Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

STS-108 Crew Interviews: Dom Gorie

STS-108 Commander Dom Gorie is seen during a prelaunch interview. He answers questions about the mission's goals and significance, explaining the meaning of 'utilization flight 1' (UF-1) as opposed to an 'assembly flight'. He gives details on the payload (Starshine Satellite, Avian Development Facility, and Rafaello Multipurpose Logistics Module (MPLM)), his role in the rendezvous, docking, and undocking of the Endeavour Orbiter to the International Space Station (ISS), how he will participate in the unloading and reloading of the MPLM, and the way in which the old and new resident crews of ISS will exchanged. Gorie ends with his thoughts on the short-term and long-term future of the International Space Station.

Source record↗

STS-108 Crew Interviews: Linda Godwin

STS-108 Mission Specialist Linda Godwin is seen during a prelaunch interview. She answers questions about the mission's goals and significance, explaining the meaning of 'utilization flight 1' (UF-1) as opposed to an 'assembly flight'. She gives details on the payload (Starshine Satellite, Avian Development Facility, and Rafaello Multipurpose Logistics Module (MPLM)), her role in the rendezvous, docking, and undocking of the Endeavour Orbiter to the International Space Station (ISS), how she will participate in the unloading and reloading of the MPLM, and the way in which the old and new resident crews of ISS will exchanged. Godwin ends with her thoughts on the short-term and long-term future of the International Space Station.

Source record↗

STS-108 Crew Interviews: Mark Kelly

STS-108 Pilot Mark Kelly is seen during a prelaunch interview. He answers questions about the mission's goals and significance, explaining the meaning of 'utilization flight 1' (UF-1) as opposed to an 'assembly flight'. He gives details on the payload (Starshine Satellite, Avian Development Facility, and Rafaello Multipurpose Logistics Module (MPLM)), his role in the rendezvous, docking, and undocking of the Endeavour Orbiter to the International Space Station (ISS), how he will participate in the unloading and reloading of the MPLM, and the way in which the old and new resident crews of ISS will exchanged. Kelly ends with his thoughts on the short-term and long-term future of the International Space Station.

Source record↗

STS-108 Crew Interviews: Dan Tani

STS-108 Mission Specialist Dan Tani is seen during a prelaunch interview. He answers questions about the mission's goals and significance, explaining the meaning of 'utilization flight 1' (UF-1) as opposed to an 'assembly flight'. He gives details on the payload (Starshine Satellite, Avian Development Facility, and Rafaello Multipurpose Logistics Module (MPLM)), his role in the rendezvous, docking, and undocking of the Endeavour Orbiter to the International Space Station (ISS), how he will participate in the unloading and reloading of the MPLM, and the way in which the old and new resident crews of ISS will exchanged. Tani ends with his thoughts on the short-term and long-term future of the International Space Station.

Source record↗

STS-105 Post-Flight

The crewmembers of STS-105, Commander Scott Horowitz, Pilot Fred Sturckow, and Mission Specialists Dan Barry and Pat Forrester, narrate this video as footage from the mission is seen, starting with the boarding and launch of Discovery. Various on-orbit activities are shown, including on-orbit activities (H Reflex Experiment), the rendezvous and docking of Discovery with the International Space Station (ISS), the transfer of materials from the Multipurpose Logistics Module, extravehicular activities, and the exchange of resident ISS crews. The video ends with Discovery undocking from the ISS and the landing of the orbiter.

Source record↗

STS-108 Flight Day Highlights: Flight Day 1

On this first day of the STS-108 mission, the crewmembers of Endeavour, Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani, are seen during various prelaunch activities, including the ceremonial breakfast, suitup, departing the Operations and Checkout (O&C) Building, and boarding the orbiter. The launch of Endeavour is shown. The payload bay doors open once in orbit and Pilot Kelly is seen as the solid rocket boosters ignite.

Source record↗

STS-108 Flight Day 2 Highlights

On this second day of the STS-108, Endeavour continues to approach the International Space Station. A camera on the end of the Remote Manipulator System robotic arm scans the side of Endeavour and shows the Rafaello Multipurpose Logistics Module.

Source record↗

STS-108 Flight Day 6 Highlights

On this sixth day of the STS-108 mission, Mission Specialists Linda Godwin and Daniel Tani perform their spacewalks, where they place insulating blankets on the two Beta Gimbal Assemblies.

Source record↗

STS-109 Crew Interviews - Altman

STS-109 crew Commander Scott D. Altman is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut and his career path. He gives details on the mission's goals and significance, which are all related to maintenance of the Hubble Space Telescope (HST). After the Columbia Orbiter's rendezvous with the HST, extravehicular activities (EVA) will be focused on several important tasks which include: (1) installing the Advanced Camera for Surveys; (2) installing a cooling system on NICMOS (Near Infrared Camera Multi-Object Spectrometer); (3) repairing the reaction wheel assembly; (4) installing additional solar arrays; (5) augmenting the power control unit; (6) working on the HST's gyros. The reaction wheel assembly task, a late addition to the mission, may necessitate the abandonment of one or more of the other tasks, such as the gyro work.

Source record↗

STS-109 Crew Interviews - Carey

STS-109 pilot Duane G. Carey is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut and his career path. He gives details on the mission's goals and significance, as well as an extended description of his role in the Orbiter's return landing. As its primary objective, this mission has the maintenance of the Hubble Space Telescope (HST). Following the Columbia Orbiter's rendezvous with the telescope, extravehicular activities (EVA) will focus on repairs to and augmentation of the HST.

Source record↗

STS-109 Crew Interviews: James H. Newman

STS-109 Mission Specialist James H. Newman is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut, his career path, and his most memorable experiences. He gives details on the mission's goals and objectives, which focus on the refurbishing of the Hubble Space Telescope, and his role in the mission. He provides a brief background on the Hubble Space Telescope, and explains the plans for the rendezvous of the Columbia Orbiter with the Hubble Space Telescope. He provides details and timelines for each of the planned Extravehicular Activities (EVAs), which include replacing the solar arrays, changing the Power Control Unit, installing the Advanced Camera for Surveys (ACS), and installing a new Cryocooler for the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). He gives further explanation of each of these pieces of equipment. He also describes the break-out plan in place for these spacewalks. The interview ends with Newman explaining the details of a late addition to the mission's tasks, which is to replace a reaction wheel on the Hubble Space Telescope.

Source record↗

STS-109 Crew Interviews: Michael J. Massimino

STS-109 Mission Specialist Michael J. Massimino is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut, his career path, and his most memorable experiences. He gives details on the mission's goals and objectives, which focus on the refurbishing of the Hubble Space Telescope, and his role in the mission. He explains the plans for the rendezvous of the Columbia Orbiter with the Hubble Space Telescope. He provides details and timelines for each of the planned Extravehicular Activities (EVAs), which include replacing the solar arrays, changing the Power Control Unit, installing the Advanced Camera for Surveys (ACS), and installing a new Cryocooler for the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). He also describes the break-out plan in place for these spacewalks. The interview ends with Massimino explaining the details of a late addition to the mission's tasks, which is to replace a reaction wheel on the Hubble Space Telescope.

Source record↗

STS-109 Crew Interviews - Linnehan

STS-109 Mission Specialist 3 (MS3) Richard M. Linnehan is seen during a prelaunch interview. He answers questions about his lifelong desire to become an astronaut and his career path, which included becoming a zoo veterinarian. He gives details on the Columbia Orbiter mission, which has as its main purpose the maintenance and augmentation of the Hubble Space Telescope (HST). As MS3, his primary role in the mission pertains to EVAs (Extravehicular Activities) 1, 3, and 5. During EVA 1, Linnehan and another crewmember will replace one of two flexible solar arrays on the HST with a smaller, more efficient rigid solar array. The second solar array will be replaced on EVA 2 by other crewmembers. EVA 3 will involve the replacement of the Power Control Unit (PCU), and will require the first complete powering down of HST since its deployment. The possibility of a serious problem occurring is greatest during this portion of the mission because the original PCU was not built to be replaced. In EVA 5, Linnehan and another crewmember will install a replacement cooling system on NICMOS (Near Infrared Camera Multi-Object Spectrometer), which has not been operational. Linnehan discusses his role during the mission as well as that of his crewmates, and provides an abbreviated timeline, including possible contingencies.

Source record↗

STS-109 Crew Interviews - Currie

STS-109 Mission Specialist 2 Nancy Jane Currie is seen during a prelaunch interview. She answers questions about her inspiration to become an astronaut and her career path. She gives details on the Columbia Orbiter mission which has as its main tasks the maintenance and augmentation of the Hubble Space Telescope (HST). While she will do many things during the mission, the most important will be her role as the primary operator of the robotic arm, which is responsible for grappling the HST, bringing it to the Orbiter bay, and providing support for the astronauts during their EVAs (Extravehicular Activities). Additionally, the robotic arm will be responsible for transferring new and replacement equipment from the Orbiter to the HST. This equipment includes: two solar arrays, a Power Control Unit (PCU), the Advanced Camera for Surveys, and a replacement cooling system for NICMOS (Near Infrared Camera Multi-Object Spectrometer).

Source record↗

STS-109 Crew Training

Footage shows the crew of STS-109 (Commander Scott Altman, Pilot Duane Carey, Payload Commander John Grunsfeld, and Mission Specialists Nancy Currie, James Newman, Richard Linnehan, and Michael Massimino) during various parts of their training. Scenes show the crew's photo session, Post Landing Egress practice, training in Dome Simulator, Extravehicular Activity Training in the Neutral Buoyancy Laboratory (NBL), and using the Virtual Reality Laboratory Robotic Arm. The crew is also seen tasting food as they choose their menus for on-orbit meals.

Source record↗

STS-108 Post Flight Presentation

The crewmembers of STS-108, Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani, narrate this video as footage from the mission is shown. The crew is seen flying into Kennedy Space Center, suiting up, boarding the Endeavour Orbiter, and during launch. Various mission highlights are seen, including the rendezvous with the International Space Station (ISS) and docking of Endeavour, the unloading of the Multipurpose Logistics Module (MPLM), and the spacewalk to install thermal blankets over the Beta Gimbal Assemblies (BGAs) at the bases of the Space Station's solar panels. A glimpse is given into the difficulties of working in a microgravity environment as the crewmembers attempt to eat food before it floats away from them and drink water from a bag. The exchange of the Expedition 4 (Yuri I. Onufrienko, Carl E. Walz, and Daniel W. Bursch) for the Expedition 3 crew (Frank L. Culbertson, Mikhail Turin, and Vladimir N. Dezhurov) is also seen. The Endeavour undocks from the ISS, which is seen over the Caribbean Sea. Endeavour passes over Cuba, and footage of the Swiss Alps is shown. The video ends with the landing of the spacecraft.

Source record↗

STS-109 Flight Day 1 Highlights

While in orbit around Earth, the crew of STS-109 aboard the Columbia Orbiter will service the Hubble Space Telescope (HST) in five extravehicular activities (EVA). In this video, prelaunch activities are shown including the positioning of the astronauts in their seats prior to liftoff. Liftoff is also shown, as is the escape flight. A comment is also made concerning the announcement shortly after liftoff that there was restricted flow in one of two freon loops in the Orbiter's radiator.

Source record↗

STS-109 Flight Day 3 Highlights

This footage from the third day of the STS-109 mission to service the Hubble Space Telescope (HST) begins with the grappling of the HST by the robotic arm of the Columbia Orbiter, operated by Mission Specialist Nancy Currie. During the grappling, numerous angles deliver close-up images of the telescope which appears to be in good shape despite many years in orbit around the Earth. Following the positioning of the HST on its berthing platform in the Shuttle bay, the robotic arm is used to perform an external survey of the telescope. Some cursory details are given about different equipment which will be installed on the HST including a replacement cooling system for the Near Infrared Camera Multi-Object Spectrometer (NICMOS) and the Advanced Camera for Surveys. Following the survey, there is footage of the retraction of both of the telescope's two flexible solar arrays, which was successful. These arrays will be replaced by rigid solar arrays with decreased surface area and increased performance.

Source record↗