stochasticity at execution time, and the presence of exogenous events. These challenges motivate an integrated approach to planning and execution that is able to respond intelligently to variation. We examine this problem in the context of the Europa Lander mission concept, and propose a planning and execution framework that responds to feedback and task failure using two techniques: flexible execution and replanning with plan optimization. We develop a theoretical framework to predict the value of each of these techniques, and we compare these predictions to empirical results generated in simulation. We demonstrate that an integrated approach to planning and execution that is grounded in flexible execution, replanning, and utility maximization will be an enabling technology for future tightly-constrained planetary surface missions.

Basich, Connor↗

Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedback during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.

Agile Development↗

Test Plan for Reirradiation and 1200°C Heating Test of AGR-3/4 Compact 8-1

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 are in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015b). This test plan describes the reirradiation and subsequent heating test of AGR-3/4 Compact 8-1. One of the main goals of this test is to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 d) and Xe-133 (t1/2 = 5.2 d) in fuel kernels. To generate short-lived fission products, the compact will first be reirradiated in the Neutron Radiography Reactor (NRAD). Following reirradiation, the compact will be removed from NRAD, gamma scanned on the Precision Gamma Scanner (PGS), and then loaded into the Fuel Accident Condition Simulator (FACS) furnace for heating at 1200°C. Fission gases and condensable fission products released from the compact will be collected in the Fission Gas Monitoring System (FGMS) and the FACS condensation plates, respectively. The planned uses of AGR-3/4 compacts (including heating testing and destructive analysis) are discussed in the AGR-3/4 PIE plan (Demkowicz 2017). Significant portions of this plan have been completed and additional samples are being used for purposes not captured in that plan.

42 ENGINEERING↗

A Robust Approach to Sequential Information Theoretic Planning

In many sequential planning applications a natural approach to generating high quality plans is to maximize an information reward such as mutual information (MI). Unfortunately, MI lacks a closed form in all but trivial models, and so must be estimated. In applications where the cost of plan execution is expensive, one desires planning estimates which admit theoretical guarantees. Through the use of robust M-estimators we obtain bounds on absolute deviation of estimated MI. Moreover, we propose a sequential algorithm which integrates inference and planning by maximally reusing particles in each stage. We validate the utility of using robust estimators in the sequential approach on a Gaussian Markov Random Field wherein information measures have a closed form. Lastly, we demonstrate the benefits of our integrated approach in the context of sequential experiment design for inferring causal regulatory networks from gene expression levels. Here, our method shows improvements over a recent method which selects intervention experiments based on the same MI objective.

Zheng, Sue↗

Incorporating climate change into risk-informed resilience planning

In response to the development of portfolio-wide Climate Action Plans by federal agencies, federal sites are working to incorporate the impacts of climate change into their resilience assessments. However, it can be challenging to incorporate climate change scenarios into resilience assessments given the uncertainty inherent in climate change modeling. Incorporating these factors into a resilience plan requires an understanding of what the different climate scenarios mean, as well as how to estimate potential impacts of climate change on hazard occurrence on a regional, or even local, scale under different scenarios. We discuss approaches to incorporating this data into risk-informed resilience assessment processes, such as those implemented in the Department of Energy’s (DOE) Federal Energy Management Program’s (FEMP) Technical Resilience Navigator (TRN) and the Sustainability Performance Division’s (SPD) Vulnerability Assessment and Resilience Plan (VARP) Risk Assessment Tool. We also describe the climate scenarios and the availability of hazard data for site resilience planning, based on modeling included in the International Panel on Climate Change (IPCC), the National Climate Assessment (NCA), and state-level reports. We present examples from the TRN risk assessment and the VARP Risk Assessment Tool to illustrate how sensitivity analysis can be used to incorporate climate change projections into the resilience planning process.

Rabinowitz, Hannah S.↗

Change vs. Transformation, Hard Edges to Soft - The Role of Integrated Land Use Planning in the Adaptive Reuse of Contaminated Sites - 16431

Between the bookends of World War II and the Cold War, numerous cycles of up-sizing, down-sizing, and right sizing resulted in changing needs for federal real property to support government missions. The end of the Cold War has yielded many opportunities for reuse of federal facilities as defense-related property needs have been lessened. These federal facilities have both a historic and an environmental legacy, from radionuclides to unexploded ordnance to landfills and everything in between. Private-sector manufacturing sites have been especially affected by changing market demands. Obsolescence and advancing technologies have made the 'have to have it' product into the 'what was that for?' The result has been thousands of hectares (acres) of contaminated land throughout the country. While site histories go back in time, it is the environmental cleanup contaminants that have the ability to go forward in time and influence the future use of a site. Demonstrating that property conditions are protective of human health and the environment facilitates reuse options for these properties. Site reuse creates land for communities to attract businesses, grow their tax bases, add open space, and implement sustainability efforts, such as renewables, or set the property aside for future possibilities. A broad range of sites have been made available across the country as a result of federal mission changes and changed economic market conditions affecting private industry. This broad range of properties should have similarly broad recipes for reuse. Even with the constraints of zoning, topographic/natural conditions and use restrictions necessitated by past operations, the pathways to creative, adaptive, and sustainable reuse can be taken by integrating the planning with the remediation or, in a more community-sensitive approach, by integrating the remediation with the planning. Situations do exist where a like-kind use is an ideal reuse option, but a redevelopment of sameness need not be a foregone conclusion. Unlike the operational and imposed environments from which these sites came, with their engineered features often developed in a systematic manner with straight lines and hard edges, they can indeed be transformed into functional, relaxed, and engaging places and be productive again. A site's transformation can begin with how the remediation incorporates sustainable techniques that consider the future use of a site, and how the sustainable remediation can dovetail with the community's reuse plans. Rather than building on Greenfields and extending infrastructure and services to more distant locations, many communities are looking within their already developed footprints for growth possibilities. For some communities this is their only source of growth. Stigmatized and challenged as they may be to reuse, the nation's excess, under-utilized, surplus, and abandoned industrial past presents opportunities well worth considering for improvement to local and regional economies. Communities that are engaged in remediation and reuse planning efforts at these sites have the opportunity to shape their futures, transform their identities and incorporate sustainable practices throughout the process. Unlike the simple name change of a facility, transformative change takes time. Transformative change relies on working partnerships, dedication to achieving something better, open communication, and cooperative planning. It is this type of change that tends to be lasting and tailored to a place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Status and Preliminary Engineering Planning for Chinshan NPP in Taiwan - 19114

The Chinshan Nuclear Power Plant, which consists of two BWR units and was owned by Taiwan Power Company (TPC), has an electrical output of 636 MWe for each unit. Unit No. 1 and Unit No. 2 were licensed till December 2018 and July 2019, respectively. According to regulations of decommissioning in Taiwan, decontamination and dismantling of a NPP should be completed within 25 years. Therefore, TPC had started compiling the decommissioning plans (DP, 17 chapters) with INER, national engineering companies and international consultants since 2012. The DP of Chinshan NPP has been approved by the regulator, Atomic Energy Council (AEC), in the end of June, 2017. There are 17 chapters in the decommissioning plans, which deal with all aspects of safety-related considerations during the decommissioning period, such as spent fuel management, waste management, personnel/workers planning, schedules/working items, environmental management and monitoring. Those items are discussed in detail in this paper in accordance with the approved DP. The implementation of decommissioning will be started while the Environmental Impact Assessment (EIA) is still under approval by EPA, which is expected to be completed in the end of 2018 or the mid of 2019. Once the decommissioning be started, all dismantling, decontamination, management teams, and preparation would be kicked off simultaneously in a very short period of time. In this paper, the planning assumptions, strategies from INER and TPC, management of radioactive waste, conversion of Turbine Building and detailed description of turbine-generator set are discussed. For the Turbine Building dismantling, inventories of equipment, cutting technology determination, storage logistics, container options and radwaste treatment and reduction would be important factors to be evaluated in the beginning. Afterwards, WBS (work breakdown structure) would be determined and be the basis for working bids, construction of a new storage warehouse, an incinerator and a super high pressure compactor. This preliminary engineering planning would be applied in the decommissioning of Chinshan NPP for the first time and be duplicated in Kuosheng NPP and Maanshan NPP in Taiwan as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Learning through EC directive based SEA in spatial planning? Evidence from the Brunswick Region in Germany

This paper presents results of an international comparative research project, funded by the UK Economic and Social Research Council (ESRC) and the Academy for Sustainable Communities (ASC) on the 'learning potential of appraisal (strategic environmental assessment - SEA) in spatial planning'. In this context, aspects of 'single-loop' and 'double-loop' learning, as well as of individual, organisational and social learning are discussed for emerging post-EC Directive German practice in the planning region (Zweckverband) of Brunswick (Braunschweig), focusing on four spatial plan SEAs from various administrative levels in the region. It is found that whilst SEA is able to lead to plan SEA specific knowledge acquisition, comprehension, application and analysis ('single-loop learning'), it is currently resulting only occasionally in wider synthesis and evaluation ('double-loop learning'). Furthermore, whilst there is evidence that individual and occasionally organisational learning may be enhanced through SEA, most notably in small municipalities, social learning appears to be happening only sporadically.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗