Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Analysis facilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Imaging and Analysis of Insoluble Electrorefiner Material

Throughout pyroprocessing efforts at the Hot Fuel Examination Facility (HFEF), insoluble material has accumulated in the Electrorefiner (ER) vessel. The objective of this effort was to analyze the accumulated material to determine its origin. Material was removed from the ER salt bath and distilled to remove excess salt prior to performing analysis. Three samples were sent for chemical and isotopic analysis and underwent an ethyl acetate-bromine dissolution to segregate the oxide fraction from the metal fraction. Actinide concentrations were determined using a quadrupole–inductively coupled plasma–mass spectrometer (Q-ICP-MS). Three additional samples were sent for morphologic and elemental analysis by scanning electron microscopy (SEM) with Energy Dispersive X-ray (EDX) analysis at the Irradiated Materials Characterization Laboratory (IMCL). Analyses suggest that the material is primarily composed of UO2. with a small fraction of metal. This study draws no single conclusion as to the origin of the insoluble material in the ER. The particle sizes and morphologies observed in SEM micrographs indicate that the larger particles observed may be a result of introducing material to the ER that has not been completely reduced in Oxide Reduction (OR) operations, which precede electrorefining. Smaller particles may be due to reactions with oxygen and moisture present in HFEF. This research suggests that microscopic analysis of fuel particles before and after OR operations (including after distillation) as well as the uranium product collected on the cathode in the ER would increase understanding about particle morphology within the pyrochemical process.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Three-dimensional Navier-Stokes analysis and redesign of an imbedded bellmouth nozzle in a turbine cascade inlet section

Experimental measurements in the inlet of a transonic turbine blade cascade showed unacceptable pitchwise flow non-uniformity. A three-dimensional, Navier-Stokes computational fluid dynamics (CFD) analysis of the imbedded bellmouth inlet in the facility was performed to identify and eliminate the source of the flow non-uniformity. The blockage and acceleration effects of the blades were accounted for by specifying a periodic static pressure exit condition interpolated from a separate three-dimensional Navier-Stokes CFD solution of flow around a single blade in an infinite cascade. Calculations of the original inlet geometry showed total pressure loss regions consistent in strength and location to experimental measurements. The results indicate that the distortions were caused by a pair of streamwise vortices that originated as a result of the interaction of the flow with the imbedded bellmouth. Computations were performed for an inlet geometry which eliminated the imbedded bellmouth by bridging the region between it and the upstream wall. This analysis indicated that eliminating the imbedded bellmouth nozzle also eliminates the pair of vortices, resulting in a flow with much greater pitchwise uniformity. Measurements taken with an installed redesigned inlet verify that the flow non-uniformity has indeed been eliminated.

VanFossen, G. J.↗

Mitigation of Electromagnetic Pulse (EMP) Effects from Short-Pulse Lasers and Fusion Neutrons

Our research focused on obtaining a fundamental understanding of the source and properties of EMP at the Titan PW(petawatt)-class laser facility. The project was motivated by data loss and damage to components due to EMP, which can limit diagnostic techniques that can be used reliably at short-pulse PW-class laser facilities. Our measurements of the electromagnetic fields, using a variety of probes, provide information on the strength, time duration, and frequency dependence of the EMP. We measure electric field strengths in the 100's of kV/m range, durations up to 100 ns, and very broad frequency response extending out to 5 GHz and possibly beyond. This information is being used to design shielding to mitigate the effects of EMP on components at various laser facilities. We showed the need for well-shielded cables and oscilloscopes to obtain high quality data. Significant work was invested in data analysis techniques to process this data. This work is now being transferred to data analysis procedures for the EMP diagnostics being fielded on the National Ignition Facility (NIF). In addition to electromagnetic field measurements, we measured the spatial and energy distribution of electrons escaping from targets. This information is used as input into the 3D electromagnetic code, EMSolve, which calculates time dependent electromagnetic fields. The simulation results compare reasonably well with data for both the strength and broad frequency bandwidth of the EMP. This modeling work required significant improvements in EMSolve to model the fields in the Titan chamber generated by electrons escaping the target. During dedicated Titan shots, we studied the effects of varying laser energy, target size, and pulse duration on EMP properties. We also studied the effect of surrounding the target with a thick conducting sphere and cube as a potential mitigation approach. System generated EMP (SGEMP) in coaxial cables does not appear to be a significant at Titan. Our results are directly relevant to planned short-pulse ARC (advanced radiographic capability) operation on NIF.

36 MATERIALS SCIENCE↗

Simulation of experimental investigations of X-ray spectral path lengths on Iskra-5 laser facility

We describe an improved Slater average-ion model employed in the numerical-theoretical analysis of experimental data, which were obtained in the investigation of X-ray spectral path lengths performed on the Iskra-5 laser facility at the All-Russian Scientific Research Institute of Experimental Physics (VNIIEF). The proposed model permits determining the spectral characteristics of the X-ray radiation with an accuracy of a few electronvolts. We outline the results of simulations of experiments with X-ray radiation-heated aluminium and germanium specimens of initial thickness of {approx}0.1 mm, in which absorption lines arising from 1s-2p transitions in Al and the absorption band arising from 2p-3d transitions in Ge were recorded.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Development of an Improved RELAP5-3D Model for the High Temperature Test Facility

High-temperature gas-cooled reactors (HTGRs) are rapidly approaching deployment. Confidence in transient analysis of these systems requires modeling and simulation tools that have been validated against data relevant to HTGR conditions. The High Temperature Test Facility (HTTF) is an integral effects thermal hydraulics test facility for prismatic HTGRs. In spring and summer of 2019, HTTF was used for a series of experiments that now serve as the basis for the Organization of Economic Cooperation and Development / Nuclear Energy Agency Thermal Hydraulic Code Validation Benchmark for High Temperature Gas-Cooled Reactors using HTTF Data (HTGR T/H Benchmark). Previous analyses as part of the HTGR T/H benchmark used a RELAP5-3D model developed at Idaho National Laboratory (INL) and demonstrated an ability to reproduce trends in the measured data but difficulties reproducing experimental values within their uncertainty. These difficulties were largely attributed to assumptions made during the development of the initial RELAP5-3D model, which predated the HTTF experiments. A significant cause of difficulty reproducing the measured temperatures may be the radial nodalization of the previous RELAP5-3D model. In this paper, we present a new RELAP5-3D model of HTTF with finer radial nodalization built to assess the impact of radial heat transfer. We describe the new model and compare it against the old one at full-power steady state and for the pressurized conduction cooldown (PCC) transient. These analyses are based on the code-to-code comparison exercise for the PCC problem of the HTGR T/H benchmark. We compare maximum block temperature as the primary figure of merit and include discussion on intracore natural circulation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Sludge Batch 10 Samples from Tank 51H (HTF-51-18-94, -95)

Savannah River National Laboratory characterized sludge samples from Tank 51H that is being used to generate Sludge Batch 10. The composite slurry sample from Tank 51H was analyzed and determined to contain a concentrated salt solution with a sodium concentration of 5.79 M (1.33E+05 mg/L) and insoluble sludge solids content of 7.20 wt% (using all nine replicates from the 3 wt% total solids measurements). Hydroxide is the main anionic species in the salt solution with a concentration of 3.00 M followed by nitrate (0.728 M) and nitrite (0.657 M). The sum of the major cations versus the sum of the major anions from the analysis of the filtered supernatant liquid phase shows a difference of <5% indicating good data quality. The results from the analysis of the digestions of the well mixed composite slurry sample show sodium to be the main component of the total dried solids of the sample followed by aluminum, iron, manganese, and thorium. Additional measurements of the weight percent total solids and density using hand shaking of the sample bottle and recirculation through a peristaltic pump indicate both methods provide adequate mixing of the sludge slurry sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TREAT Neutronics Analysis of Water-Loop Concept Accommodating LWR 9-rod Bundle

Abstract. Simulation of a variety of transient conditions has been successfully achieved in the Transient Reactor Test (TREAT) facility during operation between 1959 and 1994 to support characterization and safety analysis of nuclear fuels and materials. A majority of previously conducted tests were focused on supporting sodium-cooled fast reactor (SFR) designs. Experiments evolved in complexity. Simulation of thermal-hydraulic conditions expected to be encountered by fuels and materials in a reactor environment was realized in the development of TREAT sodium loop experiment vehicles. These loops accommodated up to 7-pin fuel bundles and served to simulate more closely the reactor environment while safely delivering large quantities of energy into the test specimen. Some of the immediate TREAT restart operations will be focused on testing light water reactor (LWR) accident tolerant fuels (ATF). Similar to the sodium loop objectives, a water loop concept, developed and analyzed in the 1990’s, aimed at achieving thermal-hydraulic conditions encountered in commercial power reactors. The historic water loop concept has been analyzed in the context of a reactivity insertion accident (RIA) simulation for high burnup LWR 2-pin and 3-pin fuel bundles. Findings showed sufficient energy could be deposited into the specimens for evaluation. Similar results of experimental feasibility for the water loop concept (past and present) have recently been obtained using MCNP6.1 with ENDF/B-VII.1 nuclear data libraries. The old water loop concept required only two central TREAT core grid spaces. Preparation for future experiments has resulted in a modified water loop conceptual design designated the TREAT water environment recirculating loop (TWERL). The current TWERL design requires nine TREAT core grid spaces in order to place the water recirculating pump under the TREAT core. Due to the effectiveness of water moderation, neutronics analysis shows that removal of seven additional TREAT fuel elements to facilitate the experiment will not inhibit the ability to successfully simulate a RIA for the 2-pin or 3-pin bundle. This new water loop design leaves room for accommodating a larger fuel pin bundle than previously analyzed. The 7-pin fuel bundle in a hexagonal array with similar spacing of fuel pins in a SFR fuel assembly was considered the minimum needed for one central fuel pin to encounter the most correct thermal conditions. The 9-rod fuel bundle in a square array similar in spacing to pins in a LWR fuel assembly would be considered the LWR equivalent. MCNP analysis conducted on a preliminary LWR 9-rod bundle design shows that sufficient energy deposition into the central pin can be achieved well within range to investigate fuel and cladding performance in a simulated RIA. This is achieved by surrounding the flow channel with an additional annulus of water. Findings also show that a highly significant increase in TREAT to specimen power coupling factor (PCF) within the central pin can be achieved by surrounding the experiment with one to two rings of TREAT upgrade fuel assemblies. The experiment design holds promise for the performance evaluation of PWR fuel at extremely high burnup under similar reactor environment conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Shuttle ground turnaround and launch projections

An analysis of factors in the Turnaround Improvement Program intended is presented as a basis for launch rate projections. Noting that a second Shuttle processing facility is in preparation at Kennedy Space Center, details of the initial reprocessing phase, the refurbishing of the SRBs, which are jettisoned about 2 min after lift-off, are described. Until STS-7, Orbiter turnaround begins by configuring the vehicle for flight to KSC on board a 747. The Orbiter Processing Facility at KSC features two identical bays for unloading, inspection, repair, analysis, testing, and preparing for the succeeding flight. The SRBs are repositioned first, then the external tank, and then the Orbiter is fitted back in place. Parallel processing of two Orbiters will begin with STS-5 turnaround, and optimized times are expected to be achieved with the STS-30 flight, with significant test reduction coming with STS-14.

Smith, R. G.↗

Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.

17 WIND ENERGY↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

Data processing system and interfacing elements time base analysis

The processing of time in the Orbiter System Services software and the associated facilities provided to the user community are described. The descriptions are directed toward showing the functional intent of the design rather than the actual implementation. Simplified flow diagrams are included. Based upon detailed analysis of a preliminary review copy of the Approach and Landing Test (ALT) System Software Detailed Design Specification and the Program Listings for Version 17 Prime, the processing of time has the potential for error free operations. The processing of time is not expected to change between ALT and the Operational Flight Test (OFT) other than differences in value of some constants for control and limit checking. Due to the dynamic nature of onboard time processing and its criticality to the successful operation of the orbiter, it is recommended that a comprehensive list of external variables, their locations, initial values, and a 'where used' listing be produced, as a by-product of the link edit process, for all non-HAL coding. In addition, a careful review of the verification test procedures for the System Services time-related software is recommended.

Blackburn, J. D.↗

UltraSciencenet: High- Performance Network Research Test-Bed

The high-performance networking requirements for next generation large-scale applications belong to two broad classes: (a) high bandwidths, typically multiples of 10Gbps, to support bulk data transfers, and (b) stable bandwidths, typically at much lower bandwidths, to support computational steering, remote visualization, and remote control of instrumentation. Current Internet technologies, however, are severely limited in meeting these demands because such bulk bandwidths are available only in the backbone, and stable control channels are hard to realize over shared connections. The UltraScience Net (USN) facilitates the development of such technologies by providing dynamic, cross-country dedicated 10Gbps channels for large data transfers, and 150 Mbps channels for interactive and control operations. Contributions of the USN project are two-fold: (a) Infrastructure Technologies for Network Experimental Facility: USN developed and/or demonstrated a number of infrastructure technologies needed for a national-scale network experimental facility. Compared to Internet, USN's data-plane is different in that it can be partitioned into isolated layer-1 or layer-2 connections, and its control-plane is different in the ability of users and applications to setup and tear down channels as needed. Its design required several new components including a Virtual Private Network infrastructure, a bandwidth and channel scheduler, and a dynamic signaling daemon. The control-plane employs a centralized scheduler to compute the channel allocations and a signaling daemon to generate configuration signals to switches. In a nutshell, USN demonstrated the ability to build and operate a stable national-scale switched network. (b) Structured Network Research Experiments: A number of network research experiments have been conducted on USN that cannot be easily supported over existing network facilities, including test-beds and production networks. It settled an open matter by demonstrating that the performance of switched connections and Multiple Protocol Label Switching tunnels over routed networks are comparable. Furthermore, such connections can be easily peered, and the performance of the resultant hybrid connections is still comparable to the constituent pure connections. USN experiments demonstrated that Infiniband transport can be effectively extended to wide-area connections of thousands of miles, which opens up new opportunities for efficient bulk data transport. USN provided dedicated connections to Cray X1 supercomputer and helped diagnose TCP performance problems which might have been otherwise incorrectly attributed to traffic on shared connections. USN contributed to the development of transport methods for dedicated connections to other traffic. Recently, experiments were conducted to assess the performance of application acceleration devices that employ flow optimization and data compression methods to improve TCP performance.

99 GENERAL AND MISCELLANEOUS↗

Effective Long-term Monitoring Strategies by Integrating Reactive Transport Models with In situ Geochemical Measurements - 16212

Long-term monitoring of contaminant transport in groundwater is expected to account for a large fraction of future life-cycle cleanup costs at the DOE sites. The Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI) is developing an innovative approach for cost-effective in situ long-term monitoring. The approach is based on strategically adding the measurements of controlling variables (such as pH, redox potential, electrical conductivity, and groundwater level), which control the plume mobility and its spatial and temporal distribution. In situ measurements of these variables - supplemented with a reduced number of standard periodic groundwater samples - are expected to lead to more cost-effective monitoring, and can also serve as an early warning system for detecting unexpected plume migration. The objective of this study is to support the development of such a long-term monitoring approach through the application of advanced computational methods, including (1) statistical data mining and analysis, and (2) three-dimensional flow and reactive chemical transport modeling. We have performed the statistical data analysis of historical and current monitoring data at the Savannah River Site (SRS) F-Area to quantify the correlations between the controlling variables and radioactive contaminant concentrations. In parallel, we have used 3D modeling of flow and contaminant transport to provide the prediction of the contaminant plume evolution. The results of both data analysis and modeling confirmed that the correlations between controlling variables and contaminant concentrations are significant. Modeling results also suggest that the correlation parameters will change in the future, which is important to assess the long-term efficacy of the proposed monitoring approach. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2022 Los Alamos National Laboratory Test and Analysis Abstracts

The abstracts included in this document are: Responsiveness, Modernization, and Radiography Test at the Centrifuge Test Facility; LANL Hostile Blast Testing Capability Development; Digital Image Correlation Measurement of B61 Center Case Fragmentation Test; and Collaborative Analysis Testing Techniques (CATT) Phase 1.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Porflow modeling for a preliminary assessment of the performance of new saltstone disposal unit designs

At the request of Savannah River Remediation (SRR), SRNL has analyzed the expected performance obtained from using seven 32 million gallon Saltstone Disposal Units (SDUs) in the Z-Area Saltstone Disposal Facility (SDF) to store future saltstone grout. The analysis was based on preliminary SDU final design specifications. The analysis used PORFLOW modeling to calculate the release of 20 radionuclides from an SDU and transport of the radionuclides and daughters through the vadose zone. Results from this vadose zone analysis were combined with previously calculated releases from existing saltstone vaults and FDCs and a second PORFLOW model run to calculate aquifer transport to assessment points located along a boundary 100 m from the nearest edge of the SDF sources. Peak concentrations within 12 sectors spaced along the 100 m boundary were determined over a period of evaluation extending 20,000 years after SDF closure cap placement. These peak concentrations were provided to SRR to use as input for dose calculations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SECONDARY WASTE/ETF (EFFLUENT TREATMENT FACILITY) PRELIMINARY PRE-CONCEPTUAL ENGINEERING STUDY

This pre-conceptual engineering study is intended to assist in supporting the critical decision (CD) 0 milestone by providing a basis for the justification of mission need (JMN) for the handling and disposal of liquid effluents. The ETF baseline strategy, to accommodate (WTP) requirements, calls for a solidification treatment unit (STU) to be added to the ETF to provide the needed additional processing capability. This STU is to process the ETF evaporator concentrate into a cement-based waste form. The cementitious waste will be cast into blocks for curing, storage, and disposal. Tis pre-conceptual engineering study explores this baseline strategy, in addition to other potential alternatives, for meeting the ETF future mission needs. Within each reviewed case study, a technical and facility description is outlined, along with a preliminary cost analysis and the associated risks and benefits.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost and Throughput Analysis for the NASA Ames Arc Jet Modernization Program

NASA Ames Center is currently evaluating alternatives to modernize the Arc Jet Complex, a critical part of testing for NASA’s planetary missions. NASA’s Arc Jet Complex facilities “are used to simulate the aerothermodynamic heating that a spacecraft endures throughout hypersonic atmospheric entry, and to test candidate thermal protection system (TPS) materials and systems. “Because planetary mission schedules often have tight windows due to planetary alignment constraints, a small increase in schedule could result in a two-year delay. Such a delay could increase the cost of a $1billionmissionbyhundreds of millions of dollars due to project personnel pay and clean room storage. To avoid these costs, the authors support NASA Ames in evaluating return on investment (ROI) and effectiveness of alternatives for modernizing the complex. The first input into the ROI is the deconstruction and construction cost estimates, which are developed using independent research on highly specialized subsystems, vendor quotes, and Unified Facilities Criteria (UFC), depending on the facility and work package. One of the measures of effectiveness is throughput analysis of the test bays, as a main goal of the modernization is to increase the number of possible test runs per year. This analysis is conducted via a probabilistic simulation and accounts for a variety of stochastic factors that influence the sequence of test runs, such as the facility availability; test complexity; the need to pause to assess test results; test failure; and the possibility of a system failure. The methodologies for both these analyses are discussed, along with the challenges presented due to the unique nature of the highly specialized test equipment.

Jennifer Scheel↗