Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Isolated Performance at Mach Numbers From 0.60 to 2.86 of Several Expendable Nozzle Concepts for Supersonic Applications

Investigations have been conducted in the Langley 16-Foot Transonic Tunnel (at Mach numbers from 0.60 to 1.25) and in the Langley Unitary Plan Wind Tunnel (at Mach numbers from 2.16 to 2.86) at an angle of attack of 0 deg to determine the isolated performance of several expendable nozzle concepts for supersonic nonaugmented turbojet applications. The effects of centerbody base shape, shroud length, shroud ventilation, cruciform shroud expansion ratio, and cruciform shroud flap vectoring were investigated. The nozzle pressure ratio range, which was a function of Mach number, was between 1.9 and 11.8 in the 16-Foot Transonic Tunnel and between 7.9 and 54.9 in the Unitary Plan Wind Tunnel. Discharge coefficient, thrust-minus-drag, and the forces and moments generated by vectoring the divergent shroud flaps (for Mach numbers of 0.60 to 1.25 only) of a cruciform nozzle configuration were measured. The shortest nozzle had the best thrust-minus-drag performance at Mach numbers up to 0.95 but was approached in performance by other configurations at Mach numbers of 1.15 and 1.25. At Mach numbers above 1.25, the cruciform nozzle configuration having the same expansion ratio (2.64) as the fixed geometry nozzles had the best thrust-minus-drag performance. Ventilation of the fixed geometry divergent shrouds to the nozzle external boattail flow generally improved thrust-minus-drag performance at Mach numbers from 0.60 to 1.25, but decreased performance above a Mach number of 1.25.

Re, Richard J.↗

2012 Ground Testing Highlights

As part of the Fundamental Aeronautics Program and a collaborative effort with Boeing, and Lockheed Martin this past year a series of sonic boom test were completed in the NASA Ames Unitary Plan Wind Tunnel (UPWT). One of the goals was to develop new test techniques and hardware for measuring sonic boom signatures in the transonic and supersonic regimes. Data for various model designs and configurations were collected and will be used to validate CFD predictions of sonic boom signatures. Reactivation of the NASA Ames Mitsubishi compressor system was completed this past year. The compressor is intended to replace and augment the existing UPWT Clark Compressor as the primary Make Up Air (MUA) source. The MUA system provides air and vacuum pumping capability to the Ames UPWT. It will improve productivity and reliability of the UPWT as a vital testing and research facility for the U.S. aerospace industry and NASA. Funding for this task was provided from the American Recovery Investment Act (ARRA). Installation and validation of a Noncontact Stress Monitoring System (NSMS) for the 3-stage compressor was completed at the 11-foot Transonic Wind Tunnel. The system, originally developed at AEDC, consists of 36 pairs of LED light sources with optic beam send and receive probes along a 1-per rev signal. The new system allows for continuous monitoring and recording of compressor blade bending and torsion stress during normal test operations. A very unusual test was completed in the 11 FT TWT to acquire aerodynamic and flow field data for the Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS) to validate CFD methods and tools. Surface pressure distribution measurements and velocity measurements in the wake of the command module back to the drogues parachute location were acquired. Testing methods included Particle Image Velocimetry (PIV), Pressure Sensitive Paint (PSP), Schlieren Infrared Imaging (IR) and boundary layer survey and skin friction.

Buchholz, Steven J.↗

Computational and Experimental Unsteady Pressures for Alternate SLS Booster Nose Shapes

Delayed Detached Eddy Simulation (DDES) predictions of the unsteady transonic flow about a Space Launch System (SLS) configuration were made with the Fully UNstructured Three-Dimensional (FUN3D) flow solver. The computational predictions were validated against results from a 2.5% model tested in the NASA Ames 11-Foot Transonic Unitary Plan Facility. The peak C(sub p,rms) value was under-predicted for the baseline, Mach 0.9 case, but the general trends of high C(sub p,rms) levels behind the forward attach hardware, reducing as one moves away both streamwise and circumferentially, were captured. Frequency of the peak power in power spectral density estimates was consistently under-predicted. Five alternate booster nose shapes were assessed, and several were shown to reduce the surface pressure fluctuations, both as predicted by the computations and verified by the wind tunnel results.

Braukmann, Gregory J.↗

The International Orion Spacecraft Is off Towards the Stars

Following a very successful year of manufacturing, assembly and testing in factories located around the globe, NASA and ESA are preparing to deliver the major Exploration Mission-1 (EM-1) Orion flight elements, including the Crew Module, ESA Service Module and Launch Abort System. This international effort to design and develop a deep space exploration capable human spacecraft is rapidly transitioning from the design, development and test phase to the early test flight and production phase. Two major flight tests, an Ascent Abort test and EM-1, Orion's first flight onboard NASA's new heavy lift Space Launch System, are planned for the near future. Further, Orion will play a crucial role in the ambitious new Deep Space Gateway human exploration Program. This paper gives a short overview of the system and subsystem configuration of the Orion spacecraft, including NASA and ESA contributions, a status of EM-1, AA-2 and EM-2 spacecraft production, and a look at Orion's role in the construction and operation of the Deep Space Gateway. The paper will also address the innovative international cooperation methods being employed to conduct Orion and Service Module integration.

Kirasich, Mark↗

Estimates of Future Numerical Weather Prediction Impacts from Hyperspectral Sounders

The United States’ satellite programs are currently in the process of evaluating the future of satellite observations of the Earth’s atmosphere, both as an individual nation and within the context of international partnerships. In an effort to better understand the impacts of various alternatives, the Global Modeling and Assimilation Office (GMAO) observing system simulation experiment (OSSE) framework has been utilized to evaluate several configurations of the international hyperspectral infrared sounder constellation from the perspective of global numerical weather prediction (NWP). This was done with an emphasis on the proposed NOAA/NASA Geostationary eXtended Observations (GeoXO) Sounder (GXS), planned to launch in the mid-2030s, and similar planned missions from international partners. GXS, in addition to contributions from EUMETSAT and JMA, will form a global ring of geostationary sounders consistent with the WMO’s 2040 vision. In addition to a novel geostationary IR sounder program, considerations extend to the future of the Low Earth Orbit (LEO) sounder program with the upcoming demise of several existing instruments and plans for future missions ongoing. The GMAO OSSE framework has examined the potential roles of GEO and LEO sounders in weather prediction improvement. Overall, the inclusion of both GEO sounders in a global ring and LEO sounders produces the most beneficial observation impact and the most accurate global weather forecasts as evaluated using several metrics, including hurricanes and the FSOI.

Erica Mcgrath-Spangler↗

Preliminary Performance Assessment for the Waste Management Area C at the Hanford Site in Southeast Washington

A performance assessment (PA) of Single-Shell Tank (SST) Waste Management Area C (WMA C) located at the U.S. Department of Energy's (DOE) Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO), as well as other Federal requirements and State-approved closure plans and permits. The WMP C PA assesses the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks and ancillary equipment and facilities in their assumed closed configuration and the subsequent risks to humans into the far future. The part of the PA focused on radiological impacts is being developed to meet the requirements for a closure authorization under DOE Order 435.1 that includes a waste incidental to reprocessing determination for residual wastes remaining in tanks, ancillary equipment, and facilities. An additional part of the PA will evaluate human health and environmental impacts from hazardous chemical inventories in residual wastes remaining in WMA C tanks, ancillary equipment, and facilities needed to meet the requirements for permitted closure under RCRA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The MICE Demonstration of Ionization Cooling

Muon beams of low emittance provide the basis for the intense, well-characterised neutrino beams necessary to elucidate the physics of flavour at the Neutrino Factory and to provide lepton-antilepton collisions at energies of up to several TeV at the Muon Collider. The International Muon Ionization Cooling Experiment (MICE) will demonstrate ionization cooling, the technique by which it is proposed to reduce the phase-space volume occupied by the muon beam at such facilities. In an ionization cooling channel, the muon beam passes through a material (the absorber) in which it loses energy. The energy lost is then replaced using RF cavities. The combined effect of energy loss and re-acceleration is to reduce the transverse emittance of the beam (transverse cooling). A major revision of the scope of the project was carried out over the summer of 2014. The revised project plan, which has received the formal endorsement of the international MICE Project Board and the international MICE Funding Agency Committee, will deliver a demonstration of ionization cooling by September 2017. In the revised configuration a central lithium-hydride absorber provides the cooling effect. The magnetic lattice is provided by the two superconducting focus coils and acceleration is provided by two 201 MHz single-cavity modules. The phase space of the muons entering and leaving the cooling cell will be measured by two solenoidal spectrometers. All the superconducting magnets for the ionization cooling demonstration are available at the Rutherford Appleton Laboratory and the first single-cavity prototype is under test in the MuCool Test Area at Fermilab. The design of the cooling demonstration experiment will be described together with a summary of the performance of each of its components. The cooling performance of the revised configuration will also be presented.

43 PARTICLE ACCELERATORS↗

Improved Performance of Asymptotically Optimal Rapidly Exploring Random Trees

Three algorithms that improve the performance of the asymptotically optimal Rapidly exploring Random Tree (RRT*) are presented here. First, we introduce the Goal Tree (GT) algorithm for motion planning in dynamic environments where unexpected obstacles appear sporadically. The GT reuses the previous RRT* by pruning the affected area and then extending the tree by drawing samples from a shadow set. The shadow is the subset of the free configuration space containing all configurations that have geodesics ending at the goal and are in conflict with the new obstacle. Smaller, well defined, sampling regions are considered for Euclidean metric spaces and Dubins' vehicles. Next, the Focused-Refinement (FR) algorithm, which samples with some probability around the first path found by an RRT*, is defined. The third improvement is the Grandparent-Connection (GP) algorithm, which attempts to connect an added vertex directly to its grandparent vertex instead of parent. The GT and GP algorithms are both proven to be asymptotically optimal. Finally, the three algorithms are simulated and compared for a Euclidean metric robot, a Dubins' vehicle, and a seven degrees-of-freedom manipulator.

42 ENGINEERING↗

Upgrade and benchmarking of a 4D treatment planning system for scanned ion beam therapy

Purpose: Upgrade and benchmarking of a research 4D treatment planning system (4DTPS) suitable for realistic patient treatment planning and treatment simulations taking into account specific requirements for scanned ion beam therapy, i.e., modeling of dose heterogeneities due to interplay effects and range changes caused by patient motion and dynamic beam delivery. Methods: The 4DTPS integrates data interfaces to 4D computed tomography (4DCT), deformable image registration and clinically used motion monitoring devices. The authors implemented a novel data model for 4D image segmentation using Boolean mask volume datasets and developed an algorithm propagating a manually contoured reference contour dataset to all 4DCT phases. They further included detailed treatment simulation and dose reconstruction functionality, based on the irregular patient motion and the temporal structure of the beam delivery. The treatment simulation functionality was validated against experimental data from irradiation of moving radiographic films in air, 3D moving ionization chambers in a water phantom, and moving cells in a biological phantom with a scanned carbon ion beam. The performance of the program was compared to results obtained with predecessor programs. Results: The measured optical density distributions of the radiographic films were reproduced by the simulations to (-2 {+-} 12)%. Compared to earlier versions of the 4DTPS, the mean agreement improved by 2%, standard deviations were reduced by 7%. The simulated dose to the moving ionization chambers in water showed an agreement with the measured dose of (-1 {+-} 4)% for the typical beam configuration. The mean deviation of the simulated from the measured biologically effective dose determined via cell survival was (617 {+-} 538) mGy relative biological effectiveness corresponding to (10 {+-} 9)%. Conclusions: The authors developed a research 4DTPS suitable for realistic treatment planning on patient data and capable of simulating dose delivery to a moving patient geometry for scanned ion beams. The accuracy and reliability of treatment simulations improved considerably with respect to earlier versions of the 4DTPS.

60 APPLIED LIFE SCIENCES↗

SU-F-T-646: SBRT Lung: Moving Beyond the 3D Conformal Paradigm with An Elekta VersaHD Accelerator

Purpose: To develop a volumetric modulated arc therapy (VMAT) planning and delivery methodology for lung stereotactic body radiation therapy (SBRT) that addresses the unique geometric challenges presented when using an Elekta VersaHD linear accelerator. Methods: The Elekta VersaHD imaging panels are fixed at 160cm SID when deployed, limiting the ability to perform non-coplanar treatments due to collisions with the treatment table. The panels can be folded in a stored position for non-coplanar treatments, but in this configuration, longitudinal table travel is restricted by the space required for the folded panels. To overcome these design features, a non-coplanar VMAT technique was designed and evaluated for 6 patients that uses a superiorly placed isocenter near the apex of the lung. A coplanar VMAT technique with isocenter placement within the target was also assessed for each patient. Non-coplanar plans included three arcs, totalling 340° of arc angle, while coplanar plans included two arcs, totalling 280° of arc angle. Each technique avoided the contralateral lung and major overlap on patient skin. Corresponding 3DCRT plans were used as a baseline for each patient in evaluating VMAT plans. Results: Coplanar and noncoplanar VMAT plans yielded a high dose conformity index (CI) improvement of 6% and low dose CI improvements of 9% and 11%, respectively, over corresponding 3DCRT plans. While both VMAT techniques provided greater skin sparing compared to 3DCRT, the non-coplanar technique offered an improvement of 20% over the coplanar approach. Treatment time with for VMAT was ∼2.5 minutes compared to ∼10 minutes for 3DCRT. Conclusion: Two VMAT techniques were developed for lung SBRT that account for machine design limitations and provide greater dose conformity and normal tissue sparing than 3DCRT plans. The non-coplanar VMAT plans showed a marginal improvement over coplanar VMAT plans and may not warrant the additional complexity.

60 APPLIED LIFE SCIENCES↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Final Demolition and Disposition of 209-E Critical Mass Laboratory - 12267

The 209-E Critical Mass Laboratory was constructed in 1960 to provide a heavy shielded reactor room where quantities of plutonium or uranium in solution could be brought to near-critical configurations under carefully controlled and monitored conditions. In the late 1980's, the responsible contractor, Pacific Northwest National Laboratory (PNNL), was directed by the Department of Energy (DOE) to prepare the facility for unoccupied status. The facility was demolished under a Removal Action Work Plan pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The funding for this project was provided by the American Recovery and Reinvestment Act (ARRA). The primary rooms of concern with regards to contamination in 209-E facility, which is over 9,000 square feet, are the criticality assembly room (CAR), the mix room, and the change room. The CAR contained two reactor hoods (HO-140 and HO-170), which each had a high efficiency particulate air (HEPA) filter system. The CAR contained 13 tanks ranging from 38 L (10 gal) to 401 L (106 gal). Tanks TK-109 and TK-110 are below grade, and were removed as part of this demolition and disposition remedy. Nonradiological and radiological hazardous substances were removed, decontaminated, or fixed in place, prior to demolition. Except for the removal of below grade tanks TK-109 and TK-110, the facility was demolished to slab-on-grade. PNNL performed stabilization and deactivation activities that included removal of bulk fissile material and chemicals, flushing tanks, stabilizing contamination within gloveboxes and hoods, and packaging and removing waste. The removal of the contaminated plutonium equipment and materials from the 209E facility presented a number of challenges similar in nature to those associated with the inventory reduction and cleanup activities at the Plutonium Finishing Plant. Although there were no bulk fissile materials or chemicals within the facility, there were residual radiological materials (isotopes of plutonium and americium) in the tanks and hoods. The complexity of the remedy was present because of the various configurations of the tanks and hoods, combined with the residual contaminants. Because of the weight and dimensional configuration, size reduction of the slab tanks, as well as removal and disposal of the different material used for moderation and absorption, were two examples of challenges that were resolved to complete the remedy. One of the key methods developed and implemented at the facility was the design and construction of a shroud to allow the cutting of the Pu contaminated tanks. The shroud design, development and implementation at the 209E Project was an example of enhanced work planning and task hazards analysis with worker involvement. This paper will present the lessons learned from the 209E facility inventory reduction activities including the shroud and other methodologies used. The initial Lessons Learned discussion for this project was scheduled for late January 2012. This facility is the first open-air demolition of a highly contaminated plutonium-contaminated facility accomplished by CH2M Hill under the Plateau Remediation Contract. The demolition was completed without spread of contamination to the workers and the surrounding area. As with any project of this complexity, there are significant accomplishments, as well as experience that can be applied to future demolition of plutonium-contaminated facilities on the Hanford Site. These experiences will be documented at a later date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Surrogate Modeling for Capacity Planning of Charging Station Equipped With Photovoltaic Panel and Hydropneumatic Energy Storage

Due to the promising potential for environmental sustainability, there has been a significant increase of electric vehicles (EVs) and plug-in hybrid electric vehicles (PHEV) in the market. To support this increasing demand for EVs and PHEVs, challenges related to capacity planning and investment costs of public charging infrastructure must be addressed. Hence, in this paper, a capacity planning problem for charging stations is developed and aims to balance the current capital investment costs and future operational revenue. The charging station is assumed to be equipped with the solar photovoltaic (PV) panel and an energy storage system, which could be electric battery or recently invented hydropneumatic energy storage (ground-level integrated diverse energy storage (GLIDES)) system. A co-optimization model that minimizes investment and operation cost is established to determine optimal solution while considering capacity planning and following operations. EV mobility is modeled as an Erlang-loss system. Meanwhile, stochastic programming is adopted to capture uncertainties from solar radiation and charging demand of EV fleet. To provide a more general and computationally efficient model, main configuration parameters are sampled in design space and then fixed in solving the co-optimization model. Sampled parameters include EV charging slots number, PV area, capacity of energy storage system, and daily mean EV arrival number. Based on the sampled parameter combinations and its responses, black-box mappings are then constructed using surrogate models, which could provide insights for charging station placement in different practical situations. The effectiveness of the proposed surrogate modeling approach is demonstrated in numerical experiments. Here, the results indicate better profit advantage of GLIDES over battery system with the increased power capacity

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mission planning for large microwave radiometers

Earth orbiting, remote sensing platforms that use microwave radiometers as sensors are susceptible to data interpretation difficulties. The capability of the large microwave radiometer (LMR) was augmented with the inclusion of auxillary sensors that expand and enhance the LMR capability. The final system configuration demonstrates a holistic approach in the design of future orbiting remote sensing platforms that use a LMR as the core instrument.

Schartel, W. A.↗

Quality assurance planning for lunar Mars exploration

A review is presented of the tools and techniques required to meet the challenge of total quality in the goal of traveling to Mars and returning to the moon. One program used by NASA to ensure the integrity of baselined requirements documents is configuration management (CM). CM is defined as an integrated management process that documents and identifies the functional and physical characteristics of a facility's systems, structures, computer software, and components. It also ensures that changes to these characteristics are properly assessed, developed, approved, implemented, verified, recorded, and incorporated into the facility's documentation. Three principal areas are discussed that will realize significant efficiencies and enhanced effectiveness, change assessment, change avoidance, and requirements management.

Myers, Kay↗

Optimal Operation and Dispatch of Voltage Regulation Devices Considering High Penetrations of Distributed Photovoltaic Generation

Voltage regulation devices have been traditionally installed and utilized to support distribution voltages. Installations of distributed energy resources (DERs) in distribution systems are rapidly increasing, and many of these generation resources have variable and uncertain power output. These generators can significantly change the voltage profile for a feeder; therefore, in the distribution system planning stage of the optimal operation and dispatch of voltage regulation devices, possible high penetrations of DERs should be considered. In this paper, we model the IEEE 34-bus test feeder, including all essential equipment. An optimization method is adopted to determine the optimal siting and operation of the voltage regulation devices in the presence of distributed solar power generation. Finally, we verify the optimal configuration of the entire system through the optimization and simulation results.

14 SOLAR ENERGY↗

Proposed muon collider R&D at SNS

Generation of a muon beam at a Muon Collider requires relatively short, high-charge proton bunches. They are produced in a high-average-power proton driver by first accumulating a proton beam from a super-conducting linac, then bunching the beam and finally compressing and combining the bunches into a single high-intensity proton pulse. All of these beam formation stages involve handling of unprecedentedly high beam charges. Validation of these intricate beam manipulations requires better understanding of extreme space-charge effects and experimental demonstration. A facility perhaps most closely resembling the proton driver configuration and beam parameters is the Spallation Neutron Source (SNS) accelerator complex at Oak Ridge National Laboratory (ORNL). Considering the energy scaling of the space-charge parameters, many of the beam formation steps planned for the proton driver can be experimentally checked at the SNS at the relevant space-charge interaction levels. This paper discusses potential proton driver and other muon-collider-related R\&D at the SNS.

43 PARTICLE ACCELERATORS↗