Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DETAIL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Communications Technology Assessment for the Unmanned Aircraft System (UAS) Control and Non-Payload Communications (CNPC) Link

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is performing communications systems research for the Unmanned Aircraft System (UAS) in the National Airspace System (NAS) Project. One of the goals of the communications element is to select and test a communications technology for the UAS Control and Non-Payload Communications (CNPC) link. The GRC UAS Modeling and Simulation (M/S) Sub Team will evaluate the performance of several potential technologies for the CNPC link through detailed software simulations. In parallel, an industry partner will implement a technology in hardware to be used for flight testing. The task necessitated a technical assessment of existing Radio Frequency (RF) communications technologies to identify the best candidate systems for use as the UAS CNPC link. The assessment provides a basis for selecting the technologies for the M/S effort and the hardware radio design. The process developed for the technical assessments for the Future Communications Study1 (FCS) was used as an initial starting point for this assessment. The FCS is a joint Federal Aviation Administration (FAA) and Eurocontrol study on technologies for use as a future aeronautical communications link. The FCS technology assessment process methodology can be applied to the UAS CNPC link; however the findings of the FCS are not directly applicable because of different requirements between a CNPC link and a general aeronautical data link. Additional technologies were added to the potential technologies list from the State of the Art Unmanned Aircraft System Communication Assessment developed by NASA GRC2. This document investigates the state of the art of communications as related to UAS. A portion of the document examines potential communications systems for a UAS communication architecture. Like the FCS, the state of the art assessment surveyed existing communications technologies. It did not, however, perform a detailed assessment of the technology necessary to recommend a technology for the UAS CNPC link. The technical assessment process, as shown in Figure 1, consists of the following steps. First, candidate RF communications technologies are identified. An initial review of each of these technologies is then performed to determine if the technology appears to be a good candidate and requires further review. Any technology that can be shown to be inadequate at that point is removed from consideration to allow for more detailed analysis of the remaining technologies. Criteria for the detailed assessments are defined and a scoring methodology is devised. This is followed by the detailed review and scoring of each technology. The least favorable technologies are removed during the process until only the few best candidates remain.

Aircraft Command and Control↗

Spacecraft Water Impurity Monitor, a System for Water Quality Analysis on Exploration Missions Beyond Low Earth Orbit

Exploration missions beyond low-earth-orbit (LEO) will require advanced instrumentation to monitor water quality. Traveling beyond LEO means the transfer of water samples to an Earth-based laboratory for detailed analysis is not feasible. Detailed analysis of water composition during exploration is still necessary, because having the capability to determine the specific organic chemical causing a change in total organic carbon (TOC) or the specific metal or ionic species causing a change in conductivity has the potential to inform the crew health and system management decisions. On a new vehicle such as a lunar or Mars surface habitat or a Mars transit vehicle, finding “new” impurities not seen on ISS should be expected. The key is to identify the impurity so the correct action can be taken. On ISS we can measure TOC, conductivity, and other physical properties but do not have the capability for detailed analysis using vehicle instrumentation. This is acceptable because ISS can send samples down to Earth for further analysis and obtain the detailed composition. The Spacecraft Water Impurity Monitor (SWIM) will provide detailed water quality analysis for missions in which sample down mass is not available. SWIM is a system comprising organic and inorganic analysis modules. For organic chemicals, a gas chromatograph mass spectrometer (GCMS) detects and identifies organic impurities. For inorganic species, a capillary electrophoresis capacitively coupled contactless conductivity detection (CE-C4D) system as well as ion specific electrodes detect and identify metal ions and other inorganic salts / acids. The SWIM technology demonstration project has completed a System Requirements Review (SRR) to finalize detection requirements and is currently working to refine vehicle interface requirements for a future technology demonstration. The project also has begun preliminary flight design activities for the core analyzers in the instrument suite.

Water Monitoring↗

Spacecraft Water Impurity Monitor, a System for Water Quality Analysis on Exploration Missions Beyond Low Earth Orbit

Exploration missions beyond low-earth-orbit (LEO) will require advanced instrumentation to monitor water quality. Traveling beyond LEO means the transfer of water samples to an Earth-based laboratory for detailed analysis is not feasible. Detailed analysis of water composition during exploration is still necessary, because having the capability to determine the specific organic chemical causing a change in total organic carbon (TOC) or the specific metal or ionic species causing a change in conductivity has the potential to inform the crew health and system management decisions. On a new vehicle such as a lunar or Mars surface habitat or a Mars transit vehicle, finding “new” impurities not seen on ISS should be expected. The key is to identify the impurity so the correct action can be taken. On ISS we can measure TOC, conductivity, and other physical properties but do not have the capability for detailed analysis using vehicle instrumentation. This is acceptable because ISS can send samples down to Earth for further analysis and obtain the detailed composition. The Spacecraft Water Impurity Monitor (SWIM) will provide detailed water quality analysis for missions in which sample down mass is not available. SWIM is a system comprising organic and inorganic analysis modules. For organic chemicals, a gas chromatograph mass spectrometer (GCMS) detects and identifies organic impurities. For inorganic species, a capillary electrophoresis capacitively coupled contactless conductivity detection (CE-C4D) system as well as ion specific electrodes detect and identify metal ions and other inorganic salts / acids. The SWIM technology demonstration project has completed a System Requirements Review (SRR) to finalize detection requirements and is currently working to refine vehicle interface requirements for a future technology demonstration. The project also has begun preliminary flight design activities for the core analyzers in the instrument suite.

Water Monitoring↗

Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility

The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: • Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. • Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it would have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. • Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. • Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High-energy high-luminosity electron-ion collider eRHIC

In this paper, we describe a future electron-ion collider (EIC), based on the existing Relativistic Heavy Ion Collider (RHIC) hadron facility, with two intersecting superconducting rings, each 3.8 km in circumference. The replacement cost of the RHIC facility is about two billion US dollars, and the eRHIC will fully take advantage and utilize this investment. We plan adding a polarized 5-30 GeV electron beam to collide with variety of species in the existing RHIC accelerator complex, from polarized protons with a top energy of 325 GeV, to heavy fully-striped ions with energies up to 130 GeV/u. Brookhaven's innovative design, is based on one of the RHIC's hadron rings and a multi-pass energy-recovery linac (ERL). Using the ERL as the electron accelerator assures high luminosity in the 10{sup 33}-10{sup 34} cm{sup -2} sec{sup -1} range, and for the natural staging of eRHIC, with the ERL located inside the RHIC tunnel. The eRHIC will provide electron-hadron collisions in up to three interaction regions. We detail the eRHIC's performance in Section 2. Since first paper on eRHIC paper in 2000, its design underwent several iterations. Initially, the main eRHIC option (the so-called ring-ring, RR, design) was based on an electron ring, with the linac-ring (LR) option as a backup. In 2004, we published the detailed 'eRHIC 0th Order Design Report' including a cost-estimate for the RR design. After detailed studies, we found that an LR eRHIC has about a 10-fold higher luminosity than the RR. Since 2007, the LR, with its natural staging strategy and full transparency for polarized electrons, became the main choice for eRHIC. In 2009, we completed technical studies of the design and dynamics for MeRHIC with 3-pass 4 GeV ERL. We learned much from this evaluation, completed a bottom-up cost estimate for this $350M machine, but then shelved the design. In the same year, we turned again to considering the cost-effective, all-in-tunnel six-pass ERL for our design of the high-luminosity eRHIC. In it, electrons from the polarized pre-injector will be accelerated to their top energy by passing six times through two SRF linacs. After colliding with the hadron beam in up to three detectors, the e-beam will be decelerated by the same linacs and dumped. The six-pass magnetic system with small-gap magnets will be installed from the start. We will stage the electron energy from 5 GeV to 30 GeV stepwise by increasing the lengths of the SRF linacs. We discuss details of eRHIC's layout in Section 3. We considered several IR designs for eRHIC. The latest one, with a 10 mrad crossing angle and {beta}* = 5 cm, takes advantage of newly commissioned Nb{sub 3}Sn quadrupoles. Section 4 details the eRHIC lattice and the IR layout. The current eRHIC design focuses on electron-hadron collisions. If justified by the EIC physics, we will add a 30 GeV polarized positron ring with full energy injection from eRHIC ERL. This addition to the eRHIC facility provide for positron-hadron collisions, but at a significantly lower luminosity than those attainable in the electron-hadron mode. As a novel high-luminosity EIC, eRHIC faces many technical challenges, such as generating 50 mA of polarized electron current. eRHIC also will employ coherent electron cooling (CeC) for the hadron beams. Staff at BNL, JLab, and MIT is pursuing vigorously an R&D program for resolving addressing these obstacles. In collaboration with Jlab, BNL plans experimentally to demonstrate CeC at the RHIC. We discuss the structure and the status of the eRHIC R&D in Section 5.

43 PARTICLE ACCELERATORS↗

Vectoring into Potential Blind Geothermal Systems in the Granite Springs Valley Area, Western Nevada: Application of the Play Fairway Analysis at Multiple Scales

The Great Basin region of the western USA is capable of generating much greater amounts of geothermal energy than currently produced. Most geothermal resources in this region are blind, and thus the favorable characteristics for geothermal activity must be synthesized and methodologies developed to discover new commercial-grade systems. The geothermal play fairway concept involves integration of multiple parameters indicative of geothermal activity as a means of identifying promising areas for new development. In the Nevada play fairway project, nine geologic, geochemical, and geophysical parameters were initially synthesized to produce a new geothermal potential map of 96,000 km2. Granite Springs Valley in western Nevada is a particularly promising site selected for detailed study. It contains several favorable structural settings, including terminations of major Quaternary normal faults and fault intersections. Geologic, geophysical, and geochemical techniques were employed to define the most likely sites for high permeability and select drilling targets for temperature-gradient holes. Local and intermediate permeability models were revised to reflect results of detailed analyses and generate new detailed play fairway maps of the area. The most promising site lies in the northeastern part of the basin directly east of Adobe Flat, where the horse-tailing termination of a major normal fault (as revealed by new gravity data), opaline sinter deposits, warm shallow wells, and a low-resistivity anomaly are collocated. Geothermometry suggests a blind system with temperatures as high as ~130°C in this area. Four new temperature-gradient holes document temperatures of ~80°C at ~150 m depth. Lessons learned in the detailed studies of this project include: 1) initially identified sites commonly include multiple favorable settings at a finer scale; 2) promising sites in Cenozoic basins cannot be well defined without detailed geophysical surveys; and 3) play fairway analysis is critical at multiple scales, providing a means to select regional prospects as well as vectoring into drilling targets at individual sites.

15 GEOTHERMAL ENERGY↗

Discovery of a Blind Geothermal System in Southern Gabbs Valley, Western Nevada, through Application of the Play Fairway Analysis at Multiple Scales

The Great Basin region is capable of generating much greater amounts of geothermal energy than currently produced. Most geothermal resources in this region are blind, and thus favorable characteristics for geothermal activity must be synthesized and methodologies developed to discover new commercial-grade systems. The geothermal play fairway concept involves integration of multiple parameters indicative of geothermal activity to identify promising areas for new development. In the Nevada play fairway project, geologic, geochemical, and geophysical parameters were initially synthesized to produce a new geothermal potential map of 96,000 km2. Southern Gabbs Valley in western Nevada is a particularly promising site selected for detailed study. It contains favorable structural settings, including Quaternary fault intersections and a displacement transfer zone. Geologic, geophysical, and geochemical techniques were employed to define the most likely sites for high permeability and select targets for temperature-gradient holes. Permeability models were revised to reflect results of detailed analyses and generate new detailed play fairway maps. The most promising site lies in an area of multiple fault intersections in a broader displacement transfer zone directly north of the Petrified Springs dextral fault, as revealed by gravity, magnetic, and MT data. A 2-m temperature anomaly and warm temperature gradient wells (~120oC at ~150 m depth) confirm the presence of a geothermal system and provide initial validation of the play fairway methodology. The system is blind, with no surface hot springs, fumaroles, or paleo-geothermal deposits. Lessons learned in the detailed studies include: 1) initially identified sites commonly include multiple favorable settings at a finer scale; 2) promising sites in Cenozoic basins cannot be recognized without detailed geophysical surveys; and 3) play fairway analysis is critical at multiple scales.

15 GEOTHERMAL ENERGY↗

Discovering New Geothermal Systems In The Great Basin Region, Western USA: An Integrated Approach For Establishing Geothermal Play Fairways

The Great Basin of the western USA is capable of producing much greater amounts of geothermal energy than the current ~670 MW from ~25 power plants. Most geothermal resources in this region are blind, and thus the favorable characteristics for geothermal activity must be synthesized and methodologies developed to discover new commercial-grade systems (>130oC). The geothermal play fairway concept involves integration of multiple parameters indicative of geothermal activity as a means of identifying promising areas for new development. In the Nevada play fairway project, nine geologic, geochemical, and geophysical parameters were initially synthesized to produce a new geothermal potential map of 96,000 km2. These parameters were grouped into subsets and individually weighted to delineate rankings for heat and local, intermediate, and regional permeability, which collectively defined the play fairways. From the regional map, 24 highly prospective areas, including known undeveloped systems and unknown potential blind systems, were identified for further analysis. Five particularly promising sites were then selected for detailed studies. Multiple techniques, including geologic mapping, Quaternary fault analysis, 2-m temperature surveys, gravity surveys, LiDAR, geochemical studies, seismic reflection analysis, and 3D modeling, were employed in these areas to define likely sites for high permeability and define highly prospective drilling targets. Local and intermediate permeability models were revised to reflect results of detailed analyses and generate new detailed play fairway maps. Lessons learned include: 1) initially identified sites commonly include multiple favorable settings at a finer scale; 2) promising sites in Cenozoic basins cannot be recognized without detailed geophysical surveys; and 3) play fairway analysis is critical at multiple scales, providing a means to select regional prospects as well as vectoring into drilling targets at individual sites. Based on our detailed studies, several potential new, high temperature systems were discovered. However, TG drilling is needed to confirm commercial grade resources.

15 GEOTHERMAL ENERGY↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Enhanced Evaluation Criteria to Meet the WIPP Waste Acceptance Criteria - 18655

The Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for the disposal of Transuranic (TRU) waste and the only such disposal facility of its kind. TRU waste is radioactive mixed waste generated by the U. S. Department of Energy in support of National Defense. In 2014, the WIPP facility was shut down when two separate accidents occurred in the repository. The two accidents were a fire on a large underground haul truck that prompted evacuation and filled the mine with smoke and soot, and a radiation release that contaminated the exhaust ventilation and disposal areas of the mine. DOE performed two accident investigations in 2014 that resulted in many corrective actions. Some of the corrective actions resulted in significant changes in the WIPP Waste Acceptance Criteria (WAC) and are required to be applied to all TRU waste upon the resumption of shipments to WIPP. WIPP re-opened and began taking shipments again in 2017 and a large backlog of over 25,000 TRU waste containers that were certified prior to the new WAC have been undergoing re-evaluation since the re-opening. This paper will focus on the new WAC criteria that TRU waste must meet above-and-beyond previous WAC criteria and the implementation of new processes for approval. The primary area for these changes is in the area of waste characterization using Acceptable Knowledge (AK) and new detailed analyses required for chemical compatibility. The accident investigation revealed that the radiation release was due to a thermal runaway and bursting of the waste container due to inadvertent mixtures of nitrates and combustibles resulting in ignitable waste forms. In other words, the TRU waste container had incompatible contents that went undiscovered and created a hazard characteristic that was prohibited at WIPP. Through detailed chemical compatibility evaluations and new oversight, the DOE should be able to prevent a similar accident (see Figure 1). The new chemical compatibility evaluations and evaluations of oxidizing chemicals combined with combustibles are complex and detailed. Chemical compatibility is not a new requirement, but a much more detailed evaluation is a new requirement. And, obtaining historical information about the generation of the final waste form for legacy packaged waste can be very challenging. Specifically, determining possible amounts of chemicals in the waste can be extremely challenging. This paper does not explore in depth, the details of oxidizing chemicals. Other papers presented will discuss oxidizing chemicals. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Features added in new release of SRFYDO - February 2009

Version 2.0 of SRFYDO, released in February 2009, has a number of new features. This document describes these additions and is designed to complement the document 'Calculating System Reliability with SRFYDO: A User Guide' (Los Alamos National Laboratory Technical Report LA-UR 08-06161). The new features include: (1) Reliability Estimates for Combinations of Components - Users can now estimate the reliability of collections of components, such as a sections or sub-systems. This optional feature is activated via a new table, SectionDef, which is used to define names and component associations for the section or sub-system aggregate. If the SectionDef table is present, section plots and tabulated reliabilities will be created during the SRY3 phase. For more details see section 1. (2) Plots of System or Component Reliability Priors - SRFYDO now creates reliability plots for each system (if system priors were given) or each component (if component priors were given) during the SRY1 phase. These plots, written in the directory 'priorPDFs', are provided to help users visualize the impact of their estimates on the final reliability calculation. For more details see section 2. (3) Convenient Exclusion of Lifecycle Covariates - Both GUI and command-line interfaces to SRFYDO now allow the user to exclude one or both of the lifecycle covariates without requiring modification to the spreadsheet. With this capability users can readily explore the effect of adding or removing lifecycle measures on the resulting statistical analysis. Note that excluding a lifecycle covariate is not the same as setting its rate (-b or -c) to zero. For more details see section 3. (4) MCMC Diagnostic Plots - Diagnostic or 'trace' plots may optionally be created for each of the statistical parameters generated during the Monte Carlo phase (SRY2). These plots can help the user determine if (1) appropriate lifecycle variable choices have been made, (2) more sampling iterations, '-i', are required, and (3) suggest the number of samples to discard, '-x', for optimal results. For more details see section 4. (5) Sample Thinning - A sample thinning feature (-e) allows advanced users to address parameter correlation issues diagnosed by trace plots (section 4). For more details see section 5. (6) Version Compatibility - An incompatibility with the previous version of SRFYDO was introduced. If you use different SRFYDO versions for different phases of an analysis see section 6.

97 MATHEMATICS AND COMPUTING↗

Nano-scale solute partitioning in devitrified bulk metalic glass.

Devitrification of bulk metallic glass leads to a novel microstructure, with high-density nanoscale crystalline precipitates evenly distributed in a glassy matrix. Significant chemical segregation is revealed at unprecedented detail by atom-probe tomography. This level of detail is crucial for understanding the interference peaks observed in small-angle X-ray and neutron scattering experiments, an unsolved mystery for over a decade.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Transport and Fate of Natural Gas and Brine Escaping from a Hydrocarbon Reservoir Through a Failed Deepwater Well in the Oceanic Subsurface of the Gulf of Mexico

The possibility of broaching, or the release of fluids at the seafloor due to a damaged or faulty well, is a hazard that must be assessed in the well permitting process. Here, this paper describes a numerical simulation study of a real-life scenario where a complex, permeable sandy formation, connected to the seafloor via known chimneys/seeps, is intersected by a damaged production well that drains another deeper, gas-bearing formation. The objective of the study is to determine the transport and fate of hydrocarbon reservoir fluids (gas and brines) escaping into the sandy formation through the casing shoe of the failed well, and to determine the time it takes for these contaminants to reach the ocean floor. We conducted a detailed simulation study to represent the conditions, properties, and behavior of the system under such failure conditions, and we investigated the migration of gas and brine for a range of reservoir and chimney properties. A key conclusion is that, for such complex systems, modeling the three-dimensional geometry of the system in detail is the key to describing transport and assessing the time and magnitude of potential releases. For the system studied here, transport times range from under 2 years (highest permeabilities) to many decades, ensuring significant time to respond to potential broaching hazards. Lastly, under the conditions investigated in this study, we also determine that gas-dominated releases associated with low rates of water flow into the sandy formation are likely to cause hydrate formation that can reduce permeabilities in the colder, upper regions of the chimneys and possibly mitigate releases.

58 GEOSCIENCES↗

Aftertreatment protocols for catalyst characterization and performance evaluation: low-temperature oxidation, storage, three-way, and NH3-SCR catalyst test protocols

A set of standardized and realistic aftertreatment catalyst test protocols have been developed by the Advanced Combustion and Emission Control Technical Team in support of the U.S.DRIVE Partnership. The protocols are intended to accelerate the pace of aftertreatment catalyst innovation by enabling the accurate evaluation and comparison of aftertreatment catalyst performance data from various testing and research facilities to maximize the impact of discovery-phase research occurring across the nation. The protocols address a need identified by the Partnership’s industry partners for consistent and accurate metrics for aftertreatment catalyst evaluation and comparison. The protocols consist of a set of standardized requirements and test procedures that sufficiently capture the performance capability of a catalyst technology in a manner that is adaptable in various laboratories. The protocols provide a detailed description of the necessary reactor system, the steps for achieving a desired aged state of the catalyst, all necessary sample pretreatment to be performed prior to testing, and realistic test conditions for evaluating performance. This article details four low-temperature catalyst test protocols applicable to (1) oxidation catalysts, (2) passive storage (and release) catalysts, (3) three-way catalysts, and (4) NH3-SCR catalysts. The catalyst test protocol descriptions are presented in five (5) sections: protocol general guidelines and the four individual catalyst test protocol descriptions. The general guidelines plus the individual protocol description forms the complete low-temperature catalyst test protocol for the application.

Emission control, Three-way catalyst, oxidation, S↗

Anomalous elasticity, fluctuations and disorder in elastic membranes

Motivated by freely suspended graphene and polymerized membranes in soft and biological matter we present a detailed study of a tensionless elastic sheet in the presence of thermal fluctuations and quenched disorder. The manuscript is based on an extensive draft dating back to 1993, that was circulated privately. It presents the general theoretical framework and calculational details of numerous results, partial forms of which have been published in brief Letters (Le Doussal and Radzihovsky, 1992; 1993). The experimental realization atom-thin graphene sheets (Novoselov et al., 2004) have driven a resurgence in this fascinating subject, making our dated predictions and their detailed derivations timely. To this end we analyze the statistical mechanics of a generalized D-dimensional elastic “membrane” embedded in d dimensions using a self-consistent screening approximation (SCSA), that has proved to be unprecedentedly accurate in this system, exact in three complementary limits: (i) d→∞, (ii) D→4, and (iii) D=d. Focusing on the critical “flat” phase, for a homogeneous two-dimensional (D=2) membrane embedded in three dimensions (d=3), we predict its universal roughness exponent ζ=0.590, length-scale dependent elastic moduli exponents η=0.821 and η{sub u}=0.358, and an anomalous Poisson ratio, σ = - 1/3. In the presence of random uncorrelated heterogeneity the membrane exhibits a glassy wrinkled ground state, characterized by ζ'=0.775,η' = 0.449,η{sub u}'=1.101 and a Poisson ratio σ ' = - 1/3. Motivated by a number of physical realizations (charged impurities, disclinations and dislocations) we also study power-law correlated quenched disorder that leads to a variety of distinct glassy wrinkled phases. Finally, neglecting self-avoiding interaction we demonstrate that at high temperature a “phantom” sheet undergoes a continuous crumpling transition, characterized by a radius of gyration exponent, ν=0.732 and η=0.535. Many of these universal predictions have received considerable support from simulations. We hope that this detailed presentation of the SCSA theory will be useful to further theoretical developments and corresponding experimental investigations on freely suspended graphene.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Dynamic Linking of Upstream Energy and Freight Demands for Bio and Fossil Energy Pathways in the Global Change Analysis Model

Comprehensive study of the environmental impacts associated with demand for an energy resource or carrier in any one sector requires a full consideration of the direct and indirect impacts on the rest of the regional and global energy system. It is important to consider the energy that is consumed in producing primary energy resources and energy consumed in transporting these energy resources internationally and domestically in order to produce a complete picture of these impacts. Biofuels are especially complex since they have feedbacks not just to the energy system but also to regional and global crop markets. Different modeling and analysis strategies have been applied to consider these impacts, which occur “upstream” of final energy consumption, with some success. Traditional life cycle models allow for rich technological detail in linking upstream impacts of energy demand with downstream final consumption; however, they cannot by themselves represent dynamic economic feedbacks across multiple sectors and regions over time. Computable general equilibrium (CGE) modeling does account for economic feedback among all sectors and regions; however, CGE modeling does not lend itself to physical representation of technological detail. Partial equilibrium (PE) modeling is a heterogeneous category describing economic models that focus on a subset of the economy, and they differ in coverage and ease in incorporating more sectors and economic links. In this study, we present a strategy for dynamically including the direct and indirect impacts of energy demand with physical and technology detail by explicitly adding these upstream energy and transportation links to GCAM, a PE model of global energy, land use, and emissions. We incorporate the following inter-sectoral linkages: energy inputs to crop production, energy inputs to fossil resource production, and freight transport requirements of energy and agricultural commodities. We assess the implications of explicitly including these links by measuring the global impacts of increased corn ethanol demand in the United States with and without these links included. Although the net global impact of the upstream links on energy and emissions are relatively modest in the scenarios we studied, the inclusion of these links illustrates interesting trade-offs in energy and transportation demand among fossil fuel and agriculture sectors. These sectoral interactions suggest that this level of modeling detail could be important in evaluating future analytical questions.

Sampedro Martinez de Estivariz, Jon↗

Crystal structure of the PDZ domain of mouse Dishevelled 1 and its interaction with CXXC5

Dishevelled (Dvl) plays a crucial role in Wnt signaling by interacting with membrane-bound receptors and downstream molecules through its PDZ domain. CXXC5 is one of the key molecules that interacts with Dvl and negatively regulates the Wnt/β-catenin pathway in osteoblast differentiation. Recently, the Dvl-CXXC5 interaction has been identified as an excellent target for osteoporosis treatment. Therefore, it is desirable to have detailed structural information for the Dvl-CXXC5 interaction. Although solution structures of the Dvl1 PDZ domain have been reported, a high-resolution crystal structure would provide detailed sidechain information that is essential for drug development. Here, we determined the first crystal structure of the Dvl-1 PDZ domain at a resolution of 1.76 Å, and compared it with its previously reported solution structure. The Dvl1 PDZ domain crystal belonged to the space group H32 with unit-cell parameters a = b = 72.837, c = 120.616, α = β = 90.00, γ = 120.00. The crystal structure of Dvl1 PDZ shared its topology with the previously reported structure determined by nuclear magnetic resonance (NMR); however, the crystal structure was quite different from the solution structure in both the secondary structural region and the ligand-binding pocket. Molecular modeling based on NMR and X-ray crystallographic data yielded detailed information about the Dvl1/CXXC5 interaction, which will be useful for designing inhibitors. - Highlights: • Crystal structure of PDZ domain of Dvl1 has been determined at 1.76 Å resolution. • NMR and X-ray crystal structure of PDZ domain is quite different in both the secondary structure and ligand binding pocket. • Molecular model of the Dvl1 PDZ and DBM peptide complex provides a detailed interaction between Dvl1 and CXXC5. • Dynamics data shows that the peptide binding pocket of the Dvl1 PDZ is stabilized upon CXXC5 binding.

60 APPLIED LIFE SCIENCES↗

Reduced-order condensed-phase kinetic models for polyethylene, polypropylene and polystyrene thermochemical recycling

Thermochemical recycling of plastic waste (PW) into chemicals and energy vectors requires coupling particle and reactor-scale simulations to accurate condensed phase pyrolysis mechanisms for each constituent. This work proposes a methodology to derive reduced-order condensed-phase kinetic models from validated semi-detailed kinetic mechanisms. Two types of kinetic models are obtained for polyethylene (PE), polypropylene (PP) and polystyrene (PS): reduced semi-detailed models and multi-step fully lumped ones. These families offer different compromises between accuracy and computational cost. The former employ 50–100 gas + liquid species and describe both the radical degradation and the detailed carbon distribution of the products. Conversely, the latter involves 5–10 species per polymer tracking only the main petroleum cuts. The kinetic mechanisms are complemented by the definition of thermochemical properties of gas, liquid, and solid-phase species, accounting for phase-transitions through pseudo-chemical reactions. Model validations are performed by comparison with experimental data and the original semi-detailed mechanisms in terms of mass loss, heat fluxes and product distribution profiles. The resulting CHEMKIN-like condensed-phase models are attached as Supplementary Material and as a GitHub repository. Extending the proposed approach to other polymers and coupling it with existing subsets in the CRECK kinetic framework (e.g., biomass, PVC, PET) offers a powerful tool to model thermochemical recycling of PW and biomass/PW mixtures.

kinetics↗