Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Low Cost Propulsion Technology at the Marshall Space Flight Center: Fastrac Engine and the Propulsion Test Article

The need for low cost access to space has initiated the development of low cost liquid rocket engine and propulsion system hardware at the Marshall Space Flight Center (MSFC). The engine, the 60,000 lbf, RP-1 and LOX Fastrac Engine has been designed as a robust, low cost liquid rocket engine with applications for X-34 as well as future low cost booster systems. The engine is a turbopump fed, gas generator cycle, rocket motor with an ablative nozzle. The Propulsion Test Article (PTA) is a test bed for low cost propulsion system hardware including a composite RP-1 tank, flight feedlines and pressurization system, stacked in a booster configuration. A general description of the PTA and the Fastrac engine is given, with emphasis on the technical specification of the hardware including flow rates, pressures and other operating conditions. The process which has been used for the design and integration of this hardware is described.

Fisher, Mark F.↗

An Assessment of Technical and Production Risks of Candidate Low-Cost Attitude/Heading Reference Systems(AHRS)

This report provides an assessment of technical and production risks of candidate low-cost attitude/heading reference systems (AHRS) for use in the Advanced General Aviation Transport Experiments (AGATE) airplanes. A low-cost AHRS is a key component of modem "glass cockpit" flight displays for General Aviation (GA) aircraft. The technical capabilities of several candidate low-cost AHRS were examined and described along with the technical issues involved with using all solid-state components for attitude measurement. An economic model was developed which describes the expected profit, rate of return, and volume requirements for the manufacture of low-cost AHRS for GA aircraft in the 2000 to 2020 time frame. The model is the result of interviews with GA airframe manufacturers, avionics manufacturers and historical analysis of avionics of similar complexity. The model shows that a manufacturer will break even after three years of AHRS production, realizing an 18 percent rate of return (23 percent profit) on an investment of $3.5M over the 20 year period. A start-up production estimate showed costs of $6-12M for a new company to build and certify an AHRS from scratch, considered to be a high-risk proposition, versus $0.25-0.75M for an experienced avionics manufacturer to manufacture a design under license, a low-risk proposition.

Yuchnovicz, Daniel↗

Spacecraft Software Maintenance: An Effective Approach to Reducing Costs and Increasing Science Return

Flight software is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are typically dealing almost entirely with the capabilities of onboard software. This software, even more than critical ground/flight communications systems, is expected to perform perfectly during all phases of spacecraft life. Due to the fact that it can be reprogrammed on-orbit to accommodate degradations or failures in flight hardware, new insights into spacecraft characteristics, new control options which permit enhanced science options, etc., the on- orbit flight software maintenance team is usually significantly responsible for the long term success of a science mission. Failure of flight software to perform as needed can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to maintaining spacecraft software--namely using the original developers, using the mission operations personnel, or assembling a center of excellence for multi-spacecraft software maintenance. Not planning properly for flight software maintenance can lead to unnecessarily high on-orbit costs and/or unacceptably long delays, or errors, in patch installations. A common approach for flight software maintenance is to access the original development staff. The argument for utilizing the development staff is that the people who developed the software will be the best people to modify the software on-orbit. However, it can quickly becomes a challenge to obtain the services of these key people. They may no longer be available to the organization. They may have a more urgent job to perform, quite likely on another project under different project management. If they havn't worked on the software for a long time, they may need precious time for refamiliarization to the software, testbeds and tools. Further, a lack of insight into issues related to flight software in its on-orbit environment, may find the developer unprepared for the challenges. The second approach is to train a member of the flight operations team to maintain the spacecraft software. This can prove to be a costly and inflexible solution. The person assigned to this duty may not have enough work to do during a problem free period and may have too much to do when a problem arises. If the person is a talented software engineer, he/she may not enjoy the limited software opportunities available in this position; and may eventually leave for newer technology computer science opportunities. Training replacement flight software personnel can be a difficult and lengthy process. The third approach is to assemble a center of excellence for on-orbit spacecraft software maintenance. Personnel in this specialty center can be managed to support flight software of multiple missions at once. The variety of challenges among a set of on-orbit missions, can result in a dedicated, talented staff which is fully trained and available to support each mission's needs. Such staff are not software developers but are rather spacecraft software systems engineers. The cost to any one mission is extremely low because the software staff works and charges, minimally on missions with no current operations issues; and their professional insight into on-orbit software troubleshooting and maintenance methods ensures low risk, effective and minimal-cost solutions to on-orbit issues.

Shell, Elaine M.↗

Improving Space Project Cost Estimating with Engineering Management Variables

Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

Hamaker, Joseph W.↗

The Effect of Mission Location on Mission Costs and Equivalent System Mass

It is the goal of developers of advanced life support researcher to develop technology that reduces the cost of life support for future space missions and thereby enables missions that are currently infeasible or too expensive. Because the cost of propulsion dominates the cost of hardware emplacement in space and because the mass of a deliverable object controls its propulsive requirements, equivalent system mass (ESM) is used as a means for accounting for mission costs. ESM is typically calculated by adding to the actual mass the equivalent amount of mass that must be added to a mission due to other characteristics of a piece of hardware such as the item s volume or energy requirements. This approach works well for comparing different pieces of hardware when they go to the same location in space. However, different locations in mission space such low Earth orbit, Mars surface, or full trip to Mars and return to low Earth orbit require vastly different amounts of propulsion. Moving an object from Earth surface to the Martian surface and returning it to Earth will require as much as 100 times the propulsion that is required to move the object to low Earth orbit only. This paper presents the case for including the effect that location can have on cost as a part of ESM and suggests a method for achieving this improvement of ESM.

Fisher, John W.↗

Designing for Cost

Designing for cost is a state of mind. Of course, a lot of technical knowledge is required and the use of appropriate tools will improve the process. Unfortunately, the extensive use of weight based cost estimating relationships has generated a perception in the aerospace community that the primary way to reduce cost is to reduce weight. Wrong! Based upon an approximation of an industry accepted formula, the PRICE H (tm) production-production equation, Dean demonstrated theoretically that the optimal trajectory for cost reduction is predominantly in the direction of system complexity reduction, not system weight reduction. Thus the phrase "keep it simple" is a primary state of mind required for reducing cost throughout the design process.

Dean, Edwin B.↗

Correlation, Cost Risk, and Geometry

The geometric viewpoint identifies the choice of a correlation matrix for the simulation of cost risk with the pairwise choice of data vectors corresponding to the parameters used to obtain cost risk. The correlation coefficient is the cosine of the angle between the data vectors after translation to an origin at the mean and normalization for magnitude. Thus correlation is equivalent to expressing the data in terms of a non orthogonal basis. To understand the many resulting phenomena requires the use of the tensor concept of raising the index to transform the measured and observed covariant components into contravariant components before vector addition can be applied. The geometric viewpoint also demonstrates that correlation and covariance are geometric properties, as opposed to purely statistical properties, of the variates. Thus, variates from different distributions may be correlated, as desired, after selection from independent distributions. By determining the principal components of the correlation matrix, variates with the desired mean, magnitude, and correlation can be generated through linear transforms which include the eigenvalues and the eigenvectors of the correlation matrix. The conversion of the data to a non orthogonal basis uses a compound linear transformation which distorts or stretches the data space. Hence, the correlated data does not have the same properties as the uncorrelated data used to generate it. This phenomena is responsible for seemingly strange observations such as the fact that the marginal distributions of the correlated data can be quite different from the distributions used to generate the data. The joint effect of statistical distributions and correlation remains a fertile area for further research. In terms of application to cost estimating, the geometric approach demonstrates that the estimator must have data and must understand that data in order to properly choose the correlation matrix appropriate for a given estimate. There is a general feeling by employers and managers that the field of cost requires little technical or mathematical background. Contrary to that opinion, this paper demonstrates that a background in mathematics equivalent to that needed for typical engineering and scientific disciplines at the masters or doctorate level is appropriate within the field of cost risk.

Dean, Edwin B.↗

REUSABLE PROPULSION ARCHITECTURE FOR SUSTAINABLE LOW-COST ACCESS TO SPACE

The primary obstacle to any space-based mission is, and has always been, the cost of access to space. Even with impressive efforts toward reusability, no system has come close to lowering the cost a significant amount. It is postulated here, that architectural innovation is necessary to make reusability feasible, not incremental subsystem changes. This paper shows two architectural approaches of reusability that merit further study investments. Both #inherently# have performance increases and cost advantages to make affordable access to space a near term reality. A rocket launched from a subsonic aircraft (specifically the Crossbow methodology) and a momentum exchange tether, reboosted by electrodynamics, offer possibilities of substantial reductions in the total transportation architecture mass - making access-to-space cost-effective. They also offer intangible benefits that reduce risk or offer large growth potential. The cost analysis indicates that approximately a 50% savings is obtained using today#s aerospace materials and practices.

Bonometti, J. A.↗

Observations on Cost Modeling and Performance Measurement of Long Term Archives

This paper describes a prototype suite of Excel-based tools that could be used for estimating lifecycle costs for newly planned or modified long-term archival facilities. These tools may also prove valuable for monitoring the long-term performance of such facilities once operational. Cost estimation is by analogy, using statistical curve-fitting techniques across a database of comparable data activities. The database currently includes 29 operational data centers ranging from small (2 FTEs) to large (66 FTEs), and is readily expandable to include additional activities specifically involving data preservation and added value. Each comparable data center is described in terms of its staffing, throughput workload, archival and distribution requirements, levels of user service, overall complexity, degree of automation, and other data, comprising 94 distinct descriptors in all. The descriptors were developed by normalizing heterogeneous data from the various centers and mapping them into an Excel framework consistent with the OAIS reference model. A user-friendly tool is provided for generating input to and updating the comparables database. This tool can also be used to benchmark the performance (in terms of cost versus throughput) of an operational data center, and to update the staffing, cost and workload data on a periodic basis. The comparables database could thus provide a history of staffing and throughput over time, as a means of performance monitoring and providing feedback for continuous improvement. Ancillary tools are also provided for performing "what-if' cost exercises for planning purposes, and for graphical display of data and results. We provide a high-level description of the tools; present our experiences and observations on gathering the information and maintaining the database; and discuss how this tool set might be applied to long term archives.

Fontaine, Kathy↗

Civil Service Workforce Market Supply and the Effect on Cost Estimating Relationship (CERS) that May Effect the Productivity Factors for Future NASA Missions

The upcoming retirement of the Baby Boomers will leave a workforce age gap between the younger generation (the future NASA decision makers) and the gray beards. This paper will reflect on the average age of the workforce across NASA Centers, the Aerospace Industry and other Government Agencies, like DoD. This paper will dig into Productivity and Realization Factors and how they get applied to bi-monthly (payroll) data for true full-time equivalent (FTE) calculations that could be used at each of the NASA Centers and other business systems that are on the forefront in being implemented. This paper offers some comparative costs analysis/solutions, from simple FTE cost-estimating relationships (CERs) versus CERs for monthly time-phasing activities for small research projects that start and get completed within a government fiscal year. This paper will present the results of a parametric study investigating the cost-effectiveness of alternative performance-based CERs and how they get applied into the Center's forward pricing rate proposals (FPRP). True CERs based on the relationship of a younger aged workforce will have some effects on labor rates used in both commercial cost models and other internal home-grown cost models which may impact the productivity factors for future NASA missions.

Sterk, Steve↗

Metabolic Cost of Experimental Exercises

Although the type and duration of activity during decompression was well documented, the metabolic cost of 1665 subject-exposures with 8 activity profiles from 17 altitude decompression sickness (DCS) protocols at Brooks City-Base, TX from 1983-2005 was not determined. Female and male human volunteers (30 planned, 4 completed) performed activity profiles matching those 8 activity profiles at ground level with continuous monitoring of metabolic cost. A Cosmed K4b2 Cardio Pulmonary Exercise Testing device was used to measure oxygen uptake (VO2) during the profiles. The results show levels of metabolic cost to the females for the profiles tested varied from 4.3 to 25.5 ml/kg/min and from 3.0 to 12.0 ml/kg/min to the males. The increase in VO2 from seated rest to the most strenuous of the 8 activity profiles was 3.6-fold for the females and 2.8-fold for the males. These preliminary data on 4 subjects indicate close agreement of oxygen uptake for activity performed during many subject-exposures as published earlier. The relatively low average oxygen uptake required to perform the most strenuous activity may imply the need for adjustment of modeling efforts using metabolic cost as a risk factor. Better definition of metabolic cost during exposure to altitude, a critical factor in DCS risk, may allow refinement of DCS prediction models.

Webb, James T.↗

Estimating Software-Development Costs With Greater Accuracy

COCOMOST is a computer program for use in estimating software development costs. The goal in the development of COCOMOST was to increase estimation accuracy in three ways: (1) develop a set of sensitivity software tools that return not only estimates of costs but also the estimation error; (2) using the sensitivity software tools, precisely define the quantities of data needed to adequately tune cost estimation models; and (3) build a repository of software-cost-estimation information that NASA managers can retrieve to improve the estimates of costs of developing software for their project. COCOMOST implements a methodology, called '2cee', in which a unique combination of well-known pre-existing data-mining and software-development- effort-estimation techniques are used to increase the accuracy of estimates. COCOMOST utilizes multiple models to analyze historical data pertaining to software-development projects and performs an exhaustive data-mining search over the space of model parameters to improve the performances of effort-estimation models. Thus, it is possible to both calibrate and generate estimates at the same time. COCOMOST is written in the C language for execution in the UNIX operating system.

Baker, Dan↗

Low-Cost Large Aperture Telescopes for Optical Communications

Low-cost, 0.5-1 meter ground apertures are required for near-Earth laser communications. Low-cost ground apertures with equivalent diameters greater than 10 meters are desired for deep-space communications. This presentation focuses on identifying schemes to lower the cost of constructing networks of large apertures while continuing to meet the requirements for laser communications. The primary emphasis here is on the primary mirror. A slumped glass spherical mirror, along with passive secondary mirror corrector and active adaptive optic corrector show promise as a low-cost alternative to large diameter monolithic apertures. To verify the technical performance and cost estimate, development of a 1.5-meter telescope equipped with gimbal and dome is underway.

optical communications↗

Situational Awareness from a Low-Cost Camera System

A method gathers scene information from a low-cost camera system. Existing surveillance systems using sufficient cameras for continuous coverage of a large field necessarily generate enormous amounts of raw data. Digitizing and channeling that data to a central computer and processing it in real time is difficult when using low-cost, commercially available components. A newly developed system is located on a combined power and data wire to form a string-of-lights camera system. Each camera is accessible through this network interface using standard TCP/IP networking protocols. The cameras more closely resemble cell-phone cameras than traditional security camera systems. Processing capabilities are built directly onto the camera backplane, which helps maintain a low cost. The low power requirements of each camera allow the creation of a single imaging system comprising over 100 cameras. Each camera has built-in processing capabilities to detect events and cooperatively share this information with neighboring cameras. The location of the event is reported to the host computer in Cartesian coordinates computed from data correlation across multiple cameras. In this way, events in the field of view can present low-bandwidth information to the host rather than high-bandwidth bitmap data constantly being generated by the cameras. This approach offers greater flexibility than conventional systems, without compromising performance through using many small, low-cost cameras with overlapping fields of view. This means significant increased viewing without ignoring surveillance areas, which can occur when pan, tilt, and zoom cameras look away. Additionally, due to the sharing of a single cable for power and data, the installation costs are lower. The technology is targeted toward 3D scene extraction and automatic target tracking for military and commercial applications. Security systems and environmental/ vehicular monitoring systems are also potential applications.

Freudinger, Lawrence C.↗

COTSAT Small Spacecraft Cost Optimization for Government and Commercial Use

Cost Optimized Test of Spacecraft Avionics and Technologies (COTSAT-1) is an ongoing spacecraft research and development project at NASA Ames Research Center (ARC). The prototype spacecraft, also known as CheapSat, is the first of what could potentially be a series of rapidly produced low-cost spacecraft. The COTSAT-1 team is committed to realizing the challenging goal of building a fully functional spacecraft for $500K parts and $2.0M labor. The project's efforts have resulted in significant accomplishments within the scope of a limited budget and schedule. Completion and delivery of the flight hardware to the Engineering Directorate at NASA Ames occurred in February 2009 and a cost effective qualification program is currently under study. The COTSAT-1 spacecraft is now located at NASA Ames Research Center and is awaiting a cost effective launch opportunity. This paper highlights the advancements of the COTSAT-1 spacecraft cost reduction techniques.

Swank, Aaron J.↗

GAJAT A Rapid Prototyping Mission Architecture Tool with Embedded Costing

GAJAT is a Near Earth Mission Architecture (NEMA) Rapid Prototyping Analysis Tool. It Was designed to be operated by a single systems engineer to replicate the mission design output of JPL's Team X. GAJAT provides estimates for: (1) The overall design of an observatory with a defined payload [instrument(s)] (2) The spacecraft consumable resources required to support the mission over its specified operational period (3) The minimum launch vehicle capability requirement (4) The Ground Segment Requirements, and (5) The cost for developing and launching the observatory (mission development cost) and the cost to operate the system over the specified operational period (mission operations cost), the sum of these two being the total mission cost.

Near Earth Mission Architecture (NEMA)↗

Preliminary Multivariable Cost Model for Space Telescopes

Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. Previously, the authors published two single variable cost models based on 19 flight missions. The current paper presents the development of a multi-variable space telescopes cost model. The validity of previously published models are tested. Cost estimating relationships which are and are not significant cost drivers are identified. And, interrelationships between variables are explored

Stahl, H. Philip↗

Cost-Benefit Analysis For Alternative Low-Emission Surface Preparation/ Depainting Technologies for Structural Steel

Stennis Space Center (SSC), Kennedy Space Center (KSC) and Air Force Space Command (AFSPC) identified particulate emissions and waste generated from the depainting process of steel structures as hazardous materials to be eliminated or reduced. A Potential Alternatives Report, Potential Alternatives Report for Validation of Alternative Low Emission Surface Preparation/Depainting Technologies for Structural Steel, provided a technical analyses of identified alternatives to the current coating removal processes, criteria used to select alternatives for further analysis, and a list of those alternatives recommended for testing. The initial coating removal alternatives list was compiled using literature searches and stakeholder recommendations. The involved project participants initially considered approximately 13 alternatives. In late 2003, core project members selected the following depainting processes to be further evaluated: (1) Plastic Blast Media-Quickstrip(R)-A. (2) Hard Abrasive-Steel-Magic(R). (3) Sponge Blasting-Sponge-Jet(R). (4) Liquid Nitrogen-NItroJet(R). (5) Mechanical Removal with Vacuum Attachment-DESCO and OCM Clean-Air (6) Laser Coating Removal Alternatives were tested in accordance with the Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, and the Field Evaluation Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel. Results of the testing are documented in the Joint Test Report. This Cost-Benefit Analysis (CBA) focuses on the three alternatives (Quickstrip(R)-A, SteelMagic (R), and Sponge-Jet(R)) that were considered viable alternatives for large area operations based on the results of the field demonstration and lab testing. This CBA was created to help participants determine if implementation of the candidate alternatives is economically justified. Each of the alternatives examined reduced Environmental Activity (EA) Costs-those costs associated with complying with environmental regulations. One alternative, Steel-Magic(R), also showed reduced Direct Costs and reduced total costs.

Lewis, Pattie↗