Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Design of the LBNF Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a wide band neutrino beam toward underground detectors placed at the SURF Facility in South Dakota, about 1,300 km away. The main elements of the facility are a primary proton beamline and a neutrino beamline. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab’s Main Injector. Neutrinos are produced after the protons hit a solid target and produce mesons which are subsequently focused by magnetic horns into a 204 m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial proton beam power is expected to be 1.2 MW; however, the facility is designed to be upgradeable to 2.4 MW. We discuss here the design status and the associated challenges as well as plans for improvements before baselining the facility.

43 PARTICLE ACCELERATORS↗

Managing a Real-Time Embedded Linux Platform with Buildroot

Developers of real-time embedded software often need to build the operating system, kernel, tools and supporting applications from source to work with the differences in their hardware configuration. The first attempts to introduce Linux-based real-time embedded systems into the Fermilab accelerator controls system used this approach but it was found to be time-consuming, difficult to maintain and difficult to adapt to different hardware configurations. Buildroot is an open source build system with a menu-driven configuration tool (similar to the Linux kernel build system) that automates this process. A customized Buildroot [1] system has been developed for use in the Fermilab accelerator controls system that includes several hardware configuration profiles (including Intel, ARM and PowerPC) and packages for Fermilab support software. A bootable image file is produced containing the Linux kernel, shell and supporting software suite that varies from 3 to 20 megabytes large – ideal for network booting. The result is a platform that is easier to maintain and deploy in diverse hardware configurations

Diamond, J.↗

Slip-stacking Dynamics and the 20 Hz Booster

Slip-stacking is an accumulation technique used at Fermilab since 2004 which nearly doubles the proton intensity. The Proton Improvement Plan II intensity upgrades require a reduction in slip-stacking losses by approximately a factor of 2. We study the single-particle dynamics that determine the stability of slip-stacking particles. We introduce universal area factors to calculate the available phase space area for any set of beam parameters without individual simulation. We show the particle loss as a function of time. We calculate the injection efficiency as a function of longitudinal emittance and aspect-ratio. We demonstrate that the losses from RF single particle dynamics can be reduced by a factor of 4-10 (depending on beam parameters) by upgrading the Fermilab Booster from a 15-Hz cycle-rate to a 20-Hz cycle-rate. We recommend a change in injection scheme to eliminate the need for a greater momentum aperture in the Fermilab Recycler.

43 PARTICLE ACCELERATORS↗

The HEPCloud Facility: elastic computing for High Energy Physics – The NOvA Use Case

The need for computing in the HEP community follows cycles of peaks and valleys mainly driven by conference dates, accelerator shutdown, holiday schedules, and other factors. Because of this, the classical method of provisioning these resources at providing facilities has drawbacks such as potential overprovisioning. As the appetite for computing increases, however, so does the need to maximize cost efficiency by developing a model for dynamically provisioning resources only when needed. To address this issue, the HEPCloud project was launched by the Fermilab Scientific Computing Division in June 2015. Its goal is to develop a facility that provides a common interface to a variety of resources, including local clusters, grids, high performance computers, and community and commercial Clouds. Initially targeted experiments include CMS and NOvA, as well as other Fermilab stakeholders. In its first phase, the project has demonstrated the use of the “elastic” provisioning model offered by commercial clouds, such as Amazon Web Services. In this model, resources are rented and provisioned automatically over the Internet upon request. In January 2016, the project demonstrated the ability to increase the total amount of global CMS resources by 58,000 cores from 150,000 cores - a 25 percent increase - in preparation for the Recontres de Moriond. In March 2016, the NOvA experiment has also demonstrated resource burst capabilities with an additional 7,300 cores, achieving a scale almost four times as large as the local allocated resources and utilizing the local AWS s3 storage to optimize data handling operations and costs. NOvA was using the same familiar services used for local computations, such as data handling and job submission, in preparation for the Neutrino 2016 conference. In both cases, the cost was contained by the use of the Amazon Spot Instance Market and the Decision Engine, a HEPCloud component that aims at minimizing cost and job interruption. This paper describes the Fermilab HEPCloud Facility and the challenges overcome for the CMS and NOvA communities.

Fuess, S.↗

Design of the LBNF Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward DUNE detectors, placed deep underground at the Sanford Underground Research Facility (SURF) in South Dakota. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab’s Main Injector and will be transported via a series of sixty-nine conventional magnets to a solid target. Neutrinos are produced after the protons hit the target and produce mesons which are subsequently focused by magnetic horns into a 194 m long decay pipe where they decay into muons and neutrinos. The hadron absorber, located directly downstream of the decay pipe is designed to absorb the residual energy from protons and secondary particles which have not decayed. Muon detectors placed downstream of the hadron absorber will provide important information about the neutrino beam properties such as the beam direction and intensity as well as the associated muon spectrum. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The LBNF beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to about 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015. We discuss here the design status and the associated challenges as well as the R&D and plans for improvements before baselining the facility.

43 PARTICLE ACCELERATORS↗

Implementation of Design Changes Towards a More Reliable, Hands-off Magnetron Ion Source

As the main H- ion source for the accelerator complex, magnetron ion sources have been used at Fermilab since the 1970’s. At the offline test stand, new R&D is carried out to develop and upgrade the present magnetron-type sources of H- ions of up to 80 mA and 35 keV beam energy in the context of the Proton Improvement Plan. The aim of this plan is to provide high-power proton beams for the experiments at FNAL. In order to reduce the amount of tuning and monitoring of these ion sources, a new electronic system consisting of a current-regulated arc discharge modulator allow the ion source to run at a constant arc current for improved beam output and operation. A solenoid-type gas valve feeds H2 gas into the source precisely and independently of ambient temperature. This summary will cover several studies and design changes that have been tested and will eventually be implemented on the operational magnetron sources at Fermilab. Innovative results for this type of ion source include cathode geometries, solenoid gas valves, current controlled arc pulser, cesium boiler redesign, gas mixtures of hydrogen and nitrogen, and duty factor reduction, with the aim to improve source lifetime, stability, and reducing the amount of tuning needed. In this summary, I will highlight the advances made in ion sources at Fermilab and will outline the directions of the continuing R&D effort.

43 PARTICLE ACCELERATORS↗

Superconducting Magnet Performance in LCLS-II Cryomodules

New LCLS-II Linear Superconducting Accelerator Cry-omodules are under construction at Fermilab. Installed in-side each SCRF Cryomodule is a superconducting magnet package to focus and steer an electron beam. The magnet package is an iron dominated configuration with conduc-tively cooled racetrack-type quadrupole and dipole coils. For easier installation the magnet can be split in the vertical plane. Initially the magnet was tested in a liquid helium bath, and high precision magnetic field measurements were performed. The first (prototype) Cryomodule with the magnet inside was built and successfully tested at Fermilab test facility. In this paper the magnet package is discussed, the Cryomodule magnet test results and current leads con-duction cooling performance are presented. So far magnets in nine Cryomodules were successfully tested at Fermilab.

Kashikhin, V.↗

Status of Dual-readout R&D for a Linear Collider in T1015 Collaboration

The hadronic energy resolution required for an hadronic operating at lepton collider is at the limits or even exceeds that obtained with traditional techniques. Furthermore, it is a well established fact that the presence of an electromagnetic section in front of an hadron calorimeter, as occurs in the layouts of the majority of detectors operating at a collider, would deteriorate the hadronic energy resolution of the device. The novel $ADRIANO$ technology (\textit{A Dual-readout Integrally Active Non-segmented Option}), currently under development at Fermilab, overcomes the above limitations by complementing an integrally active calorimeter with the dual-readout technique. Detailed Monte Carlo studies indicate that the energy resolution is in the $25\%/\sqrt{E}$ - $38\%/\sqrt{E}$ interval with a linear response of the detector up to an energy of 200 GeV. A baseline configuration is chosen with an estimated energy resolution of $\sigma(E)/E\approx30\%/\sqrt{E}$. Several prototypes have been built by \textit{T1015} Collaboration at Fermilab, to explore the effect of modifications of the layout from the baseline configuration. Preliminary results from several test beams at the \textit{Fermilab Test Beam Facility} (FTBF) of $\sim1\lambda_{I}$ prototypes are presented. Future prospects with ultra-heavy glass are, also, summarized.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design Status of the LBNF / DUNE Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a wide band beam of neutrinos of sufficient intensity and appropriate energy toward DUNE detectors, placed 4850 feet underground at SURF in South Dakota, about 1,300 km away. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos are produced after the protons hit a four-interaction length solid target and produce mesons which are subsequently focused by a set of three magnetic horns into a 194 m long helium-filled decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spatial and radiological constraints, extensive simulations and the experience gained by operating the NuMI facility at Fermilab. The Beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to about 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015 and CD-3a approval in September 2016. We discuss here the Beamline design status and the associated challenges.

43 PARTICLE ACCELERATORS↗

A moment with Anne Schukraft

Meet Anne Schukraft, a neutrino scientist at Fermilab. Schukraft is a member of the Short-Baseline Near Detector experiment, which will investigate ghostly particles called neutrinos. SBND will also help the lab prepare for the international Deep Underground Neutrino Experiment (http://fnal.gov/dune), hosted by Fermilab. In her spare time, Schukraft likes to swim and cycle. She appreciates Fermilab's collaborative atmosphere and believes it creates a positive environment for current and future generations of scientists. For even more information about neutrinos, visit All Things Neutrino: http://neutrinos.fnal.gov/

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

What is the DUNE experiment?

Big discoveries need big detectors, and Fermilab’s Deep Underground Neutrino Experiment is one of the biggest. Fermilab plans to shoot beams of neutrinos and antimatter neutrinos through the Earth from Chicago to western South Dakota. The DUNE experiment will study neutrino interactions in great detail, with special attention on (a) comparing the behaviors of neutrinos vs. antineutrinos, (b) looking for proton decay, and (c) searching for the neutrinos emitted by supernovae. The experiment is being built and should start operations in the mid-to-late 2020s. In this video, Fermilab’s Dr. Don Lincoln gives us the lowdown on this fascinating project.

43 PARTICLE ACCELERATORS↗

Alvin Tollestrup (1924-2020): A Life in Science

Alvin Tollestrup was a physicist and engineer of uncommon insight, intuition, and ingenuity who was revered in life for his essential leadership in the development of superconducting magnets for high-energy accelerators. He exhibited a matchless mastery of what he called freshman physics — though his mastery hardly ended there — and an uncanny gift for joining careful measurements with transparent calculations to reveal the essence of a subject. To watch Alvin at work was to learn how a true scientist formulates and solves a problem. He had other gifts: a nose for significant problems in both science and technology, the ability to draw talented people to an important cause, and a mentor's instinct for spotting gifted junior colleagues and helping them to mature as engineers and scientists. He was also good company! Alvin brought his keen vision about what constitutes important science, along with powerful ambition for the institution and for fundamental science, to considerat ions about Fermilab's future. His questions were uniformly probing, his opinions unfailingly interesting, and his appetite for work consistently inspiring. Among Alvin's many contributions to experimental particle physics — in a career that spanned seven decades — the rich achievements of the Collider Detector at Fermilab Collaboration, of which he was a founder and an enduring leader, stand out. The discovery of the top quark in 1995 earned worldwide acclaim. He reaped individual accolades as well, including election to the National Academy of Sciences. The National Medal of Technology, conferred in 1989, recognized Alvin’s leading role in developing superconducting magnets for Fermilab's Tevatron. Universities Research Association created the Tollestrup Award for Postdoctoral Research, commemorating Alvin's avuncular support for young scientists. This volume celebrates Alvin Tollestrup’s career and the rich, fulfilling life he led beyond the laboratory. Contributions from colleagues and family illuminate many facets of this remarka! ble figure. May old friends savor the memory of the Alvin they knew, while discovering less-familiar parts of his history; and may readers who did not have the opportunity to know Alvin firsthand find inspiration in his exemplary life in science.

Palmer, Mark↗

Detector response calibration for the NOvA quasi-elastic cross-section measurement

NOvA is a long-baseline neutrino experiment designed to observe the neutrino oscillation phenomenon of muon neutrinos oscillating into electron neutrinos. The NuMI beam line located at Fermilab produces the muon neutrinos for this observation. The Near and Far Detectors are constructed off-axis of the NuMI beam line and located at Fermilab and northern Minnesota (electron neutrino appearance maximum), respectively. In order to carry out the long-term goals of the experiment, the NOvA Near Detector Prototype (NDOS) was built and commissioned at Fermilab. Its goals are to demonstrate that, using the same materials and technologies as the larger NOvA detectors, we are able to observe neutrino data from the NuMI beam and cosmic ray muons. The cosmic ray muon data were used in the commissioning and it is currently being used in testing of detector response. These data are also being used in the development of reconstruction and calibration techniques to be used in the Near and Far Detectors. Furthermore, the neutrino data acquired are being used in the development and implementation of physics analyses, not only for NDOS data, but also for the first NOvA data. This thesis will discuss the development of the detector response calibration using cosmic ray muon data and its effects on the preliminary charged current quasi-elastic cross-section measurement using beam neutrino data in the NDOS.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Trigger-DAQ and Slow Controls Systems in the Mu2e Experiment

The muon campus program at Fermilab includes the Mu2e experiment that will search for a charged-lepton flavor violating processes where a negative muon converts into an electron in the field of an aluminum nucleus, improving by four orders of magnitude the search sensitivity reached so far. Mu2e's Trigger and Data Acquisition System (TDAQ) uses otsdaq as its solution. Developed at Fermilab, otsdaq uses the artdaq DAQ framework and art analysis framework, under the-hood, for event transfer, filtering, and processing. otsdaq is an online DAQ software suite with a focus on flexibility and scalability, while providing a multi-user, web-based, interface accessible through the Chrome or Firefox web browser. The detector Read Out Controller (ROC), from the tracker and calorimeter, stream out zero-suppressed data continuously to the Data Transfer Controller (DTC). Data is then read over the PCIe bus to a software filter algorithm that selects events which are finally combined with the data flux that comes froma Cosmic Ray Ve to System (CRV). A Detector Control System (DCS) for monitoring, controlling, alarming, and archiving has been developed using the Experimental Physics and Industrial Control System (EPICS) Open Source Platform. The DCS System has also been itegrated into otsdaq. The installation of the TDAQ and the DCS systems in the Mu2e building is planned for 2021-2022, and a prototype has been built at Fermilab's Feynman Computing Center. We report here on the developments and achievements of the integration of Mu2e's DCS system into the online otsdaq software.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Strongly Tapered Helical Undulator System for Fast-greens Installation

RadiaBeam, in collaboration with UCLA and Fermilab, is developing a strongly tapered helical undulator system for the Tapering Enhanced Stimulated Superradiant Amplification experiment at 515 nm (TESSA-515). The experiment will be carried out at the FAST facility at Fermilab as a Gamma-Ray high Efficiency ENhanced Source (FAST-GREENS). The undulator system was designed by UCLA, engineered by RadiaBeam, and will be installed on the beamline at Fermilab (FNAL). The design is based on a permanent magnet Halbach scheme of four 1-meter long undulator sections; two of which have been completed and installed. The undulator period is fixed at 32 mm and the magnetic field amplitude can be tapered by tuning the gap along the interaction. Each magnet can be individually adjusted by 1 mm, offering up to 25% magnetic field tunability with a minimum gap of 5.58 mm. This paper discusses the design and engineering of the undulator system and the stage 0 installation status.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Warm Unit Stand Assembly and Testing for Proton Improvement Plan - II

The Proton Improvement Project II (PIP II), situated at Fermilab, signifies a critical advancement in the realm of high-energy physics. PIP II, a linear accelerator renovation endeavor, aspires to double the output of the existing proton beam, reinforcing Fermilab’ s position as a vanguard in this field. The proton beam's creation involves a series of high-frequency cryomodules, necessitating environmental temperature arrays of magnets and vacuum pumps henceforth described as ‘Warm Units.’ The Warm Units include design features of : 1. insertion between the cryomodules, 2. multi-stage adjustments in six degrees of freedom to ensure precise beam alignment; 3. Natural frequency modes that avoid specified ranges. In adherence to Fermilab’ s stringent safety standards, comprehensive testing procedures are slated to validate the Warm Units' capacity to simultaneously achieve local alignment adjustments while averting low-frequency oscillation less than 15 Hertz. The testing regimen will scrutinize the Warm Units' alignment adjustment capabilities and their resilience against low-frequency oscillations, with an overarching objective of satisfying the Final Design Review criteria specific to the PIP II initiative. This project works to furnish technicians responsible for the assembly of Warm Units with a comprehensive guide for successful installation, concurrently documenting any requisite design modifications essential for achieving a real-world configuration.

43 PARTICLE ACCELERATORS↗

Development of a half-meter scale Traveling-Wave (TW) SRF cavity

Traveling-wave technology can push the accelerator field gradient of niobium SRF cavity to 70MV/m or higher beyond the fundamental limit of 50~60MV/m in Standing-Wave regime. The 1st demonstration of TW resonance excitation in a proof-of-principle 3-cell SRF cavity in 2K liquid helium was successfully carried out at Fermilab in collaboration with Euclid Techlabs. In parallel with that, the RF design process of 0.5~1 meter scale TW cavity was begun at Fermilab for advancing TW technologies necessary more for future accelerator-scale one. Considering the physical dimensions of existing SRF facilities (for fabrication, processing, and cryogenic testing) and the lessons learned from the 3-cell, Fermilab has proposed a preliminary RF design of a half-meter scale TW SRF cavity. It consists of a 7-cell structure and a power feedback waveguide (WG) loop with new RF configurations to control TW resonance. Here we report a preliminary RF design, development plans, and activities.

43 PARTICLE ACCELERATORS↗

Particle Physics Division Lifting Fixtures Database Restructure

In this project, a thorough investigation is conducted to determine the current placements of all lifting fixtures within the Particle Physics Division (PPD) buildings - as well as whether which ones are still operable. Briefly, the reasoning as to why these lifting fixtures must be found and the database must be updated is covered in the beginning sections of the report. Many tools and fixtures get moved around and forgotten about, and Fermilab’s systems have been updated more than a few times throughout the years, so data can get lost and forgotten about. Considering that many of these lifting fixtures have not been used in years or there is missing, impertinent information that is required by Fermilab’s modern standards and safety regulations. Lifting fixtures found at each site are measured, photographed, and logged; later analyzed to determine if they are under PPD’s purview or another department so that the respective authorities can be notified. Once maximum information is found for all the fixtures they are formatted to 2025 Fermilab standards in an easily accessible digital list for PPD employees.

Creedon, Carroll [Unlisted, US, IL]↗