Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Modularity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Thermal Energy Storage Selection for Near Term Nuclear Integration

Thermal energy storage (TES) integration with existing and future light water reactors (LWRs) has the capability to increase the deployment options and uses for the large amounts of heat produced in nuclear reactor cores. The present method of exclusively producing electricity has become less economical with increases in renewable energy penetration leading to times of low or negative electricity prices. Some response to this new grid reality has been to begin load following nuclear reactors, an unideal choice due to the relatively small modular cost of producing nuclear energy compared to the revenue that could be received by using all of the heat produced. To support research in this area, Idaho National Laboratory (INL) has joined with Utah Associated Municipal Power Systems (UAMPS) on the Carbon Free Power Project (CFPP) to contract the Joint Use Modular Plant (JUMP). CFPP is planned to be a 12-module NuScale operating site built on INL property, with the first module dedicated to JUMP for research, development, and demonstration purposes. The JUMP module coming online around the beginning of fiscal year 2027 in the current project timeline. One primary goal of JUMP is to demonstrate TES integrated with an operating LWR in a real-world environment. TES integration will allow for the demonstration of nuclear power’s capability to participate in grid load following without reactor cycling, process heat integration, and electrical ancillary market opportunities. The goal of this research is to support both SMR deployment opportunities as well as support LWR retrofit capabilities. In a discussion limited to load following or energy arbitration, “charging” and “discharging” can be simply defined. TES charging refers to time when energy is removed from the nuclear reactor power conversion cycle and directed to be stored in the TES storage medium resulting in less available energy available for grid output. Discharging refers to the process of releasing energy stored in the TES medium and having an increase in grid. This paper quantifies energy storage technologies for use with nuclear reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗

Public Views on Nuclear Facility Siting and Radioactive Waste Management in the United States: Methodology and Response Reference Report for the 2017 Energy and Environment Survey

This report presents the questions and responses to a nationwide survey of U.S. residents taken May 2017. The focus of the 2017 survey is public perceptions on (1) nuclear energy and new nuclear technology, such as small modular reactors; (2) the risks and benefits of nuclear energy; (3) different options for managing spent nuclear fuel (SNF); and (4) the role of individuals, organizations and elected officials in locating SNF facilities. Highlights of survey results related to nuclear energy found the U.S. public (1) wants nuclear energy to continue to contribute 20% of total electrical power produced for the next 20 years; (2) is more supportive of adding new reactors at existing sites than at new sites; and (3) is more supportive of small modular reactors than traditional reactors. Highlights related to risks and benefits of nuclear energy include (1) the public believes that terrorist attacks are the greatest threat and that energy independence is the greatest benefit; (2) 56% of the public believes that nuclear power has both high benefit and high risk; (3) the 2011 accident at the Fukushima nuclear facility continues to negatively influence the perceived benefits and risks of nuclear energy except for those who perceive nuclear power as low risk and high benefit; (4) building new reactors is supported by those who perceive nuclear power as low risk and high benefit, and opposed by those who perceive it as high risk and low benefit. Highlights related to SNF management options include (1) support remains higher for permanent disposal than either consolidated interim storage or continued on-site storage; (2) support for private initiatives for interim storage in New Mexico and Texas are higher than generic storage and disposal options; (3) the general public is more likely to increase support if a majority of the local and state residents support an SNF facility. Highlights related to the role of individuals, organizations, and elected officials include (1) 54% of the public agrees that if an SNF facility is deemed safe by regulators, political considerations should not derail the location; (2) 47% of the US public agrees that non-governmental organizations should be able to provide input to locating an SNF facility; (3) 36% of the public believes that the federal government should lead siting of an SNF facility while 25% believes private companies should lead; (4) 81% of the public believes local residents and farmers/ranchers should have a say in the final decision on locating a SNF facility and 56% believe that they should have veto power; and (5) only 27% of the public believes the state governor should have a say and veto power.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

The Multiphysics on Advanced Platforms Project

In 2015, the Lawrence Livermore National Laboratory started development of next-generation multiphysics simulation capabilities for the National Nuclear Security Administration under the Advanced Technologies Development and Mitigation (ATDM) element of the Advanced Simulation and Computing program in collaboration with the Exascale Computing Project (ECP). A key driver for this effort across the NNSA tri-lab was the emergence of advanced high performance computing (HPC) architectures based on heterogeneous compute capabilities, including GPU based systems, as part of the national drive toward exascale computing platforms at multiple Department of Energy (DOE) facilities. Developing a multiphysics code capable of meeting the various simulation needs of the NNSA as defined by the current generation of integrated codes (or ICs), initially developed as part of the Accelerated Strategic Computing Initiative (ASCI) program beginning in 1996, and able to scale to the current 100 petaflop class pre-exascale systems, as well the forthcoming exaflop class computers, is a daunting challenge. To accomplish this ambitious goal, LLNL has embraced two key themes: use of high-order numerical methods and a modular approach to code development. The LLNL next generation effort is organized under the Multi-Physics on Advanced Platforms Project (MAPP). A foundational component of MAPP is the Axom computer science (CS) toolkit which provides infrastructure for the development of modular, performance portable, multi-physics application codes. MARBL is a next-generation application code built on the Axom base to address the modeling needs of the high energy density physics (HEDP) community for simulating high-explosive, magnetic or laser driven experiments such as inertial confinement fusion (ICF), pulsed-power magneto-hydrodynamics (MHD), equation of state (EOS) and material strength studies as part of the NNSA’s stockpile stewardship program (SSP).

97 MATHEMATICS AND COMPUTING↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ManiPIO - Manipulate Process I/O for Industrial Control Systems

The Manipulate Process Input/Output (IO) (ManiPIO) program allows users to develop custom scripts to execute Industrial Control System (ICS) manipulations. The driving development principles of ManiPIO are modularity and ease of use. Currently the program can utilize the Modbus TCP communication protocol, but its modular programming structure allows other protocols to be quickly and easily implemented. Additional functionality can be added to fit specific user needs, due to the usage of Python classes. The input configuration instructions are human readable and allow the user to create a complex series of control system manipulations.

97 MATHEMATICS AND COMPUTING↗

Metal-Supported Ceria Electrolyte-based SOFC Stack for Scalable, Low-Cost, High-Efficiency and Robust Stationary Power Systems (Final Report)

This is the end of project report for the DOE Project DE-FE-0027844 “Metal-Supported Ceria Electrolyte-based SOFC Stack for Scalable, Low-Cost, High-Efficiency and Robust Stationary Power Systems”. The objectives of the project were to develop several technologies required for the mass adoption of Solid Oxide Fuel Cell systems for medium to large power generation applications. The key achievements of this project were: 1) Development of fuel cells with complete internal fuel reforming capability. 2) Fuel cell power scale up with production of cells with larger active areas. 3) Assembly of an integrated 5 kW modular stack platform capable of installation into medium to large power systems. 4) Demonstration of a 10 kW Fuel Cell Power System utilizing the integrated 5 kW modular stack platform. 5) Cost modelling to show system cost of $1,500/kW are achievable at production volumes. 6) Development of cathode air poison getters for reduced degradation and extended fuel cell life. 7) Assessment of fuel poison on anode degradation, particularly poisons frequently produced from the process of gasification of coal. The Cummins led Voice of Customer (VOC) work identified several significant markets for natural gas powered fuel cell systems, where the end customer is interested in reducing energy consumption and emissions, or increasing reliability of electrical supply. Data centers and truck Auxiliary Power Units (APU) were highlighted as 2 key future markets for fuel cell systems.

30 DIRECT ENERGY CONVERSION↗

Hamilton: Flexible, Open Source $10 Wireless Sensor System for Energy Efficient Building Operation

Sensors for improving building performance are rapidly populating the market, driven in part by the drive to reduce greenhouse gas emissions resulting from energy production as well as improve the interior environment for healthy and more productive spaces. UC Berkeley has led wireless sensor development over the past 25 years (e.g., Telos mote), with the Hamilton (named after Alexander Hamilton on the US $10 bill) as the most recent. The Hamilton sensor was designed as a low-cost high-performance sensor that is modular and interoperable. The objective of the Hamilton project was to create, evaluate and establish the technological foundations for secure and easy to deploy building energy efficiency applications utilizing pervasive, low-cost wireless sensors integrated with traditional Building Management Systems (BMS), consumer-sector building components, and powerful data analytics. The project included iterative hardware design, incorporating a high-performance database (BTrDb, http://btrdb.io/), creating and iterating the development of secure data middleware (BOSSwave, WAVE/WAVEMQ), working with and pushing the development of an open-source tiny operating system RiotOS, and implementing and improving protocols such as Thread/OpenThread and TCP/IP. The hardware benefited from careful design to drive down the cost; the design included a System-on-a-Chip (SoC), chip antenna, single crystal and five passive components. Careful design of the operating system created a low-power design to enable a long life with small batteries. The hardware included several sensors: temperature, radiant temperature, relative humidity, magnetometer, accelerometer, and light, with an optional occupancy (Passive InfraRed) sensor. The project was the basis of several applications, both internal to the research team and other researchers and professionals at other institutions. Several applications used the sensor hardware as the basis for other complex devices. Other applications used the sensors to improve building performance through interoperating with the building Heating Ventilation and Air-Conditioning (HVAC) system, such as using occupancy and/or distributed temperature sensing to reduce HVAC zone energy while still providing thermal comfort and to reduce peak loads in small commercial buildings. We demonstrated cloud-based energy analytics, implemented a schedule and a Model Predictive Controller in a small commercial building to optimize HVAC energy, occupancy and electricity price. Initial integration of these technological innovations was performed through the creation of execution containers containing the WAVE agent and various driver, proxy, or building system function logic. The research added to the understanding of efficient sensor hardware, secure middleware, time-series data management (high performance database), efficient communication protocols, and interoperating with applications and building systems. The project showed the technical effectiveness and economic feasibility of creating a low-cost, modular, and easy-to-deploy sensor. Through conversations with multiple end users, the research team discovered that many customers wanted data management and services in addition to the sensors. HamiltonIOT developed packages of sensors, border router, and data services to provide a seamless “plug-and-play” sensor deployment. Some customers were willing to pay for higher quality sensors (such as light); some customers wanted a robust enclosure (waterproof).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analytic Framework for Optimal Sizing of Hydrogen Fueling Stations for Heavy Duty Vehicles at Ports (CRADA 512)

This CRADA presents the strategy that PNNL and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL) in properly sizing a hydrogen station for class 8 drayage trucks at the Port of Seattle (Port), as part of a coordinated plan of mixed uses for hydrogen. The proper sizing for the fueling station is unique from past experiences because it will be part of a coordinated plan for a multi-use scheme for the hydrogen, and not a stand-alone fueling station. The multiple use-streams, and their relative values, will impact all facets of station sizing and design, including fueling rates, storage technology and size, equipment selection, and safety considerations. The future deployment of this fueling station, and its proper sizing, is seen as a critical first step in the larger vision of utilizing hydrogen to address a range of issues for SCL and the Port. These include, but are not limited to, large scale fueling of medium duty (MD) and heavy duty (HD) vehicles to reduce emissions, support of adjacent light duty (LD) vehicles, support of critical port operation during extreme events (e.g. resiliency), mitigation of capital intensive electrical distribution system upgrades to support evolving port operations, a market resource that can be used by SCL to generate revenue, and support of planned future maritime operations that currently require heavy use of shipboard hydrogen. While the broader use of hydrogen by SCL and the Port is not the focus of this CRADA, how its use impacts the design of the initial vehicle fueling station, and the modular approach, are the central work. As such, this project will develop the framework and process for developing a modular station design that considers the broader range of coordinate uses of hydrogen as an energy resource.

08 HYDROGEN↗

High Temperature Steam Electrolysis Process Performance and Cost Estimates

Technology readiness levels (TRLs) of electrolysis systems have dramatically increased in recent years as the interest in clean hydrogen production and decarbonization of transportation, industrial and other sectors increases across the globe. This is especially true of high temperature steam electrolysis (HTSE) / solid oxide electrolysis cell (SOEC) systems which show promise of much higher system efficiencies than other more developed electrolysis technologies. This possibility of higher efficiencies of HTSE / SOEC systems has been previously assumed to be theoretically possible but in recent years it has become less theoretical and more realistic as an increasing amount of suppliers complete lab and pilot tests showing very promising results. Research in the areas of manufacturing techniques, material selection, electrode and electrolyte compositions, and balance of plant size and integration continues at a fast pace as an increasing number of suppliers both internationally and domestically become involved. The advantages of HTSE become more pronounced when HTSE is coupled with nuclear power plants (NPPs). This is because thermal energy produced by the nuclear reactor can be used in a series of heat transfer loops and heat exchangers to vaporize HTSE feedwater, which drastically improves the economics of the process. Idaho National Laboratory (INL) has been very involved in the research and modeling of HTSE systems for a number of years, in collaboration with other national laboratories, academia, and industry stakeholders both on the hydrogen production as well as the hydrogen demand side. The modeling completed over the years on a large variety of projects has led to a wealth of knowledge at INL including in the area of the technoeconomic assessment (TEA) of HTSE systems. TEAs include process modeling of the HTSE systems to calculate system energy requirements and equipment sizing, followed by estimation of capital and operating costs to enable calculation of the levelized cost of hydrogen (LCOH). The TEA work performed has produced incremental improvements and tuning of the methods, assumptions, models, and results of the analyses as well as providing some opportunities for validating these results. The purpose of this document is to record the current baseline HTSE analyses led by INL to show the current status of assumptions and costs of these systems. Given the rapid development of this technology, the variety of suppliers entering the space, and the increasing attention government and industry are giving to such systems, this document may be updated on a periodic basis with updated analysis and assumptions. This document compiles various analyses results and approaches completed over a period of years into a single document to be used as a baseline going forward. It represents what the INL HTSE analysis group assumes to be the internal best estimate of the current operation, costs, and landscape of the HTSE industry state of the art capability for current SOEC technology in an Nth-of-a-Kind (NOAK) plant, which in this study is defined as existence of the manufacturing capacity to support previous deployment of N = 100 count of 25 MWe modular HTSE blocks (with modular equipment component cost reductions specified as following a 95% learning curve). That said, This is a public document and as such so no proprietary data was used or included in this report. There may be HTSE suppliers that have performance specifications, and cost estimates, and test data that differ from the analysis presented in this document. This document is meant to be a best conservative estimate of the technology and not an absolute reference.

08 HYDROGEN↗

Non-Powered Dam Retrofit Exemplary Design for Hydropower Applications

Non-powered dams (NPDs) represent complex systems, situated at the intersection of natural stream environments and the built environment. The presence and operations of NPDs affect stream constituents (e.g., fish, recreational craft, sediment, water) and serve one or more engineered purposes (e.g., recreation, flood control, water supply, irrigation, tailings and debris control, navigation). By definition, NPDs do not provide hydropower generation. However, every NPD contains some untapped hydropower resource potential, represented by the pre-existing hydraulic head created by the dam and presence of flowing water. Adding power generation to an NPD requires retrofitting the NPD, which could involve the addition of any new component or function beyond that currently installed. Because this research is funded by the US Department of Energy Water Power Technologies Office, adding hydropower to NPDs is among the primary objectives for research investment. However, NPD retrofitting extends beyond the purview of hydropower additions. This report provides background information regarding NPD development in the United States, including an overview of the US NPD population, development potential, and recent development. It also summarizes challenges and opportunities facing NPD retrofit development, highlights the importance of maintaining or improving stream and dam functionality, notes key NPD characteristics, describes NPD retrofit methods, and identifies innovation areas for spurring future NPD retrofit development. Section 4 describes retrofit exemplary design principles and concepts that could apply to a wide range of NPD projects. These principles and concepts inform an NPD Retrofit Exemplary Design Specification (REDS), as included in Appendix A. The NPD REDS is heavily influenced by prior work under the standard modular hydropower technology acceleration research initiative, especially the work documented in the Exemplary Design Envelope Specification for Standard Modular Hydropower Technology (Witt et al., 2017). Whereas this prior work focuses on a particular technology class that applies most intentionally for new stream-reach development (i.e., greenfield sites), the NPD REDS contained herein applies more broadly to the NPD resource class and is technology-agnostic (i.e., the specific technologies intended to be described are not explicitly prescribed). This report serves as a part of early-phase research on NPD retrofit development, aimed toward spurring additional, follow-on efforts to specifically address development challenges, capitalize on development opportunities, and inspire innovation. As documented in the landmark “Hydropower Vision” report (DOE 2016), “transformative technical innovations able to meet the co-objectives of environmental sustainability and low-carbon energy will be critical to enabling additional hydropower growth.” This report serves as an important step in steering transformation of US non-powered dam infrastructure.

13 HYDRO ENERGY↗

Hydrogen Energy Storage Integrated with a Combined Cycle Plant

A project is being developed that will build upon the existing infrastructure and resources at the Intermountain Power Project (IPP) site to provide reliable, dispatchable energy and to support the transmission of renewable energy resources while transitioning to an economical green energy future. The concept study depicted in this report outlines a techno-economic optimization to fulfill the demand for 30% vol hydrogen co-firing in the IPP 840 MW advanced class combined cycle power plant. In an initial step, a site assessment concluded the site has sufficient land available to co-locate a hydrogen production and storage facility. The team evaluated and defined a scalable concept that considered technology characteristics, including input and output models to be used for optimization purposes. The concept for the hydrogen production and storage system integrates multiple technologies, to determine system size and scalable approach, for each of the technologies evaluated, the team defined component and subcomponent sizes, minimum and maximum capacity, modularity, component utility consumption (electric, water), component flexibility and servicing, layout, and technology status, as well as technology alternatives. For hydrogen generation, the project considers Siemens Energy’s Silyzer-300 (S300) technology, a 17.5 MW modular Proton Exchange Membrane (PEM) electrolyzer. For the S300 configuration, the team determined that three S300 arrays, or approximately 1,000 kg/hr, per block would yield a compact block design. This configuration results in a fairly wide and flexible arrangement that fits well into the spaces available at the site. Therefore, the overall design approach is based on multiple identical blocks of 3 arrays to minimize engineering cost and optimize constructability. In parallel, a transmission screening study was conducted to determine any potential transmission constraints from the energy sources that could feed the hydrogen production equipment. The study results show that minimum transmission constraints would be encountered to deliver 400 MW renewable generation from southern California, or south-central Wyoming. At last, the techno-economic analysis concluded that a scenario that uses solar and wind power yields the lowest levelized cost of hydrogen (LCOH 2 ) production and the lowest cost per tonne of CO 2 reduced. In this optimized scenario, the hydrogen production plant was determined as 6,201 kg/hr and the hydrogen storage (underground cavern) was determined as 4,600 tonnes. The resulting capacity factor for the hydrogen production plant was 66.33% with 8,745 operating hours in one year. This techno-economic analysis provided various options for integrating hydrogen storage at the Intermountain Power Plant site to co-fire the CCPP units. The results provide insightful data about the magnitude of capacity needed and the economics of producing hydrogen and reducing CO 2 emissions.

08 HYDROGEN↗

Tempus Project (Final Report)

This final technical report tracks the accomplishments of the Tempus Project to the statement of project objectives and resulting deliverables. The objective of the Tempus project was to develop and demonstrate the capabilities of a secure, modular, and customizable time synchronization platform that provides layers of protection from GPS spoofing attacks and other vulnerabilities. These vulnerabilities present a challenge to power system operators utilizing GPS-based time synchronization, as time synchronization increasingly plays a critical role in the efficient and reliable operation of power systems. The Tempus project addressed these concerns through the development of a secure, customizable time synchronization platform. The Tempus platform applies a layered approach to time security that protects from manipulation of timing systems used by power utilities. The Tempus platform consists of a component framework utilizing modularized time sources and customizable manipulation detection algorithms. With multiple time sources, and comparisons between sources and tracking sudden or subtle changes to the timing phase and time information, the Tempus system can detect and mitigate compromised timing sources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development and Demonstration of Medium-Heavy Duty PHEV Work Trucks

The heavy-duty vehicle market (Class 6-8) has been a difficult segment for the introduction of plug-in vehicles due to the large energy storage requirement (with corresponding cost), challenging duty cycles, and the diversity of vehicle configurations. The Work Truck market represents a significant opportunity for Heavy-Duty PHEV adoption. (1) The usage cycle includes driving and stationary/worksite power requirements, ensuring full daily usage of the grid-charged battery (battery size: 15-30kWhr). Though daily driving can often be short (an average of 26 miles per day), worksite power includes substantial demand (hydraulics, exportable 110/220V power, 12V support, HVAC). (2) Worksite power demands for conventional vehicles require continuous loaded engine operation, resulting in significant emissions, fuel consumption and noise impacts. (3) These trucks serve an industry that is highly diverse in final vehicle duty cycle, configuration, and jobsite power demands resulting in the need for a modular, configurable hybrid solution. Through this program, Odyne has developed and demonstrated a medium/heavy duty plug-in hybrid solution capable of meeting the needs of the work truck market while delivering fuel and emissions reductions of 50% or greater when evaluated against the full-day work truck duty cycle. The Odyne system developed in this project was released for commercial sale as the G2V7 Odyne Plug-in Hybrid and ePTO systems. The testing and field demonstration proved that the Odyne hybrid system is capable of reducing work truck fuel use and emissions by over 50% while subsequent commercial sales demonstrate the flexibility of the modular design and the capability to support electric systems of 12 – 30 kW and hydraulic based systems of 60 kW (80 HP) or greater. Odyne is continuing to work with suppliers on reducing component costs and working with supporting agencies to initiate projects to increase the driving and full day fuel and emissions savings in order to continue to improve the customer value and return on investment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Oak Ridge National Laboratory Security by Design: A Plant Design and Component-Based Approach to Technical Solutions to Insider and Outsider Threat

Security costs for nuclear reactors have been shown to rise over the lifecycle of a nuclear facility as new threats, security weaknesses, and the generic threat profile of the plant location change over time. This paper conducts a review of the technological gaps that currently exist in Security by Design (SeBD) based on the literature available and attempts to close those gaps through proposing technological constructs and processes that can integrate safety and security in the design process of a plant, with a primary focus on SMR technology. Under the new modular and mass manufacturing regime, where plant designs attempt to reduce costs with potential economies of scale and modular construction, the current SeBD definitions focusing on state level regulators are not considered adequate since the licensing stage is often too late in the design process to integrate the true cost savings of SeBD. Thus, this paper attempts to remedy the current logic in order to allow for continuous implementation of security alongside the development of the safety concept for the plant. If adopted within the design process the establishment of this type of technology will allow for a technological ecosystem to evolve that will imbed security concepts into the physical design of the components of the plant.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Implement and Test 3D Mortar Contact in BISON

We leverage the extension of the generation of mortar segment meshes to three dimensions in MOOSE’s framework to extend thermomechanical modeling capabilities to problems with three dimensions. A modular approach to gap heat transfer physics using the mortar finite element method was created and documented, mechanical contact was extended to three dimensions—including frictional behavior, performance and ease of use were improved, and steps towards scalability of solid mechanics problems involving contact were taken. Many of these new developments are demonstrated in the simulation of 3D light-water reactor (LWR) problems, where the thermomechanical interface problem is solved using the mortar finite element method. Usage of the mortar framework has improved convergence in 2D problems and has enabled employing friction in 3D problems, of which we show results of a short, local stack of 3D pellets. Consequently, the benefits of mortar in terms of solution convergence and quality are extended to three dimensions. Section 2 discusses fundamental developments that enabled the simulation of practical mortar problems in three dimensions and other general improvements, including the reduction of the derivative container size, the modification of dual basis computations when edge dropping (lack of secondary element projection) takes place, the improvement of conditioning when employing the VCP in-edge dropping conditions, and code usability and quality improvements. These latter code enhancements include the migration of tests using “old” mortar contact constraints to using dual mortar with a semi-smooth Newton solution strategy and the reuse of lower dimensional domains for straightforwardly setting up a mortar thermomechanical LWR problem, i.e. the MOOSE action is employed for mechanical contact and the thermal LWR action is employed to capture the gas conductance, contact, and radiation components of gap heat transfer physics. Independently of the mortar LWR thermal action, we developed a modular approach to gap heat transfer that resides in MOOSE and can be leveraged, e.g., in metallic fuel problems. This approach, whose code design based on MOOSE’s user objects to model specific physics was proposed by the maintenance activity, is detailed in Section 3. Based on the dual mortar finite element method, the frictional contact constraints were extended to three dimensions. A block sheared in two directions in and out of contact with a rigid plane is employed in Section 4 to show the way the approach handles changes in frictional states (e.g. stick to slip) within a competitive number of Newton iterations. Equations and numerical results on the use of the VCP with Cartesian Lagrange multipliers, whose combination enables their direct condensation, are described in Section 5.3. Two-dimensional and three-dimensional BISON LWR simulations are discussed in Section 6. Particularly, a stack of five eccentric pellets with a surface defect is simulated and the effect of pellet-cladding friction is assessed. Finally, conclusions are outlined in Section 7.

42 ENGINEERING↗

43-0434 Bridge Inspection Report 2021

The documentation includes the following: 1. 2021 NMDOT Bridge Inspection Report including Element Level Data Collection (in digital formats prepared by NMSU)--conforms to the National Bridge Inspection Standards and AASHTO Manual for Bridge Element Inspection; 2. 2021 Supplemental Report (in digital formats prepared by NMSU)--provides detailed information related to current condition of major bridge components; 3. 2021 Inspection Pictures (in digital format prepared by NMSU); 4. 2021 Delamination Map (in digital format prepared by LANL). During the 2021 inspection, three critical findings were reported to our LANL contact, Mr. Jonathan Stein, by text and/or email on June 26, 2021. 1. The south joint of the bridge had a modular section of the joint that could potentially come loose during the passing of vehicles. This was reported as a critical finding for safety. If the modular section becomes dislodged or deformed it could pose a serious hazard that could result in a punctured tire to vehicles, motorcyclists and/or bicyclist causing drivers/riders to lose control; 2. The bracket plate located at the north end of the bridge on the pedestrian walkway was corroded through and provides little protection to pedestrians and bicyclists. This was reported as a critical finding for safety to prevent injuries to people; 3. The north approach rail has three missing posts. These posts help ensure that traffic is redirected and the energy is absorbed by the rail. This was reported as a critical finding for safety. Additionally, the approach rail is on a curve with a nearby drop off. Immediate repair is recommended. Based on the 2021 inspection, the bridge deck is rated in "fair" condition. The chain drag performed on the deck identified several areas with delamination that are concentrated near the expansion joints, in the closure joint of the deck near the bridge centerline, and at the south end of the northbound lanes. The chain drag performed during the 2021 inspection revealed 215,333 sq. in. (1495 sq. ft) of delaminations and patched areas (not including the sidewalk). This is approximately a 600% increase from 2019. It is recommended that the delaminations and spalls with exposed rebar be repaired. The "delaminated area" map for the 2021 inspection is provided in the supplemental report.

42 ENGINEERING↗