Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task, C++”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

PETSc Users Manual (Rev. 3.5)

This manual describes the use of PETSc for the numerical solution of partial differential equations and related problems on high-performance computers. The Portable, Extensible Toolkit for Scientific Computation (PETSc) is a suite of data structures and routines that provide the building blocks for the implementation of large-scale application codes on parallel (and serial) computers. PETSc uses the MPI standard for all message-passing communication. PETSc includes an expanding suite of parallel linear, nonlinear equation solvers and time integrators that may be used in application codes written in Fortran, C, C++, Python, and MATLAB (sequential). PETSc provides many of the mechanisms needed within parallel application codes, such as parallel matrix and vector assembly routines. The library is organized hierarchically, enabling users to employ the level of abstraction that is most appropriate for a particular problem. By using techniques of object-oriented programming, PETSc provides enormous flexibility for users. PETSc is a sophisticated set of software tools; as such, for some users it initially has a much steeper learning curve than a simple subroutine library. In particular, for individuals without some computer science background, experience programming in C, C++ or Fortran and experience using a debugger such as gdb or dbx, it may require a significant amount of time to take full advantage of the features that enable efficient software use. However, the power of the PETSc design and the algorithms it incorporates may make the efficient implementation of many application codes simpler than “rolling them” yourself. ;For many tasks a package such as MATLAB is often the best tool; PETSc is not intended for the classes of problems for which effective MATLAB code can be written. PETSc also has a MATLAB interface, so portions of your code can be written in MATLAB to “try out” the PETSc solvers. The resulting code will not be scalable however because currently MATLAB is inherently not scalable; and PETSc should not be used to attempt to provide a “parallel linear solver” in an otherwise sequential code. Certainly all parts of a previously sequential code need not be parallelized but the matrix generation portion must be parallelized to expect any kind of reasonable performance. Do not expect to generate your matrix sequentially and then “use PETSc” to solve the linear system in parallel. Since PETSc is under continued development, small changes in usage and calling sequences of routines will occur. PETSc is supported; see the web site http://www.mcs.anl.gov/petsc for information on contacting support. A http://www.mcs.anl.gov/petsc/publications may be found a list of publications and web sites that feature work involving PETSc. We welcome any reports of corrections for this document.

97 MATHEMATICS AND COMPUTING↗

Low-Cost HTS Based Magnet System with an Inductively Coupled Pulsed Energy Extraction Protection System

In this project, RadiaBeam Technologies was tasked with developing a novel solution for a cost effective quench protection based on fast expansion of the normal zone. By inductively coupling a strong electromagnetic pulse via a resonant LC circuit, we attempted to demonstrate accelerated normal zone propagation. The AC field induces currents in the superconducting layer with the current density exceeding that of the critical current density, J c . This creates a large normal zone, uniformly distributing the dissipation through the magnet body. The method does not rely on thermal heating of the conductor, thus enabling nearly instantaneous protection. Through the course of the Phase II project, RadiaBeam Technologies continued extensive numerical modeling of the inductive quench system, re-designed and built several iterations of the POC system for testing and observed evidence of a transient partial quench being induced. However the final device was not fabricated. This was a consequence of the fundamentally complex nature of the energy extraction process and the challenges associated even with demonstrating the proof of concept in a bench top device.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Initial Site-Specific Studies for Removing SNF from Six Shutdown Sites - 18042

The US Department of Energy (DOE) is exploring options for developing a large-scale transportation system for the safe transport of spent nuclear fuel (SNF) and high-level radioactive waste to future storage or disposal facilities. This complex, large-scale transportation system will involve coordinated, integrated activities. Interfaces with various transportation and non-transportation activities must be defined, and systems must be developed to ensure successful integration when the system becomes operational. To provide an understanding of the tasks and interfaces required for the complete de-inventory of particular sites where SNF is stored, DOE solicited bids from integrating contractors to develop initial site-specific de-inventory reports. The reports were developed for several nuclear power plant sites selected to represent a range of geographic locations, existing on-site SNF storage systems, and expected transportation modal options. Each report is presented in a self-contained narrative describing a potential campaign for removing all SNF and greater-than-class-C low-level radioactive waste (GTCC waste) from each specified site. Each study narrative includes site information; an analysis of the near-site transportation infrastructure; a concept of operations for the de-inventory; an estimated budget and schedule for the duration of operations; and a safety and security plan with site-specific considerations, emergency response considerations, and recommendations for the next steps DOE could take to de-inventory the site. The reports provide cost estimates for analytical purposes only; they do not attempt to specify the party or parties responsible for the costs. These reports present a first look at how an integrating contractor might recommend removing SNF from particular sites. They are written from the perspective of the contractor and do not represent DOE's plans. At this writing, six sites have been studied: - Connecticut Yankee, - Big Rock Point, - Humboldt Bay, - Maine Yankee, - Trojan, - Kewaunee. DOE may develop de-inventory reports for all reactor sites, with an initial focus on shutdown reactor sites. The order in which sites have been selected for study should not be considered an indicator of the order used by DOE to remove SNF from the sites. Since the SNF's destination is not important for the purpose of this work, DOE tasked the contractor with planning transportation of the SNF from the site to a generic railroad location in the approximate geographical center of the United States. These reports represent an initial study of the specific sites. Per the terms of the contract, the contractor was not permitted to engage in dialogue with power plant site personnel; near-site railroad personnel; or any local, state, or regional stakeholders about the studies. DOE provided site-specific data. The contractor was tasked to rely on past corporate experience, data available from DOE, and publicly available data when making site-specific recommendations for removing all SNF from each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Working Party on International Nuclear Data Evaluation Cooperation (WPEC)

The OECD Nuclear Energy Agency (NEA) organizes cooperation between the major nuclear data evaluation projects in the world. The NEA Working Party on International Nuclear Data Evaluation Cooperation (WPEC) was established to promote the exchange of information on nuclear data evaluation, measurement, nuclear model calculation, validation, and related topics, and to provide a framework for cooperative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint activities in the framework of dedicated WPEC subgroups. Studies recently completed comprise a number of works related to nuclear data covariance and associated processing issues, as well as more specific studies related to the resonance parameter representation in the unresolved resonance region, the gamma production from fission product capture reactions, the {sup 235}U capture cross section, the EXFOR database, and the improvement of nuclear data for advanced reactor systems. Ongoing activities focus on the evaluation of {sup 239}Pu in the resonance region, scattering angular distribution in the fast energy range, and reporting/usage of experimental data for evaluation in the resolved resonance region. New activities include two subgroups on improved fission product yield evaluation methodologies and on modern nuclear database structures. Future activities under discussion include a pilot project for a Collaborative International Evaluated Library Organization (CIELO) and methods to provide feedback from nuclear and covariance data adjustment for improvement of nuclear data. In addition to the above mentioned short-term task-oriented subgroups, WPEC also hosts a longer-term subgroup charged with reviewing and compiling the most important nuclear data requirements in a high priority request list (HPRL)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Design & Implementation of MACSio

We are proposing to develop “MACSio” (pronounced “max-ee-oh”), a Multi-purpose, Application-Centric, Scalable I/O proxy application. It is being proposed to fill a long existing void in co-design proxy applications that allow for I/O performance testing and evaluation of tradeoffs in data model interfaces and parallel I/O paradigms for multi-physics, HPC applications. Two key design features of MACSio will set it apart from existing I/O benchmarking tools. The first is the level of abstraction (LOA) at which MACSio is being designed to operate. The second is the degree of flexibility MACSio is being designed to provide in driving an HPC I/O workload through parameterized, user-defined data objects and a variety of parallel I/O paradigms and I/O interfaces. Combined, these features will allow MACSio to closely mimic I/O workloads for a wide variety of real applications and, in particular, multi-physics applications where data object distribution and composition vary dramatically both within and across parallel tasks. These data objects can then be marshaled using one or more I/O interfaces and parallel I/O paradigms, allowing for direct comparisons of software interfaces, parallel I/O paradigms, and filesystem technologies with the same set of customizable data objects.

97 MATHEMATICS AND COMPUTING↗

First-of-A-Kind Control Room Modernization Project Plan

This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Physical and Operational Status of the Photovoltaic Systems in the Municipality of Pinotepa de Don Luis, Oaxaca, One Year after Their Installation [Estado fisico y operativo de los sistemas fotovoltaicos en el municipio de Pinotepa de Don Luis, Oaxaca un ano despues de su instalacion]

In November 1990, an inspection visit was made to the residential lighting photovoltaic systems that had been installed approximately one year before in the rural communities of the Municipality of Pinotepa de Don Luis, in the State of Oaxaca. The main purpose of the visit was to evaluate the physical and operational status of these systems. The systems typically consist of a photovoltaic module with a capacity of 30 or 35 Watts, an automotive type battery, an indicator of the status of charge of the battery, 3 fluorescent lamps and the corresponding installation, including cables, connection or outlet box and switches. It can be seen that the systems are in good physical condition and do not show any signs of intentionally caused damage. However, the incidence of failures is higher than what had been expected; therefore the operational status of these systems is considered to be below a level that could be accepted, with a tendency to getting worse. The main problem that has been detected is the lack of automatic charge controllers. This problem has caused other important failures. Serious deficiencies were appreciated in the installations, which show evidence of the poor workmanship of the installers. The lack of system standardization is evident, both regarding the components and the installation. As a consequence, there are technical factors which indicate that the installed systems will keep deteriorating at a rate faster than normal, and will stop operating in a short time unless urgent preventive and corrective measures are taken. The attitude of the users with respect to the systems is generally positive. However, there are elements that make the correct operation and maintenance of these systems a very difficult task. The users did not receive any training regarding the best way to operate and take care of their systems, nor any other information in relation to their technical limitations.

14 SOLAR ENERGY↗

Demonstration of Datacenter Automation Software and Hardware (DASH) at the California Franchise Tax Board

Control software and wireless sensors designed for closed-loop, monitoring and control of IT equipment's inlet air temperatures in datacenters were evaluated and tested while other datacenter cooling best practices were implemented. The controls software and hardware along with each best practice were installed sequentially and evaluated using a measurement and verification procedure between each measure. The results show that the overall project eliminates 475,239 kWh per year, which is 21.3percent of the baseline energy consumption of the data center. The total project, including the best practices will save $42,772 per year and cost $134,057 yielding a simple payback of 3.1 years. However, the control system alone eliminates 59.6percent of the baseline energy used to move air in the datacenter and 13.6percent of the baseline cooling energy, which is 15.2percent of the baseline energy consumption (see Project Approach, Task 1, below, for additional information) while keeping temperatures substantially within the limits recommended by ASHRAE. Savings attributed to the control system are $30,564 per year with a cost $56,824 for a simple payback of 1.9 years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Checkout/demonstration application program for the SEL 840MP Multi-Processing Control System: Version 1 (MPCS/1)

The characteristics of the application program were developed to verify and demonstrate the SEL 840MP Multi-Processing Control System - Version I (MPCS/1). The application program emphasizes the display support and task control capabilities. The application program is further intended to be used as an aid to familization with MPCS/1. It complements the information provided in the MPCS/1 Users Guide, Volume I and II.

Anderson, W. F.↗

Effect of display size on utilization of traffic situation display for self-spacing task

The weather radar cathode ray tube (CRT) is the prime candidate for presenting cockpit display of traffic information (CDTI) in current, conventionally equipped transport aircraft. Problems may result from this, since the CRT size is not optimized for CDTI applications and the CRT is not in the pilot's primary visual scan area. The impact of display size on the ability of pilots to utilize the traffic information to maintain a specified spacing interval behind a lead aircraft during an approach task was studied. The five display sizes considered are representative of the display hardware configurations of airborne weather radar systems. From a pilot's subjective workload viewpoint, even the smallest display size was usable for performing the self spacing task. From a performane viewpoint, the mean spacing values, which are indicative of how well the pilots were able to perform the task, exhibit the same trends, irrespective of display size; however, the standard deviation of the spacing intervals decreased (performance improves) as the display size increased. Display size, therefore, does have a significant effect on pilot performance.

Abbott, T. S.↗

Preliminary design of a lunar construction utility vehicle

Construction of a lunar base, prior to manned occupancy, is one of the most demanding technological challenges facing space system designers today. A flexible lunar construction machine is needed that can be operated remotely and that can perform a variety of construction tasks over a wide range of lunar conditions. A preliminary lunar construction utility vehicle (LCUV) design has been developed as part of a capstone design course at Old Dominion University and is described in this summary report. The design requirements are taken from a 1988 USRA Summer Design Report entitled The Lunar Split Mission: A Robotic Constructed Lunar Base Scenario, and from the proceedings of a workshop hosted by United Technologies Corporation entitled Report of the In Situ Resources Utilization Workshop. The first report describes a bootstrap base concept in which a minimum of essential surface elements are delivered and configured such that minimum EVA is required to bring the initial base on-line. The base is to be built in three phases, the first of which will be unmanned, while the second and third will be manned. The key to these concepts is the development of a semiautonomous, telerobotic lunar construction utility vehicle (LCUV). The tasks required of this robotic vehicle during the phase 1 build-up are as follows: (1) surface element transportation, handling, and assembly; (2) soil excavation and movement for site preparation; (3) radiation protection and materials processing; and (4) repair and maintenance of surface elements. In order to meet the stated requirements, the LCUV must be: (1) transformable to perform a wide variety of tasks; (2) self supporting; (3) designed to allow for telerobotic control as well as autonomous operation; (4) able to transport one fully configured space station common module (SSCM); (5) upgradable to allow for future growth; and (6) easy to maintain.

Bryant, C. A.↗

Natural Atmospheric Environment Model Development for the National Aeronautics and Space Administration's Second Generation Reusable Launch Vehicle

The National Aeronautics and Space Administration (NASA) recently began development of a new reusable launch vehicle. The program office is located at Marshall Space Flight Center (MSFC) and is called the Second Generation Reusable Launch Vehicle (2GRLV). The purpose of the program is to improve upon the safety and reliability of the first generation reusable launch vehicle, the Space Shuttle. Specifically, the goals are to reduce the risk of crew loss to less than 1-in-10,000 missions and decreased costs by a factor of 10 to approximately $1,000 per pound of payload launched to low Earth orbit. The program is currently in the very early stages of development and many two-stage vehicle concepts will be evaluated. Risk reduction activities are also taking place. These activities include developing new technologies and advancing current technologies to be used by the vehicle. The Environments Group at MSFC is tasked by the 2GRLV Program to develop and maintain an extensive series of analytical tools and environmental databases which enable it to provide detailed atmospheric studies in support of structural, guidance, navigation and control, and operation of the 2GRLV.

Roberts, Barry C.↗

Experience with a three-axis side-located controller during a static and centrifuge simulation of the piloted launch of a manned multistage vehicle

An investigation was conducted to determine a human pilot's ability to control a multistage vehicle through the launch trajectory. The simulation was performed statically and dynamically by utilizing a human centrifuge. An interesting byproduct of the program was the three-axis side-located controller incorporated for pilot control inputs. This method of control proved to be acceptable for the successful completion of the tracking task during the simulation. There was no apparent effect of acceleration on the mechanical operation of the controller, but the pilot's control feel deteriorated as his dexterity decreased at high levels of acceleration. The application of control in a specific control mode was not difficult. However, coordination of more than one mode was difficult, and, in many instances, resulted in inadvertent control inputs. The acceptable control harmony at an acceleration level of 1 g became unacceptable at higher acceleration levels. Proper control-force harmony for a particular control task appears to be more critical for a three-axis controller than for conventional controllers. During simulations in which the pilot wore a pressure suit, the nature of the suit gloves further aggravated this condition.

Andrews, William H.↗

Improving Sensorimotor Function Using Stochastic Vestibular Stimulation

Astronauts experience sensorimotor changes during spaceflight, particularly during G-transition phases. Post flight sensorimotor changes may include postural and gait instability, spatial disorientation, and visual performance decrements, all of which can degrade operational capabilities of the astronauts and endanger the crew. Crewmember safety would be improved if these detrimental effects of spaceflight could be mitigated by a sensorimotor countermeasure and even further if adaptation to baseline could be facilitated. The goal of this research is to investigate the potential use of stochastic vestibular stimulation (SVS) as a technology to improve sensorimotor function. We hypothesize that low levels of SVS will improve sensorimotor performance through stochastic resonance (SR). The SR phenomenon occurs when the response of a nonlinear system to a weak input signal is optimized by the application of a particular nonzero level of noise. Two studies have been initiated to investigate the beneficial effects and potential practical usage of SVS. In both studies, electrical vestibular stimulation is applied via electrodes on the mastoid processes using a constant current stimulator. The first study aims to determine the repeatability of the effect of vestibular stimulation on sensorimotor performance and perception in order to better understand the practical use of SVS. The beneficial effect of low levels of SVS on balance performance has been shown in the past. This research uses the same balance task repeated multiple times within a day and across days to study the repeatability of the stimulation effects. The balance test consists of 50 sec trials in which the subject stands with his or her feet together, arms crossed, and eyes closed on compliant foam. Varying levels of SVS, ranging from 0-700 micro A, are applied across different trials. The subject-specific optimal SVS level is that which results in the best balance performance as measured by inertial measurement units placed on the upper and lower torso of the subjects. Additionally, each individual’s threshold for illusory motion perception of suprasensory electrical vestibular stimulation is measured multiple times within and across days to better understand how multiple SVS test methods compare. The second study aims to demonstrate stochastic resonance in the vestibular system using a perception based motion recognition task. This task measures an individual’s velocity threshold of motion recognition using a 6-degree of freedom Stewart platform and a 3-down/1-up staircase procedure. For this study, thresholds are determined using 150 trials in the upright, head-centered roll tilt motion direction at a 0.2 Hz frequency. We aim to demonstrate the characteristic bell shaped curve associated with stochastic resonance with each subject’s motion recognition thresholds at varying SVS levels ranging from 0 to 1500 micro A. The curve includes the individual’s baseline threshold with no SVS, optimal or minimal threshold at some mid-level of SVS, and finally degraded or increased threshold at a high SVS level. An additional aim is to formally retest each subject at his or her individual optimal SVS level on a different day than the original testing for additional validity. The overall purpose of this research is to further quantify the effects of SVS on various sensorimotor tasks and investigate the practical implications of its use in the context of human space flight so that it may be implemented in the future as a component of a comprehensive countermeasure plan for adaptation to G-transitions.

Galvan, R. C.↗

Configuration and Evaluation of a Dual-Doppler 3-D Wind Field System

Current LSP, GSDO, and SLS space vehicle operations are halted when wind speeds from specific directions exceed defined thresholds and when lightning is a threat. Strong winds and lightning are difficult parameters for the 45th Weather Squadron (45 WS) to forecast, yet are important in the protection of customer vehicle operations and the personnel that conduct them. A display of the low-level horizontal wind field to reveal areas of high winds or convergence would be a valuable tool for forecasters in assessing the timing of high winds, or convection initiation and subsequent lightning occurrence. This is especially important for areas where no weather observation platforms exist. Developing a dual-Doppler radar capability would provide such a display to assist forecasters in predicting high winds and convection initiation. The wind fields can also be used to initialize a local mesoscale numerical weather prediction model to help improve the model forecast winds, convection initiation, and other phenomena. The 45 WS and NWS MLB tasked the Applied Meteorology Unit (AMU) to develop a dual- Doppler wind field display using data from the 45th Space Wing radar, known as the Weather Surveillance Radar (WSR), NWS MLB Weather Surveillance Radar 1988 Doppler (KMLB), and the Orlando International Airport Terminal Doppler Weather Radar (KMCO). They also stipulated that the software used should be freely available. The AMU evaluated two software packages and, with concurrence from NWS MLB and the 45 WS, chose the Warning Decision Support System-Integrated Information (WDSS-II). The AMU collected data from two significant weather cases: a tornadic event on 14 April 2013 and a severe wind and hail event on 12 February 2014. For the 14 April case, the data were from WSR and KMLB. For the 12 February case, the data were from KMCO and KMLB. The AMU installed WDSS-II on a Linux PC, then processed and quality controlled the radar data for display and analysis using WDSS-II tools. Because of issues with de-aliasing the WSR velocity field, the AMU did not use data from this radar in this study and only analyzed the 12 February case. Merging the data to create the dual-Doppler analysis involved several steps. The AMU used instructions from the WDSS-II website and discussion forum to determine the correct tools to use for the analysis, and was successful in creating a merged reflectivity field, which was critical to the success of creating a merged velocity field. However, the AMU was unable to create a merged velocity field. The AMU researched the WDSS-II forum for discussions on similar issues, asked questions on the forum, and tested different options and values in the merger tool with no success. Developing a dual-Doppler wind field was the main goal of this task, but that was not accomplished. It could be an issue of not using the correct options or the correct value for the options used, or there could be issues with the radar data. There is a follow-on AMU task to install the operational version of WDSS-II in the NWS MLB office. This will provide more opportunities to try different options and input values in order to create a merged wind field from KMCO and KMLB.

Doppler radar↗

Ensuring Payload Safety in Missions with Special Partnerships

The National Aeronautics and Space Administration (NASA) Expendable Launch Vehicle (ELV) payload space flight missions involve cooperative work between NASA and partners including spacecraft (or payload) contractors, universities, nonprofit research centers, Agency payload organization, Range Safety organization, Agency launch service organizations, and launch vehicle contractors. The role of NASA's Safety and Mission Assurance (SMA) Directorate is typically fairly straightforward, but when a mission's partnerships become more complex, to realize cost and science benefits (e.g., multi-agency payload(s) or cooperative international missions), the task of ensuring payload safety becomes much more challenging. This paper discusses lessons learned from NASA safety professionals working multiple-agency missions and offers suggestions to help fellow safety professionals working multiple-agency missions.

Agency launch service organizations↗

Using Graph Edit Distance for Noisy Subgraph Matching of Semantic Property Graphs

The subgraph matching problem is a fundamental problem in graph theory that is known to be NP-complete. In this study, performers were asked to develop algorithms to search for semantic property graphs that were subgraphs of a large knowledge graph. The templates provided contained structural information about the subgraphs and some attributes for each node and edge. There also exists a similarity measure between a set of attribute values that occurs on every node and edge. Algorithms performed well in the case where an exact match existed, but performers were also provided templates that had noise added such that there existed no match in the knowledge graph. Performers were asked to find the closest matches to those noisy subgraphs. To evaluate performance on this task, we developed a version of the graph edit distance algorithm to measure the cost of editing the template graph so that it is isomorphic in structure and attributes to the performer submission.

Ebsch, Christopher L.↗

A PRELIMINARY ASSESSMENT OF THE OCCUPATIONAL RADIATION EXPOSURE FROM MAINTAINING THE US ITER DCLL TBM

This paper details an Occupational Radiation Exposure (ORE) analysis performed for the US International Thermonuclear Experimental Reactor (ITER) Dual Coolant Lead Lithium (DCLL) Test Blanket Module (TBM). This ORE analysis was performed with the QADMOD dose code for maintenance activities anticipated for the US DCLL TBM concept and its ancillary systems. Identification of the maintenance tasks that will have to be performed and estimates of the time required to perform these tasks were developed based on either expert opinion or on industrial maintenance experience for similar technologies. This paper details the modeling activity and the calculated doses for the maintenance activities envisioned for the US DCLL TBM.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗