Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Concept of Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Initial Site-Specific Studies for Removing SNF from Six Shutdown Sites - 18042

The US Department of Energy (DOE) is exploring options for developing a large-scale transportation system for the safe transport of spent nuclear fuel (SNF) and high-level radioactive waste to future storage or disposal facilities. This complex, large-scale transportation system will involve coordinated, integrated activities. Interfaces with various transportation and non-transportation activities must be defined, and systems must be developed to ensure successful integration when the system becomes operational. To provide an understanding of the tasks and interfaces required for the complete de-inventory of particular sites where SNF is stored, DOE solicited bids from integrating contractors to develop initial site-specific de-inventory reports. The reports were developed for several nuclear power plant sites selected to represent a range of geographic locations, existing on-site SNF storage systems, and expected transportation modal options. Each report is presented in a self-contained narrative describing a potential campaign for removing all SNF and greater-than-class-C low-level radioactive waste (GTCC waste) from each specified site. Each study narrative includes site information; an analysis of the near-site transportation infrastructure; a concept of operations for the de-inventory; an estimated budget and schedule for the duration of operations; and a safety and security plan with site-specific considerations, emergency response considerations, and recommendations for the next steps DOE could take to de-inventory the site. The reports provide cost estimates for analytical purposes only; they do not attempt to specify the party or parties responsible for the costs. These reports present a first look at how an integrating contractor might recommend removing SNF from particular sites. They are written from the perspective of the contractor and do not represent DOE's plans. At this writing, six sites have been studied: - Connecticut Yankee, - Big Rock Point, - Humboldt Bay, - Maine Yankee, - Trojan, - Kewaunee. DOE may develop de-inventory reports for all reactor sites, with an initial focus on shutdown reactor sites. The order in which sites have been selected for study should not be considered an indicator of the order used by DOE to remove SNF from the sites. Since the SNF's destination is not important for the purpose of this work, DOE tasked the contractor with planning transportation of the SNF from the site to a generic railroad location in the approximate geographical center of the United States. These reports represent an initial study of the specific sites. Per the terms of the contract, the contractor was not permitted to engage in dialogue with power plant site personnel; near-site railroad personnel; or any local, state, or regional stakeholders about the studies. DOE provided site-specific data. The contractor was tasked to rely on past corporate experience, data available from DOE, and publicly available data when making site-specific recommendations for removing all SNF from each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

Application of Regolith Polymer Composite Fused Granular Fabrication Construction in Simulated Lunar Conditions

NASA’s Artemis program has the goal of creating a sustained lunar presence to provide unprecedented opportunities for scientific discovery and to ensure industry’s access to the unlimited resources and commercial potential in space. To achieve this goal, NASA must incrementally develop and expand its capabilities beyond the short lunar stays of the Apollo program to a robust continued presence with infrastructure and equipment to reduce mission risk. Kennedy Space Center’s Granular Mechanics and Regolith Operations laboratory (a.k.a. Swamp Works) has partnered with SpaceFactory and LERA Consulting Structural Engineers to develop the architectural and structural design of a robotically constructable unpressurized shelter. The shelter, called Lunar Infrastructure Asset (LINA), is designed to protect astronauts and surface assets from radiation, meteoroid impact, thermal gradients, and to withstand moonquakes. A Fused Granular Fabrication (FGF) construction process using regolith polymer composites was developed. The construction system and associated print parameters are discussed along with the environmental simulation equipment and a summary of test conditions. Test samples were printed in dirty thermal vacuum conditions (~10-3 torr, ~-200 °C,) and subscale versions of LINA were printed on a regolith simulant substrate in vacuum (~10-4 torr). Full scale LINA design optimization, simulation, and construction concept of operations are discussed.

lunar infrastructure↗

Selection, Production and Properties of Regolith Polymer Composite for Lunar Construction

NASA’s Artemis program has the goal of creating a sustained lunar presence to provide unprecedented opportunities for scientific discovery and to ensure industry’s access to the unlimited resources and commercial potential in space. To achieve this goal, NASA must incrementally develop and expand its capabilities beyond the short lunar stays of the Apollo program to a robust continued presence with infrastructure and equipment to reduce mission risk. Kennedy Space Center’s Granular Mechanics and Regolith Operations laboratory (a.k.a. Swamp Works) has partnered with SpaceFactory and LERA Consulting Structural Engineers to develop the architectural and structural design of a robotically constructable unpressurized shelter. The shelter, called Lunar Infrastructure Asset (LINA), is designed to protect astronauts and surface assets from radiation, meteoroid impact, thermal gradients, and to withstand moonquakes. A Fused Granular Fabrication (FGF) construction process using regolith polymer composites was developed. The construction system and associated print parameters are discussed along with the environmental simulation equipment and a summary of test conditions. Test samples were printed in dirty thermal vacuum conditions (~10-3 torr, ~-200 °C,) and subscale versions of LINA were printed on a regolith simulant substrate in vacuum (~10-4 torr). Full scale LINA design optimization, simulation, and construction concept of operations are discussed.

lunar infrastructure↗

TechEdSat-11: Prototyping Autonomous Communications in Orbit

Cognitive Engine 1 (CE-1) is a state-of-the-art automated system designed to manage routine operations and respond to adverse events without requiring human operator input. CE-1 will optimize scheduling capabilities, detect and react to link failures, and ensure data delivery deadlines are met efficiently. Seamless roaming between government and commercial providers will allow for a robust and cost-effective network. TechEdSat-11 will demonstrate two key components of CE-1: User Initiated Services (UIS) and Delay Tolerant Networking (DTN). The first phase of the experiment will use UIS to automate on-demand scheduling of a commercial S-band ground station. Later phases of the experiment will demonstrate DTN store-and-forward and space internetworking capabilities through the TechEdSat-11 S-band radio. This paper will discuss the CE-1 main components relevant to the experiment, the flight and ground software architecture, experiment concept of operations and preliminary results.

Rachel Dudukovich↗

Characterization of How CO2 Level May Impact Crew Performance Related to the HSIA Risk

Safety and mission critical anomalies are inevitable on NASA exploration missions. Delays and interruptions in communication with Earth-experts drives the requirement that crew resolve these anomalies on their own. The Human Factors and Behavioral Performance (HFBP) element of the NASA Human Research Program (HRP) recently stood-up the Human-System Integration Architecture (HSIA) risk. The specific risk statement is: “Given decreasing real-time ground support for execution of complex operations during future exploration missions, there is a possibility of adverse performance outcomes including that crew are unable to adequately respond to unanticipated critical malfunctions or detect safety critical procedural errors.” Reliable, on-board capabilities will need to support the crew - not only to resolve anomalies, but also to promote situation awareness (SA) and to reduce workload. Unfortunately, the present level of technological advancement limits the range of achievable intelligent support (Wu & Vera, 2019). The Human Capabilities Assessment for Autonomous Missions (HCAAM) projects were devised to identify how technology may benefit crew situation awareness and enhance crew trust in the intelligent systems. A suite of time-critical and complex exploration tasks have been identified (Holden et al., 2019) that may advance human-integration Concept of Operations (ConOps) development. This ConOps (a future HFBP directed task) along with standards and guidelines (Holden et al., 2019) may be used as the foundation for human-system requirements for a self-reliant crew. Spaceflight CO2 levels are elevated relative to terrestrial levels. Above 2.5 mmHg there is an increase in the incidence of crew headaches (Law et al., 2014) and Mission Control reports of mood and performance changes in the crew. The concern is that elevated CO2 effects may exacerbate the HSIA risk. Unfortunately, effects of higher concentrations of CO2 on performance decrements are not well established. The main goal of the current report is to identify how elevated CO2 impacts the HSIA risk. The approach taken is to trace the relationship between cognitive and motor abilities required for anomaly response with critical mission tasks and the level of technological advancement to support anomaly resolution to identify how elevated CO2 may impact the HSIA risk. The conclusion is that elevated CO2 could exacerbate the HSIA risk. Several research gaps are identified.

cognition↗

Space-Based Solar Power: An Enabler for Expanded Lunar Surface Exploration and Mobility Operations

The achievement of industrial and scientific goals set by the National Aeronautics and Space Administration (NASA) Artemis missions within the Moon to Mars (M2M) architecture greatly relies on the breadth and efficacy of lunar surface exploration. The lunar surface environment presents various challenges and complexities to sustainable mission operations and activities. Power generation and distribution capabilities are vital for exploration on the lunar surface, which can enable activities such as subsurface sample collection, permanently shadowed region (PSR) prospecting, and lunar terrain mapping. Innovative power technologies that demonstrate flexibility, reliability, and high capacity are desirable to achieve sustainable operations and infrastructure on the lunar surface. Studies have proposed solar-powered spacecraft in cislunar orbit capable of beaming power to lunar surface assets as a solution to this problem. This study analyzes the benefit that space-based solar power (SBSP) assets could deliver to the M2M architecture by measuring its potential to augment lunar surface exploration opportunity. Qualitative measures of SBSP’s potential impact will include, but not be limited to, power available across surface elements, surface mobility range, and delivered landed mass. These measures are assessed for a notional surface architecture measured against its baseline configuration (no external power augmentation). Additionally, this presentation will provide an overview of the SBSP system design configuration trade space, subsystem parameter trade space, and results from preliminary spacecraft concept of operations (ConOps) and sizing.

Space-based solar power↗

Engineering America's Future in Space: Systems Engineering Innovations for Sustainable Exploration

The National Aeronautics and Space Administration (NASA) delivers space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides U.S. capability for both crew and cargo to low-Earth orbit to construct the International Space Station, before the Shuttle is retired in 2010, as outlined in the 2006 NASA Strategic Plan. I In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle/Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle/Altair Lunar Lander. The goals for this new system include increased safety and reliability, coupled with lower operations costs that promote sustainable space exploration over a multi-decade schedule. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level test activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity against predictions made by modern modeling and simulation analysis. It also will give information about the work in progress for the Ares I-X developmental test flight planned in 2009 to provide key data before the Ares I Critical Design Review. Activities such as these will help prove and refine mission concepts of operation, while supporting the spectrum of design and development tasks being performed by Marshall's Engineering Directorate, ranging from launch vehicles and lunar rovers to scientific spacecraft and associated experiments. Ultimately, the work performed will lead to the fielding of a robust space transportation solution that will carry international explorers and essential payloads for sustainable scientific discovery beyond planet Earth.

Dumbacher, Daniel L.↗

Risk Analysis Associated with Loss of Toxic Gases During Orion Landing and Recovery Operations

Mission, landing and recovery operations for the Orion crew module involve reentry into the Earth's atmosphere and the deployment of three Nomex parachutes to slow the descent before landing along the west coast of the United States. Orion may have residual fuel (hydrazine, N2H4) or coolant (ammonia, NH3) on board which are both highly toxic to crew in the event of exposure. These risks were evaluated using a first principles analysis approach through fluid dynamics modeling. Plume calculations were first performed with the ANSYS Fluent computational fluid dynamics code. Data were then extracted at locations relevant to crew safety such as the snorkel fan inlet and the egress hatch. Mixing calculations were performed to quantify exposure concentrations within the crew bay before and during egress and departure. Finally, results included herein were used to inform the Orion post-landing Concept of Operations (ConOps) so that strategies could be formulated to maintain crew safety in the event of the loss of fuel or coolant.

Orion↗

Resource Prospector: A Lunar Volatiles Prospecting and ISRU Demonstration Mission

A variety of recent observations have indicated several possible reservoirs of water and other volatiles. These volatiles, and in particular water, have the potential to be a valuable or enabling resource for future exploration. NASA's Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) is supporting the development of Resource Prospector (RP) to explore the distribution and concentration of lunar volatiles prospecting and to demonstrate In-Situ Resource Utilization (ISRU). The mission includes a NASA developed rover and payload, and a lander will most likely be a contributed element by an international partner or the Lunar Cargo Transportation and Landing by Soft Touchdown (CATALYST) initiative. The RP payload is designed to: (1) locate near-subsurface volatiles, (2) excavate and analyze samples of the volatile-bearing regolith, and (3) demonstrate the form. extractability and usefulness of the materials. RP is being designed with thought given to its extensibility to resource prospecting and ISRU on other airless bodies and Mars. This presentation will describe the Resource Prospector mission, the payload and measurements, and concept of operations

In-Situ Resource Utilization (ISRU)↗

FRMAC Assessment Manual Volume 1 - Assessment Division Operations

In the event of a major radiological incident or accident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities and/or capabilities for responding to such incidents (Ref. FRMAC10). The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. For less severe radiological incidents, elements of the Department of Energy (DOE) Consequence Management (CM) program, such as the CM Response Team (CMRT) or CM Home Team (CMHT) may be activated to provide similar support activities to regional or local response assets. This manual describes the roles and responsibilities of the Assessment Division of the FRMAC during a response to a radiological incident. Every effort will be made in this manual in accordance with the Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center (FRMAC) – Emergency Phase (Ref. RSL07) to use terminology consistent with the National Incident Management System (NIMS) for Incident Command System (ICS) organizations, planning processes, and leadership positions (Ref. FEMA17). This manual also applies to smaller scale CM responses that may involve the CMRT or CMHT elements without the formation of a FRMAC. It details the concept of operations for the Assessment Division, including common tasks performed by the Division. This manual also describes the organizational structure of the Assessment Division and roles of the personnel within the Division.

61 RADIATION PROTECTION AND DOSIMETRY↗

Draft Summary Report on Irradiated Fuel Handling and Management for LOTUS

The National Reactor Innovation Center (NRIC) has conceptualized the design of the Laboratory for Operation and Testing in the United States (LOTUS) test bed to provide the United States Department of Energy (DOE) with the infrastructure necessary to make advanced reactor designs available for commercial developers. LOTUS will provide a test bed to developers with the capabilities of supporting a wide range of experiment design possibilities. Upon completion of the developers’ operations and experiments within the test bed, the irradiated fuel, reactor components, and other experiment materials must be removed. Idaho National Laboratory (INL) possesses significant capabilities for radioactive material handling such as casks, carts, and forklifts. However, given the unique environment presented by the NRIC-LOTUS test bed, located inside the Zero Power Physics Reactor (ZPPR) Perimeter Intrusion Detection and Assessment System (PIDAS) area at the Materials and Fuels Complex (MFC) and the complexity of novel removal activities of recently operated reactor experiments through the new proposed access tunnel. The efficacy was not apparent for existing equipment to provide all the needed capability. To bridge the potential gaps in cask designs, storage, and transportation, NRIC requested the development of trade studies for the transfer, handling, and storage requirements of irradiated fuel salts and other radioactive materials. NRIC directed Boston Government Services, LLC (BGS) to perform the trade studies and develop a report analyzing alternatives. In addition to the BGS reports, the Idaho National Lab’s (INL), provided by the first potential user’s Advanced Reactor Development (ARD) team, prepared a feasibility study for the storage of specific irradiated fuel within the existing ZPPR vault.This summary report is intended to present the trade studies, options, and alternatives that were investigated. The maturity level of LOTUS, the reactor, fuel salt containers, gloveboxes, and reactor testing campaign and concept of operations were not at a level sufficient to base critical decisions on. This report is not intended to present a final recommendation. The final recommendations for fuel storage location, transport, handling equipment, and operations will be made in FY 2024 and will be based on known materials, test campaign requirements, funding, and final analysis of the fuel and equipment to be used.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of a Surface Water Transportation System for ISRU Operations on Mars

NASA is working to define the architecture needed for a Mars exploration campaign. Initial analysis assumptions allow for pre-deployment of essential cargo and equipment to support a crew landing, including the pre-positioning of a Mars Ascent Vehicle (MAV). This MAV is likely to represent the largest single payload that must be landed on the Mars surface. Its size would be influenced by the amount of mass that state-of-the-art Entry, Descent, and Landing (EDL) systems would be capable of placing on Mars. One possible method of increasing the usable size of the MAV without exceeding available EDL capabilities is to land the MAV without ascent propellant on board. Following such a method may necessitate a strategy to acquire sufficient ascent propellant to allow a crew to safely depart the Martian surface. This paper describes a conceptual return propellant strategy that uses a liquid transportation skid, or pallet, to be used in conjunction with a rover mobility system to transfer water across the Martian surface from a source point to an in-situ resource utilization (ISRU) plant that would use this water as a feedstock to generate oxygen and methane to enable launch of the MAV. Design considerations, concept of operations, and rover energetics will be discussed in this paper.

Fluid Structure Interface↗

Assessment of a Surface Water Transportation System for ISRU Operations on Mars

NASA is working to define the architecture needed for a Mars exploration campaign. Initial analysis assumptions allow for pre-deployment of essential cargo and equipment to support a crew landing, including the pre-positioning of a Mars Ascent Vehicle (MAV). This MAV is likely to represent the largest single payload that must be landed on the Mars surface. Its size would be influenced by the amount of mass that state-of-the-art Entry, Descent, and Landing (EDL) systems would be capable of placing on Mars. One possible method of increasing the usable size of the MAV without exceeding available EDL capabilities is to land the MAV without ascent propellant on board. Following such a method may necessitate a strategy to acquire sufficient ascent propellant to allow a crew to safely depart the Martian surface. This paper describes a conceptual return propellant strategy that uses a liquid transportation skid, or pallet, to be used in conjunction with a rover mobility system to transfer water across the Martian surface from a source point to an in-situ resource utilization (ISRU) plant that would use this water as a feedstock to generate oxygen and methane to enable launch of the MAV. Design considerations, concept of operations, and rover energetics will be discussed in this paper.

Fluid Structure Interface↗

Prediction of a propellant tank pressure history using state space methods

An analysis of the time response of a propellant supply system operating in the blowdown mode is presented. The supply system is part of a pump-fed propulsion system intended for use on interplanetary spacecraft. As such, the supply system must provide the pump with propellant at sufficient pressure to avoid pump cavitation. The system, consisting of the tank, the liquid propellant, the pressurant gas and propellant vapor mixture, and a film layer separating the liquid and vapor phases, is analyzed using the principles of mass and energy conservation. The resulting set of ordinary, coupled, nonlinear differential equations for the thermodynamic state variables is integrated as an initial value problem. The resulting histories of total pressure, propellant vapor pressure, propellant liquid temperature, film layer temperature, propellant vapor/pressurant gas temperature, propellant vapor mass, and propellant liquid mass enable the calculation of the net positive suction head available at the pump which determines the viability of the pump-fed system concept when operated in the blowdown mode.

Estey, P. N.↗

Assessment of Uncertainty-Based Screening Volumes for NASA Robotic LEO and GEO Conjunction Risk Assessment

Conjunction Assessment operations require screening assets against the space object catalog by placing a pre-determined spatial volume around each asset and predicting when another object will violate that volume. The selection of the screening volume used for each spacecraft is a trade-off between observing all conjunction events that may pose a potential risk to the primary spacecraft and the ability to analyze those predicted events. If the screening volumes are larger, then more conjunctions can be observed and therefore the probability of a missed detection of a high risk conjunction event is small; however, the amount of data which needs to be analyzed increases. This paper characterizes the sensitivity of screening volume size to capturing typical orbit uncertainties and the expected number of conjunction events observed. These sensitivities are quantified in the form of a trade space that allows for selection of appropriate screen-ing volumes to fit the desired concept of operations, system limitations, and tolerable analyst workloads. This analysis will specifically highlight the screening volume determination and selection process for use in the NASA Conjunction Assessment Risk Analysis process but will also provide a general framework for other Owner / Operators faced with similar decisions.

Narvet, Steven W.↗

Raven: An On-Orbit Relative Navigation Demonstration Using International Space Station Visiting Vehicles

Since the last Hubble Servicing Mission five years ago, the Satellite Servicing Capabilities Office (SSCO) at the NASA Goddard Space Flight Center (GSFC) has been focusing on maturing the technologies necessary to robotically service orbiting legacy assets-spacecraft not necessarily designed for in-flight service. Raven, SSCO's next orbital experiment to the International Space Station (ISS), is a real-time autonomous non-cooperative relative navigation system that will mature the estimation algorithms required for rendezvous and proximity operations for a satellite-servicing mission. Raven will fly as a hosted payload as part of the Space Test Program's STP-H5 mission, which will be mounted on an external ExPRESS Logistics Carrier (ELC) and will image the many visiting vehicles arriving and departing from the ISS as targets for observation. Raven will host multiple sensors: a visible camera with a variable field of view lens, a long-wave infrared camera, and a short-wave flash lidar. This sensor suite can be pointed via a two-axis gimbal to provide a wide field of regard to track the visiting vehicles as they make their approach. Various real-time vision processing algorithms will produce range, bearing, and six degree of freedom pose measurements that will be processed in a relative navigation filter to produce an optimal relative state estimate. In this overview paper, we will cover top-level requirements, experimental concept of operations, system design, and the status of Raven integration and test activities.

Rendezvous↗

Engineering America's Current and Future Space Transportation Systems: 50 Years of Systems Engineering Innovation for Sustainable Exploration

Over the past 50 years, the National Aeronautics and Space Administration (NASA) has delivered space transportation solutions for America's complex missions, ranging from scientific payloads that expand knowledge, such as the Hubble Space Telescope, to astronauts and lunar rovers destined for voyages to the Moon. Currently, the venerable Space Shuttle, which has been in service since 1981, provides the United States' (U.S.) capability for both crew and heavy cargo to low-Earth orbit to' construct the International Space Station, before the Shuttle is retired in 2010. In the next decade, NASA will replace this system with a duo of launch vehicles: the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle (Figure 1). The goals for this new system include increased safety and reliability coupled with lower operations costs that promote sustainable space exploration for decades to come. The Ares I will loft the Orion Crew Exploration Vehicle, while the heavy-lift Ares V will carry the Altair Lunar Lander and the equipment and supplies needed to construct a lunar outpost for a new generation of human and robotic space pioneers. This paper will provide details of the in-house systems engineering and vehicle integration work now being performed for the Ares I and planned for the Ares V. It will give an overview of the Ares I system-level test activities, such as the ground vibration testing that will be conducted in the Marshall Center's Dynamic Test Stand to verify the integrated vehicle stack's structural integrity and to validate computer modeling and simulation (Figure 2), as well as the main propulsion test article analysis to be conducted in the Static Test Stand. These activities also will help prove and refine mission concepts of operation, while supporting the spectrum of design and development work being performed by Marshall's Engineering Directorate, ranging from launch vehicles and lunar rovers to scientific spacecraft and associated experiments. Ultimately, fielding a robust space transportation solution that will carry international explorers and essential payloads will pave the way for a new century of scientific discovery beyond planet Earth.

Dmbacher, Daniel L.↗