Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Multi-mission nuclear electric propulsion stage design.

Results of a mission engineering analysis of nuclear-thermionic electric propulsion spacecraft for unmanned interplanetary and geocentric missions. Critical technologies assessed are associated with the development of nuclear electric propulsion (NEP), and the impact of its availability on future space programs. Specific areas of investigation include outer planet and comet rendezvous mission analysis, NEP stage design for geocentric and interplanetary missions, and technology requirements for NEP stage development. A multimission NEP stage can be developed to perform both multiple geocentric and interplanetary missions for a 1983 launch. Identified pacing NEP technology requirements are the development of 20,000 full power hour ion thrustors and thermionic reactor and the development of related power conditioning. The resulting NEP stage design provides both inherent reliability and high payload mass capability.

Prickett, W. Z.↗

Gemini Program Mission Planning Report

This report defines the Gemini Program objectives and presents guidelines for the individual Gemini missions. It provides general space vehicle configuration data, and descriptions of planned missions. Contingency mission requirements and extravehicular operations to be performed during specific missions are described in the last two sections of the basic document. Data on spacecraft weights and Gemini Launch Vehicle performance capabilities are provided in Appendix A, while Appendix B provides descriptions of onboard experiments to be conducted during Gemini missions.

Source record↗

Solar proton fluences as observed during 1966-1972 and as predicted for 1977-1983 space missions

The probability with which any given proton fluence level will be exceeded during a space mission is computed for missions to be flown during the active phase of the next solar cycle (1977-1983). This probability is a function of fluence level, proton energy threshold, and mission duration. Data on the major solar proton events of 1966-1972 are given; it is argued that only this data set (and not that of the previous solar cycle) is appropriate for estimating next-cycle fluences. Probable numbers of each of the two types of events are estimated from Burrell's extension of Poisson statistics. Fluences of all future anomalously large events are assumed to have a common spectrum, that given by the August 1972 event. Fluences of the ordinary events are assumed to obey a log normal distribution. It is shown that for much of the confidence-level mission-duration regime of interest, at least one anomalously large event will occur; and given such an occurrence, the ordinary-event contribution to mission fluence is negligible.

King, J. H.↗

Pioneer Mars 1979 mission options

A preliminary investigation of lower cost Mars missions which perform useful exploration objectives after the Viking/75 mission was conducted. As a study guideline, it was assumed that significant cost savings would be realized by utilizing Pioneer hardware currently being developed for a pair of 1978 Venus missions. This in turn led to the additional constraint of a 1979 launch with the Atlas/Centaur launch vehicle which has been designated for the Pioneer Venus missions. Two concepts, using an orbiter bus platform, were identified which have both good science potential and mission simplicity indicative of lower cost. These are: (1) an aeronomy/geology orbiter, and (2) a remote sensing orbiter with a number of deployable surface penetrometers.

Friedlander, A. L.↗

Mission design for a 1980 Encke slow flyby using solar electric propulsion

The comet Encke at its apparition in 1980 is investigated as the target for a solar electric slow flyby mission having a flight time of approximately two years. Mission trade off studies are performed for two modes: namely the direct earth to Encke mode and the Venus gravity assist mode. Baseline missions for each mode are selected which flyby Encke at 4 km/s 30 days before perihelion. The direct mission baseline is investigated in detail for trajectory parameters related to spacecraft and science requirements. The Venus flyby mode can deliver the same payload with a total power requirement about 20% less than the direct mode. The cost is a longer flight time and a Venus flyby at about 500 km above the surface. One asteroid can be encountered at very close range on either mission. The asteroids available and the extra propellant required are determined.

Bender, D. F.↗

Pioneer Mars 1979 mission options

Two mission concepts utilizing modified Pioneer Venus hardware are presented as relatively low-cost alternatives for scientific exploration of Mars in 1979. Mission A would perform in situ aeronomy measurements in the Martian ionosphere and include several remote sensing instruments capable of geological surface mapping at low altitudes. The initial high eccentricity orbit would be allowed to decay in an adaptive mode. Mission B would sequentially deploy (from an orbiter bus), four, nondestructing surface penetrometers carrying instrumentation to investigate soil density, composition and chemistry, subsurface water, and perhaps seismology. Mission B is more expensive than mission A, since it requires more extensive hardware modifications and systems development.

Niehoff, J. C.↗

Experiment planning during the Skylab missions

The objectives of the Skylab Program included observations of the earth, the sun, the stars, and a comet in addition to a variety of engineering and medical experiments. Attention is given to mission planning activities accomplished before the launch of the orbital workshop, during the manned missions, and between manned missions. Two major purposes of early experiments planning were related to the establishment of reasonable potential goals in terms of accomplishment and the discovery of potential problems in scheduling. Planning during the mission proceeded according to a scheme in which the planning was done on a daily basis. Experiences from the three Skylab missions are discussed separately. The results of the Skylab Program demonstrate the value of the daily experiment planning system that was capable of reacting to changing constraints.

Sevier, J. R.↗

Outer planet mission guidance and navigation for spinning spacecraft

The orbit determination accuracies, maneuver results, and navigation system specification for spinning Pioneer planetary probe missions are analyzed to aid in determining the feasibility of deploying probes into the atmospheres of the outer planets. Radio-only navigation suffices for a direct Saturn mission and the Jupiter flyby of a Jupiter/Uranus mission. Saturn ephemeris errors (1000 km) plus rigid entry constraints at Uranus result in very high velocity requirements (140 m/sec) on the final legs of the Saturn/Uranus and Jupiter/Uranus missions if only Earth-based tracking is employed. The capabilities of a conceptual V-slit sensor are assessed to supplement radio tracking by star/satellite observations. By processing the optical measurements with a batch filter, entry conditions at Uranus can be controlled to acceptable mission-defined levels (+ or - 3 deg) and the Saturn-Uranus leg velocity requirements can be reduced by a factor of 6 (from 139 to 23 m/sec) if nominal specified accuracies of the sensor can be realized.

Paul, C. K.↗

Spacecraft attitude control for a solar electric geosynchronous transfer mission

A study of the Attitude Control System (ACS) is made for a solar electric propulsion geosynchronous transfer mission. The basic mission considered is spacecraft injection into a low altitude, inclined orbit followed by low thrust orbit changing to achieve geosynchronous orbit. Because of the extended thrusting time, the mission performance is a strong function of the attitude control system. Two attitude control system design options for an example mission evolve from consideration of the spacecraft configuration, the environmental disturbances, and the probable ACS modes of operation. The impact of these design options on other spacecraft subsystems is discussed. The factors which must be considered in determining the ACS actuation and sensing subsystems are discussed. The effects of the actuation and sensing subsystems on the mission performance are also considered.

Leroy, B. E.↗

Navigation results of the Mariner Venus/Mercury 1973 mission

The navigation aspects of the Mariner Venus/Mercury 1973 mission are presented. Principal emphasis is on the maneuver strategy employed, propellant costs and the results of the navigation performance relating to the accomplishment of the mission objectives including an extended mission for a second Mercury encounter. Key error sources and mission constraints are discussed. Of particular interest is the impact of in-flight adaptation of the pre-launch maneuver strategy (due to spacecraft anomalies) on propellant cost and the delivery achieved at the first Mercury encounter. The maneuver strategy and propellant cost for the extended mission are shown to be heavily influenced by the delivery achieved at the first Mercury encounter and the science objectives at the second Mercury encounter.

Bantell, M. H., Jr.↗

Spacecraft attitude control for a solar electric geosynchronous transfer mission

A study of the Attitude Control System (ACS) is made for a solar electric propulsion geosynchronous transfer mission. The basic mission considered is spacecraft injection into a low altitude, inclined orbit followed by low thrust orbit changing to achieve geosynchronous orbit. Because of the extended thrusting time, the mission performance is a strong function of the attitude control system. Two attitude control system design options for an example mission evolve from consideration of the spacecraft configuration, the environmental disturbances, and the probable ACS modes of operation. The impact of these design options on other spacecraft subsystems is discussed. The paper presents a discussion of the factors which must be considered in determining the ACS actuation and sensing subsystems. The effects of the actuation and sensing subsystems on the mission performance are also considered.

Leroy, B. E.↗

The 1975 Viking mission to Mars

An overall description is presented of the Viking mission and systems as well as what may be learned from this mission. Pre-space-age knowledge about Mars is summarized together with information obtained by the Mariner probes. It is noted that the subject of life on Mars is a prominent theme of the Viking mission, and brief descriptions are given of the mission profile and landing sites. The thirteen scientific investigations to be conducted are outlined, including atmospheric-water mapping, surface thermal mapping, orbiter and lander imaging, radio experiments, measurements of the present physical and chemical state of the Martian atmosphere, and the three biochemical experiments. Relatively detailed descriptions are provided for the space vehicles, launch operations, mission profile, and management responsibilities.

Martin, J. S., Jr.↗

Nuclear emulsion measurements of the astronauts' radiation exposures on Skylab missions 2, 3, and 4

On the Skylab missions, Ilford G.5 and K.2 emulsions were flown as part of passive dosimeter packs carried by the astronauts on their wrists. Due to the long mission times, latent image fading and track crowing imposed limitations on a quantitative track and grain count analysis. For Skylab 2, the complete proton energy spectrum was determined within reasonable error limits. A combined mission dose equivalent of 2,490 millirems from protons, tissue stars and neutrons was measured on Skylab 2. A stationary emulsion stack, kept in a film vault drawer on the same mission, displayed a highly structured directional distribution of the fluence of low-energy protons (enders) reflecting the local shield distribution. On the 59 and 84-day mission 3 and 4, G.5 emulsions had to be cut on the microtom to 5-7 microns for microscopic examination. Even so, the short track segments in such thin layers precluded a statistically reliable grain count analysis. However, the K.2 emulsions still allowed accurate proton ender counts without special provisions.

Schaefer, H. J.↗

Mission description

The Apollo Soyuz mission was the first manned space flight conducted jointly by two nations. The United States and the U.S.S.R. achieved a substantial degree of success in: (1) obtaining flight experience for rendezvous and docking of manned spacecraft and developing a docking system that would be suitable for use as a standard international system, (2) demonstrating in-flight intervehicular crew transfer, and (3) conducting a series of science and applications experiments. The Apollo and Soyuz spacecraft, with minor exceptions, were similar to those flown on previous missions, but a new Apollo module, the docking module, was built specifically for this mission. The mission started with the Soyuz launch on July 15, 1975, followed by the Apollo launch on the same day. Docking of the two spacecraft occurred on July 17, and joint operations were conducted for 2 days. Both spacecraft landed safely and on schedule; the Soyuz landing in the U.S.S.R. occurred on July 21, and the Apollo landing near Hawaii occurred on July 24. Twenty-eight science experiments were performed during the mission.

Hardee, S. N.↗

Apollo Soyuz, mission evaluation report

The Apollo Soyuz mission was the first manned space flight to be conducted jointly by two nations - the United States and the Union of Soviet Socialist Republics. The primary purpose of the mission was to test systems for rendezvous and docking of manned spacecraft that would be suitable for use as a standard international system, and to demonstrate crew transfer between spacecraft. The secondary purpose was to conduct a program of scientific and applications experimentation. With minor modifications, the Apollo and Soyuz spacecraft were like those flown on previous missions. However, a new module was built specifically for this mission - the docking module. It served as an airlock for crew transfer and as a structural base for the docking mechanism that interfaced with a similar mechanism on the Soyuz orbital module. The postflight evaluation of the performance of the docking system and docking module, as well as the overall performance of the Apollo spacecraft and experiments is presented. In addition, the mission is evaluated from the viewpoints of the flight crew, ground support operations, and biomedical operations. Descriptions of the docking mechanism, docking module, crew equipment and experiment hardware are given.

Source record↗

Dosimetry during space missions

Comparative radiation hazards due to various sources of radiation in several prominent manned space missions are surveyed, along with techniques for coping with the hazards. Cosmic radiation of solar and galactic origin, and Van Allen belt radiation, are the major hazards outside the earth's geomagnetic shield, and were a major problem in the Apollo missions. The Skylab missions, while within the geomagnetic field, were subject to extensive exposure to the trapped radiation belts (Van Allen belts), while the Soyuz-Apollo test project involved orbiting at a lower altitude, with lower exposure. No solar particle bursts affected Apollo missions, and the Solar Particle Alert Network devised to help cope with the problem is described. Dosimetry practices and devices are described. Radiation experience and dose readings logged with the various missions are reported.

Bailey, J. V.↗

The first Spacelab mission

The purpose of Spacelab, an Orbiter-mounted NASA/ESA laboratory, is to include in the Space Transportation System (STS) a payload carrier with maximum flexibility to accommodate multidisciplinary scientific payloads. The major Spacelab configurations obtained by combination of two basic elements, the module and pallet, are described along with the anticipated program of experiments and payloads, and mission management general concept. The first Spacelab 7-day mission is scheduled for flight in the second half of 1980, with the primary objective being to verify system performance capabilities. Detailed attention is given to the payload mission management responsibilities for the first flight, including program control, science management, payload interfaces, integrated payload mission planning, integration requirements, payload specialist training, payload integration, launch site integration, payload flight/mission operations, and postmission activities. The Spacelab configuration (including the long module and one pallet) and the overall schedule for this mission are presented.

Pace, R. E., Jr.↗

Apollo 12 Mission Report

The Apollo 12 mission was the twelfth in a series of flights using Apollo flight hardware and was the second lunar landing. The purpose of the mission was to perform a precise lunar landing and to conduct a specific scientific exploration of a designated landing site in the Ocean of Storms. Since the performance of the entire spacecraft was excellent, this report discusses only the systems performance that significantly differed from that of previous missions. Because they were unique to Apollo 12, the lunar surface experiments, the precision landing operation, and lunar dust contamination are reported in sections 3, 4, and 6, respectively. A complete analysis of all flight data is not possible within the time allowed for preparation of this report. Therefore, report supple­ments will be published for certain Apollo 12 systems analyses, as shown in appendix E. This appendix also lists the current status of all Apollo mission supplements, either published or in preparation. Other supplements will be published as the need is identified. In this report, all actual times prior to earth landing are elapsed time from range zero, established as the integral second before lift-off. Range zero for this mission was 16:22:00 G.m.t., November 14, 1969. Greenwich mean time is used for all times after earth landing as well as for the discussions of the experiments left on the lunar surface. All references to mileage distance are in nautical miles.

Source record↗