Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Leg”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,571 records · Page 88

Implementation of Motion Simulation Software and Visual-Auditory Electronics for Use in a Low Gravity Robotic Testbed

The Jet Propulsion Laboratory (JPL) is developing the All-Terrain Hex-Limbed Extra-Terrestrial Explorer (ATHLETE) to assist in manned space missions. One of the proposed targets for this robotic vehicle is a near-Earth asteroid (NEA), which typically exhibit a surface gravity of only a few micro-g. In order to properly test ATHLETE in such an environment, the development team has constructed an inverted Stewart platform testbed that acts as a robotic motion simulator. This project focused on creating physical simulation software that is able to predict how ATHLETE will function on and around a NEA. The corresponding platform configurations are calculated and then passed to the testbed to control ATHLETE's motion. In addition, imitation attitude, imitation attitude control thrusters were designed and fabricated for use on ATHLETE. These utilize a combination of high power LEDs and audio amplifiers to provide visual and auditory cues that correspond to the physics simulation.

gravity↗

ATHLETE: Trading Complexity for Mass in Roving Vehicles

This paper describes a scaling analysis of ATHLETE for exploration of the moon, Mars and Near-Earth Asteroids (NEAs) in comparison to a more conventional vehicle configuration. Recently, the focus of human exploration beyond LEO has been on NEAs. A low gravity testbed has been constructed in the ATHLETE lab, with six computer-controlled winches able to lift ATHLETE and payloads so as to simulate the motion of the system in the vicinity of a NEA or to simulate ATHLETE on extreme terrain in lunar or Mars gravity. Test results from this system are described.

robotics↗

WSTF Transporting of Spare Altitude Chamber from LM Site to CSM Site

Transporting of Spare Altitude Chamber from Lunar Module (LM) Site to Command Service Module (CSM) Site. The video is broken into three parts: - Part 1: Run time of 21 min., 21 sec.; color; no sound - Part 2: Run time of 17 min., 14 sec.; color; no sound - Part 3: Run time of 18 min., 41 sec.; color, no sound All videos are in the mp4 format.

Heavy Equipment↗