Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Coils”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Central Solenoid Insert Technical Specification

The US ITER Project Office (USIPO) is responsible for the ITER central solenoid (CS) contribution to the ITER project. The Central Solenoid Insert (CSI) project will allow ITER validation the appropriate lengths of the conductors to be used in the full-scale CS coils under relevant conditions. The ITER Program plans to build and test a CSI to verify the performance of the CS conductor. The CSI is a one-layer solenoid with an inner diameter of 1.48 m and a height of 4.45 m between electric terminal ends. The coil weight with the terminals is approximately 820 kg without insulation. The major goal of the CSI is to measure the temperature margin of the CS under the ITER direct current (DC) operating conditions, including determining sensitivity to load cycles. Performance of the joints, ramp rate sensitivity, and stability against thermal or electromagnetic disturbances, electrical insulation, losses, and instrumentation are addressed separately and therefore are not major goals in this project. However, losses and joint performance will be tested during the CSI testing campaign. The USIPO will build the CSI that will be tested at the Central Solenoid Model Coil (CSMC) Test Facility at the Japan Atomic Energy Agency (JAEA), Naka, Japan. The industrial vendors (the Suppliers) will report to the USIPO (the Company). All approvals to proceed will be issued by the Company, which in some cases, as specified in this document, will also require the approval of the ITER Organization. Responsibilities and obligations will be covered by respective contracts between the USIPO, called Company interchangeably, and the industrial Prime Contractors, called Suppliers. Different stages of work may be performed by more than one Prime Contractor, as described in this specification. Technical requirements of the contract between the Company and the Prime Contractor will be covered by the Fabrication Specifications developed by the Prime Contractor based on this document and approved by the Company and ITER. The Fabrication Specifications may reflect some national requirements and regulations that are not fully provided here. This document presents the ITER CSI specifications.

36 MATERIALS SCIENCE↗

Discoloration of the wetted surface in the 6.1D dissolver

During a camera inspection of a failed coil in the 6.1D dissolver, an orange discoloration was observed on a portion of the dissolver wall and coils. At the request of H-Canyon Engineering, the inspection video of the dissolver was reviewed by SRNL to assess if the observed condition (a non-uniform, orange-colored substance on internal surfaces) was a result of corrosion. Although the dissolver vessel and coil corrode during dissolution operations, the high acid conditions are not consistent with the formation of ferrous oxides (i.e., orange/rust-colored corrosion products). In a subsequent investigation, SRNL performed dissolution experiments to determine if residues from the nylon bags used for Pu containment could have generated the orange discoloration following dissolution. When small pieces of a nylon bag were placed in boiling 8 M nitric acid solutions containing other components representative of the H-Canyon process, complete dissolution occurred almost immediately. No residues were obtained even when a nylon mass to volume ratio greater than 100 times the 6.1D dissolver value was used. Degradation products from the dissolution of nylon bags are not responsible for the discoloration observed in the dissolver.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Requirements for the Mu2e Production Solenoid Heat and Radiation Shield

This paper describes the Heat and Radiation Shield (HRS). It serves to protect the superconducting coils of the Mu2e Production Solenoid (PS) from the intense radiation generated by the 8 GeV kinetic energy primary proton beam striking the production target within the warm bore of the PS. This shield also protects the coils in the far upstream end of the Transport Solenoid (TS), a straight section of coils called TS1, at the exit from the PS. The HRS aperture should allow the maximum stopping rate of negative muons in the Detector Solenoid stopping target. Requirements to the Heat and Radiation Shield are discussed in the paper.

Ambrosio, G.↗

Multipole approximation of special nonlinear magnets for the IOTA ring

All existing focusing optics for accelerators are built to be "linear", i.e. the transverse focusing force is proportional to the particle displacement from the closed orbit. Such approach is used in order to make trajectories stable in the entire area of phase space, because the potential describing linear focusing is integrable and does not produce chaotic motion. Technically, the needed field is achieved with the help of dipole and quadrupole magnets. But the linear motion is unstable to perturbations in the focusing fields and excludes any betatron tune spread over particle's energy, which is beneficial for the beam stability. Moreover, the focusing strength depends on the particle's energy deviation from the designed one. These undesired effects are usually suppressed by the addition of non- linear elements, such as sextupoles and octupoles. Unfortunately, these additions make focusing potential nonintegrabe, leading to the limitation of stable phase space area. Recent research showed, that there exist non-linear potentials that, nevertheless, are fully integrable [1, 2]. Thus, there is an opportunity to create stable non-linear focusing optics that provides high betatron tune spread and mitigate magnetic field errors. This approach is to be implemented in electron storage ring called Integrable Optics Test Accelerator (IOTA) at Fermilab [3]. The main goal is to show the possibility to implement the nonlinear integrable system in a realistic accelerator design. Development of a magnet, which creates exact non-linear potential, is a technically complicated task, that takes much time and efforts. However, it is possible to expand the non- linear potential into superposition of multipoles of even orders (i.e quadrupole, octupole, etc.). Though this series is not convergent in the entire space, a few low order terms can be used to model the true potential in some limited area. In turn, each of the multipole potentials can be generated by speci ed electrical current in PCB coiled on the surface of storage ring's vacuum tube. Such approach is much cheaper than the creation of a magnet of solid iron with high current coil and faster than the development of \exact" non-linear magnet, but it can help identify some features of non-linear integrable optics application. The goal of this research work is to find analytically the angular distribution of electrical current on the surface of the vacuum tube, which creates inside it multipole potential with given parameters. Hereafter, there is the task to develop a model of flexible printed circuit board (PCB), which could be coiled around the vacuum tube in order to provide the desired current distribution.

Vorobev, Viktor↗

Development of A High Performance Cold Climate Heat Pump

The primary goals of the proposed project were to develop, test, and evaluate a high performance and cost-effective vapor compression air-source heat pump for use in cold climate regions. Vapor compression heat pumps are a proven technology, and have been used for many years to meet heating requirements for buildings in residential, commercial, and industrial applications. However, in climate regions that experience very low outdoor ambient temperatures both the heating capacity and coefficient of performance (COP) of traditional air-source vapor compression heat pumps drops dramatically with a decrease in the outdoor air temperature. The efficiency of heat pumping equipment has improved substantially over the past 20 years; however, the efficiencies of the highest rated equipment on the market are approaching practical limits that cannot be surpassed without modifications to the basic cycle and possibly the use of additional hardware. In this report, three technologies to improve the efficiency of vapor compression systems are described. These are a) vapor injected compression, b) oil flooded compression and c) hybrid flow control of the evaporator. Compressor prototypes for both, oil flooded and vapor injected compression were developed by Emerson Climate Technologies. For the oil flooded compressor, the oil injection port location was optimized and an internal oil separator was added using several design iterations. After initial testing at Emerson Climate Technologies, further testing was done at Purdue University, and compressor models were developed. These models were then integrated into a system model to determine the achievable improvement of seasonal energy efficiency (SEER) for Minneapolis (Minnesota) climate. For the oil flooded compression, a 34% improvement in seasonal energy efficiency was found while a 21% improvement in seasonal energy efficiency ratio was found for the vapor injected compression. It was found that one benefit of both tested compression technologies is a lower discharge temperature, which allows for continued operation at lower ambient temperatures. A bin analysis of the vapor injected prototype cold climate heat pump predicts a 6% improvement in HSPF for Minneapolis. This improvement is mainly a result of the increased capacity of the system for active vapor injection. For the oil flooded system, a slightly larger performance improvement is predicted, in this case mostly caused by an increase in heating COP. Based on an economic analysis of these results, the maximum additional cost of the system changes, for the Minneapolis location, are $\$430$ for the vapor injected system and $\$391$ for the oil flooded system. These estimates assume that a 3-year simple payback period is accepted by the customer. For the hybrid flow control of evaporators, a new type of balancing valve was developed together with Emerson Climate technologies to reduce the cost of the control scheme. In contrast to conventional stepper motor valves, this valve requires less cables and can be driven by a cheaper output circuit on the control board. The correct valve size was determined in a dedicated test stand in several design iterations. The performance benefits of the hybrid control of the evaporator coil were determined for clean coil conditions as well as with partial blockage of the air inlet grille and under frosting conditions. For clean coil conditions, the benefits in terms of COP and capacity are negligible. However, significant benefits were noted for severely air-maldistributed operating conditions. For the H2-test, the maximum COP improvement of 17% along with a capacity improvement of nearly 40% was observed. Overall, the hybrid control scheme leads to a significant amount of performance improvement, if the air inlet conditions to the evaporator are maldistributed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Technical Report for DOE DE-FG02-05ER54831 "Laboratory Studies of Dynamos."

Laboratory Studies of Dynamos: Executive Summary. The self-generation of magnetic fields by astrophysical bodies like planets, stars, accretion disks, galaxies, and even galaxy clusters arises due to a mechanism referred to as a homogeneous dynamo. It is quite simple to demonstrate the generation of a magnetic fi eld from a rotating copper disk coupled with a coil of wire, a device known as the homopolar dynamo. The device works like a magnetic fi eld ampli er with a feedback circuit: the differential rotation of a metal disk past an infinitesimally small seed magnetic field induces currents in the disk which, when coupled to a coil winding, can amplify the field until it becomes strong enough to slow the rotation of the disk. What is remarkable is that the same type of circuit may be achieved in a flowing conducting fluid such as a liquid metal in the case of planetary dynamos or a plasma in the case of astrophysical dynamos. The complexity of describing planetary and stellar dynamos despite their ubiquity and the plethora of observational data from the Earth and the Sun motivates the demonstration of a laboratory homogenous dynamo. To create a homogenous dynamo, one first needs a su fficiently large, fast flow of a highly conducting fluid that the velocity shear in the fluid can bend magnetic field lines. With a high Rm-flow, the magnetic fi eld can be ampli ed by the stretching action provided by di fferential rotation. The other critical ingredient is a flow geometry that provides feedback so that the ampli ed eld reinforces the initial in nitesimal seed field - a mechanism that recreates the feedback provided by the coil of wire in the homopolar dynamo. In the Madison Dynamo Experiment, this combination of magnetic ampli cation and feedback is feasible in the simple geometry of two counter-rotating helical vortices in a 1 meter-diameter spherical vessel lled with liquid sodium. For an optimal helical pitch of the flow the threshold for exciting a dynamo is predicted from laminar flow modeling to be at peak flow speeds of 5 m/s. Liquid metals tend to have viscosities similar to that of water yielding inviscid flows. Whereas the timescale for the dynamo instability is on the resistive dissipation time, the timescale for hydrodynamic instability of the shear layer is quite short meaning that the shear layer required to generate the magnetic eld is broken up by Kelvin-Helmholtz instabilities. The eddies generated by large-scale flow drive instabilities at progressively smaller scale giving rise to a cascade of turbulent eddies driven at the largest scale of the experiment. The major contribution of the Madison Dynamo Experiment has been quantifying the role this turbulence plays in the generation of magnetic elds. Overall, the Madison Dynamo Experiment has now operated for about 1 decade and carried out experiments related to magnetic fi eld generation by turbulent flows of liquid metal. The principle thrust of research and indeed the main scienti fic outcomes are related to how turbulent flows create and transport magnetic fi elds.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Catalyst-Assisted Manufacture of Olefins from Natural Gas liquids: Prototype Development and Full-Scale Testing

The steam cracking of ethane to ethylene consumes the greatest amount energy of any process currently practiced by the US chemical industry. U.S. ethylene production consumed an estimated 450 trillion BTU of energy to produce nearly 53 billion pounds of ethylene in 2010. A significant portion of this energy consumption is to overcome the insulating effect of coke (carbonaceous deposits) on the internal surfaces of cracker furnace tubes. This buildup of coke is the result of both metal-catalyzed coke formation on the tube walls (“filamentous coke”), and deposition of gas-phase coke on the tube walls (“amorphous coke”). Coke buildup requires a continuous increase in energy input (firing of external coil tube wall) to achieve the same conversion of ethane feedstock to ethylene product, until the tubes must be taken out of service and the coke removed by steam treatment (“decoking”). This step interrupts production and increases the cost of ethylene. Coke buildup also shortens the coil life by increasing the rate of “creep” (sagging) that occurs due to higher temperature operation and migration of the deposited carbon into the coil metal.

03 NATURAL GAS↗

MQXFS1 Quadrupole Fabrication Report

This report presents the fabrication and QC data of MQXFS1, the first short model of the low-beta quadrupoles (MQXF) for the LHC High Luminosity Upgrade. It describes the conductor, the coils, and the structure that make the MQXFS1 magnet. Qualification tests and non-conformities are also presented and discussed. The fabrication of MQXFS1 was started before the finalization of conductor and coil design for MQXF magnets. Two strand design were used (RRP 108/127 and RRP 132/169). Cable and coil cross-sections were “first generation”.

43 PARTICLE ACCELERATORS↗

MagMicro with Ultra-High Energy Resolution (FY19 Q3 Progress Report)

The fabrication of the MMC detector arrays involves two photolithographic procedures. The first is to fabricate the Nb magnetization coil and pick-up coils, the SQUID preamplifiers and the associated wiring. This is done on a full 4” Si wafer, which is subsequently diced into ~0.5 cm2 SQUID chips and ~1 cm2 detector chips. The detector chips are then processed separately by depositing and patterning the paramagnetic Ag:Er sensor and support structures and then electroplating the Au absorber. In Q3, we have successfully completed the full wafer processing for the 32-pixel MMC detector arrays, diced the 4” wafer into the smaller chips and tested the individual components. The coils have the required critical current, the heat switches have a critical temperature in the desired range, and the SQUIDs have the required low noise. Unfortunately, the sputter deposition of the paramagnetic Ag:Er sensor failed several times. We spent considerable time to trace the problem to contaminations of the purifier for the Ar sputtering gas that had been exposed to atmosphere for an extended time during an earlier clean room upgrade. We then determined that the purifier is not essential for high-quality Ag:Er sensor films (Fig. 1), and successfully deposited the Ag:Er sensor film on the ~1 cm 2 detector chip.

42 ENGINEERING↗

SR19007 - Future TCAP Implementation Issues

This project demonstrates the success of the PDRD program in bringing a concept from the R&D phase to direct plant funding. Although Mini-TCAP technology is overall at a TRL of ~6.5, the specific questions addressed in this project were brought from a low (2-3 TRL) to a TRL 5 over the course of the project. This project successfully completed all initial goals ahead of schedule (inventory control, guard bed, ammonia impact, and cycle time) and furthermore addressed additional scope (continued TCAP evaluation, ion chamber) in FY20. First, this project resolved minor inventory control issues by introducing a new parameter tracking and correcting for inventory changes over multiple cycles. This project also involved modification of the previously constructed plant-configured Mini-TCAP in order to allow ammonia impurity studies. TCAP was tested with ammonia in the feed stream both with and without a guard bed present to determine guard bed efficacy and the effect of ammonia if it enters TCAP. The TCAP columns were then replaced with brazed columns, where the LN2 cooling coil is brazed to the column and the column is self-brazed along the coils. This drastically improved heat transfer and consequently reduced cycle time compared to the previous columns, in which the coils were mechanically held in place. Finally, additional scopes were taken on in FY20, including evaluation of TCAP with faster cycle time and procurement of ion chambers for future TCAP integration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Mapper for Superconducting Torus Magnet for the Jefferson Lab 12GeV Upgrade

As part of the Jefferson Lab 12 GeV upgrade, the Hall B magnet system requires two conduction cooled superconducting magnets ? a Torus and a Solenoid. The Torus consists of 6 trapezoidal coils connected in series with an operating current of 3770 A. During commissioning of the torus magnet, field mapping was carried out at different levels of operating current in order to determine the field profile and field error table. In order to meet the physics requirement of the field accuracy we need magnetic field strength measurements which are accurate at the 0.1% level, and we need to know radius and azimuth to 0.1 mm and z to 0.5 mm. The center line of the torus magnet is approximately 6 m from ground level and the overall height of the torus magnet is approximately 8.5 m. There is also limited space around the magnet and in between the coils. Field mapping had to be carried out along the Z axis (i.e. along the bore) and at 4 radial locations between each coil. These restrictions provided certain challenges for the magnetic field mapping task. The mapper prototype was built and tested prior to use on the Torus itself. In this presentation the field mapper design, prototyping and actual data collection procedure will be presented.

Rajput-Ghoshal, Renuka↗

Advanced Manufacturing of High-Performance Superconductor Wires for Next Generation Electric Machines

While the transition of RE-Ba-Cu-O (REBCO, RE = rare earth) wires from lab-scale to initial manufacturing demonstrations has been accomplished, the high manufacturing cost is a major impediment to a commercial market. At the onset of this project, commercial REBCO wires exhibiting a critical current of ~ 340 A/cm at 65 K, 1.5T (operating condition of superconducting rotating machines targeted in this project) costed about $\$$300/kA-m which is well above the cost of copper wire. In this project, the UH-led team employed multiple innovative techniques to meet the aggressive performance and cost targets established. The key technology that was developed in this project was advanced metal organic chemical vapor deposition (MOCVD) to fabricate REBCO wires with films as thick as 5 µm and with excellent critical current performance at 65 K, 1.5 T. In addition to excellent performance in short samples, a major accomplishment of this project was to scale up the Advanced MOCVD technology to lengths of 50 meters while maintaining the superior critical current. Multiple 50-m-long tapes were demonstrated in the project with uniform critical current, that confirmed the viability of our technology for industrial manufacturing. Beyond scaling up our technology to long lengths, we worked with our industrial partners to design a REBCO-based motor coil, constructed one such coil and fabricated it using long tapes made in this project. This motor coil was successfully tested at 77 K and 65 K which affirmed the viability of high-performance REBCO wires made in this work for industrial applications. In addition to high critical current, we also demonstrated >4x precursor-to-film conversion efficiency in the advanced MOCVD process which has a first order impact on wire cost.

36 MATERIALS SCIENCE↗

Mechanical Design of the PIP-II ORBUMP Pulsed Dipole Magnet

The Proton Improvement Plan-II (PIP-II) is a vital upgrade to Fermilab's accelerator complex. The upgrade is designed to power the world s most intense high-energy neutrino beam in future experiments. The magnet pulse repetition rate of the PIP-II injection system is being upgraded from 15 Hz to 20 Hz and requires a roughly 30% increase in the magnetic field of the new Orbital Bump (ORBUMP) magnets in the Booster. The magnet is secured in a vacuum box and the core is made up of 0.127 mm thick, low carbon steel laminations with a C-5 inorganic coating. The core is clamped using external tie bars welded to the core end plates. ANSYS Finite Element Analysis (FEA) was used to evaluate the clamping design to minimize the deflection of the core post welding of the tie bars. The water-cooled single turn coil is electrically isolated from the core using virgin PEEK insulating material in the gap. An investigation into the high voltage performance of the virgin PEEK insulator was conducted. The design of the coil which shapes the magnetic field by acting as the pole tips is critical for the integrated field homogeneity. The coil manufacturing tolerances and fabrication techniques were evaluated to ensure the magnetic properties of the magnet could be obtained. The ORBUMP magnet mechanical design is presented in this paper.

Karas, Dino [Fermilab] (ORCID:0000000304340670)↗

Hydronic Shell: An Affordable Solution for Multifamily Deep Energy Retrofit

Approximately 42% of multi-family buildings in the United States have do not have insulation as required by the building codes. Envelope retrofits of these buildings are needed to improve their thermal performance, provide thermal resilience, and enable a pathway to electrification of space heating systems. Hydronic shell (HS) is a retrofit technique where a stud wall layer is added to a masonry wall along with a convective coil and a fan coil unit fitted in the façade cavity which can provide both heating and cooling to the space. The HS system serves a dual purpose of 1) retrofitting the building envelope and 2) retrofitting the HVAC system and enabling electrification of space heating. The electrification of space heating is possible from the installation of a combination of hydronic system/fan coil unit system which uses a central heat pump as a source of heating water in the cavity between the existing wall and retrofit insulation layer. This study evaluates the performance of the HS system at varying outdoor conditions mimicked by a climate chamber and hot water supply temperature from a water bath. During the ramp-up period, the indoor chamber temperature could be increased from 66 ºF to 69.5 ºF within an hour using heating water at 120 ºF when the outdoor chamber temperature was at 0 ºF. When the indoor chamber temperature was maintained within a deadband, variation in cavity air temperature was mostly influenced by the duration when water was flowing through the cavity convector. It was seen from the testing that the hydronic system alone without use of fan in the system is able to maintain the space temperature at coldest outdoor condition used in the experiment (0 ºF) even at lowest hot water supply temperature chosen (90 ºF). During the ramp-down period, the fastest decline in temperature took 6.4 hours from temperature to drop from 69.6 ºF to 66 ºF which shows tremendous potential of thermal resilience and peak load shifting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Snakes for the Hadron Storage Ring

The Electron Ion Collider calls for collisions of polarized proton and polarized helion beams on polarized electron beams. To preserve polarization of these polarized hadron beams during acceleration, six full helical snakes will be installed. As there are currently 4 snakes in RHIC, the remaining two snakes will be made from existing rotator magnet coils. The existing snakes are made from only right-handed helices where the rotator magnets are made from both right handed and left handed helicity magnets. In order for a sufficient stock of spare coils, one snake will be made of left handed coils. Simulations using Opera field maps in zgoubi show the left handed snake has sufficient range to provide the desired snake precession axes for helions and protons with the existing power supplies. This is an overview of the right and left handed snake assemblies and their effects.

43 PARTICLE ACCELERATORS↗

NFE-24-10417: Durability and Life-time Energy Performance Enhancement of Vapor Compression Systems

This project investigated the use of a Centrifugal Particle Separation (CPS) system to improve the durability and operational reliability of outdoor heat exchangers in vapor-compression based heating, ventilation, air conditioning, and refrigeration (HVACR) systems. The developed method introduced a novel dust and fouling mitigation approach by integrating an ambient air pre-cleaner that employs centrifugal forces to remove particulate matter from incoming air before it reaches the heat exchanger. By reducing the accumulation of dust and debris on coil surfaces, the CPS system aims to lower maintenance requirements and extend equipment lifespan. The project specifically involves coupling a centrifugal air pre-cleaner with a single-zone ductless mini-split system and evaluating its effectiveness in maintaining cleaner coil surfaces. Additionally, the study examined the impact of CPS integration on system energy performance. Through controlled experimental testing and performance monitoring, this work seeks to validate CPS-based air pre-cleaning as a practical, efficient solution for mitigating outdoor coil dust accumulation and fouling in both residential and commercial HVACR applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Q2 Report for FY25 Theory and Simulation Performance Target: Development of an integrated modeling framework for fusion reactor design and assessment

This report describes the work and activities carried out towards the completion of each of the following milestones in FY25 Q2: 1. Demonstrate workflow for generating self-consistent CESOL plasma profiles + first wall and divertor loading prediction and generate the CAT plasma and neutron loading needed for further engineering analysis: $\circ$ Run CESOL with BOUT++/Hermes-3 and immersed boundary condition to directly map to wall: • Run BOUT++/Hermes-3 through the IPS workflow to find radial particle and energy diffusivities to match either the Eich or the physics-based scaling of the SOL heat flux width, and • Expand source of first wall heat flux to include charged particles, neutrals, and radiation from the core+edge. 2. Generate medium fidelity parametrized CAD: $\circ$ Develop the TRACER tool to read an existing CAD, regenerate the geometry based on vertex location and connectivity information, define vertex translation and parameters needed for scaling the CAD, and $\circ$ Utilize the FreeGS code to determine CAT PF coil placement, including minimizing the number of coils, coil current, and electromechanical stresses. 3. Utilize plasma loading for engineering analysis: $\circ$ Couple the plasma loading to input for OpenFOAM and demonstrate initial test of thermal analysis of CAT first wall loading with typical DCLL blanket component cooling boundary conditions. 4. Demonstrate nuclear analysis: $\circ$ Apply initial analysis of tritium transport in DCLL blanket by evaluating spatially resolved tritium generation rates, tritium diffusion and convection.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Making Wireless Power Matter (CRADA Final Report)

The Resonant Link project team investigated the integration of their novel, self-resonant magnetic structure for electromagnetic coils into inductive wireless power transfer systems. Relative to conventional wireless power coils, their multi-layer self-resonant structure (the “MSRS”) reduces losses by up to 6x and lowers to BOM cost by up to 10x. These power-dense, cost-effective coils are a promising path towards the first value-add wireless power systems in a variety of applications, from phones to medical devices to kitchen appliances to mobile robots to electric vehicles. The researchers explored development of the power electronics for wireless power transfer systems using the multi-layer self-resonant structure (MSRS) concept that efficiently transmits power over air gaps for in-home applications, including through-wall power transfer, appliances built around the Ki and Qi standards, and other potential use cases This project specifically focused on the power electronics design, development, and testing for these applications. Resonant Link’s proprietary wireless power technology holds the promise of matching the performance of wired chargers in size and efficiency, especially when operated from a DC distribution grid.

42 ENGINEERING↗