Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CERTIFICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Basic Data Report for Piezometers PZ-13, PZ-14, and PZ-15, and Shallow Subsurface Water (Rev. 3)

The Site and Preliminary Design Validation (SPDV) pile is located in the southwest corner of Section 21, Township 22 South, Range 31 East in Eddy County, New Mexico, adjacent to the Waste Isolation Pilot Plant (WIPP) operational area. During August 2007, piezometers (PZ)-13, PZ-14, and PZ-15 were drilled around the SPDV pile to determine if shallow subsurface water (SSW) existed around the SPDV pile and, if so, provide a means to monitor. These piezometers were drilled with a combination of hollow-stem auger and air-assisted hollow-stem auger drilling. Below the surficial dunes and Berino soil, piezometers PZ-13 and PZ-14 encountered in order, from shallowest to deepest, the Mescalero caliche, Gatuña Formation, Santa Rosa Formation, and Dewey Lake Formation. Piezometer PZ-15 was completed in the Gatuña Formation, having not encountered the lower formations by the time SSW was detected. Water was encountered in all wells. Piezometers were constructed of 2-inch polyvinyl chloride casing and 15 feet of 0.020-inch slot screen. Water samples were obtained and analyzed for each well. Based on the results of the installation of the piezometers, analysis of water levels, and geological analysis, it is concluded that the water levels identified in PZ-13 and PZ-14 are the result of the SPDV pile runoff or infiltration prior to being lined. Water in PZ-15 is much shallower and chemically different that water in the other two wells, indicating another source, such as recharge and infiltration from the east of the SPDV pile.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description for WIPP Wells 25 and H-4b

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) for fiscal year 2009. The addendum adds work scope to the previously developed program plan (DOE/WIPP-08-3376, Fiscal Year 2008 Well Plugging and Abandonment and Reconfiguration Program). Over the years, a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico licensed drilling contractor. The term "Contractor" refers to the driller, who will be supervised by the Site Technical Representative (STR) or designee. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Green Power Marketing in the United States: A Status Report (2009 Data)

This report documents green power marketing activities and trends in the United States. First, aggregate green power sales data for all voluntary purchase markets across the United States are presented. Next, we summarize data on utility green pricing programs offered in regulated electricity markets; green power marketing activity in competitive electricity markets, as well as green power soldto voluntary purchasers in the form of RECs; and renewable energy sold as greenhouse gas offsets in the United States. Finally, this is followed by a discussion of key market trends and issues. The data presented in this report are based primarily on figures provided to NREL by utilities and independent renewable energy marketers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

U.S. Voluntary Green Power Market Data 2017

This data book provides certain data behind figures and tables found in the NREL report Status and Trends in the U.S. Voluntary Green Power Market 2017 Data. These data reflect estimates based on the best available data.

14 SOLAR ENERGY↗

U.S. Voluntary Green Power Market Data 2019

This data book provides certain data behind figures and tables found in the NREL presentation, Status and Trends in the U.S. Voluntary Green Power Market (2019 Data). These data reflect estimates based on the best available data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Key Management Challenges in Smart Grid

Agenda Awarded in February 2011 Team of industry and research organizations Project Objectives Address difficult issues Complexity Diversity of systems Scale Longevity of solution Participate in standards efforts and working groups Develop innovative key management solutions Modeling and simulation ORNL Cyber Security Econometric Enterprise System Demonstrate effectiveness of solution Demonstrate scalability

99 GENERAL AND MISCELLANEOUS↗

INL@Work Firefighter

Did you know INL has its own firefighting team? Its members help protect our remote 890-square-mile site from range fires and other incidents. Meet firefighter Wendy Baron, who was recently named Idaho's firefighter of the year.

99 GENERAL AND MISCELLANEOUS↗

Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

and Guidance↗

EVALUATION OF THREE ULTRASONIC INSTRUMENTS FOR CRITICAL VELOCITY DETERMINATION DURING HANFORD TANK WASTE TRANSFER OPERATIONS - 11121

Three ultrasonic instruments were evaluated by the Pacific Northwest National Laboratory (PNNL) to determine their ability to detect critical velocities for solids settling during slurry transfer operation between the Hanford Tank farms and the Waste Treatment and Immobilization Plant (WTP). The evaluation was conducted in a flow loop using prototypic transfer piping and a suite of simulants that encompass a broad range of waste physical and rheological properties that are likely encountered during Hanford tank waste transfer operations. The results from the evaluation are presented in this paper.

Ultrasonics, Waste Certification, Hanford Tank Was↗

NASA's Marshall Space Flight Center Improves Cooling System Performance

National Aeronautics and Space Administration’s (NASA) Marshall Space Flight Center (MSFC) has a longstanding sustainability program that revolves around energy and water efficiency as well as environmental protection. MSFC identified a problematic cooling loop with six separate compressor heat exchangers and a history of poor efficiency. The facility engineering team at MSFC partnered with Flozone Services, Incorporated to implement a comprehensive water treatment platform to improve the overall efficiency of the system.

comprehensive water treatment platform↗

Characterization and Delivery of Hanford High-Level Radioactive Waste Slurry

Two primary challenges to characterizing Hanford’s high-level radioactive waste slurry prior to transfer to a treatment facility are the ability to representatively sample million-gallon tanks and to estimate the critical velocity of the complex slurry. Washington River Protection Solutions has successfully demonstrated a sampling concept that minimizes sample errors by collecting multiple sample increments from a sample loop where the mixed tank contents are recirculated. Pacific Northwest National Laboratory has developed and demonstrated an ultrasonic-based Pulse-Echo detection device that is capable of detecting a stationary settled bed of solids in a pipe with flowing slurry. These two concepts are essential elements of a feed delivery strategy that drives the Hanford clean-up mission.

critical velocity↗

Defining Bankability for Each Step of a PV Project Using IECRE

How can a PV customer know whether a PV plant is 'good'? IECRE was created to provide a cost-effective way to identify 'good' PV plants. This presentation describes the motivation, strategy, and status of the IECRE effort as of July, 2016.

14 SOLAR ENERGY↗

Advanced Demonstration and Test Reactor Options Study

Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power’s share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercialization of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy’s (DOE’s) broader commitment to pursuing an “all of the above” clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate “advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy”. Advanced reactors are defined in this study as reactors that use coolants other than water. Advanced reactor technologies have the potential to expand the energy applications, enhance the competitiveness, and improve the sustainability of nuclear energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2020 Component Innovation Awardee: Carter Wind Turbines

With support from the Competitiveness Improvement Project's Component Innovation Award, Carter Wind Energy aims to address the need for lower-cost, more-reliable distributed wind energy generation. The company plans to increase efficiency and improve the energy capture of its Carter Model 300 midsize, self-erecting wind turbine. This fact sheet provides an overview of Carter Wind Energy's project, how the company will achieve the goals of the award, and how the project fits within the overall Competitiveness Improvement Project.

CIP↗

2020 System Optimization Awardee: Pecos Wind Power

With support from the Competitiveness Improvement Project's System Optimization Award, Pecos Wind Power will help lower the cost of distributed wind technology and expand deployment. To do so, the company will optimize their PW85 distributed wind turbine to achieve a production levelized cost of energy of $0.099 per kilowatt hour, which is a 48% cost reduction in distributed wind energy costs. This reduction is a critical step toward Pecos Wind Power's ultimate target of $0.089 per kilowatt-hour. This fact sheet provides an overview of Pecos Wind Power's project, how the company will achieve the goals of the award, and how the project fits within the overall Competitiveness Improvement Project.

CIP↗

2020 System Optimization Awardee: Carter Wind Turbines

With support from the Competitiveness Improvement Project's System Optimization Award, Carter Wind Energy aims to lower the cost of distributed wind technology and expand deployment. To do so, the company will improve the cost-effectiveness and reliability of midsize wind turbines for remote, off-grid power applications, creating new wind energy deployment opportunities worldwide. This fact sheet provides an overview of Carter Wind Energy's project, how the company will achieve the goals of the award, and how the project fits within the overall Competitiveness Improvement Project.

CIP↗