Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fuel testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

X-ray Diffraction Characterization of U-10wt% EBR-II Driver Fuel and Fuel Used for AFC-4B and AFC-4D Testing in the Advanced Test Reactor

The purpose of this report is to show the final XRD characterization of EBR-II U-10wt%Zr driver fuel and the methods prescribed to assess whether there is a pronounced crystallographic texture in these archive samples. The results provide this method and information as to the condition of as-fabricated EBR-II fuel, thereby potentially allowing a linkage between the documented performance of these fuels with future U-10wt%Zr fuels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Apparatus for testing high pressure injector elements

An apparatus for testing and evaluating the spray pattern of high pressure fuel injector elements for use in supplying fuel to combustion engines is presented. Prior art fuel injector elements were normally tested by use of low pressure apparatuses which did not provide a purge to prevent mist from obscuring the injector element or to prevent frosting of the view windows; could utilize only one fluid during each test; and had their viewing ports positioned one hundred eighty (180 deg) apart, thus preventing optimum use of laser diagnostics. The high pressure fluid injector test apparatus includes an upper hub, an upper weldment or housing, a first clamp and stud/nut assembly for securing the upper hub to the upper weldment, a standoff assembly within the upper weldment, a pair of window housings having view glasses within the upper weldment, an injector block assembly and purge plate within the upper weldment for holding an injector element to be tested and evaluated, a lower weldment or housing, a second clamp and stud/nut assembly for securing the lower weldment to the upper weldment, a lower hub, a third clamp and stud/nut assembly for securing the lower hub to the lower weldment, mechanisms for introducing fluid under high pressure for testing an injector element, and mechanisms for purging the apparatus to prevent frosting of view glasses within the window housings and to permit unobstructed viewing of the injector element.

Myers, William Neill↗

Apparatus for testing high pressure injector elements

An apparatus for testing and evaluating the spray pattern of high pressure fuel injector elements for use in supplying fuel to combustion engines is presented. Prior art fuel injector elements were normally tested by use of low pressure apparatuses which did not provide a purge to prevent mist from obscuring the injector element or to prevent frosting of the view windows; could utilize only one fluid during each test; and had their viewing ports positioned one hundred eighty (180 deg) apart, thus preventing optimum use of laser diagnostics. The high pressure fluid injector test apparatus includes an upper hub, an upper weldment or housing, a first clamp and stud/nut assembly for securing the upper hub to the upper weldment, a standoff assembly within the upper weldment, a pair of window housings having view glasses within the upper weldment, an injector block assembly and purge plate within the upper weldment for holding an injector element to be tested and evaluated, a lower weldment or housing, a second clamp and stud/nut assembly for securing the lower weldment to the upper hub, a third clamp and stud/nut assembly for securing the lower hub to the lower weldment, mechanisms for introducing fluid under high pressure for testing an injector element, and mechanisms for purging the apparatus to prevent frosting of view glasses within the window housings and to permit unobstructed viewing of the injector element.

Myers, William Neill↗

Westinghouse Accident Tolerant Fuel Phase 2B with Higher Enriched and Higher Burnup Add-On Project Final Technical Report Deliverable Volume 1

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program funded by Westinghouse and the US Department of Energy (DOE) utilized chromium (Cr) coated zirconium alloy cladding with doped UO 2 (ADOPT(TM)) and uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. ADOPT is a Cr 2 O 3 +Al 2 O 3 doped UO 2 pellet with increased oxidation resistance and density, and increased resistance to fission gas release. Due to the issues with U 3 Si 2 fuel reaction in pressurized water reactor (PWR) environments, uranium nitride (U 15 N) has been substituted for U 3 Si 2 as a long-term fuel option. Cr coated cladding with ADOPT fuel is the near-term Westinghouse EnCore fuel product. The long-term EnCore ® fuel product is SiGA ® SiC/SiC composite cladding with high density/high thermal conductivity UN fuel. In 2020, the higher burnup and higher enriched and (HBHE) program was integrated into the ATF program. The objective of this expanded program is to extend ATF burnups to at least 75 MWd/kgU to economically facilitate 24-month cycles in PWRs. The ATF program now includes ADOPT fuel with enrichments >5% 235 U. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in Westinghouse Churchill autoclaves and the Massachusetts Institute of Technology (MIT) reactor. Additionally, the Cr coated cladding has been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) and in LTR programs at the Doel 4 and Bryon 2 commercial reactors. High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried out to determine the time and temperature limits for the Cr coated zirconium claddings. These tests indicate that Cr coated Zr cladding can take temperatures up to about 1500°C for short periods of time without becoming totally oxidized. The main issue is the formation of the Cr-Zr eutectic at 1333°C resulting in the migration of this eutectic inward with the formation of ZrCr 2 which rapidly oxidizes to ZrO 2 on the outside of the tube. The Cr coated Zr cladding also delays the bursting of the tube, reduces the burst area, and reduces hydriding and embrittlement of the Zr which is a major benefit for reducing fuel fragmentation, redistribution, and dispersal (FFRD), the major licensing issue faced by HBHE. The manufacturing parameters for the SiC have been found to have a significant effect on the corrosion rate of the SiC in light water reactor (LWR) conditions and significant improvements have been made in the yield, quality, and oxidation resistance of the SiC cladding by identifying and tightening manufacturing process parameters. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year can be achieved which meets corrosion requirements under normal operating conditions. High temperature steam oxidation tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried and determined that SiC cladding can withstand temperatures up to about 1800°C to 1900°C before excessive corrosion reactions begin, and that the SiC will not balloon and burst. ADOPT fuel pellets were incorporated into the Westinghouse ATF program because of their increased density and oxidation resistance. A topical report supporting the use of ADOPT pellets has been submitted to the NRC and will be approved shortly. ADOPT pellets have been a product in Europe for over 15 years. The additives work to make larger grain sizes which appear to reduce fission gas release during transients as well as increase the density of the pellet. Fuel rod and assembly design in preparation for the lead test rod (LTR) and lead test assembly (LTA) programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that both Cr coated cladding and SiC composite cladding can increase the time to fuel rod loss of geometry for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher oxidation resistance of the SiC and Cr coated cladding. These two hours can be used to implement additional response options instituted through the Diverse and Flexible Mitigation Capability (FLEX) program by reactor operators. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely if the modest water flow provided by FLEX continues. Experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Methods for mitigating or stopping the Cr-Zr eutectic are also needed to further improve the oxidation resistance of Cr coated Zr. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 MWd/kgU were completed but post irradiation examinations were not done since U 3 Si 2 has been replaced by UN. UN has three issues that are being addressed. The first is increasing the oxidation resistance so that there is not excessive reaction up to ~1500°C. While UN increases the pellet density and additives to the UN postponed the temperature at which rapid oxidation occurred by ~100°C to 200°C, this is not enough, and pellet coating options are now being pursued. The second is developing a method to manufacture that does not require the multi-step process of UF 6 to UO 2 to UC to UN. Efforts are underway looking at UF 6 to UN 2 to UN and UF 6 to UF 4 to UN 2 to UN reactions. Finally, an economically acceptable process for potentially enriching the 15 N content of the nitrogen used to make UN to >95% 15N was identified though not experimentally validated. In addition to the work supported by the DOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan, and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings were organized in 2018 and 2019 by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. No meetings were held in 2020 and 2021 due to the COVID-19 related restrictions on traveling and gatherings. Since SiC, coated cladding, and high-density fuel options are not currently used in the nuclear industry; support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/UO 2 fuel. Several meetings have been held with the NRC to generate a fast-track approach to licensing ATF using a combination of atomic modeling, in-rod sensors, and in-reactor testing. This approach was memorialized in an “Accelerated Fuel Qualification White Paper” prepared by the Accelerated Fuel Qualification Working Group lead by General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Westinghouse Accident Tolerant Fuel Phase 2B with Higher Enriched and Higher Burnup Add-On Project Final Technical Report Deliverable Volume 2

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program funded by Westinghouse and the US Department of Energy (DOE) utilized chromium (Cr) coated zirconium alloy cladding with doped UO 2 (ADOPT(TM)) and uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. ADOPT is a Cr 2 O 3 +Al 2 O 3 doped UO 2 pellet with increased oxidation resistance and density, and increased resistance to fission gas release. Due to the issues with U 3 Si 2 fuel reaction in pressurized water reactor (PWR) environments, uranium nitride (U 15 N) has been substituted for U 3 Si 2 as a long-term fuel option. Cr coated cladding with ADOPT fuel is the near-term Westinghouse EnCore ® fuel product. The long-term EnCore fuel product is SiGA ® SiC/SiC composite cladding with high density/high thermal conductivity UN fuel. In 2020, the higher burnup and higher enriched and (HBHE) program was integrated into the ATF program. The objective of this expanded program is to extend ATF burnups to at least 75 MWd/kgU to economically facilitate 24-month cycles in PWRs. The ATF program now includes ADOPT fuel with enrichments >5% 235 U. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in Westinghouse Churchill autoclaves and the Massachusetts Institute of Technology (MIT) reactor. Additionally, the Cr coated cladding has been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) and in LTR programs at the Doel 4 and Bryon 2 commercial reactors. High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried out to determine the time and temperature limits for the Cr coated zirconium claddings. These tests indicate that Cr coated Zr cladding can take temperatures up to about 1500°C for short periods of time without becoming totally oxidized. The main issue is the formation of the Cr-Zr eutectic at 1333°C resulting in the migration of this eutectic inward with the formation of ZrCr 2 which rapidly oxidizes to ZrO 2 on the outside of the tube. The Cr coated Zr cladding also delays the bursting of the tube, reduces the burst area, and reduces hydriding and embrittlement of the Zr which is a major benefit for reducing fuel fragmentation, redistribution, and dispersal (FFRD), the major licensing issue faced by HBHE. The manufacturing parameters for the SiC have been found to have a significant effect on the corrosion rate of the SiC in light water reactor (LWR) conditions and significant improvements have been made in the yield, quality, and oxidation resistance of the SiC cladding by identifying and tightening manufacturing process parameters. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year can be achieved which meets corrosion requirements under normal operating conditions. High temperature steam oxidation tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried and determined that SiC cladding can withstand temperatures up to about 1800°C to 1900°C before excessive corrosion reactions begin, and that the SiC will not balloon and burst. ADOPT fuel pellets were incorporated into the Westinghouse ATF program because of their increased density and oxidation resistance. A topical report supporting the use of ADOPT pellets has been submitted to the NRC and will be approved shortly. ADOPT pellets have been a product in Europe for over 15 years. The additives work to make larger grain sizes which appear to reduce fission gas release during transients as well as increase the density of the pellet. Fuel rod and assembly design in preparation for the lead test rod (LTR) and lead test assembly (LTA) programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that both Cr coated cladding and SiC composite cladding can increase the time to fuel rod loss of geometry for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher oxidation resistance of the SiC and Cr coated cladding. These two hours can be used to implement additional response options instituted through the Diverse and Flexible Mitigation Capability (FLEX) program by reactor operators. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely if the modest water flow provided by FLEX continues. Experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Methods for mitigating or stopping the Cr-Zr eutectic are also needed to further improve the oxidation resistance of Cr coated Zr. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 MWd/kgU were completed but post irradiation examinations were not done since U 3 Si 2 has been replaced by UN. UN has three issues that are being addressed. The first is increasing the oxidation resistance so that there is not excessive reaction up to ~1500°C. While UN increases the pellet density and additives to the UN postponed the temperature at which rapid oxidation occurred by ~100°C to 200°C, this is not enough, and pellet coating options are now being pursued. The second is developing a method to manufacture that does not require the multi-step process of UF 6 to UO 2 to UC to UN. Efforts are underway looking at UF 6 to UN 2 to UN and UF 6 to UF 4 to UN 2 to UN reactions. Finally, an economically acceptable process for potentially enriching the 15 N content of the nitrogen used to make UN to >95% 15 N was identified though not experimentally validated. In addition to the work supported by the DOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan, and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings were organized in 2018 and 2019 by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. No meetings were held in 2020 and 2021 due to the COVID-19 related restrictions on traveling and gatherings. Since SiC, coated cladding, and high-density fuel options are not currently used in the nuclear industry; support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/UO 2 fuel. Several meetings have been held with the NRC to generate a fast-track approach to licensing ATF using a combination of atomic modeling, in-rod sensors, and in-reactor testing. This approach was memorialized in an “Accelerated Fuel Qualification White Paper” prepared by the Accelerated Fuel Qualification Working Group lead by General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Out-of-Pile Testing and Instrumentation Transient Water Irradiation System

Current initiatives to increase the burnup of conventional nuclear fuels past the approximate 62 GWd/t limit have been spurred on by direct savings to refueling and waste storage. The technical justification for a new license limit requires extensive qualification through experimental testing. Unlike beginning-of-life fuels, high-burnup fuels are more susceptible to fuel fragmentation, relocation, and dispersal (FFRD), therefore more data is needed to characterize fuels under key accident scenarios. The Transient Reactor Test Facility (TREAT) located at the Idaho National Laboratory has developed a testing apparatus architecture to test fuels and claddings at prototypic conditions. The Transient Water Irradiation System (TWIST) is the latest iteration of a testing device capable of conducting loss of coolant accidents (LOCAs) in TREAT. The Out-of-Pile Testing and Instrumentation TWIST (OPTI-TWIST) is an electrically heated device that is analogous to TWIST. OPTI-TWIST allows for detailed instrumentation and thermal-hydraulic characterization. TWIST ultimately aims to conduct the most advanced in-situ diagnostics to evaluate FFRD in a prototypic LOCA. Moreover, it will explore the phenomenological bifurcation of a decay-energy heat up driven LOCA and a stored-energy heat up driven LOCA. The instrumentation suite includes conventional thermocouples and pressure transducers in addition to an electro impedance sensor, an acoustic emission sensor, an optical pressure sensor, and an optical pyrometer. Characterizing these instruments in OPTI-TWIST eliminates complications of irradiation effects while preserving extreme thermal-hydraulic conditions. Finally, benchmarking both devices to a thermal-hydraulic code like the Reactor Excursion and Leak Analysis Program (RELAP)5-3D provides a unique opportunity for iteration. Pre-test predictions and post-test interpretations inform the physical designs, operational procedures, test conditions, and instrumentation types and positions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Test program to provide confidence in liquid oxygen cooling of hydrocarbon fueled rocket thrust chambers

An experimental program has been planned at the NASA Lewis Research Center to build confidence in the feasibility of liquid oxygen cooling for hydrocarbon fueled rocket engines. Although liquid oxygen cooling has previously been incorporated in test hardware, more runtime is necessary to gain confidence in this concept. In the previous tests, small oxygen leaks developed at the throat of the thrust chamber and film cooled the hot-gas side of the chamber wall without resulting in catastrophic failure. However, more testing is necessary to demonstrate that a catastrophic failure would not occur if cracks developed further upstream between the injector and the throat, where the boundary layer has not been established. Since under normal conditions cracks are expected to form in the throat region of the thrust chamber, cracks must be initiated artificially in order to control their location. Several methods of crack initiation are discussed in this report. Four thrust chambers, three with cracks and one without, should be tested. The axial location of the cracks should be varied parametrically. Each chamber should be instrumented to determine the effects of the cracks, as well as the overall performance and durability of the chambers.

Armstrong, E. S.↗

The Advanced Test Reactor

The Advanced Test Reactor (ATR) is currently the highest-powered research reactor in the world with a maximum thermal power of 250 MW. The ATR began operation in 1967 to support fuels and materials irradiation testing programs in the United States and current plans (2019) are to operate the ATR for two more decades. Since 2007, the ATR has been designated a National Scientific User Facility (NSUF) to provide more access for non-government researchers to use the ATR for academic irradiation research. This article is a brief description of the ATR history, construction, and experiment configurations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hydrogen Fuel Capability Added to Combustor Flametube Rig

Facility capabilities have been expanded at Test Cell 23, Research Combustor Lab (RCL23) at the NASA Glenn Research Center, with a new gaseous hydrogen fuel system. The purpose of this facility is to test a variety of fuel nozzle and flameholder hardware configurations for use in aircraft combustors. Previously, this facility only had jet fuel available to perform these various combustor flametube tests. The new hydrogen fuel system will support the testing and development of aircraft combustors with zero carbon dioxide (CO2) emissions. Research information generated from this test rig includes combustor emissions and performance data via gas sampling probes and emissions measuring equipment. The new gaseous hydrogen system is being supplied from a 70 000-standard-ft3 tube trailer at flow rates up to 0.05 lb/s (maximum). The hydrogen supply pressure is regulated, and the flow is controlled with a -in. remotely operated globe valve. Both a calibrated subsonic venturi and a coriolis mass flowmeter are used to measure flow. Safety concerns required the placement of all hydrogen connections within purge boxes, each of which contains a small nitrogen flow that is vented past a hydrogen detector. If any hydrogen leaks occur, the hydrogen detectors alert the operators and automatically safe the facility. Facility upgrades and modifications were also performed on other fluids systems, including the nitrogen gas, cooling water, and air systems. RCL23 can provide nonvitiated heated air to the research combustor, up to 350 psig at 1200 F and 3.0 lb/s. Significant modernization of the facility control systems and the data acquisition systems was completed. A flexible control architecture was installed that allows quick changes of research configurations. The labor-intensive hardware interface has been removed and changed to a software-based system. In addition, the operation of this facility has been greatly enhanced with new software programming and graphic operator interface stations. Glenn s RCL23 facility systems were successfully checked out in the spring of 2002, and hydrogen combustor research testing began in the summer of 2002.

Frankenfield, Bruce J.↗

Transient Reactor Test Facility (TREAT) Startup Status

Transient testing is critical for understanding how new fuels perform in accident conditions such as transient overpower and/or under cooling events. In February of 2014, The U.S. Department of Energy (DOE) determined that a Finding of No Significant Impact (FONSI) was appropriate for the resumption of transient testing of nuclear fuels and materials. At that point, work began on the restart of the Transient Reactor Test Facility (TREAT), which was the DOE preferred alternative for reestablishing transient testing capability for nuclear fuels and materials in the U.S. Significant progress has been made in the restart of TREAT for transient testing since the FONSI in 2014. The progress made since 2014 towards restarting TREAT and the current status is documented in this summary. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Test Article and Test Plan for Heat-Pipe Gap-Conductance Testing

The SPHERE Facility at INL is established to test phenomena related to heat pipes in nuclear applications. The current capability of the SPHERE testbed is operation of liquid alkali-metal-cooled heat pipes in a variety of atmospheres. The controlled atmosphere can be used to prevent oxidation of system parts and also to affect the thermal conductivity of gases for any interfacial gaps within the heat-pipe assembly. Currently available modes are vacuum, air, nitrogen, helium, and argon. Controlled mixtures of helium and argon are available to vary the thermal conductivity of the gas. The primary test article will be based on the existing 7-hole block design used for shakedown testing of the SPHERE Facility. The SPHERE test stand will be used with test articles to establish the conductivity between fuel elements as well as between the heat pipe and other layers of the fuel-rod assembly. Existing and new test blocks will be used and modified with additional instrumentation to establish the thermal conductivity between the gap of the block wall and the heat pipes.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Internal voltage control of hydrogen-oxygen fuel cells: Feasibility study

An experimental study was conducted to assess the feasibility of internal voltage regulation of fuel cell systems. Two methods were tested. In one, reactant partial pressure was used as the voltage control parameter and in the other reactant total pressure was used for control. Both techniques were breadboarded and tested on a single alkaline-electrolyte fuel cell. Both methods were found to be possible forms of regulation, however, of the two the total pressure technique would be more efficient, simpler to apply and would provide better transient characteristics.

Prokopius, P. R.↗

Initial test results with a single-cylinder rhombic-drive Stirling engine

A 6 kW (8 hp), single-cylinder, rhombic-drive Stirling engine was restored to operating condition, and preliminary characterization tests run with hydrogen and helium as the working gases. Initial tests show the engine brake specific fuel consumption (BSFC) with hydrogen working gas to be within the range of BSFC observed by the Army at Fort Belvoir, Virginia, in 1966. The minimum system specific fuel consumption (SFC) observed during the initial tests with hydrogen was 669 g/kW hr (1.1 lb/hpx hr), compared with 620 g/kWx hr (1.02 lb/hpx hr) for the Army tests. However, the engine output power for a given mean compression-space pressure was lower than for the Army tests. The observed output power at a working-space pressure of 5 MPa (725 psig) was 3.27 kW (4.39 hp) for the initial tests and 3.80 kW (5.09 hp) for the Army tests. As expected, the engine power with helium was substantially lower than with hydrogen.

Cairelli, J. E.↗

Automotive fuel economy and emissions program

Experimental data were generated to support an assessment of the relationship between automobile fuel economy and emissions control systems. Tests were made at both the engine and vehicle levels. Detailed investigations were made on cold-start emissions devices, exhaust gas recirculation systems, and air injection reactor systems. Based on the results of engine tests, an alternative emission control system and modified control strategy were implemented and tested in the vehicle. With the same fuel economy and NOx emissions as the stock vehicle, the modified vehicle reduced HC and CO emissions by about 20 percent. By removing the NOx emissions constraint, the modified vehicle demonstrated about 12 percent better fuel economy than the stock vehicle.

Dowdy, M. W.↗

Optimization of a Wcl6 CVD System to Coat UO2 Powder with Tungsten

In order to achieve deep space exploration via Nuclear Thermal Propulsion (NTP), Marshall Space Flight Center (MSFC) is developing W-UO2 CERMET fuel elements, with focus on fabrication, testing, and process optimization. A risk of fuel loss is present due to the CTE mismatch between tungsten and UO2 in the W-60vol%UO2 fuel element, leading to high thermal stresses. This fuel loss can be reduced by coating the spherical UO2 particles with tungsten via H2/WCl6 reduction in a fluidized bed CVD system. Since the latest incarnation of the inverted reactor was completed, various minor modifications to the system design were completed, including an inverted frit sublimer. In order to optimize the parameters to achieve the desired tungsten coating thickness, a number of trials using surrogate HfO2 powder were performed. The furnace temperature was varied between 930 C and 1000degC, and the sublimer temperature was varied between 140 C and 200 C. Each trial lasted 73-82 minutes, with one lasting 205 minutes. A total of 13 trials were performed over the course of three months, two of which were re-coatings of previous trials. The powder samples were weighed before and after coating to roughly determine mass gain, and Scanning Electron Microscope (SEM) data was also obtained. Initial mass results indicated that the rate of layer deposition was lower than desired in all of the trials. SEM confirmed that while a uniform coating was obtained, the average coating thickness was 9.1% of the goal. The two re-coating trials did increase the thickness of the tungsten layer, but only to an average 14.3% of the goal. Therefore, the number of CVD runs required to fully coat one batch of material with the current configuration is not feasible for high production rates. Therefore, the system will be modified to operate with a negative pressure environment. This will allow for better gas mixing and more efficient heating of the substrate material, yielding greater tungsten coating per trial.

Belancik, Grace A.↗