Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Administration of H-Prize Final Report

The Hydrogen Education Foundation (HEF) administrated the H-Prize, a program authorized by Congress in 2007 to incentivize innovative technology development in the hydrogen and fuel cell sector. Under this authorization, DOE allocated $\$$1 million for one Prize. DOE selected HEF competitively in 2008 to administer the competition, perform fundraising activities to develop a robust prize program, and perform marketing and communications, from 2008 to 2017. HEF administered two H-Prize competitions for DOE, the first for development of hydrogen storage materials for use on board fuel cell electric vehicles, and the second for a home or community sized hydrogen fueling system. HEF marketed the competitions through industry channels, at industry meetings, a specialized website and press releases to obtain entrants to the competitions. HEF provided assistance to the DOE for development of the judging criteria, and administered the judging and the final decision processes. In parallel, HEF sought additional prize funding from industry and foundations to expand the number of potential competitions and the amount of future prizes, consistent with the Congressional authorization of H-Prize. The first prize sought the development of a hydrogen storage material that could meet DOE’s criteria for onboard storage. This competition did not achieve any entrants that met the requirements. The second prize was for a small-scale hydrogen fueling system. The $\$$1 million prize was awarded to the industry consortium SimpleFuel for their home hydrogen refueling system. HEF executed a three-pronged strategy for raising funds to expand the competitions through private (non-public) funding – corporate contributions consistent with company interests; foundation contributions consistent with their goals; and individual contributions, principally through the United Way Campaigns. For a variety of reasons, HEF did not achieve the envisioned fundraising goals, which made it difficult to achieve the excitement originally envisioned by the H-Prize Congressional authors. Originally planned as a multi-year, multi-prize competition, an expansion of H-Prize to additional competitions with potentially larger awards did not happen. Prize competitions remain a useful way to stimulate technological innovation by researchers and product developers. Creating excitement through topic selection and harmony with important and achievable energy goals that inspire both applicants and their development work, and prize funders, is key.

08 HYDROGEN↗

2016 Nuclear Energy Voucher Pilot Program Final Summary

In March 2016, the Department of Energy Office of Nuclear Energy (DOE-NE) Gateway for Accelerated Innovation in Nuclear (GAIN) initiative launched the NE Voucher pilot program for small businesses that develop advanced nuclear technologies. The intent of this program is to provide access to unique physical and intellectual capital that exists within the DOE National Laboratory complex for private-sector developers of innovative nuclear energy technologies. Vouchers allow recipients to have work performed on their behalf at select DOE laboratory facilities. The work is funded by DOE-NE and must be completed within approximately 12 months of the award date. Awards for the pilot had values of $50,000–300,000 each, depending on the complexity of the task requested. The program requires a 20% cost share by voucher recipients. In addition to providing the technical assistance sought by the awardees, the 2016 pilot award cycle showed that the program fosters relationships between these businesses and DOE laboratory staff, serving the GAIN mission to develop a private-public partnership framework that will enable accelerated commercialization of innovative concepts. For the inaugural voucher program, DOE-NE made a total of $2M available. In total, twenty-nine proposals were received and eight (Table 1) were chosen for award based on several criteria, including technical quality, level of innovation, commercialization potential, and relevance to the DOE-NE mission. After the review process, cooperative agreements were finalized, and work on all eight vouchers started in September 2016 and all but one were completed by the end of September, 2017. The single exception was completed in December, 2017.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sustainable Solar Education Project - Final Project Report

This project supported the sustainable growth of the distributed solar market by providing information and training to state and municipal officials to help ensure that distributed solar electricity remains consumer friendly and benefits low- and moderate-income households. Our project’s official name was “Training for State Officials to Make Solar More Inclusive, Affordable, and Consumer Friendly,” but we publicly referred to it as “the Sustainable Solar Education Project.” The project started March 1, 2016 and ran through July 2018. The first year of the project centered around research, development, and production of a series of guides for state and municipal officials on topics related to solar consumer protection and equitability. The final year and a half was focused on providing in-person training on project issues and disseminating project resources to reach our target audience.

14 SOLAR ENERGY↗

AGR-1 Irradiation Test Final As-Run Report

This document presents the as-run analysis of the AGR-1 irradiation experiment. AGR-1 is the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the US Department of Energy (DOE) as part of the Next-Generation Nuclear Plant (NGNP) project. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment was irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) for a total duration of 620 effective full power days of irradiation. Irradiation began on December 24, 2006 and ended on November 6, 2009 spanning 13 ATR cycles and approximately three calendar years. The test contained six independently controlled and monitored capsules. Each capsule contained 12 compacts of a single type, or variant, of the AGR coated fuel. No fuel particles failed during the AGR-1 irradiation. Final burnup values on a per compact basis ranged from 11.5 to 19.6 %FIMA, while fast fluence values ranged from 2.21 to 4.39 x 10 25 n/m 2 (E >0.18 MeV). We’ll say something here about temperatures once thermal recalc is done. Thermocouples performed well, failing at a lower rate than expected. At the end of the irradiation, nine of the originally-planned 19 TCs were considered functional. Fission product release-to-birth (R/B) ratios were quite low. In most capsules, R/B values at the end of the irradiation were at or below 10 -7 with only one capsule significantly exceeding this value. A maximum R/B of around 2 x 10 -7 was reached at the end of the irradiation in Capsule 5. Several shakedown issues were encountered and resolved during the first three cycles. These include the repair of minor gas line leaks; repair of faulty gas line valves; the need to position moisture monitors in regions of low radiation fields for proper functioning; the enforcement of proper on-line data storage and backup, the need to monitor thermocouple performance, correcting for detector spectral gain shift, and a change in the mass flow rate range of the neon flow controllers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Scientific/Technical Report, Multi-Sensor Inspection and Robotic Systems for Dry Storage Casks

Once removed from service, fuel rod assemblies are cooled in a pool and then placed in dry storage until they can be transported to a repository for disposal. The extended duration that used nuclear fuel spends in dry storage makes it prudent to be able to nondestructively inspect the dry storage casks. The degradation mechanisms of most concern are chloride-induced stress corrosion cracking of the stainless steel canister that confines the spent fuel and distributed cracking of the concrete in the overpack structure. Multi-sensor inspection and robotic systems were researched, developed, built, and tested. One system operates completely outside the cask to inspect the concrete. The other system, known as the PRINSE system, for Proactive Robotic Inspection of Nuclear Storage Enclosures, enters the cask through an outlet vent and navigates around the outer surface of the stainless steel canister. The PRINSE system delivers sensors for: (i) real-time characterization of the canister surface in order to assess whether chlorides are present, (ii) detecting the presence of cracks using shear-horizontal ultrasonic guided waves, (iii) measuring the temperature of the canister surface, and (iv) a gamma radiation counter. The four sensing modalities are applicable to any cask containing a stainless steel canister, however the robotic delivery system is designed specifically for Holtec’s HI-STORM family of casks. Horizontal axis casks have exposed concrete surfaces. A fully contactless air-coupled scanning ultrasonic test platform and a frequency-wavenumber domain data analysis method are used for these concrete structures. Analysis, numerical simulation and experimental results demonstrate that distributed cracks in concrete can be detected and cracked regions localized within a scanned region of concrete. Vertical axis casks (like the HI-STORM family) have steel-clad concrete overpacks. In a separate effort, a semi-coupled test platform and a guided wave attenuation-based data analysis method are used for disbond detection. Analysis, numerical simulation and experimental results show that the bonding conditions of steel-concrete interfaces can be quantitatively characterized using the guided wave signal analysis scheme. The PRINSE system is designed for vertical axis dry storage casks, specifically the HI-STORM family. The double pulse laser-induced breakdown spectroscopy (LIBS) system takes advantage of an optical fiber to deliver intense light to the canister surface that enables surface composition characterization in-situ in real time. Chlorine concentrations as low as 10 mg/m2 were detected on stainless steel. Additionally, a simpler laser setup was created to detect sodium as a surrogate for chlorine, and sodium was detectable when the chlorine concentration was as low as 0.5 mg/m2. The electromagnetic acoustic transducers (EMATs) enable detection of stress corrosion cracks. The EMATs generate shear-horizontal waves that propagate around the canister and are reflected by cracks enabling 100% of the canister weld lines to be inspected. The EMAT-based crack detection system was tested at the Pacific Northwest National Laboratory on a canister containing blind defects and was shown to detect the crack sizes it was designed to detect. The PRINSE system is a novel marsupial robot. The command center and winch outside the cask control the delivery arm and train of cars that traverse the outside of the canister from the cask ventilation system. The sensors are housed in the cargo bays of three cars that comprise the train, which is lowered to the bottom of the canister by the winch. Encoders on the winch enable the sensors to be delivered to a prescribed location, e.g., for re-inspection of a problem area. The PRINSE system does not mar the canister surface, can be extracted manually in the case of a power failure, and is designed for an elevated temperature and gamma radiation environment, although not all components of the prototype are made from the final materials. The PRINSE system was tested on a full canister that was placed inside a HI-STORM cask at the Holtec Manufacturing Division. It was also demonstrated on a full-height mockup at Penn State to a live audience.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

JRT (Joint Research Target) 2016 4th Quarter Report and Final Summary

This report summarizes the work completed during the final quarter of FY2016 on the three major US tokamak facilities as part of this past year’s joint research target. Following this summary section are detailed reports from the three facilities. We begin by requoting the overarching JRT goals, including the particulars for the 4 th quarter milestones.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advanced QPSK Optical Modulators Using Lithium Niobate Thin Films (Final Scientific Report)

Lithium niobate thin film based optical modulator devices have been produced using this SBIR award. A bonding apparatus was developed that was used to bond lithium niobate to silicon at room temperature. The bonding apparatus was designed, assembled and qualified for production of thin film substrates. The optical properties of ion sliced thin films produced using this bonding apparatus was optimized to achieve low loss optical waveguides. Optical grating coupler and other component of the proposed optical modulator were designed. Preliminary results show the proposed method for making optical modulator meets the required customer specifications. All the required process steps for manufacturing of the devices were developed and optimized. Further funding is required to make a final prototype device that can be provided to customers.

36 MATERIALS SCIENCE↗

Final Scientific / Technical Report: Enabling Technologies for Heavy-Duty Vehicles – Cummins 55BTE

The Cummins 55% BTE (55BTE) program has completed the planned technical work on the project. This work includes the planned engine system demonstration in pursuit of the goal of demonstrating a peak system brake thermal efficiency (BTE) of 55%. The engine system included a high efficiency diesel engine integrated with a state-of-the-art waste heat recovery (WHR) system and an advanced aftertreatment system capable of meeting the current emissions standards. While the ultimate program goal of 55% BTE was not fully achieved due to hardware issues during the final testing phase, the program demonstrated a significant increase in reported engine system BTE for a heavy duty sized engine. The previous demonstrations in the Department of Energy funded SuperTruck 1 programs ranged between 50% - 51% BTE. The Cummins 55% BTE program demonstrated 54% BTE. Additionally, the program established a revised path-to-target showing how the system could be improved to reach the ultimate program goal of 55% BTE with some minor modification to the engine system. The changes in the revised path-to-target were unable to be completed during the course of this program due to time and money constraints placed on the program. The program’s goals were challenging in both scope and timing. Although the program’s goal can be simply stated in terms of demonstrating a system efficiency of 55%, the achievement of a heavy-duty diesel engine capable of full torque curve operation, adequate transient performance, low emissions and high brake thermal efficiency (>51% BTE) had not been previously demonstrated in a heavy-duty engine. The closest efforts to date included the SuperTruck 1 programs referenced earlier. The program made several advancements in all system areas. The combustion system was re-designed for a shorter combustion duration and lower in-cylinder heat loss. This was achieved through optimization of the fuel injection rate shape, number of spray holes, piston bowl shape, compression ratio, piston oil cooling, heat flow through the piston and in-cylinder charge motion. The air handling system was re-designed to provide cooled EGR at virtually no pumping penalty. This was achieved through implementation of a dual loop EGR system, reduction of EGR system pressure drop, and implementation of advanced turbocharger efficiency technologies. The engine friction and parasitic signature was dramatically reduced by the program through adoption of variable flow pumps, advanced rings and coatings, rollerized valvetrain, adoption of low viscosity lubricants and reduction in cylinder line bore distortion. The aftertreatment system was optimized through use of low dP substrates and an ammonia gas injection system. The WHR system development included the use of a dual-entry turbine and a mixed charger cooler. Finding and implementing these solutions in a short two-year program at the budgeted funding provided the greatest challenge for the program.

33 ADVANCED PROPULSION SYSTEMS↗

Advanced Gasification and Novel Transformational Coal Conversion Technologies Development: Final Technical Report

This report summarizes the work carried out in furtherance of the NETL/DOE award, OTM-Enhanced Coal Syngas for Carbon Capture Power Systems and Fuel Synthesis Applications. The overall objective of the project was to further develop Oxygen Transport Membrane (OTM) technology and assess the potential for integration in coal power generation. OTM technology has the potential to enhance the quality of syngas produced by coal gasifiers, reduce the amount of cryogenic-derived oxygen required in Integrated Gasification Combined Cycle (IGCC) power plants, and allow for coal and natural gas integration. Process simulations and techno-economic analyses were carried out to estimate the cost and performance of OTM enhanced IGCC plants, IG-NGCC plants, and OTM enhanced Fischer Tropsch (FT) Liquids from coal and natural gas plants. The OTM enhanced power plants achieved higher carbon capture rates, higher efficiencies, and lower cost of electricity compared to the base cases. The most significant benefits were achieved for cases which used low rank coal as the feed. Fischer-Tropsch coal to liquids plants with iron-based catalysts and natural gas integration utilizing OTM technology showed improved carbon conversion, improved thermal efficiency and lower cost of production. With respect to OTM core technology development, significant advances have been made in several areas. The development and implementation of a third-generation membrane materials and manufacturing process has resulted in the availability of robust and reliable, high performance membranes, that can be manufactured at high yield. Progress towards the goal of higher pressure operation has been demonstrated with the development of improved metal-ceramic seals and components of the panel array module that integrate membrane-seal assemblies with primary and secondary reforming catalysts have been further developed and demonstrated. Work concluded with the successful start-up and operation of a multi-panel pilot-scale system which is the final step in technology development ahead of demonstration.

20 FOSSIL-FUELED POWER PLANTS↗

Final Technical Report for Grant No. DE-FC02-01ER54648, SciDAC Center for Simulation of Wave-Plasma Interactions

Harnessing the energy that is released in fusion reactions would provide a safe and abundant source of power to meet the growing energy needs of the world population. The next step toward the development of fusion as a practical energy source is the construction of ITER, a device capable of producing and controlling the high performance plasma required for self-sustaining fusion reactions, or “burning” plasma. The input power required to drive the ITER plasma into the burning regime will be supplied primarily with a combination of external power from radio frequency waves in the ion cyclotron range of frequencies and energetic ions from neutral beam injection sources, in addition to internally-generated Ohmic heating from the induced plasma current that also serves to create the magnetic equilibrium for the discharge. Since the success of the ITER project depends critically on the ability to create and maintain burning plasma conditions, it is absolutely necessary to have physics-based models that can accurately simulate the RF processes that affect the dynamical evolution of the ITER discharge. The Center for Simulation of Wave-Plasma Interactions (CSWPI) is a multi-institutional collaboration that has conducted ongoing research aimed at developing: (1) Coupled core-to-edge simulations that will lead to an increased understanding of parasitic losses of the applied RF power in the boundary plasma between the RF antenna and the core plasma; (2) Development of models for core interactions of RF waves with energetic electrons and ions (including fusion alpha particles and fast neutral beam ions) that include a more accurate representation of the particle dynamics in the combined equilibrium and wave fields; and (3) Development of improved algorithms that will take advantage of massively parallel computing platforms at the petascale level and beyond to achieve the needed physics, resolution, and/or statistics to address these issues. This research reported in this final technical report is focused on further verification and validation of simulation models for interactions of RF waves with energetic particles in the core with a long term goal of assessing their readiness for inclusion in integrated modeling frameworks and utilizing the world’s largest supercomputers to quantitatively predict the detailed electric field structure in the vicinity of the launching structures.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hanford Tank Waste Disposition Integrated Flowsheet: Corrosion Specification Development Final Report

The Savannah River National Laboratory has developed a corrosion model to facilitate implementation of Hanford’s Direct Feed Low Activity Waste flowsheet. The focus was specifically on secondary effluent waste stream compositions from the Hanford Waste Treatment and Immobilization Plant’s melter off-gas treatment system returned to the Hanford Tank Farms (return stream.) The return stream compositions were predicted to contain components at relative concentrations that are significantly more corrosive toward the carbon steel waste tanks, specifically halide and sulfate anions, than the current waste compositions in the tank farms. Electrochemical tests were performed, utilizing a statistically designed matrix, to determine the corrosion chemistry limits that will mitigate pitting in the return stream. The current corrosion chemistry specifications for the Hanford Tank Farms do not mitigate for the halide concentrations that will be expected in the return stream. The model requires a 10:1 nitrite to total halide ratio, for stream compositions at a minimum of pH 10 and a maximum temperature of 40°C. The final specification may use other corrosion data that is being generated for the DST chemistry control limits to delineate between the effect of fluoride and chloride. This test program has employed statistically designed test matrices and electrochemical test methods to validate the corrosion model specifically at boundary regions to optimize corrosion control specifications.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final technical report for DE-SC0006957 Center for Simulation of Plasma Microturbulence

This final report for the CSPM (Center for Simulation of Plasma Microturbulence) project documents contributions from University of California, San Diego researchers over the period of 9/1/2011 – 8/31/2018. The primary focus of these efforts was on performing validation studies using the GYRO code, addressing topics such as finite-beta effects on H-mode transport and turbulence physics mechanisms in electron transport dominated regimes. Key results and products of the work include a formalized system of turbulent transport validation metrics and the first multiscale gyrokinetic simulations of coupled ion and electron scale turbulence, for physically realistic and experimentally measured parameters.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Final Report for the Project Characterization and Valorization of Aqueous Phases Derived from Liquefaction and Upgrading of Bio-Oils

The Characterization and Valorization of Aqueous Phases Derived from Liquefaction and Upgrading of Bio-Oils project developed processes to extract value from the organics within aqueous streams derived from biomass direct liquefaction processes. The focus of the project was twofold. First, we characterized a diverse set of aqueous streams from numerous processes and feedstocks. The characterization effort served to inform this project toward development around the most prevalent compounds to maximize versatility and impact. We analyzed diverse streams from hydrothermal liquefaction of lignocellulosic, algal, and waste feedstocks; catalytic fast-pyrolysis aqueous phases; fast-pyrolysis aqueous phases; and aqueous phases produced by hydroprocessing of fast-pyrolysis bio-oil. Second, thermochemical catalytic processes were developed to convert aqueous-phase organics into useful products. These processes focused mostly on organic acids and specifically acetic acid, which was found to be ubiquitous from the characterization effort. A La x Zr y O z catalyst was discovered and developed for the ketonization of acids to ketones in the condensed aqueous phase. A dual-bed steam reforming process was developed to convert acids and other organics to hydrogen for bio-oil hydroprocessing. The dual-bed reforming process consisted of a ketonization step followed by a steam reforming step with Co as the active metal. The dual-bed process significantly reduced the rate of coke deposition versus direct steam reforming of the organic acids and beneficially produced CH 4 below the equilibrium value. Finally, we demonstrated direct conversion of aqueous-phase organics to olefins over a Zn x Zr y O z catalyst. Each thermochemical catalytic process was demonstrated with process-derived aqueous mixtures. Model compounds were used to benchmark performance and optimize conditions, but emphasis was placed on utilizing “real” aqueous streams whenever possible. A liquid-liquid extraction process using methyl tert-butyl ether as the solvent was developed to segregate dissolved inorganic species and sugars from desirable light oxygenates such as acids and alcohols. Furthermore, a carbon treatment to remove color bodies was employed after it was found the presumably heavy organic chromophore species deactivated catalysts. These economic separation processes allowed for the successful demonstration of stable catalytic processing in the condensed-phase ketonization, dual-bed reforming, and direct olefin production processes for tens to hundreds of hours, which were limited only by the quantity of feed available. Techno-economic analysis of these processes demonstrated the impact possible when capturing “waste” organics as valuable products. The condensed-phase ketonization process for converting aqueous stream acids to ketones followed by reduction and dehydration to olefins sold as a co-product resulted in the reduction of the minimum fuel selling price by about 13% compared to the anaerobic-digestion, aqueous-phase treatment base case (3.74 to 4.29/GGE). The dual-bed reforming process was commensurate in price to the anaerobic digestion base case (4.24 versus 4.29/GGE). However, the need for external natural gas to produce hydrogen for bio-oil hydroprocessing was eliminated, thereby lowering the carbon impact of the process.

09 BIOMASS FUELS↗

Integrated mid-continent stacked carbon storage hub, Phase I Final Report

The final technical report of the Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB). Describes the projects tasks and results of a Phase I prefeasibility study for commercial-scale carbon storage in Nebraska and Kansas. The project focused on ethanol plants as CO 2 sources in central Nebraska as a CO 2 Supply and stacked-storage oilfields in southwest Nebraska and Western Kansas as storage sites. The results of the work show that the midcontinent United States is ideal for an early commercial-scale project considering the relative ease of CO 2 capture from ethanol plants and the utilization of CO 2 for enhanced oil recovery in combination with saline storage.

58 GEOSCIENCES↗

Research in Integrated Assessment Inter-Model Development, Testing and Diagnostics (Final Technical Report)

This is the final report on the second phase (spanning 2013-2018) of a project focused on further establishing an integrated assessment modeling (IAM) community research program on IAM model development, diagnostic testing, and inter-comparisons (PIAMDDI), including multi-model scenario ensemble analyses. The program was dedicated to improving the science of integrated assessment by doing cutting edge research in critical scientific areas of IAM development, and integrating that research with research programs on improved methods for model diagnostics, inter-comparison and ensemble-like analyses. We continued to link this program closely to other climate change research programs in the U.S. and abroad, and to make the work highly transparent, accessible and credible. As anticipated, progress in the scientific research areas informed the model comparison methods development and scenario tasks, and the comparisons and ensemble activities helped set priorities for the research areas.

54 ENVIRONMENTAL SCIENCES↗

Final Report: Nuclear Computational Low Energy Initiative (NUCLEI) SCIDAC Project for Indiana University

This is the final report for Indiana University for the NUCLEI SciDAC-3 project. The NUCLEI project developed implemented and ran codes for large-scale computations of many topics in low-energy nuclear physics. At Indiana University, we performed large-scale semiclassical molecular dynamics simulations and large-scale quantum mechanical mean field calculations of the nonuniform nuclear pasta phases expected in neutron star crust.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Final Report: Pushing the Dark-Matter Limit: Triggering LUX and LZ.

The group led by Professor Wolfs is responsible for the installation, commissioning, and operation of the LUX trigger electronics. The electronics was developed at Rochester and was installed in the Davis Cavern at the Sanford Underground Research Facility (SURF) and the entire system has been operational since Fall 2012. During the grant period, the LUX detector started and completed its 300-day run. Professor Wolfs is also serving as the L2 manager for the electronics for LZ, the generation-2 dark matter detector that will replace LUX at SURF. The digital electronics for LZ is being developed in Rochester. This final report summarizes the achievements of the Rochester group during the grant period.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗