A Technique for Determining Neutron Beam Fluence to 0.01% Uncertainty

The achievable uncertainty in neutron lifetime measurements using the beam technique has been limited by the uncertainty in the determination of the neutron density in the decay volume. In the Sussex-ILL-NIST series of beam lifetime experiments, the density was determined with a neutron fluence mon itor that detected the charged particle products from neutron absorption in a thin layer of 6Li or lOB. In each of the experiments, the absolute detection efficiency of the neutron monitor was determined from the measured density of the neutron absorber, the thermal neutron cross section for the absorbing ma terial, and the solid angle of the charged particle detectors. The efficiency of the neutron monitor used in the most recent beam lifetime experiment has since been measured directly by operating it on a monochromatic neutron beam in which the total neutron rate is determined with a totally absorbing neutron detector. The absolute nature of this technique does not rely on any knowl edge of neutron absorption cross sections or a measurement of the density of the neutron absorbing deposit. This technique has been used to measure the neutron monitor efficiency to 0.06% uncertainty. VVe show that a new monitor and absolute neutron detector employing the same technique would be capable of achieving determining neutron fluence to an uncertainty of 0.01%.

neutron fluence↗

Total Measurement Uncertainty in Neutron Coincidence Multiplicity Analysis

Neutron multiplicity analysis is a widely used technique in international safeguards and is most commonly applied to the assay of product and scrap materials in the production of mixed oxide fuel. The typical neutron multiplicity analysis applies only a crude, almost cursory, uncertainty analysis limited to propagation of statistical errors in the derived singles, doubles, and triples count rates through the point source model. While these analyses do not account for uncertainties in basic detector parameters (e.g., efficiency or gate utilization factors), nuclear data, or covariances between any of these values, measurement uncertainties are often quoted in the range of 1–2% of the resulting mass values. In this work, we examined the impact of the nuclear data and instrumentation uncertainties on the multiplicity assay result for various counting regimes using the point-model equations as the basis for discussion. Potential biases introduced by the current nuclear data set on the measurement and the need for a more complete error treatment when we progress beyond empirical calibrations based on highly representative items will be discussed.

Mcelroy Jr, Robert↗

Uncertainty Quantification of Bifacial Performance Modeling

Analysis on uncertainty in the annual energy of PV systems that can be attributed to parameters of particular importance to bifacial PV modules is presented. Monte Carlo simulations are used to evaluate the effect of uncertain module bifaciality factors, module transmission fractions, albedo values, and ground clearance. The analyses cover a wide spectrum of potential PV array archetypes through variation of installation parameters. The results of the Monte Carlo analysis reveal that the uncertainty is largely dependent on albedo uncertainty, but more simulations are needed to identify trends across system archetypes. The simulations are aimed at attributing an annual energy uncertainty factor for bifacial considerations that can be applied in post-processing of project probability of exceedance analysis.

bifacial↗

Temperature Uncertainty Modeling with Proxy Structural Data as Geostatistical Constraints for Well Siting: An Example Applied to Granite Springs Valley, NV, USA

Utilizing existing temperature and structural information around Granite Springs Valley, Nevada, we build 3D stochastic temperature models with the aim of evaluating the 3D uncertainty of temperature and choosing between candidate exploration well locations . The data used to support the modeling are measured temperatures and structural proxies from 3D geologic modeling, the latter considered "secondary" data. Two stochastic geostatistical techniques are explored for incorporating the structural proxies: cosimulation and local varying mean. With both the cosimulation and local varying mean methods, many equally likely temperature models (i.e., realizations) are produced, from which temperature probability profiles are calculated at candidate well locations. To aid in choosing between the candidate locations, two quantities summarize the temperature probabilities: Vprior and entropy. Vprior quantifies the likelihood for economic temperatures at each candidate location, whereas entropy identifies where new information has the most potential to reduce uncertainty. In general, the cosimulation realizations have smoother spatial structure, and extrapolate high temperatures at candidate locations that are located along the direction of the longest spatial correlation, which are down dip from existing temperature logs. The smooth realizations result in tight temperature probability profiles that are easier to interpret, but they have unrealistic temperature reversals in some locations because the cosimulation technique does not enforce a conductive geothermal gradient as a baseline (i.e., linearly increasing temperature with depth). The local varying mean results produce realizations with more realistic geothermal gradients, with temperatures increasing downward since a depth-temperature relationship is included. However, because they have much noisier spatial nature compared to cosimulation, it is harder to interpret the temperature probability profiles. The different local varying mean results allow the geologist to determine which proxy (e.g., dilation versus distance to fault termination) should be used given the specific geothermal system. In general, Vprior from local varying mean results identify locations that are close to high values for the structural proxies: areas with highe r probabilities for higher temperatures. The entropy results identify where uncertainty is greatest and therefore new drilling information could be most useful. Though these techniques provide useful information, even when applied to areas of sparse data, our comp arison of these two techniques demonstrates the need for new geothermal geostatistics techniques that combine the advantages of these two methods and that are tailored to the spatial uncertainty issues inherent in geothermal exploration.

3D temperature modeling↗

Uncertainties In Performance Assessments For The Yucca Mountain Site And The Edge-of-Compliance

Numerical performance assessments of deep geologic disposal systems of long-lived radioactive wastes serve as the primary tool for quantitatively assessing projected performance and for making regulatory compliance decisions, both in the U.S. and disposal programs abroad. However there is a significant body of opinion, expressed in the international literature, that the confidence that can be placed on such assessments decreases significantly as the analysis time frames increase into the many hundreds of thousands of years. With the inclusion of highly corrosion resistant metals in the planned waste package designs for the Yucca Mountain (YM) system commercial spent fuel and defense-generated high-level radioactive waste disposal, published projections for the site show doses to the receptor at times extending into the many hundreds of thousands of years. The question of relative confidence in dose projections becomes more important at very long time frames, particularly when the time frame for significant doses increases dramatically reflecting the effects of using highly corrosion resistant materials. To examine uncertainties in performance assessments of the YM disposal system over very long time frames, a site model developed by the U.S. Department of Energy to assess sensitivities in peak dose performance was modified and used to examine the propagation of uncertainties for a hypothetical disposal system. These analyses start with a hypothetical disposal system at the 'edge-of-compliance' at 10,000 years, reflecting the generic repository standard in 40 CFR Part 191. The hypothetical system was poised to give a mean dose of 0.15 milli-sievert/year (15 mrem/yr.) at 10,000 years, by allowing a fixed number of waste packages to 'fail' within the first 5,000 years after closure. By maintaining the number failed waste packages constant over time, the spread in dose estimates over the time to peak dose was calculated for this system perched at the 'edge-of-compliance' at 10,000 years. This hypothetical construct removes waste package performance from the analyses and allows the site model to explore the effects of uncertainties in the natural barrier and site conditions on the dose projections out to the time of peak dose. The sensitivities of these projections to various 'driver' parameters were examined, including infiltration rates, solubility constraints, water chemistry and roof collapse assumptions. Overall, the initial construct showed a one and one-half order of magnitude spread between the 5. and 95. percentiles at 10,000 years, the initial state for the analyses. This spread increased to approximately three and one-half orders of magnitude at peak dose, reflecting the effects of transport and retardation mechanisms on the fixed source term. The model eliminated portions of the transport path from the repository where relatively little retardation would be expected. Travel times were therefore significantly reduced thereby eliminating radioactive decay as an important mechanism in reducing projected doses. Solubility controls appear to be a major source of uncertainties in the dose projections for the model used. These results support the general international consensus that confidence in dose projections over very long time frames does decrease, and illustrates that this conclusion also applies to assessments of the YM projected performance as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An inquiry into the potential of scenario analysis for dealing with uncertainty in strategic environmental assessment in China

Strategic environmental assessment (SEA) inherently needs to address greater levels of uncertainty in the formulation and implementation processes of strategic decisions, compared with project environmental impact assessment. The range of uncertainties includes internal and external factors of the complex system that is concerned in the strategy. Scenario analysis is increasingly being used to cope with uncertainty in SEA. Following a brief introduction of scenarios and scenario analysis, this paper examines the rationale for scenario analysis in SEA in the context of China. The state of the art associated with scenario analysis applied to SEA in China was reviewed through four SEA case analyses. Lessons learned from these cases indicated the word 'scenario' appears to be abused and the scenario-based methods appear to be misused due to the lack of understanding of an uncertain future and scenario analysis. However, good experiences were also drawn on, regarding how to integrate scenario analysis into the SEA process in China, how to cope with driving forces including uncertainties, how to combine qualitative scenario storylines with quantitative impact predictions, and how to conduct assessments and propose recommendations based on scenarios. Additionally, the ways to improve the application of this tool in SEA were suggested. We concluded by calling for further methodological research on this issue and more practices.

54 ENVIRONMENTAL SCIENCES↗

The importance of covariance in nuclear data uncertainty propagation studies

A study has been undertaken to investigate what proportion of the uncertainty propagated through plutonium critical assembly calculations is due to the covariances between the fission cross section in different neutron energy groups. The uncertainties on k{sub eff} calculated show that the presence of covariances between the cross section in different neutron energy groups accounts for approximately 27-37% of the propagated uncertainty due to the plutonium fission cross section. This study also confirmed the validity of employing the sandwich equation, with associated sensitivity and covariance data, instead of a Monte Carlo sampling approach to calculating uncertainties for linearly varying systems. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear data uncertainties by the PWR MOX/UO{sub 2} core rod ejection benchmark

Rod ejection transient of the OECD/NEA and U.S. NRC PWR MOX/UO{sub 2} core benchmark is considered under the influence of nuclear data uncertainties. Using the GRS uncertainty and sensitivity software package XSUSA the propagation of the uncertainties in nuclear data up to the transient calculations are considered. A statistically representative set of transient calculations is analyzed and both integral as well as local output quantities are compared with the benchmark results of different participants. It is shown that the uncertainties in nuclear data play a crucial role in the interpretation of the results of the simulation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Identifying and bounding uncertainties in nuclear reactor thermal power calculations

Determination of the thermal power generated in the reactor core of a nuclear power plant is a critical element in the safe and economic operation of the plant. Direct measurement of the reactor core thermal power is made using neutron flux instrumentation; however, this instrumentation requires frequent calibration due to changes in the measured flux caused by fuel burn-up, flux pattern changes, and instrumentation drift. To calibrate the nuclear instruments, steam plant calorimetry, a process of performing a heat balance around the nuclear steam supply system, is used. There are four basic elements involved in the calculation of thermal power based on steam plant calorimetry: The mass flow of the feedwater from the power conversion system, the specific enthalpy of that feedwater, the specific enthalpy of the steam delivered to the power conversion system, and other cycle gains and losses. Of these elements, the accuracy of the feedwater mass flow and the feedwater enthalpy, as determined from its temperature and pressure, are typically the largest contributors to the calorimetric calculation uncertainty. Historically, plants have been required to include a margin of 2% in the calculation of the reactor thermal power for the licensed maximum plant output to account for instrumentation uncertainty. The margin is intended to ensure a cushion between operating power and the power for which safety analyses are performed. Use of approved chordal ultrasonic transit-time technology to make the feedwater flow and temperature measurements (in place of traditional differential-pressure- based instruments and resistance temperature detectors [RTDs]) allows for nuclear plant thermal power calculations accurate to 0.3%-0.4% of plant rated power. This improvement in measurement accuracy has allowed many plant operators in the U.S. and around the world to increase plant power output through Measurement Uncertainty Recapture (MUR) up-rates of up to 1.7% of rated power, while also decreasing the probability of significant over-power events. This paper will examine the basic elements involved in calculation of thermal power using ultrasonic transit-time technology and will discuss the criteria for bounding uncertainties associated with each element in order to achieve reactor thermal power calculations to within 0.3% to 0.4%. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Physics-based dimension reduction in uncertainty quantification for radiative transfer

We present a physics-based methodology for quantifying the uncertainty in a given quantity of interest (QOI) that is contributed by uncertainties in opacities in radiation transport problems. Typically, opacities are tabulated as a function of density, temperature, and photon energy group. The size of this table makes a study of uncertainties at this level challenging because of the well-known 'curse of dimensionality.' We address this by studying uncertain parameters in the underlying physical model that generates the opacity tables. At this level, there are fewer uncertain parameters but still too many to analyze directly through computationally expensive radiation transport simulations. In order to explore this large uncertain parameter space, we develop two simplified radiation transport problems that are much less computationally demanding than the target problem of interest. An emulator is created for each QOI for each simplified problem using Bayesian Multivariate Adaptive Regression Splines (BMARS). This emulator is used to create a functional relationship between the QOIs and the uncertain parameters. Sensitivity analysis is performed using the emulator to determine which parameters contribute significantly to the uncertainty. This physics-based screening process reduces the dimension of the parameter space that is then studied via the computationally expensive radiation transport calculation to generate distributions of quantities of interest. Results of this research demonstrate that the QOIs for the target problem agree for varying screening criteria determined by the sensitivity analysis, and the QOIs agree well for varying Latin Hypercube Design (LHD) sample sizes for the uncertain space. (authors)

97 MATHEMATICS AND COMPUTING↗

A Method for Optimizing Waste Management and Disposal Practices Using a Group-Based Uncertainty Model for the Analysis of Characterization Data - 13191

It is a universal requirement for characterization of radioactive waste, that the consignor shall calculate and report a Total Measurement Uncertainty (TMU) value associated with each of the measured quantities such as nuclide activity. For Non-destructive Assay systems, the TMU analysis is typically performed on an individual container basis. However, in many cases, the waste consignor treats, transports, stores and disposes of containers in groups for example by over-packing smaller containers into a larger container or emplacing containers into groups for final disposal. The current standard practice for container-group data analysis is usually to treat each container as independent and uncorrelated and use a simple summation / averaging method (or in some cases summation of TMU in quadrature) to define the overall characteristics and associated uncertainty in the container group. In reality, many groups of containers are assayed on the same system, so there will be a large degree of co-dependence in the individual uncertainty elements. Many uncertainty terms may be significantly reduced when addressing issues such as the source position and variability in matrix contents over large populations. The systematic terms encompass both inherently 'two-directional' random effects (e.g. variation of source position) and other terms that are 'one-directional' i.e. designed to account for potential sources of bias. An analysis has been performed with population groups of a variety of non-destructive assay platforms in order to define a quantitative mechanism for waste consignors to determine overall TMU for batches of containers that have been assayed on the same system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Uncertainty in Modeling DFLAW Treatment at Hanford - 17115

Average or mean is understood by most; standard deviation (SD) is understood by few. Certainty is easy to model; uncertainty is not. The flowsheet simulation, described in this paper, placed uncertainties in the G2 model of the Hanford Tank Waste Treatment and Immobilization Plant's (WTP) Direct Feed Low-Activity Waste (DFLAW) process for performance and sensitivity evaluations. G2 is a dynamic material balance model that starts and proceeds with operating logic until all the feed is processed. Dynamic material balance is achieved by tracking the flows, storage, and change of all materials within the plant as time increments. Processing equipment and limitations of the flowsheet are modeled (e.g., equipment types, piping, volumes, flowrates, efficiencies, and physical and chemical environments that impact separations, phase equilibriums, and chemical reactions). Operating logic represents the rules and strategies of a running plant. The G2 model simulated both certainty and uncertainty scenarios for comparison purposes. For the uncertainty scenarios, process decisions were made using presumed values to simulate various operational measurement errors and process variabilities. Presumed means that the known G2 values are adjusted to replicate measurement errors and variabilities. These include: 1) volume measurement, 2) sample analysis, 3) melter decontamination factor (DF), 4) glass former weighing, and 5) glass former composition variations. The errors were randomly generated in accordance with SD values of measurement devices, laboratory methods, and glass former composition ranges. The G2 model runs give insight on the DFLAW process' controllability and the expected range of glass properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prediction of countercurrent flow limitation and its uncertainty in a PWR hot leg

In previous studies, we did small-scale air-water experiments for the hot leg and pressurizer surge line in a PWR and three-dimensional (3D) numerical simulations for PWR conditions to evaluate countercurrent flow limitation (CCFL) there, and we developed a one-dimensional (1D) prediction method to generalize prediction of CCFL in a piping system such as the hot leg and pressurizer surge line. In this study, we evaluated computation errors of the 1D prediction method in comparison with CCFL data in the PWR hot leg models with the diameter D and length L of D = 50-650 mm and L/D = 4.5-9.5, and then evaluated uncertainties of the 1D prediction method in comparison with 3D numerical simulations for PWR conditions with D = 750 mm and L/D = 8.6. We found the computation errors were within the difference of dC = ±0.05 for the CCFL constant of C = 0.63 in the correlation with the Wallis parameters, but the computation errors include experimental errors and they are not uncertainties for the PWR conditions. The total uncertainty of the 1D computations for the actual PWR hot leg (including effects of the diameter and fluid properties) was estimated to be dC = ±0.035. The CCFL correlation and its uncertainty of dC = ±0.035 derived from the 1D prediction method were very close to those previously obtained from CCFL data and 3D simulations (dC = ±0.03). (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Uncertainty and Sensitivity Analysis of Reactivity Insertion Accidents using BISON Fuel Performance Code

The development of Accident Tolerant Fuels (ATF) has expanded into a considerable research program in the wake of the events at the Japanese Fukushima Daiichi nuclear power plant in 2011. The ATF goal is to insert a test assembly into a commercial reactor by 2022. To support this, testing of the ATF design under off-normal conditions is needed to assess the 'enhanced accident tolerance' capability of the fuel rod design over standard UO{sub 2}-Zircaloy concepts. Transient testing capabilities are necessary for off-normal testing of events such as loss of coolant accidents (LOCA) and reactivity insertion accidents (RIA). A transient testing program has been developed to support the testing of ATF designs. The Transient Reactor Test (TREAT) facility has been chosen as the site to perform the transient testing of the ATF designs. TREAT is a versatile test facility capable of subjecting fuel specimens to various off-normal conditions. Historic TREAT experiments were performed in a variety of experimental test vehicles including static environment capsules, once-through flowing systems, and also recirculating flowing systems. The planned TREAT experiments will be operated under PWR conditions. Therefore, a static capsule vehicle is under development to handle required temperatures and pressures. The static capsule, termed the Static Environment Rodlet Transient Test Apparatus (SERTTA), will be used for irradiation tests in TREAT to subject ATF fuel rodlets to a range of power pulse conditions and environments. To aid in the design and analysis of future tests in TREAT, the fuel performance code BISON is being used. Fuel performance codes capable of accident modeling have been developed for some time and they have shown an ability to reproduce experimental results with some degree of adequacy, but they still require extensive verification and validation. Future experiments in TREAT will add to a limited database of past transient tests performed in transient reactors to support LWR systems. These tests can be used for future verification and validation of fuel performance codes. Understanding the impact of the uncertainty of influential parameters is critical for not only analyzing the results of the experiment but also for modeling and validation of codes. For example, uncertainties associated with the initial manufactured state of the sample, instrument measurements, material property models, and planned experiment conditions can provide important insight into model performance, experimental data, and play an important role in experimental design. The objective of this work is to perform an uncertainty and sensitivity analysis on a simplified RIA case of a standard UO{sub 2}-Zircaloy sample using expected nominal conditions in the SERTTA capsule in TREAT. The BISON fuel performance code is used in conjunction with DAKOTA (Design Analysis Kit for Optimization and Tera-scale Applications) to perform the uncertainty and sensitivity analysis. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Importance of treating correlations in the uncertainty quantification of radiation damage metrics - 25461

The radiation effects community embraces the importance of quantifying uncertainty in model predictions and the importance of propagating this uncertainty into the integral metrics used to validate models, but they are not always aware of the importance of addressing the energy- and reaction-dependent correlations in the underlying uncertainty contributors. This paper presents a rigorous high-fidelity Total Monte Carlo approach that addresses the correlation in the underlying uncertainty components and quantifies the role of both energy and reaction-dependent correlations in a sample application that addresses the damage metrics relevant to silicon semiconductors. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Analysis of an existing spent fuel pool storage rack using current practices and updated depletion bias and uncertainty values - 14458

In accordance with NRC Information Notice 2011-03: Nonconservative Criticality Safety Analysis for Fuel Storage, a US nuclear power plant reviewed their analysis of record (AOR) for possible nonconservative technical specifications related to the criticality safety of fuel storage. During this review, it was determined that some legacy fuel assemblies did not meet all the assumptions of the AOR, but did meet the plant Technical Specifications. The plant entered into an Operability Evaluation in order to evaluate the moderator temperature and boron concentration assumptions used in the AOR, as well as evaluate the impact of including additional biases and depletion uncertainties for the non-borated case. As this study was part of a response to the NRC Information Notice, a full assessment was not conducted. A re-analysis of the spent fuel rack in accordance with current practices was performed. This analysis used the bounding core conditions, and included all biases and depletion uncertainties. The results challenged the 10CFR50.68(b) requirement that 'the k-effective must remain below 1.0 (subcritical), at a 95 percent probability, 95 percent confidence level, if flooded with un-borated water'. Credits for additional reactivity offsets were then analyzed. Previous assumptions for the measurement uncertainty were evaluated and subsequently reduced. New values for the depletion bias and uncertainty were applied. More detailed, realistic modeling was used to remove conservatisms. The results showed that the storage racks met the 10CFR50.68(b) criteria for the un-borated case. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The PARADIGM Project: Case Study in Balancing Experiment Uncertainty with Design simplicity

Accurate nuclear data are required for simulations of many applications including nuclear criticality safety. Actinide nuclear data at intermediate energies (from 1 to 100s of keV) are imprecise and inaccurate, because of scarce differential data, and an insufficient theory approach to capture the structures expected in the data to yield evaluated nuclear data, and lack of integral data for proper validation. This is a known deficiency but has proved challenging to address. More specifically, only 5% of integral experiments in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) benchmark suite address intermediate energies (Fig. 1). Associated calculated effective multiplication factor, k eff , values for these experiments are far outside the experimental uncertainties and are 25× further from experiment than for fast energies. These differences could either stem from systematic biases in nuclear data, experiments or both. The goal of the PARADIGM (PARallel Approach of Differential and InteGral Measurements) project is to significantly reduce (by more than tens of percent) the uncertainties of intermediate energy actinide nuclear data. The PARADIGM project designed and intends to execute LANSCE (Los Alamos Neutron Science CEnter) and NCERC (National Criticality Experiments Research Center) intermediate experiments in parallel. They will specifically address a high priority nuclear data need—reducing bias and uncertainty in intermediate plutonium nuclear data. The two experiment will achieve that by informing each other and nuclear theory. By doing all these steps in parallel, the timeline to deliver improved nuclear data to users will significantly be reduced. This work will focus on the integral experiment final design and the balance of design and modeling simplicity while minimizing experiment uncertainty.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Using Cross-Section Uncertainty Data to Estimate Biases

Ideally, computational method validation is performed by modeling critical experiments that are very similar, neutronically, to the model used in the safety analysis. Similar, in this context, means that the neutron multiplication factors (k eff ) of the safety analysis model and critical experiment model are affected in the same way to the same degree by variations (or errors) in the same nuclear data. Where similarity is demonstrated, the computational bias calculated using the critical experiment model results is 'applicable' to the safety analysis model. Unfortunately, criticality safety analysts occasionally find that the safety analysis models include some feature or material for which adequately similar well-defined critical experiments do not exist to support validation. For example, the analyst may want to take credit for the presence of fission products in spent nuclear fuel. In such cases, analysts sometimes rely on 'expert judgment' to assign an additional administrative margin to compensate for the validation weakness or to conclude that the impact on the calculated bias and bias uncertainty is negligible. Due to advances in computer programs and the evolution of cross-section uncertainty data, analysts can use the sensitivity and uncertainty analyses tools implemented in the SCALE TSUNAMI codes to estimate the potential impact on the application-specific bias and bias uncertainty resulting from nuclides that are under-represented or not present in the critical experiments. This paper discusses the method, computer codes, and data used to estimate the potential contribution toward the computational bias of individual nuclides. The results from application of the method to fission products in a burnup credit model are presented.

97 MATHEMATICS AND COMPUTING↗