Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

The ASTRO-H (Hitomi) X-Ray Astronomy Satellite

The Hitomi (ASTRO-H) mission is the sixth Japanese X-ray astronomy satellite developed by a large international collaboration, including Japan, USA, Canada, and Europe. The mission aimed to provide the highest energy resolution ever achieved at E greater than 2 keV, using a microcalorimeter instrument, and to cover a wide energy range spanning four decades in energy from soft X-rays to gamma-rays. After a successful launch on 2016 February 17, the spacecraft lost its function on 2016 March 26, but the commissioning phase for about a month provided valuable information on the on-board instruments and the spacecraft system, including astrophysical results obtained from first light observations. The paper describes the Hitomi (ASTRO-H) mission, its capabilities, the initial operation, and the instruments/spacecraft performances confirmed during the commissioning operations for about a month.

Hard X-ray↗

TPSAS-NF1676L-35283-DND

In this talk, we present a long-term burned area database that has been developed using Advanced Very High Resolution Radiometer (AVHRR) Global Area Coverage (GAC) data from 1979-2000. Burned area has been verified using Total Ozone Mapping Spectrometer data and validated using available Landsat imagery (160 scenes thus far representing 5.6 Mha of burned area, 219 fire events, and 11% of the total burned area in the AVHRR database). Visually the burned scar data compare well. Validation is in ongoing, though initial analyses show an intersection of 42% with commission and omission errors of 31% and 25%, respectively. Most commission and omission errors are related to spatial inconsistencies using imagery with significantly different spatial resolutions. Of the fire events missed by AVHRR (omissions), 86% are related to fires <10,000 ha (6 GAC pixels) and 44% are related to fires <3,000ha (2 GAC pixels). Total burned area compares well, with the AVHRR database under-representing burned area by 10% compared to the Landsat data analyzed. Correlation in burned scar area between the AVHRR and Landsat data is 0.98 for all fires and 0.68 for fires that are < 0.1 Mha.

Amber Soja↗

Preparing the JWST Observatory for Science Observations

The James Webb Space Telescope (JWST) is a large (6.5 m) near-and mid-infrared telescope scheduled for launch in 2021. JWST will be used to explore fundamental questions in astrophysics and planetary science, including the evolution of galaxies, the first light of stars, the formation of stars and planets as well as the characterization of exoplanets. To achieve these scientific goals, NASA and its international partners, the Canadian Space Agency (CSA) and the European Space Agency (ESA), have developed four science instruments for JWST and have prepared detailed commissioning plans for each. The NASA Project Science team has also outlined activities to characterize the performance of the Observatory as a whole. These activities include: 1) monitoring of the instrument and telescope cooldown for contamination mitigation; 2) measurements of straylight and other backgrounds for validation of the JWST stray light models as well as instrument background subtraction algorithms; 3) characterization of optical thermal distortion between its hot and cold telescope pointings within the observable field of regard and 4) trending of observatory performance parameters. Each of these activities has been planned in close collaboration with the observatory wavefront, commissioning planning, and science instrument teams. Here we present the plans for these activities, the expected results and how they will impact future guest observer (GO) proposals and JWST science community

Erin C Smith↗

GRACE Follow-On Early In-Flight Challenges

The Gravity Recovery and Climate Experiment (GRACE) Follow-On Mission is a successor to the highly successful GRACE Mission, which operated from 2002-2017. It is a partnership between the National Aeronautics and Space Administration (NASA) and the German Research Center for Geosciences, GeoForschungsZentrum Potsdam (GFZ). Under this partnership, the United States provides the project management, satellites and instruments, Germany provides the launch and mission operations. The partners share responsibilities for producing science data products. GRACE Follow-On, like its predecessor GRACE, consists of twin satellites which fly in a tandem formation at a near polar orbit separated by about 200 km along track. The mission continues the work of GRACE by tracking the movement of water, observing changes in ice sheets and sea level to provide a unique view of Earth’s changing climate. The satellites were launched May 22, 2018 from Vandenberg Air Force Base, in California, on a SpaceX Falcon 9 Rocket. Launch and Early Operations (LEOP) were completed within the first week and on-orbit commissioning proceeded for the next 8 months. The GRACE Follow-On mission is designed to last five years. The mission operations team has had to address several technical challenges early into the planned five-year mission life. The commissioning period was extended by 5 months to successfully address these issues, making it possible for the mission to meet key requirements for delivery and quality of the science data products. This paper will address the challenges faced by GRACE Follow-On and the actions taken by the mission operations team to continue to safely operate the mission.

Witkowski, M.M.↗

Progress on LISA Colloid Microthruster Technology Development

Colloid microthrusters have been operated successfully in flight, providing drag-free and precision control for spacecraft that can be used for future applications such as gravity wave and exoplanet observatories. The Space Technology 7 Disturbance Reduction System (ST7- DRS) technology demonstration payload included eight Busek Colloid Micro-Newton Thrusters (CMNTs) as part of the Laser Interferometer Space Antenna (LISA) Pathfinder mission that launched in December of 2015. The CMNTs provided full attitude and precision drag-free control of the spacecraft with <10 nm/√Hz stability along the most sensitive axis during commissioning, nominal, and extended mission phases through April of 2017. Performance requirements (≤0.1 μN/√Hz) were met and models were validated based on on- orbit measurements of test mass motion and actuation during the 60-day nominal and 30-day extended missions. In 2018, the European Space Agency (ESA) selected LISA to be the agency’s next “large-class” mission, currently in Phase A, with a launch scheduled for 2034 and a 12.5-year duration, including the transfer (1.5 years), commissioning (1 year), nominal (4 or 6 years), and extended (6 or 4 years) phases of the mission, which sets the lifetime and consumables requirement. NASA is considering a significant contribution of hardware to the ESA-led mission, potentially including colloid microthrusters. In preparation, NASA is developing five technologies to TRL 5 and 6, including the colloid microthrusters, to be ready for infusion into LISA by the mission adoption review (MAR), currently scheduled for 2024. While ST7-DRS effectively brought the CMNTs to TRL 7, additional lower-TRL flow control components must be developed for full redundancy, reducing the system-level TRL back to 4. Key to the future of the colloid microthruster technology will be to use lessons learned and keep as much of the heritage from the ST7 design as possible while updating the system to support redundancy and lifetime requirements of a flagship-class mission. This paper describes the technology plan and progress to reach TRL 6 by the MAR, focusing on near- term plans to reach TRL 5 by the end of March 2022 for the LISA Colloid Microthrusters (CMTs). Work includes requirements development and sizing studies, breadboard and brassboard hardware developments at Busek, including relevant lifetime and environment testing, and lifetime modeling, verification and validation efforts at JPL, UCLA, and UCI.

Gamero-Castaño, Manuel↗

The James Webb Space Telescope Mission Status

The James Webb Space Telescope (Webb) is a large, infrared space telescope that recently completed its on-orbit commissioning activities and will now embark on the first year of approved science. Its architecture includes many first-of-its-kind innovations for space, including a segmented primary mirror that is 6.6 m in diameter and a 5-layer sunshield used to passively cool the telescope and its four science instruments. Although Webb had an extensive test program, the system-level performance often relied on predictions based on integrated modeling, using conservative factors for the model uncertainties and primarily focusing on evaluating the performance requirements at end of life. A set of commissioning activities were designed for a system-level characterization of the performance. This proceeding will provide the status of the mission, including a discussion of the major events, on-orbit system performance, and early science highlights.

Michael McElwain↗

Launching and Deploying the James Webb Space Telescope

On December 25, 2021, at 12:20 UTC, the James Webb Space Telescope lifted off and onward to its destination in orbit at the second Lagrange point. With more than two decades in development, and an international collaboration between NASA, CSA, and ESA, Webb is one of the most anticipated science missions ever launched. After a dramatic and flawless launch, Webb's toughest and riskiest days lie ahead. Unprecedented in its complexity and ambition, over the next two weeks Webb would undergo the most complex on-orbit deployment sequence ever attempted, with any single deployment anomaly carrying the risk of full mission failure. An exquisite design, years of ground testing, a exhaustively trained and rehearsed operations and engineering team, and an unprecedented level of contingency planning, all resulted in a fully and successfully deployed Webb observatory, on its way to L2, and nominally cooling to its cryogenic temperatures. Although Webb still had many more months of commissioning left, there was a collective sigh of relief heard round the world. This incredible achievement was not by chance but was years in the making. We go behind the scenes of Webb's first month on orbit, starting with the unique and challenging launch itself, the time criticality of its mid-course corrections, and a summary of nearly 14 days to undergo nearly 50 major deployments. We discuss what went better than planned and how years of robust and detailed contingency planning were prepared for unanticipated events and on-orbit spacecraft behavior. And finally, we provide a brief overview of the entire commissioning process which successfully completed on July 10th, 2022.

Keith A Parrish↗

Reviewing Benefits and Costs of Hydropower Development Evidence From the Lower Mekong River Basin

In this paper, we examine the benefits and costs of hydropower development in the Mekong River Basin. We compare four major reports—the Mekong River Commission's (MRC's) Basin Development Plan Programme, Phase 2 (BDP2), the Strategic Environmental Assessment of Hydropower on the Mekong Mainstream (SEA), the Study on the Impacts of Mainstream Hydropower on the Mekong River (MDS), and the MRC's recent council study (CS)—in order to provide the basis for a comparative analysis of the major impact evaluation literature on mainstream dam construction in the Mekong River Basin for the period of 2010–2018. The primary objective of the review is to identify points of agreement, disagreement, inconsistency, and knowledge gaps. Both Mekong River Commission reports (BDP2 and CS) suggest extensive economic benefits for proposed hydropower development, whereas the SEA and MDS indicate that the net impact would be negative. The projected impacts of hydropower development on fisheries, sediment flows, and ecosystems vary widely both in economic and biophysical terms. However, all four reports point to decreased food security and loss of local livelihoods for millions of people as major concerns related to dam development. While considerable resources have been devoted to producing these important studies, the lack of standardization across reports, especially assumptions and methodologies for economic impacts, frustrates efforts at meaningful comparison of their findings and precludes the prospect of clear analytical outcomes or policy impacts.

Cumulative impact assessment↗

The Twin Decadal Survey Testbeds in the High Contrast Imaging Testbed facility at NASA’s Jet Propulsion Laboratory

Direct imaging of an Earth-like exoplanet will require future missions, such as the proposed HabEx or LUVOIR concepts, to achieve starlight suppression with planet/star contrast ratios on the order of 10−10 at angular separations <100 milliarcseconds in visible wavelengths. To facilitate the technology and algorithm development required to enable this ambitious scientific goal, NASA’s Exoplanet Exploration Program (ExEP) High Contrast Imaging Testbed (HCIT) facility at the Jet Propulsion Laboratory (JPL) recently commissioned the Decadal Survey Testbed (DST), a state-of-the-art, flexible, and extremely stable coronagraph testbed. This testbed integrates years of experience and lessons learned at HCIT and has now demonstrated contrast ratios as low as few times 10−10 in 10% bandwidth. Following the success of DST, the HCIT team has developed a companion testbed, the Decadal Survey Testbed 2 (DST2) that further implements lessons learned from DST, and will provide the HCIT with additional coronagraph testbed capacity and efficiency. Commissioning for DST2 is currently targeted for Fall 2021. Here we provide an update on the status of DST, and report on the design, performance modeling simulations, and status of integration and testing for DST2, highlighting updates to the design from the original DST.

Siegler, Nick↗

JWST NIRCam Defocused Imaging Photometric Stability Performance and How It Can Sense Mirror Tilts

We use JWST NIRCam short-wavelength photometry to capture a transit lightcurve of the exoplanet HAT-P-14 b to assess performance as part of instrument commissioning. The short-wavelength precision is 152 ppm per 27 s integration as measured over the full time series compared to a theoretical limit of 107 ppm, after corrections to spatially correlated 1/f noise. Persistence effects from charge trapping are well fit by an exponential function with short characteristic timescales, settling on the order of 5–15 minutes. The short-wavelength defocused photometry is also uniquely well suited to measure the real-time wave-front error of JWST. Analysis of the images and reconstructed wave-front maps indicates that two different hexagonal primary mirror segments exhibited “tilt events,” where they changed orientation rapidly in less than ∼1.4 s. In some cases, the magnitude and timing of the flux jumps caused by tilt events can be accurately predicted with a telescope model. These tilt events can be sensed by simultaneous longer-wavelength NIRCam grism spectral images alone in the form of changes to the point-spread function, diagnosed from the full width at half maximum. They can also be sensed with the fine guidance sensor instrument from difference images. Tilt events possibly from sudden releases of stress in the backplane structure behind the mirrors were expected during the commissioning period because they were found in ground-based testing. Tilt events have shown signs of decreasing in frequency but have not disappeared completely. The detectors exhibit some minor (less than 1%) deviations from linear behavior in the first few groups of each integration, potentially impacting absolute fluxes and transit depths on bright targets, where only a handful of groups are possible. Overall, the noise is within 50% of the theoretical photon noise and read noise. This bodes well for high-precision measurements of transiting exoplanets and other time variable targets.

Everett Schlawin↗

In-Orbit Selection of Cryocooler Drive Frequencies for XRISM/Resolve

The XRISM/Resolve instrument cooling system uses adiabatic demagnetization refrigerators (ADRs) to cool the detectors to 50 mK and two types of cryocoolers to reduce heat load on the He tank, Joule-Thomson and Stirling cryocoolers. Resolve was designed with tunable cryocooler frequencies so that any mechanical interference and its effect on performance could be minimized. Measurements at different cryocooler drive frequencies were used to quantify the interference and narrow the acceptable range of frequency options. For Resolve the choice of cryocooler drive frequencies dramatically influences the instrument performance. Poor choices have been shown to degrade ADR cooling power and degrade the spectroscopic performance of the instrument. However, good choices have been shown to be free of undesirable features, allowing the instrument to satisfy its performance requirements with significant margin. Thus, the choice of drive frequencies is a critical factor for overall instrument performance. The drive frequencies of the Joule-Thomson cooler operating near 52 Hz, and the Stirling coolers operating near 15 Hz were adjusted in three distinct scan sequences to efficiently narrow the candidate frequency options. The frequency choices were based on stability of the 50 mK control thermometer, changes in the ADR demagnetization rate, and changes in detector noise. Scans across the drive frequency range of each cryocooler were performed multiple times during ground testing. Surprisingly, the results were not repeatable across test campaigns and did not conform to any discernable trend, but they were repeatable when remeasured within a single cool-down cycle. The conclusion was that the good/bad drive frequencies changed during Dewar warmup/cooldown, and possibly after mechanical vibration tests. Therefore, the settings could not be finalized before launch, and scans during instrument commissioning were necessary. This paper describes the cryocooler frequency scan measurements and compares the results during instrument commissioning to those performed during ground tests.

Gary A. Sneiderman↗

Vacuum Pump-Down of the Annular Insulation Space for Large Field-Erected Liquid Hydrogen Storage Tanks

Insulation systems are critical to liquid hydrogen storage tank performance. Tanks in the capacity range of 100 to 1,000 m 3 are typically shop built and designed with high-vacuum (HV) multi-layer insulation (MLI), whereas storage vessels larger than 1,000 m 3 are typically field-erected and supplied with bulk fill insulation working at moderate vacuum (MV) levels (1-100 millitorr). For large, field-erected vessels, two types of bulk fill insulation typically used: perlite and hollow glass microspheres (glass bubbles). Selection of either material is driven by a tradeoff between CAPEX and OPEX, such as the material and construction cost versus operating thermal performance and maintenance. In either case, the vacuum level needed to achieve optimum performance is likely to drive the field testing and commissioning portion of the construction schedule. A primary goal of this paper is to present practical experience and data for warm vacuum pressure (WVP) and cold vacuum pressure (CVP) levels. Recommended WVP levels needed prior to cooldown consider both perlite powder and glass bubbles. Pumping time expected to achieve target vacuum levels, considering a variety of factors, is also discussed. Recommendations for a standard practice in vacuum-insulated tank commissioning are based on historical NASA data, and those collected during recent projects.

A M Swanger↗

The Plankton, Aerosol, Cloud, Ocean Ecosystem (Pace) Mission Overview: From Concept to Launch

Abstract for Technical Review: The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Launched in February 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s, building on the exceptional heritages of the Sea-Viewing Wide Field-of-View Sensor (SeaWiFS), the Moderate Resolution Imaging Spectroradiometer (MODIS), the Multi-angle Imaging SpectroRadiometer (MISR), and the Visible Infrared Imaging Radiometer Suite (VIIRS). NASA Headquarters directed the mission development and implementation to the NASA Goddard Space Flight Center (GSFC) with guidance to utilize a Design-to-Cost (DTC) process. Mission studies were conducted to define appropriate approaches within and across elements while maximizing science capabilities at a high cost confidence. Mission baseline requirements development is also embedded within the DTC process, as these requirements were not established at the onset of the mission concept development. The PACE project office at NASA’s GSFC was responsible for the satellite development, launch and commissioning. The NASA Headquarters PACE Program Science office is responsible for supporting the science data processing system and assembling competed community science teams, which includes field-based vicarious calibration and data product validation efforts to support the PACE Project Science team. The PACE observatory is comprised of three instruments, the Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone) and the PACE spacecraft. The observatory has been commissioned and is performing on-orbit science data collection operations. Summary for Program: The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Launched in February 2024 under the leadership of the NASA Goddard Space Flight Center (GSFC), the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s. The PACE observatory is comprised of the Ocean Color Instrument (OCI), the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone), along with the PACE spacecraft.

Robert H Estep, Jr↗

In-Orbit Selection of Cryocooler Drive Frequencies for XRISM/Resolve

The XRISM/Resolve instrument cooling system uses adiabatic demagnetization refrigerators (ADRs) to cool the detectors to 50 mK and two types of cryocoolers to reduce heat load on the He tank, Joule-Thomson and Stirling cryocoolers. Resolve was designed with tunable cryocooler frequencies so that any mechanical interference and its effect on performance could be minimized. Measurements at different cryocooler drive frequencies were used to quantify the interference and narrow the acceptable range of frequency options. For Resolve the choice of cryocooler drive frequencies dramatically influences the instrument performance. Poor choices have been shown to degrade ADR cooling power and degrade the spectroscopic performance of the instrument. However, good choices have been shown to be free of undesirable features, allowing the instrument to satisfy its performance requirements with significant margin. Thus, the choice of drive frequencies is a critical factor for overall instrument performance. The drive frequencies of the Joule-Thomson cooler operating near 52 Hz, and the Stirling coolers operating near 15 Hz were adjusted in three distinct scan sequences to efficiently narrow the candidate frequency options. The frequency choices were based on stability of the 50 mK control thermometer, changes in the ADR demagnetization rate, and changes in detector noise. Scans across the drive frequency range of each cryocooler were performed multiple times during ground testing. Surprisingly, the results were not repeatable across test campaigns and did not conform to any discernable trend, but they were repeatable when remeasured within a single cool-down cycle. The conclusion was that the good/bad drive frequencies changed during Dewar warmup/cooldown, and possibly after mechanical vibration tests. Therefore, the settings could not be finalized before launch, and scans during instrument commissioning were necessary. This paper describes the cryocooler frequency scan measurements and compares the results during instrument commissioning to those performed during ground tests.

XRISM↗

Insights and Observations from Operating a Geostationary Laser Communication Relay Mission: Operational Lessons from NASA’s Laser Communications Relay Demonstration (LCRD) and Associated Optical Ground Stations (OGSs)

The NASA Laser Communications Relay Demonstration (LCRD) has operated on orbit for the last two years. The LCRD Mission consists of a geostationary payload and two optical ground stations. This technology demonstration mission is NASA’s first two-way, end-to-end optical communications relay. LCRD has performed an extensive experiment campaign to analyze laser communication performance for extended operations. This paper discusses various lessons learned while operating the optical relay mission from early commissioning through two years of operation. Before launch, engineers and operators performed analyses to generate operational procedures based on expected LCRD performance. However, only operation on orbit can supply actual performance data. Additional topics covered in this paper include pre-launch and commissioning testing, ephemeris generation and cadence, environmental configurations, and accommodation concerns. The addition of Integrated Laser Communications Relay Demonstration Low Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) to the optical network supplemented the LCRD team’s operational experiences and enabled them to garner new lessons learned. The authors of this paper include day-to-day flight leads who consulted with on-console operators, engineers, and subject matter experts analyzing data and experiment results to gather the lessons learned described in this paper. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

Lessons Learned↗

Mission Overview and Status from Concept to Launch

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Launched in February 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s, building on the exceptional heritages of the Sea-Viewing Wide Field-of-View Sensor (SeaWiFS), the Moderate Resolution Imaging Spectroradiometer (MODIS), the Multi-angle Imaging SpectroRadiometer (MISR), and the Visible Infrared Imaging Radiometer Suite (VIIRS). NASA Headquarters directed the mission development and implementation to the NASA Goddard Space Flight Center (GSFC) with guidance to utilize a Design-to-Cost (DTC) process. Mission studies were conducted to define appropriate approaches within and across elements while maximizing science capabilities at a high cost confidence. Mission baseline requirements development is also embedded within the DTC process, as these requirements were not established at the onset of the mission concept development. The PACE project office at NASA’s GSFC was responsible for the satellite development, launch and commissioning. The NASA Headquarters PACE Program Science office is responsible for supporting the science data processing system and assembling competed community science teams, which includes field-based vicarious calibration and data product validation efforts to support the PACE Project Science team. The PACE observatory is comprised of three instruments, the Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone) and the PACE spacecraft. The observatory has been commissioned and is performing on-orbit science data collection operations. Summary for Program: The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Launched in February 2024 under the leadership of the NASA Goddard Space Flight Center (GSFC), the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s. The PACE observatory is comprised of the Ocean Color Instrument (OCI), the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone), along with the PACE spacecraft.

Robby Estep↗

Update on Planetary, Lunar, & Asteroid Natural Environment Testbed (PLANET)

At ISMSE15, the Planetary, Lunar, & Asteroid Natural Environment Testbed (PLANET) was introduced as an upcoming high-fidelity, combined-effects planetary surface environment laboratory. This year, we will present an update on the facility status, describing the procurement, installation, commissioning of the chamber in Huntsville, Alabama (USA). With NASA’s push to return to the Moon through the Artemis program, there is a clear need for more high-fidelity test chambers that can replicate multiple aspects of the lunar surface, especially the fine, dusty lunar soil known as regolith. The PLANET chamber is designed to fill this gap, enabling research & development, qualification, and verification testing in a combined lunar surface environment, at an affordable price, for government, commercial/industry, and academic partners. Features include a large regolith simulant bed, low energy electron and ion sources to replicate the solar wind, full-spectrum UV and Solar simulation, and a liquid nitrogen cryogenic shroud, all in a high-vacuum environment (as low as 10^-7 mbar). PLANET’s initial focus will be on the lunar environment, but other surface environments (Martian, asteroid, etc.) are also possible to simulate. Besides the environmental instrumentation, PLANET will be equipped with specialized test systems that the Space Environmental Effects Team has developed over the past two years, including an in-situ tribometer and uniform dust distribution system. The chamber is currently being manufactured, with plans to install in May 2024. This will be followed by outfitting and commissioning. The challenges and accomplishments seen during this process will be detailed, and data from the first tests performed in PLANET will be shared with the community.

environmental testing↗

Preliminary Node Separation Orbit Determination Analysis for the HelioSwarm Observatory

The HelioSwarm Observatory is a nine-spacecraft swarm design, consisting of one Hub and eight Node spacecraft co-orbiting the Earth in a ~13.7-day orbit. Each Node separates from the Hub during the Node Commissioning Phase, and the Nodes’ sole source of tracking is inter-satellite relative ranging with the Hub. This study characterizes how soon the relative ranging should occur post-separation to maintain a reasonable knowledge of the Nodes’ position relative to the hub and quantifies how often, and at what measurement cadence, relative ranging needs to occur during the early days of commissioning.

orbit determination↗