Joint munitions program technology transition opportunity.
No abstract prepared.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract prepared.
In 1999 an integrated biological control system was instituted at the U.S. Department of Energy's Hanford Site. Successes and changes to the program needed to be communicated to a large and diverse mix of organizations and individuals. Efforts at communication are directed toward the following: Hanford Contractors (Liquid or Tank Waste, Solid Waste, Environmental Restoration, Science and Technology, Site Infrastructure), General Hanford Employees, and Hanford Advisory Board (Native American Tribes, Environmental Groups, Local Citizens, Washington State and Oregon State regulatory agencies). Communication was done through direct interface meetings, individual communication, where appropriate, and broadly sharing program reports. The objectives of the communication efforts was to have the program well coordinated with Hanford contractors, and to have the program understood well enough that all stakeholders would have confidence in the work performed by the program to reduce or elimated spread of radioactive contamination by biotic vectors. Communication of successes and changes to an integrated biological control system instituted in 1999 at the Department of Energy's Hanford Site have required regular interfaces with not only a diverse group of Hanford contractors (i.e., those responsible for liquid or tank waste, solid wastes, environmental restoration, science and technology, and site infrastructure), and general Hanford employees, but also with a consortium of designated stake holders organized as the Hanford Advisory Board (i.e., Native American tribes, various environmental groups, local citizens, Washington state and Oregon regulatory agencies, etc.). Direct interface meetings, individual communication where appropriate, and transparency of the biological control program were the methods and outcome of this effort.
Workflow Management Systems (WFMS), such as Kepler, are proving to be an important tool in scientific problem solving. They can automate and manage complex processes and huge amounts of data produced by petascale simulations. Typically, the produced data need to be properly visualized and analyzed by scientists in order to achieve the desired scientific goals. Both run-time and post analysis may benefit from, even require, additional meta-data - provenance information. One of the challenges in this context is the tracking of the data files that can be produced in very large numbers during stages of the workflow, such as visualizations. The Kepler provenance framework collects all or part of the raw information flowing through the workflow graph. This information then needs to be further parsed to extract meta-data of interest. This can be done through add-on tools and algorithms. We show how to automate tracking specific information such as data files locations.
No abstract prepared.
Requirements for the control of electric lighting in daylighted areas have historically been avoided in the national building energy codes. This is potentially a rich source of energy savings but as most lighting designers and architects know, daylighting design is not simple! The sheer complication of daylighting design makes crafting daylighting control requirements that could be applied generically in a national energy code a difficult task. However, that is currently changing. The Department of Energy’s (DOE) Building Energy Codes Program (BECP) managed by Pacific Northwest National Laboratory (PNNL) has been supporting the ANSI/ASHRAE/IESNA 90.1 committee in developing improvements to the 90.1 Standard. With subcontract support, the 90.1 Lighting Subcommittee has championed the incorporation of daylighting design and control requirements for the upcoming 2010 version of the nationally available ANSI/ASHRAE/IESNA Standard 90.1 for commercial building energy use.
The U.S. Department of Energy DOE Order 413.3A (Program and Project Management for the Acquisition of Capital Assets) identifies major milestones in a project life cycle that require approval upon achievement, including Critical Decision-4 (CD-4), the project completion milestone. A CD-4 document is required for all DOE projects in accordance with DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. A conditional CD-4 report was prepared for the Melton Valley Completion Project (MVCP) in order to document the completion of the remedial action in the Melton Valley watershed. Approval of the MVCP CD-4 was 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in one of the waste trenches that were to be remediated as part of the completion project. This paper will provide an overview of the MVCP remediation work and the process successfully used to demonstrate closeout of a major CERCLA project in accordance with DOE requirements. In summary: The MV ROD was planned to be completed in 12 years; however, under the ACP the remedial activities were completed 6 years ahead of schedule (September 2006). Highlights of the remedial actions include: - Completion of remedial action activities at 219 release sites identified in the MV ROD. - Construction of 58 hectares of multilayer caps for SWSA 4, SWSA 5, SWSA 6, Pits 2, 3 and 4 and Trenches 5, 6, and 7; - Complete excavation, retrieval and over-pack of 204 casks, 8 boxes, and 530 m{sup 3} of loose waste from the TRU waste retrieval project; - Complete demolition and disposition of approx. 557 m{sup 2} of various buildings such as HRE ancillary facilities, NHF, Liquid LLW pumping stations, 7841 Scrap Yard, misc. storage buildings, and well P and A; - Removal of LLW sludges and stabilization of T-1, T-2, and HFIR tanks; - In situ grouting/stabilization of approx. 12 km of inactive waste pipelines; - Excavation and disposition of approx. 38,000 m{sup 3} of soil from HFIR impoundments, HRE cryogenic pond, IHP and contaminated soil from miscellaneous leak sites; - Completion of in-situ grouting of LLLW matrix at Trenches 5 and 7. The CD-4 document to demonstrate attainment of the project completion milestone was prepared to document close-out activities. Approval of the MVCP CD-4 was obtained but deemed 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in Trench 13 of the 22 Trench Area in SWSA 5N. DOE is currently evaluating options for the final disposition of this material and has committed to resolution of the issue by the end of Fiscal Year 2008. At that time, all aspects of the Melton Valley Completion Project will be complete. (authors)
Highlights: • A multistage type-2-fuzzy interval-stochastic programming (MTIP) method is developed. • Air quality index (AQI) is introduced to manage energy and environmental systems. • AQI-MTIP model is formulated and results for Tianjin's EES are generated. • Impacts of environmental requirements on energy systems is analyzed. • Results can provide support for making effective pollutant mitigation policy. In this study, a multistage type-2-fuzzy interval-stochastic programming (MTIP) method is developed, which extends upon the existing multistage stochastic programming (MSP) by allowing uncertainties expressed as probabilistic distributions, interval values and type-2 fuzzy sets to be effectively incorporated within the optimization framework. Through coupling air quality index (AQI) with MTIP, an AQI-MTIP model is formulated for energy and environmental systems (EES) management of Tianjin. A number of scenarios based on changed AQIs are examined to analyze the impacts of environmental requirements on the city's energy system. Results indicate that (i) with the improvement of environmental requirement, utilization of clean energies (especially natural gas) is provoked markedly; (ii) PM{sub 2.5} is the primary pollutant, 64.50% of which should be reduced each period to maintain the city's air quality at a health-safe level. These findings can help decision makers adjust energy structure, make effective mitigation strategy, and gain deep insight into the relationship between energy consumption and environmental requirement.
In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.
In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.
This paper describes a safety design basis documentation change control process. The process identifies elements that can be used to manage the project/facility configuration during design evolution through the Initiation, Definition, and Execution project phases. The project phases addressed by the process are defined in US Department of Energy (DOE) Order (O) 413.3A, Program and Project Management for the Acquisition of Capital Assets, in support of DOE project Critical Decisions (CD). This approach has been developed for application to two Hanford Site projects in their early CD phases and is considered to be a key element of safety and design integration. As described in the work that has been performed, the purpose of change control is to maintain consistency among design requirements, the physical configuration, related facility documentation, and the nuclear safety basis during the evolution of the design. The process developed (1) ensures an appropriate level of rigor is applied at each project phase and (2) is considered to implement the requirements and guidance provided in DOE-STD-1189-2008, Integration of Safety into the Design Process. Presentation of this work is expected to benefit others in the DOE Complex that may be implementing DOE-STD-1189-2008 or managing nuclear safety documentation in support of projects in-process.
The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.
Highlights: • The multi-objective multi-period optimization model. • The solution approach for the generation of the Pareto front with mathematical programming. • The very detailed description of the model (decision variables, parameters, equations). • The use of IPCC 2006 guidelines for landfill emissions (first order decay model) in the mathematical programming formulation. - Abstract: In this study a multi-objective mathematical programming model is developed for taking into account GHG emissions for Municipal Solid Waste (MSW) management. Mathematical programming models are often used for structure, design and operational optimization of various systems (energy, supply chain, processes, etc.). The last twenty years they are used all the more often in Municipal Solid Waste (MSW) management in order to provide optimal solutions with the cost objective being the usual driver of the optimization. In our work we consider the GHG emissions as an additional criterion, aiming at a multi-objective approach. The Pareto front (Cost vs. GHG emissions) of the system is generated using an appropriate multi-objective method. This information is essential to the decision maker because he can explore the trade-offs in the Pareto curve and select his most preferred among the Pareto optimal solutions. In the present work a detailed multi-objective, multi-period mathematical programming model is developed in order to describe the waste management problem. Apart from the bi-objective approach, the major innovations of the model are (1) the detailed modeling considering 34 materials and 42 technologies, (2) the detailed calculation of the energy content of the various streams based on the detailed material balances, and (3) the incorporation of the IPCC guidelines for the CH{sub 4} generated in the landfills (first order decay model). The equations of the model are described in full detail. Finally, the whole approach is illustrated with a case study referring to the application of the model in a Greek region.
In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.
During Fiscal Year 2012, a team from the Pacific Northwest National Laboratory (PNNL) conducted an assessment and analysis of the Second Line of Defense (SLD) Sustainability spare parts program. Spare parts management touches many aspects of the SLD Sustainability Program including contracting and integration of Local Maintenance Providers (LMP), equipment vendors, analyses and metrics on program performance, system state of health, and maintenance practices. Standardized spares management will provide better data for decisions during site transition phase and will facilitate transition to host country sustainability ownership. The effort was coordinated with related SLD Sustainability Program initiatives, including a configuration items baselining initiative, a metrics initiative, and a maintenance initiative. The spares study has also led to pilot programs for sourcing alternatives that include regional intermediate inventories and partnering agreements that leverage existing supply chains. Many partners from the SLD Sustainability program contributed to and were consulted in the course of the study. This document provides a description of the findings, recommendations, and implemented solutions that have resulted from the study.
The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)
The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)