Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “software estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,564 records · Page 87

The Majorana Parts Tracking Database

The MAJORANA DEMONSTRATOR is an ultra-low background physics experiment searching for the neutrinoless double beta decay of 76Ge. The MAJORANA Parts Tracking Database is used to record the history of components used in the construction of the DEMONSTRATOR. Transportation, storage, and processes undergone by parts such as machining or cleaning are linked to part records. Tracking parts provides a great logistics benefit and an important quality assurance reference during construction. In addition, the location history of parts provides an estimate of their exposure to cosmic radiation. A web application for data entry and a radiation exposure calculator have been developed as tools for achieving the extreme radiopurity required for this rare decay search.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Computer Aided Multi-scale Design of SiC-Si3N4 Nanoceramic Composites for High-Temperature Structural Applications

It is estimated that by using better and improved high temperature structural materials, the power generation efficiency of the power plants can be increased by 15% resulting in significant cost savings. One such promising material system for future high-temperature structural applications in power plants is Silicon Carbide-Silicon Nitride (SiC-Si{sub 3}N{sub 4}) nanoceramic matrix composites. The described research work focuses on multiscale simulation-based design of these SiC-Si{sub 3}N{sub 4} nanoceramic matrix composites. There were two primary objectives of the research: (1) Development of a multiscale simulation tool and corresponding multiscale analyses of the high-temperature creep and fracture resistance properties of the SiC-Si{sub 3}N{sub 4} nanocomposites at nano-, meso- and continuum length- and timescales; and (2) Development of a simulation-based robust design optimization methodology for application to the multiscale simulations to predict the range of the most suitable phase morphologies for the desired high-temperature properties of the SiC-Si{sub 3}N{sub 4} nanocomposites. The multiscale simulation tool is based on a combination of molecular dynamics (MD), cohesive finite element method (CFEM), and continuum level modeling for characterizing time-dependent material deformation behavior. The material simulation tool is incorporated in a variable fidelity model management based design optimization framework. Material modeling includes development of an experimental verification framework. Using material models based on multiscaling, it was found using molecular simulations that clustering of the SiC particles near Si{sub 3}N{sub 4} grain boundaries leads to significant nanocomposite strengthening and significant rise in fracture resistance. It was found that a control of grain boundary thicknesses by dispersing non-stoichiometric carbide or nitride phases can lead to reduction in strength however significant rise in fracture strength. The temperature dependent strength and microstructural stability was also significantly depended upon the dispersion of new phases at grain boundaries. The material design framework incorporates high temperature creep and mechanical strength data in order to develop a collaborative multiscale framework of morphology optimization. The work also incorporates a computer aided material design dataset development procedure where a systematic dataset on material properties and morphology correlation could be obtained depending upon a material processing scientist's requirements. Two different aspects covered under this requirement are: (1) performing morphology related analyses at the nanoscale and at the microscale to develop a multiscale material design and analyses capability; (2) linking material behavior analyses with the developed design tool to form a set of material design problems that illustrate the range of material design dataset development that could be performed. Overall, a software based methodology to design microstructure of particle based ceramic nanocomposites has been developed. This methodology has been shown to predict changes in phase morphologies required for achieving optimal balance of conflicting properties such as minimal creep strain rate and high fracture strength at high temperatures. The methodology incorporates complex material models including atomistic approaches. The methodology will be useful to design materials for high temperature applications including those of interest to DoE while significantly reducing cost of expensive experiments.

36 MATERIALS SCIENCE↗

Scaling Input Distributions for Probabilistic Models - 19472

It is important to address scaling issues when building models to support risk-based decisions for radioactive waste disposal sites. Currently, probabilistic risk assessment and probabilistic performance assessment models are run for multiple realizations where each realization uses one value from each input distribution over the entire modeled time. The input distributions represent the current state of knowledge in the mean of the input variable over the spatial region of interest and over the time period of the model run. This paper focuses on the time factor in input distribution scaling because it presents more serious conceptual and distributional challenges than the spatial factor. One of the challenges in temporal scaling is the effect of non-linearity on propagation of distribution uncertainty through to uncertainty in results. Radioactive waste disposal models tend to have both linear and non-linear components in their models. Dose assessment calculations are typically represented by linear models, while contaminant transport models have linear and non-linear components. In principle, temporal scaling of input parameter distributions for a linear model is straightforward, but scaling of input distributions for non-linear models is not. This paper uses examples to investigate the effects of input distribution temporal scaling on simple linear and non-linear models. Different scaling scenarios were investigated by comparing three analysis tools: analytical mathematical representations, statistical software programming, and GoldSim Monte Carlo simulation software. R statistical software is an open source statistical programming language often used for statistical analyses and graphical representation of data. GoldSim is a robust probabilistic dynamic modeling platform used in performance assessment modeling of radioactive waste sites. A simple linear model, a quadratic model and a multiplicative model were the cases explored for each of these tools. For the three analysis tools considered and with each of the scaling cases, 1,000 realizations were implemented from distributions of the random variables of interest. This is a sufficient number of realizations for simple models to capture the model space. An annual temporal resolution of a 100-year simulation period was chosen for all models and analysis tools. The effects of temporal scaling were demonstrated by investigating two different options for time scaling. Option 1 was set up so that the input distributions represented the expected value on an annual time scale, and a new value from that distribution was chosen every year (at every time step which equaled a year) for 100 years. In Option 2, the input distributions were scaled to represent the expected mean value of the input variable over the 100 years of simulation, and one value from that distribution was chosen for the entire elapsed time. Results show agreement across the three analysis tools. As expected, the linear models have identical results for the two different scaling Options, and the non-linear models diverge in the results for different time scale implementation. The implications of this work point to the need for careful consideration of input distribution temporal scaling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of CO 2 Storage Resources in Depleted Oil and Gas Fields in the Ship Shoal Area, Gulf of Mexico

The Gulf of Mexico is one of the most important regions in the United States for energy resources and infrastructure. Gulf of Mexico federal offshore oil and gas production accounts for 17% of total U.S. crude oil production and 5% of total U.S. gas production (EIA Gulf of Mexico Fact Sheet). This region presents an excellent combination of high need and significant opportunity for large scale geologic storage of CO 2 . The Ship Shoal Area is located about 20 miles offshore Louisiana within the Gulf Coast federal waters. Miocene and Pliocene sediments in the Ship Shoal Area are proven to provide excellent and secure traps for oil and gas. The Ship Shoal Area contains a large number of depleted oil and gas fields either currently abandoned, or planned for abandonment by 2025, which may provide very significant potential CO 2 storage capacity. GeoMechanics Technologies conducted a comprehensive research project to better characterize Neogene sediments in the Ship Shoal Area for high volume CO 2 storage. The data generated from literature, well data, well log, and formation evaluation were input into Rockwork 16 geologic software to create a detailed geologic model for the Ship Shoal study area. The geologic grids were then fed into TOUGH2, the gas migration model software and FLAC 3D, the geomechanical model software. The fluid flow modeling for both the Miocene and Pliocene simulation from both Block 107 and Block 84 indicated that Pliocene and Miocene are a good reservoir for the CO 2 sequestration. Thirty years of CO 2 injection (at a rate of 1 million metric tons CO 2 per year) and 30 years of observation simulations were run with the fluid flow modeling. The 3D geomechanical modeling for Ship Shoal Block 107 and Block 84 were developed to evaluate induced surface deformation and potential fault reactivation after 30 years CO 2 injection at base of Pliocene and at upper Miocene injection locations. Evaluation results indicate low to no risks for fault slips or fault reactivation. Twelve well bores and 76 well bores for Ship Shoal Blocks 84 and 107 respectively were reviewed for their cement history. Most wells (57 out of 76 and 7 out of 12 wells in Ship Shoal Block 107 and 84 respectively) have good integrity. Nineteen and 5 wells (in Ship Shoal Block 107 and 84 respectively) with no top plug, incomplete cement or Plug and Abandonment information are given yellow cautionary indicators. These cautionary wells may provide leakage paths of CO 2 through the well bores to the USDWs. Using our Quantitative Risk & Decision Analysis Tool (QRDAT) for caprock integrity evaluation, we compared Ship Shoal’s risk to that of In Salah, Sleipner, Kevin Dome, Loudon, Illinois Industrial CCS and Wilmington Graben. We found the risk at the Ship Shoal Blocks 84 and 107 fields are similar to the known CO 2 active sequestration sites, but lower than the Wilmington Graben turbidities offshore California studied site. The risk of natural seismicity in the Gulf of Mexico is relatively low. Geomechanics Technologies has documented the top 25 CO 2 emission sources within the close proximity of the Ship Shoal Block 84 and 107 fields. All the offshore and onshore pipelines have been digitized and can be viewed in an interactive website (http://www.geomechanicstech.com/shipshoal.html). We also performed a feasibility study on the potential for converting existing oil or gas pipelines for CO 2 transport. There are abandoned, idled and retired onshore and offshore pipelines. However, there is no standard specification for maximum pipeline pressures needed for CO 2 transport. It is a function of design, materials, and testing provided; thus it will be the responsibility of the pipeline operator to correctly determine, maintain and operate within the limits of the pipelines. There are a few transit corridors extending from onshore Louisiana (Cailou Bay) to offshore trunk-lines. The cost for constructing a pipeline has increased about 46% from 2015 to an average cost of $5,064,046 per mile in 2016. We use the NETL CO 2 storage resource mass estimate to calculate the potential resources for Ship Shoal Block 84 and 107 fields using the depleted oil and gas reservoir volume and sand volume generated from our geologic modeling. The estimated storage resource results are greater when using the sand volumes derived through geologic modeling than the oil and gas reservoir data. The difference is due to the depleted oil and gas reservoir information not accounting for the water-flooded sand located below the oil/gas-water contact or unproductive sand units. Resource calculation using the sand volume obtained through geologic modeling overestimate the storage capacity as the model accounts for all sand within the formation, not just the interconnected sand.

02 PETROLEUM↗

Demontration of Integrated Optimization Software at the Baldwin Energy Complex

This project encompassed the design, development, and demonstration of integrated online optimization systems at Dynegy Midwest Generation's Baldwin Energy Complex (BEC) located in Baldwin, Illinois. The overall project objective was to improve coal-based generation's emission profile, efficiency, maintenance requirements and plant asset life in order to enhance the long-term viability of the United States abundant coal resources. Five separate but integrated optimization products were developed, addressing combustion, sootblowing, SCR operations, overall unit thermal performance, and plant-wide availability optimization. Optimization results are inherently unit-specific and cannot be known for a particular generating unit in advance. However, NeuCo believed that the following were reasonable targets for the completed, integrated set of products: Furnace NOx reduction improvement by 5%, Heat rate improvement by 1.5%, Increase of annual Available MWh by 1.5%, Commensurate reductions in greenhouse gases, mercury, and particulates; and Commensurate increases in profitability from lower costs, improved reliability, and greater commercial availability. The goal during Phase I was to establish each system and demonstrate their integration in unified plant optimization. Efforts during Phase I focused on: (1) developing, deploying, integrating, and testing prototypes for each of the five products; (2) identifying and addressing issues required for the products to integrate with plant operations; and (3) systematically collecting and assimilating feedback to improve subsequent product releases. As described in the Phase II continuation application NeuCo successfully achieved the goal for Phase I. The goal of Phase II was to improve upon the products installed and tested in Phase I and to quantify the benefits of the integrated system. As this report documents, NeuCo has also successfully achieved the goal for Phase II. The overall results of the project, compared with the project goals, are: (1) NOx Reduction: The 5% target for NOx reduction was exceeded with average CEMS and SCR Inlet (furnace) NOx reduction of between 12% and 14%. (2) Heat Rate Improvement: The optimization systems delivered an average heat rate improvement of between 0.67% and 0.7%. This falls short of the 1.5% heat rate improvement target largely because Cyclone Stability (availability) and CEMS and SCR Inlet NOx were prioritized over heat rate in the event they needed to be traded-off with one another. A different prioritization of objectives could have driven a different balance, thereby meeting the target of 1.5% improvement. There were also several factors that could have been masking greater heat rate improvements such as the decrease in fuel density over the course of the project and the impact of actions taken as a result of advice provided by the optimizers that are difficult to quantify. (3) Increased Annual Available MWh: Although difficult to measure precisely, the target of increasing available MWh's by 1.5% was met by providing prioritized alerts and knowledge-based diagnostics for a wide array of plant equipment and process anomalies; helping the plant to move from high sulfur, high Btu Illinois coal to PRB and run that fuel at low stoichiometries without derates; and improved management of cyclone flame quality as well as improved vigilance with respect to cyclone conditions which avoided some degree of temporary de-rate due to cyclone slag build up. (4) Commensurate Reductions in Greenhouse Gases, Mercury, and Particulates: Reductions in all three of these indices can be associated directly with the optimization leverage observed in the heat rate and NOx reductions. (5) Commensurate Increases in Profitability from Lower Costs, Improved Reliability, and Greater Commercial Availability: Commensurate improvements in costs, reliability and availability resulted from the previously described benefits. Also playing a role were the sustained operation of the cyclones while using more available, less expensive but off-design fuel; more effective catalytic reduction of NOx; and the reduced time required to discover, prioritize and diagnose plant equipment issues. The total annual dollar value of the benefits associated with the products installed, refined, and commercialized at BEC are estimated to range from $1.8 to $3.2 million dollars per-unit, and $7.2 to $8.1 million dollars per year plant-wide depending on whether CO{sub 2} benefits are included. In summary, the NeuCo project at BEC was successfully completed and has demonstrated that advanced optimization technologies can play an important role in improving the environmental footprint of coal-based power generation while achieving other important operating objectives.

01 COAL, LIGNITE, AND PEAT↗

Assembling Multiple Models Within the RAVEN Framework

RAVEN (Risk Analysis Virtual Environment) is an INL-developed software tool that can be used to identify and increase the safety margin in complex systems. As a generic software framework, RAVEN is designed to perform parametric and probabilistic analysis based on the response of complex system codes. RAVEN is capable of investigating the system response as well as the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused toward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. RAVEN is currently able to construct multi-targets Reduced Order Models (ROMs), which are aimed to represent the response of a system (in a fixed configuration) for multiple Figures of Merits (FOMs) and time-dependent ROMs. These capabilities represent the initial steps for a larger implementation about the interaction of multiple models. In fact, in several cases, multiple models need to interface with each other since the initial conditions of one are dependent on the outcomes of another. To better understand the problem that here is solved, it is useful to consider a simple example: The following problem is considered: a weather forecast simulation code 'a' is used to compute the external (i.e. ambient) temperature in a certain location. A second model 'b' is inquired to compute the average temperature in a room having as boundary condition, among several others, the external ambient temperature. The response of the model 'b' depends on the outcome of the model 'a'. The reported example is only aimed to illustrate the reason why the creation of a framework to make interact different models is a key development for the advancement of RAVEN as a comprehensive calculation flow driver. Before reporting how the ensemble-models have been implemented, it is necessary to briefly describe the representative Model 'entities' that are available in RAVEN.

42 ENGINEERING↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 19295

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The reprocessing wastes include high-level waste (HLW), so U.S. Department of Energy (DOE) was compelled to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980, including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the contamination at the West Valley Site and its potential implications for human health and the environment. The West Valley PPA Model (the Model), developed using the GoldSim modeling software, is a tool intended to provide support for decision making with uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-organized contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of HLW resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife are exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion in subsurface air and water, and erosion of the Site. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes that contribute most to overall uncertainty. With this information, the Supplemental Environmental Impact Statement (SEIS) can inform defensible decisions regarding remediation of the Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Automated Software Program for the Analysis of Alzheimer's Disease Scans: Evaluation of PET imaging with PBR-111 in HV and AD subjects

Study goal: A Phase 1 evaluation of the kinetics, clearance and cerebral distribution of one novel peripheral benzodiazepine receptors(PBR)positron emission tomography (PET) imaging agent, 18F-PBR-111 following intravenous administration in healthy volunteers and Alzheimer's disease (AD) patients. Short title: Evaluation of PET imaging with PBR-111 in HV and AD subjects Proof of Mechanism. Primary Objective: To evaluate the cerebral distribution of PBR-111 positron emission tomography (PET) for detection/exclusion of microglial activation in patients with Alzheimer's disease subjects compared to healthy volunteers. Secondary objectives: - To assess the dynamic uptake and washout of [18F]PBR-111, a potential imaging bio-marker for inflammatory changes in brain, using positron emission tomography in subjects with Alzheimer's disease (AD) and healthy volunteers (HV). - To perform blood metabolite characterization of [18F]PBR-111 in subjects with AD and HV to determine the nature of metabolites in assessment of [18F]-PBR-111 as a PET brain imaging agent. Name of radioactive drug substance: PBR-111 Dose(s): The applied PBR-111 radioactive dose will be up to 5.0 mCi, diluted in a maximum of 10 ml of saline. The radioligand will be administered as a slow intravenous bolus injection (i.e., 6 sec/ml) into a large vein (e.g., antecubital vein). Route of administration: Intravenous injection Duration of treatment: Single administration of a diagnostic agent Indication: PBR-111 positron emission tomography (PET) imaging has the potential to detect microglial activation. In the presence of PBR-111 uptake (representative of microglial activation), inflammation in the brain can be detected. Diagnosis and main criteria for inclusion: Study participants will be HVs and patients diagnosed with probable AD. HVs must be 18 years of age (at least four subjects 50 years of age) and have no evidence of cognitive impairment or other neurologic disease by medical history. The lack of cognitive impairment will also be based on a Clinical Dementia Rating (CDR) of 0. Patients with probable AD must be 50 years of age and must fulfill the National Institute of Neurological and Communicative Disorders and Stroke, Alzheimer's Disease and Related Disorders Association [NINCDS-ADRDA] criteria for probable AD. The CDR score must be 1.0 and 2.0 and have a modified Hachinski of 4. All HVs and all patients with probable AD must be able to comply with all study procedures. Study design: This is a Phase 1, open-label, single-center, non-randomized single dose study to assess the kinetics, clearance and cerebral distribution of PBR-111 PET imaging in detecting microglial activation in the brain in patients with probable AD compared to HVs. All aspects related to image acquisition, processing, and visual as well as quantitative evaluation will be developed, optimized, and validated (where required). Each subject will be required to visit the study center during the screening phase and on the PBR-111 PET imaging day (baseline). A telephone follow-up visit will be performed 7 days (± 3 days) after PBR-111 PET administration. At the screening visit, each subject (or caregiver in the case of AD subjects) will be asked to provide written informed consent or assent. During the screening phase (maximum duration of 60 days) subject medical, neurological, and surgical history, clinical assessments, and a neuro-psychiatric evaluation will be performed on all eligible subjects. Subjects will be allowed to leave the center after all evaluations have been completed. During this period an MRI of the brain will be performed during the screening period. If an MRI of the brain has been performed within six months of the imaging visit using the methods described in the protocol, and there has been no medically significant events in the interim, the previous MRI may be used. During the PBR-111 PET imaging day, all subjects will receive a single intravenous injection of PBR-111 and scanning will be performed over a 3.5 hour period. Each subject will have a telephone follow-up 7 days (± 3 days) thereafter to assess for adverse events. Methodology: - Assessments to provide clinical characterization of the AD subjects will be performed. - After administration of PBR-111, images will be generated with state-of-the-art PET imaging. Images will be assessed quantitatively for the presence of microglial activation by a nuclear physician blinded to clinical data. - Total radioactivity and estimation of the fraction of radioactivity associated to the un-metabolized tracer will be determined. In addition, the metabolite patterns of PBR-111 are determined in venous plasma and arterial samples based on high-performance liquid chromatography (HPLC) analyses. - Arterial sampling will be acquired in the initial two AD and two HV subjects and modeling will be assessed to determine if additional arterial sampling is necessary.

97 MATHEMATICS AND COMPUTING↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

A Comparison of RESRAD and GoldSim Models for Assessing Radiological Dose for a RCRA Landfill - 20418

US Ecology Idaho (USEI) operates a Resource Conservation and Recovery Act (RCRA) Subtitle C, Hazardous Waste Treatment, Storage, and Disposal (TSD) Facility on a 640-acre property in Owyhee County, Idaho. USEI accepts a wide variety of RCRA-exempt low activity radioactive wastes, including naturally occurring radioactive material (NORM) and technologically enhanced NORM (TENORM) (USEI 2009). The performance of the landfill with regard to radiological operating permit requirements was previously assessed using a model constructed with the residual radioactivity (RESRAD) computer program, developed by Argonne National Laboratory for the U.S. Department of Energy (DOE). RESRAD supports the evaluation of several environmental transport pathways related to a radionuclide-contaminated soil source term, but it was not conceived as a model for the evaluation of landfill radiological performance. A more comprehensive and realistic model is desired in order to better support submissions to both the State of Idaho's Department of Environmental Quality as well as the U.S. Nuclear Regulatory Commission. A Performance Assessment (PA) computer model was developed using GoldSim software for the USEI RCRA Subtitle C landfill. The RESRAD computer model was specifically developed for calculating soil cleanup criteria and radiological dose and cancer risk from residual radioactive material in soil. To evaluate site-specific conditions, users may select from among a number of available environmental transport and exposure pathways and modify 'default' parameter values. In GoldSim, a user must construct the model 'from scratch.' However, this modeling is facilitated by a number of specialized elements available in GoldSim to support a radiological mass transport model. These include elements for defining radiological decay and ingrowth, container failure and radiological release, advective and diffusive transport, and other processes. Advantages afforded by the use of RESRAD for modeling radiological dose for a RCRA Subtitle C landfill include ease of use and reasonable flexibility in specifying site-specific conditions. GoldSim allows for considerably more flexibility and site-specificity than RESRAD, including evaluation of potentially relevant environmental transport processes not supported in RESRAD. The probabilistic modeling capabilities of GoldSim also far exceed those of RESRAD. The pros and cons of RESRAD and GoldSim for this modeling problem are explored with a focus on identifying approaches and critical factors in identifying the appropriate platform. The capabilities of RESRAD and GoldSim for mathematically modeling the disposal system will be contrasted and compared. For example, the existing RESRAD radiological safety assessment evaluated potentially complete exposure pathways related to infiltration to groundwater and upwards diffusion of radon. Additional transport pathways identified in the USEI Idaho facility Conceptual Site Model include deposition of radon decay products in cover material, root uptake of radionuclides in disposed wastes by native plants, and mixing of cover material by burrowing animals. Results of the two models and how the different transport and dose pathways affect results will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis of the Area 3 Radioactive Waste Management Site at the Nevada National Security Site, Nye County, Nevada

This report describes the methods and results of a special analysis (SA) of the Area 3 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The purpose of the SA is to determine if the approved performance assessment (PA) and composite analysis (CA) (Shott et al., 2001) remain valid. The Area 3 RWMS PA and CA were prepared as a single document and received conditional approval on October 6, 1999. A conditional Disposal Authorization Statement (DAS) for the Area 3 RWMS was issued on October 20, 1999. Since preparation of the approved PA and CA, new information and additional environmental monitoring data have been used to update the PA and CA. At the same time, continual advancements in computer processors and software have allowed improvement to the PA and CA models. Annual reviews of the PA and CA required by U.S. Department of Energy (DOE) Order DOE O 435.1 have documented multiple changes occurring since preparation of the PA and CA. Potentially important changes include: Development of a new and improved baseline PA and CA model implemented in the probabilistic GoldSim simulation platform. A significant increase in the waste inventory disposed at the site. Revision and updating of model parameters based on additional years of site monitoring data and new research and development results. Although changes have occurred, many important PA/CA issues remain unchanged, including the site conceptual model, important features, events, and processes, and the points of compliance. The SA is performed to document the current status of the PA/CA model and to quantitatively assess the impact of cumulative changes on the PA and CA results. The results of the SA are used to assess the validity of the approved PA/CA and make a determination if revision of the PA or CA is necessary. The SA was performed using the Area 3 RWMS, version 2.102, GoldSim model, the current baseline PA/CA model. Comparison of the maximum SA results with the PA performance objectives indicates that there continues to be a reasonable expectation of compliance. The resident exposure scenario was evaluated for compliance with the air pathway and all-pathways annual total effective dose (TED) performance objectives. The maximum mean air pathway TED, 7E-6 millisievert (mSv) at 1,000 years (y) has decreased relative to the approved PA and is significantly less than the 0.1 mSv limit. The maximum mean all-pathways annual TED, 7E-5 mSv at 1,000 y has increased but remains a small fraction of the 0.25 mSv limit. The SA maximum mean radon-222 (222Rn) flux density, 0.03 becquerel per square meter per second (Bq m-2 s-1), has increased relative to the PA results but is significantly less than the 0.74 Bq m-2 s-1 limit. The SA results continue to support a conclusion that the disposed waste inventory is protective of intruders and groundwater resources. The maximum mean intruder TED, 0.01 mSv for an acute construction scenario at the U-3ah/at disposal unit, was less than the 5 mSv performance measure. Site monitoring data and research results continue to support a conclusion that a groundwater pathway will not exist within the 1,000 y compliance period. Projected releases to the environment are a small fraction of the performance objectives. Cost-effective options for reducing releases further are unlikely to exist. Therefore, releases from the Area 3 RWMS are judged to be as low as reasonably achievable. Comparison of the maximum CA result with the 0.3 mSv CA dose constraint indicates that no action is required to reduce the dose from the Area 3 RWMS and all interacting sources of residual radioactive contamination. The SA maximum mean CA annual TED, 0.02 mSv at 1,000 y, has increased from the approved CA result but remains less than 10% of the dose constraint. The CA TED continues to be due predominantly to inhalation of plutonium-239 resuspended from soils contaminated by nuclear weapons tests conducted near the Area 3 RWMS. The SA results estimated with the Area 3 RWMS version 2.102 model indicate that changes to the PA and CA do not significantly alter the PA/CA results or conclusions. Although increases occur for the all-pathways annual TED, the 222Rn flux density, and the CA annual TED, all PA and CA results are a small fraction of the performance objectives or dose constraints. The same conclusion was reached for the approved PA and CA. The SA results continue to support a conclusion that there is a reasonable expectation of meeting all performance objectives and the CA dose constraint. There is no need to revise the DAS at this time. The SA results support a conclusion that the Area 3 RWMS PA and CA remain valid, and revision is not necessary at this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Discovering the desirable alleles contributing to the lignocellulosic biomass traits in saccharum germplasm collections for energy cane improvement

Phenotyping Methods: The accessions (which includes 21 taxa and 1,177 accessions) in the World Collection of Sugarcane and Related Grasses (WCSRG) was evaluated for the following traits: arenchyma, internode length and diameter, pubescence, pith, Brix, stalk number and fiber. A core of 300 accessions that included each species in the World Collection was selected by using the Maximization Strategy in MStrat software. Results: The core had a higher diversity rating than random selections of 300 accessions. The Shannon–Weaver Diversity Index scores of the core and whole collection were similar indicating that the majority of the diversity was captured by the core collection. The ranges and medians between the core and WCSRG were similar; only two of the trait medians were not significant at P = 0.05 using the non-parametric Wilcoxon method and the coincidence rate (CR % = 96.2) was high (>80) indicating that extreme values were retained. Thus, the phenotypic diversity of these traits in the WCSRG was well represented by the core collection. Associations Methods: Genotypic and phenotypic data were collected for 1002 accessions of the WCSRG including 209 SSR markers. Association analysis was performed using both General Linear (GLM) and Maximum Likelihood (MLM) models. Different core collections with 300 accessions each were selected based on genotypic, phenotypic and combined data based on the Maximization Strategy in MStrat software. Results: A major portion of the genotyping involving SNPs is being conducted by Dr. Jianping Wang of the University of Florida under the DOE award DE-FG 02-11ER 65214 and the genotypic and phenotypic associations will be reported separately next year. In the current, study forty one and seventeen markers were found to be associated with traits using the GLM and MLM methods respectively including associations with arenchyma, internode length and diameter, pubescence, pith, and Sugar Cane Yellow Leaf Virus. The data indicates that each of the cores and the World Collection are similar to each other genotypically and phenotypically, but the core that was selected using only genotypic data was significantly different phenotypically. This indicates that there is not enough association between the genotypic and phenotypic diversity as to select using only genotypic diversity and get the full phenotypic diversity. Core Collection: Creation and Phenotyping Methods: To evaluate this germplasm for breeding purposes, a representative diversity panel selected from the WCSRG of approximately 300 accessions was planted at Canal Point, FL in three replications. These accessions were measured for stalk height and stalk number multiple times throughout the growing season and Brix and fresh biomass during harvest in 2013 and, stalk height, stalk number, stalk diameter, internode length, Brix and fresh and dry biomass was determined in the ratoon crop harvest in 2014. Results: In correlations of multiple measurements, there were higher correlations for early measurements of stalk number and stalk height with harvest traits like Brix and fresh weight. Hybrids had higher fresh mass and Brix while Saccharum spontaneum had higher stalk number and dry mass. The heritability of hybrid mass traits was lower in the ratoon crop. According to the principal component analysis, the diversity panel was divided into two groups. One group had accessions with high stalk number and high dry biomass like S. spontaneum and the other groups contained accessions with higher Brix and fresh biomass like S. officinarum. Mass traits correlated with each other as expected but hybrids had lower correlations between fresh and dry mass. Stalk number and the mass traits correlated with each other except in S. spontaneum and hybrids in the first ratoon. There were 110 accessions not significantly different in Brix from the commercial sugarcane checks including 10 S. spontaneum accessions. There were 27 dry and 6 fresh mass accessions significantly higher than the commercial sugarcane checks. Core Collection: Fiber analysis Methods: A biomass sample was taken from each accession then shredded and dried. Fiber analysis was then performed on each sample. The acetyl groups, acid insoluble lignin, acid soluble lignin, arabinan, glucan, holocellulose, total lignin, structural ash, and xylan were quantified on a % fiber basis and nonstructural ash on a % total basis. Results: There were significant, but not large differences between species for holocellulose, lignin, acetyl, acid soluble lignin, nonstructural ash, and glucan. For each trait, S. spontaneum had significantly more holocellulose, glucan, lignin, and nonstructural ash and less acetyl and acid soluble lignin than the other species. In all populations, glucan and was positively correlated with holocellulose were positively correlated and glucan and and holocellulose were negatively correlated with lignin. In hybrids, internode length correlated positively with holocellulose and nonstructural ash and negatively with lignin. The heritability estimates for each of the fiber component traits is low indicating that environment is an important factor in fiber composition. Principal component analysis indicated that a large amount of diversity exists within each of the species.

09 BIOMASS FUELS↗

A Pilot Study of the Effectiveness of Indoor Plants for Removal of Volatile Organic Compounds in Indoor Air in a Seven-Story Office Building

The Paharpur Business Centre and Software Technology Incubator Park (PBC) is a 7 story, 50,400 ft{sup 2} office building located near Nehru Place in New Delhi India. The occupancy of the building at full normal operations is about 500 people. The building management philosophy embodies innovation in energy efficiency while providing full service and a comfortable, safe, healthy environment to the occupants. Provision of excellent Indoor Air Quality (IAQ) is an expressed goal of the facility, and the management has gone to great lengths to achieve it. This is particularly challenging in New Delhi, where ambient urban pollution levels rank among the worst on the planet. The approach to provide good IAQ in the building includes a range of technical elements: air washing and filtration of ventilation intake air from rooftop air handler, the use of an enclosed rooftop greenhouse with a high density of potted plants as a bio-filtration system, dedicated secondary HVAC/air handling units on each floor with re-circulating high efficiency filtration and UVC treatment of the heat exchanger coils, additional potted plants for bio-filtration on each floor, and a final exhaust via the restrooms located at each floor. The conditioned building exhaust air is passed through an energy recovery wheel and chemisorbent cartridge, transferring some heat to the incoming air to increase the HVAC energy efficiency. The management uses 'green' cleaning products exclusively in the building. Flooring is a combination of stone, tile and 'zero VOC' carpeting. Wood trim and finish appears to be primarily of solid sawn materials, with very little evidence of composite wood products. Furniture is likewise in large proportion constructed from solid wood materials. The overall impression is that of a very clean and well-kept facility. Surfaces are polished to a high sheen, probably with wax products. There was an odor of urinal cake in the restrooms. Smoking is not allowed in the building. The plants used in the rooftop greenhouse and on the floors were made up of a number of species selected for the following functions: daytime metabolic carbon dioxide (CO{sub 2}) absorption, nighttime metabolic CO{sub 2} absorption, and volatile organic compound (VOC) and inorganic gas absorption/removal for air cleaning. The building contains a reported 910 indoor plants. Daytime metabolic species reported by the PBC include Areca Palm, Oxycardium, Rubber Plant, and Ficus alii totaling 188 plants (21%). The single nighttime metabolic species is the Sansevieria with a total of 28 plants (3%). The 'air cleaning' plant species reported by the PBC include the Money Plant, Aglaonema, Dracaena Warneckii, Bamboo Palm, and Raphis Palm with a total of 694 plants (76%). The plants in the greenhouse (Areca Palm, Rubber Plant, Ficus alii, Bamboo Palm, and Raphis Palm) numbering 161 (18%) of those in the building are grown hydroponically, with the room air blown by fan across the plant root zones. The plants on the building floors are grown in pots and are located on floors 1-6. We conducted a one-day monitoring session in the PBC on January 1, 2010. The date of the study was based on availability of the measurement equipment that the researchers had shipped from Lawrence Berkeley National Lab in the U.S.A. The study date was not optimal because a large proportion of the regular building occupants were not present being New Year's Day. An estimated 40 people were present in the building all day during January 1. This being said, the building systems were in normal operations, including the air handlers and other HVAC components. The study was focused primarily on measurements in the Greenhouse and 3rd and 5th floor environments as well as rooftop outdoors. Measurements included a set of volatile organic compounds (VOCs) and aldehydes, with a more limited set of observations of indoor and outdoor particulate and carbon dioxide concentrations. Continuous measurements of Temperature (T) and relative humidity (RH) were made selected indoor and outdoor locations.

54 ENVIRONMENTAL SCIENCES↗

Annual Report: Carbon Capture Simulation Initiative (CCSI) (30 September 2013)

The Carbon Capture Simulation Initiative (CCSI) is a partnership among national laboratories, industry and academic institutions that is developing and deploying state-of-the-art computational modeling and simulation tools to accelerate the commercialization of carbon capture technologies from discovery to development, demonstration, and ultimately the widespread deployment to hundreds of power plants. The CCSI Toolset will provide end users in industry with a comprehensive, integrated suite of scientifically validated models, with uncertainty quantification (UQ), optimization, risk analysis and decision making capabilities. The CCSI Toolset incorporates commercial and open-source software currently in use by industry and is also developing new software tools as necessary to fill technology gaps identified during execution of the project. Ultimately, the CCSI Toolset will (1) enable promising concepts to be more quickly identified through rapid computational screening of devices and processes; (2) reduce the time to design and troubleshoot new devices and processes; (3) quantify the technical risk in taking technology from laboratory-scale to commercial-scale; and (4) stabilize deployment costs more quickly by replacing some of the physical operational tests with virtual power plant simulations. CCSI is led by the National Energy Technology Laboratory (NETL) and leverages the Department of Energy (DOE) national laboratories’ core strengths in modeling and simulation, bringing together the best capabilities at NETL, Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), and Pacific Northwest National Laboratory (PNNL). The CCSI’s industrial partners provide representation from the power generation industry, equipment manufacturers, technology providers and engineering and construction firms. The CCSI’s academic participants (Carnegie Mellon University, Princeton University, West Virginia University, Boston University and the University of Texas at Austin) bring unparalleled expertise in multiphase flow reactors, combustion, process synthesis and optimization, planning and scheduling, and process control techniques for energy processes. During Fiscal Year (FY) 13, CCSI announced the initial release of its first set of computational tools and models during the October 2012 meeting of its Industry Advisory Board. This initial release led to five companies licensing the CCSI Toolset under a Test and Evaluation Agreement this year. By the end of FY13, the CCSI Technical Team had completed development of an updated suite of computational tools and models. The list below summarizes the new and enhanced toolset components that were released following comprehensive testing during October 2013. 1. FOQUS. Framework for Optimization and Quantification of Uncertainty and Sensitivity. Package includes: FOQUS Graphic User Interface (GUI), simulation-based optimization engine, Turbine Client, and heat integration capabilities. There is also an updated simulation interface and new configuration GUI for connecting Aspen Plus or Aspen Custom Modeler (ACM) simulations to FOQUS and the Turbine Science Gateway. 2. A new MFIX-based Computational Fluid Dynamics (CFD) model to predict particle attrition. 3. A new dynamic reduced model (RM) builder, which generates computationally efficient RMs of the behavior of a dynamic system. 4. A completely re-written version of the algebraic surrogate model builder for optimization (ALAMO). The new version is several orders of magnitude faster than the initial release and eliminates the MATLAB dependency. 5. A new suite of high resolution filtered models for the hydrodynamics associated with horizontal cylindrical objects in a flow path. 6. The new Turbine Science Gateway (Cluster), which supports FOQUS for running multiple simulations for optimization or UQ using a local computer or cluster. 7. A new statistical tool (BSS-ANOVA-UQ) for calibration and validation of CFD models. 8. A new basic data submodel in Aspen Plus format for a representative high viscosity capture solvent, 2-MPZ system. 9. An updated RM tool for CFD (REVEAL) that can create a RM from MFIX. A new lightweight, stand-alone version will be available in late 2013. 10. An updated RM integration tool to convert the RM from REVEAL into a CAPE-OPEN or ACM model for use in a process simulator. 11. An updated suite of unified steady-state and dynamic process models for solid sorbent carbon capture included bubbling fluidized bed and moving bed reactors. 12. An updated and unified set of compressor models including steady-state design point model and dynamic model with surge detection. 13. A new framework for the synthesis and optimization of coal oxycombustion power plants using advanced optimization algorithms. This release focuses on modeling and optimization of a cryogenic air separation unit (ASU). 14. A new technical risk model in spreadsheet format. 15. An updated version of the sorbent kinetic/equilibrium model for parameter estimation for the 1st generation sorbent model. 16. An updated process synthesis superstructure model to determine optimal process configurations utilizing surrogate models from ALAMO for adsorption and regeneration in a solid sorbent process. 17. Validation models for NETL Carbon Capture Unit utilizing sorbent AX. Additional validation models will be available for sorbent 32D in 2014. 18. An updated hollow fiber membrane model and system example for carbon capture. 19. An updated reference power plant model in Thermoflex that includes additional steam extraction and reinjection points to enable heat integration module. 20. An updated financial risk model in spreadsheet format.

01 COAL, LIGNITE, AND PEAT↗

Evaluating the Effectiveness of an Ultrasonic Acoustic Deterrent in Reducing Bat Fatalities at Wind Energy Facilities

This project was designed to use thermal video cameras and fatality monitoring to evaluate the effectiveness of an ultrasonic acoustic deterrent (UAD) on bat activity and mortality, respectively. Our goals were to redesign the UAD device and installation infrastructure, determine the placement on wind turbines to optimize safety, compatibility and functionality, and to compare the mortality among the following conditions: Control (deterrents off and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Deterrent (deterrents on and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Curtailment (deterrents off and turbines feathered up to 5/ m/s), and combination (deterrents on and turbines feathered up to 5 m/s). The project was divided into a Feasibility Study and Comparative Study. The objectives for the Feasibility Study were to develop an installation strategy, redesign a previous iteration of a UAD to improve performance and weatherization, and test the effectiveness of the deterrents on bat activity. The Feasibility Study was intended to work out potential issues using a relatively small number of devices prior to manufacturing and installing numerous devices for a larger-scale comparative study. The division of the project into these separate studies was based on previous experience and the challenges of assessing the capabilities of an untested UAD. During the initial development and manufacturing of the UAD, NRG Systems decided to use a piezoelectric transducer rather than an electrostatic transducer, which was used by a previous device (i.e. Deaton UAD). NRG Systems conducted lab testing (i.e., IP67 or Ingress Protection) to ensure no water or dust ingress. In addition, shock/drop trials and variations in temperature exposure were conducted as part of the reliability testing. NRG Systems also developed a communications system to allow for continuous performance monitoring of the UADs. For the Feasibility Study, we installed 6 UADs on each of 2 Gamesa G90 2-MW wind turbines (Turbine 14 and 8) at the South Chestnut Wind Energy Facility, Pennsylvania and monitored activity under control and treatment (i.e. Deterrent) conditions using thermal video monitoring. There are two major sources of variation in bat activity (beyond the anticipated treatment effect): 1) environment around the turbines might inherently favor more activity at one than the other; 2) weather conditions on any given night or within season difference (e.g., migration later during the study period) might favor more activity on some nights than on other nights. Because we could only monitor two turbines on any night, we sought to control the potential influences of these two sources by alternating the turbine on which deterrents were activated each night. If there were no loss of data due to technical failures, this design would result in an equal number of deterrent and control nights at each turbine through the monitoring period, balancing the effects of both sources of variation. We compared the time bats spent and the number of events that occurred in overlapping cameras FOV as an indicator of risk, since 80% of the overlapping FOV of the cameras was in the RSA. Equipment failures, majority due to lightning, resulted in only 17 nights with useable data, with unbalanced treatment assignment within turbines and uneven distribution of treatment assignment throughout the observational period. This resulted in a confounding of treatment assignment and seasonal change. Deterrent treatment was measured at Turbine 14 on only 2 of the first 8 usable nights (spanning the period from 8/18-9/17), whereas 6 times on Turbine 8. From 9/18-927, deterrent was on at Turbine 14 on 6 of the remaining 10 nights, and 4 on Turbine 8. We recorded a total of 1,057 bats and observed a reduction in number of events and duration of events at the UAD-activated turbine when it was Turbine 14. When Turbine 8 had the UAD activated, we observed no difference in number or duration of events. Variation between turbines is not unusual and can cause issues when study designs have no true replication, i.e., multiple turbines per treatment. Within-turbine differences suggested a trend for reduced activity when UADs were activated, particularly for Turbine 14. These results may be caused by the overall higher bat activity at Turbine 8 and confounding of treatment assignment and seasonal trends. We mapped 58 bat events in 3-dimensional space (3D), 30 and 28 events during control and treatment conditions, respectively. We observed bats crossing the rotor plane under both control and treatment conditions and observed a total of 40 confirmed or near-collisions (i.e., target close to blade but no visual confirmation of a strike) out of a total of 1,491 medium and high confidence bat observations (880 control, 611 at treatment). Twice as many collisions/possible collisions were observed during control conditions. Given the challenges with the equipment and potential confounding of the data (i.e., different activity levels at the two wind turbines), we were unable to determine whether this initial turbine placement and orientation was optimal. Given no new information on how best to install the devices, we elected to use the same placement and orientation for the comparative study. For the Comparative Study, the objectives were to investigate the relative mortality rates among 4 treatments. We searched the area within 90 m of each turbine daily to recover the highest number of fresh fatalities possible. We were unable to detect a clear reduction in mortality from deterrents alone for any individual species. Surprisingly, mortality rate of the eastern red bat (Lasiurus borealis) was estimated to be 1.3–4.2 times as much when turbines were operating normally and UADs were on than when UADs were off. Reduction in mortality of all bat species combined due to curtailment of turbines was estimated to be between 0%–38%. This effect was nullified when, in addition to curtailment, UADs were on, with 95% confidence interval ranging from a 45% reduction to a 36% increase in mortality. This was likely due to the large proportion of eastern red bats in the total carcass population. Mortality of all low-frequency echolocating bats combined (i.e. hoary bat [L. cinereus], big brown bat [Eptesicus fuscus], silver-haired bat [Lasionycteris noctivagans]) relative to control was lower when curtailed (95% CI: 0%–74%), but the addition of UADs had no detectable effect (95%CI: 13%–79%). The combined treatment reduced mortality in silver-haired bats relative to control by 11%–99%, compared to curtailment (81% reduction–67% increase) or deterrent (82% reduction–67% increase) alone. Because silver-haired bats comprised a large proportion of low-frequency calling bats found during this study, a similar effect was seen for that group. The higher mortality observed for eastern red bats at UAD compared to control could have been caused by several factors, such as the effective range of the UAD, particularly at higher frequencies, behavior, positioning of the devices on the nacelle, or a combination of these. We used 3D thermal videography to compare control and UAD bat behavior from two turbines using a total of 203 3D bat-tracks across 34 nights. We recorded a similar number of bat-tracks between treatment groups, with 51% and 49% for control and UAD, respectively. Due to potential differences in bat behavior around spinning vs stationary turbine blades, we examined UAD effectiveness separately for non-operating turbines (feathered below cut-in speed of 3.5 m/s) and operating (normal operation above wind speed of 3.5 m/s). We found a higher proportion of bat-tracks at operating turbines (82%) compared to non-operating turbines (18%), although this does not account for overall time turbines were operating versus not. At non-operating turbines the UAD appears to be effective at reducing the amount of time, flight length, and number of passes through the rotor plane, compared to control. In addition, we found bats approached turbines similarly between control and treatment turbines, with 61% of control and 63% of UAD bat-tracks originating leeward of the hub. In contrast, at operating turbines, we saw little change in bat behavior in response to UADs. For example, we found an increase in the average duration of bat-tracks between non-operating and operating turbines for UAD but at control turbines we found average duration decreased once turbines became operational. Both control and UAD had a high proportion of bat-tracks that crossed the rotor plane (i.e., collision risk) originate from the windward side when turbines were operational 65% to 92%, respectively. Given that the UAD devices closest to the blades were orientated parallel to the blades, its possible bats were not exposed to the signal until they were close to the turbine blades, as suggested by the slightly higher mean duration within 5 meters of the blades for UAD turbines. Future research should consider concentrating UAD intensity on the areas of risk (i.e. blades) with enough buffer to allow bats to react to the sound before entering the rotor-swept area (RSA). In addition, investigating the potential of installing UAD units windward of the turbine blades (e.g. a hub-mounted UAD), particularly since even under control conditions, a relatively high proportion (65%) of crosses through the blade plane originated windward. 3D thermal videography provided valuable information on future testing strategies (e.g. device placement, UAD orientation) to improve UAD effectiveness when bats are at risk (i.e., operating wind turbines). Across the entire project we experienced issues with the operation and communication with the UADs. Most of the issues occurred during the Feasibility Study and were resolved prior to the Comparability Study. Additional challenges surfaced during the Comparability Study but were remedied immediately and are thought to have little impact on the results. We had logistical constraints at the project that limited our ability use traditional methods in our camera calibration. Several calibrations showed inaccurate scales, which may have been related to inadequate spatial coverage of “points” in the camera calibration volume. Because we were using actual video recordings of bats at a wind turbine, the behavior of bats could have concentrated “points” in specific areas of the turbine (i.e. leeward of nacelle), and limited “points” in other areas, resulting in camera calibration issues. We have plans to address these inconsistencies and improving the software and related methodologies by early 2020.

17 WIND ENERGY↗