Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “verification & validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

A measurement system for large, complex software programs

This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.

Rone, Kyle Y.↗

The Role of Independent V&V in Upstream Software Development Processes

This paper describes the role of Verification and Validation (V&V) during the requirements and high level design processes, and in particular the role of Independent V&V (IV&V). The job of IV&V during these phases is to ensure that the requirements are complete, consistent and valid, and to ensure that the high level design meets the requirements. This contrasts with the role of Quality Assurance (QA), which ensures that appropriate standards and process models are defined and applied. This paper describes the current state of practice for IV&V, concentrating on the process model used in NASA projects. We describe a case study, showing the processes by which problem reporting and tracking takes place, and how IV&V feeds into decision making by the development team. We then describe the problems faced in implementing IV&V. We conclude that despite a well defined process model, and tools to support it, IV&V is still beset by communication and coordination problems.

Easterbrook, Steve↗

The Application of V&V within Reuse-Based Software Engineering

Verification and Validation (V&V) is performed during application development for many systems, especially safety-critical and mission-critical systems. The V&V process is intended to discover errors as early as possible during the development process. Early discovery is important in order to minimize the cost and other impacts of correcting these errors. In reuse-based software engineering, decisions on the requirements, design and even implementation of domain assets can can be made prior to beginning development of a specific system. in order to bring the effectiveness of V&V to bear within reuse-based software engineering. V&V must be incorporated within the domain engineering process.

Addy, Edward↗

A Framework for Performing V&V within Reuse-Based Software Engineering

Verification and validation (V&V) is performed during application development for many systems, especially safety-critical and mission-critical systems. The V&V process is intended to discover errors, especially errors related to critical processing, as early as possible during the development process. Early discovery is important in order to minimize the cost and other impacts of correcting these errors. In order to provide early detection of errors, V&V is conducted in parallel with system development, often beginning with the concept phase. In reuse-based software engineering, however, decisions on the requirements, design and even implementation of domain assets can be made prior to beginning development of a specific system. In this case, V&V must be performed during domain engineering in order to have an impact on system development. This paper describes a framework for performing V&V within architecture-centric, reuse-based software engineering. This framework includes the activities of traditional application-level V&V, and extends these activities into domain engineering and into the transition between domain engineering and application engineering. The framework includes descriptions of the types of activities to be performed during each of the life-cycle phases, and provides motivation for the activities.

Addy, Edward A.↗

Formal Methods of V&V of Partial Specifications: An Experience Report

This paper describes our work exploring the suitability of formal specification methods for independent verification and validation (IV&V) of software specifications for large, safety critical systems. An IV&V contractor often has to perform rapid analysis on incomplete specifications, with no control over how those specifications are represented. Lightweight formal methods show significant promise in this context, as they offer a way of uncovering major errors, without the burden of full proofs of correctness. We describe an experiment in the application of the method SCR. to testing for consistency properties of a partial model of requirements for Fault Detection Isolation and Recovery on the space station. We conclude that the insights gained from formalizing a specification is valuable, and it is the process of formalization, rather than the end product that is important. It was only necessary to build enough of the formal model to test the properties in which we were interested. Maintenance of fidelity between multiple representations of the same requirements (as they evolve) is still a problem, and deserves further study.

Easterbrook, Steve↗

V&V Within Reuse-Based Software Engineering

Verification and Validation (V&V) is used to increase the level of assurance of critical software, particularly that of safety-critical and mission-critical software. V&V is a systems engineering discipline that evaluates the software in a systems context, and is currently applied during the development of a specific application system. In order to bring the effectiveness of V&V to bear within reuse-based software engineering, V&V must be incorporated within the domain engineering process.

Addy, Edward A.↗

V & V Within Reuse-Based Software Engineering

Verification and validation (V&V) is used to increase the level of assurance of critical software, particularly that of safety-critical and mission critical software. This paper describes the working group's success in identifying V&V tasks that could be performed in the domain engineering and transition levels of reuse-based software engineering. The primary motivation for V&V at the domain level is to provide assurance that the domain requirements are correct and that the domain artifacts correctly implement the domain requirements. A secondary motivation is the possible elimination of redundant V&V activities at the application level. The group also considered the criteria and motivation for performing V&V in domain engineering.

Addy, Edward A.↗

Systems Engineering Metrics: Organizational Complexity and Product Quality Modeling

Innovative organizational complexity and product quality models applicable to performance metrics for NASA-MSFC's Systems Analysis and Integration Laboratory (SAIL) missions and objectives are presented. An intensive research effort focuses on the synergistic combination of stochastic process modeling, nodal and spatial decomposition techniques, organizational and computational complexity, systems science and metrics, chaos, and proprietary statistical tools for accelerated risk assessment. This is followed by the development of a preliminary model, which is uniquely applicable and robust for quantitative purposes. Exercise of the preliminary model using a generic system hierarchy and the AXAF-I architectural hierarchy is provided. The Kendall test for positive dependence provides an initial verification and validation of the model. Finally, the research and development of the innovation is revisited, prior to peer review. This research and development effort results in near-term, measurable SAIL organizational and product quality methodologies, enhanced organizational risk assessment and evolutionary modeling results, and 91 improved statistical quantification of SAIL productivity interests.

Mog, Robert A.↗

A Case Study of 4 & 5 Cost Effectiveness

This paper looks at the Independent Verification and Validation (IV&V) of NASA's Space Shuttle Day of Launch I-Load Update (DoLILU) project. IV&V is defined. The system's development life cycle is explained. Data collection and analysis are described. DoLILU Issue Tracking Reports (DITRs) authored by IV&V personnel are analyzed to determine the effectiveness of IV&V in finding errors before the code, testing, and integration phase of the software development life cycle. The study's findings are reported along with the limitations of the study and planned future research.

Neal, Ralph D.↗

Development and Testing of a High Stability Engine Control (HISTEC) System

Flight tests were recently completed to demonstrate an inlet-distortion-tolerant engine control system. These flight tests were part of NASA's High Stability Engine Control (HISTEC) program. The objective of the HISTEC program was to design, develop, and flight demonstrate an advanced integrated engine control system that uses measurement-based, real-time estimates of inlet airflow distortion to enhance engine stability. With improved stability and tolerance of inlet airflow distortion, future engine designs may benefit from a reduction in design stall-margin requirements and enhanced reliability, with a corresponding increase in performance and decrease in fuel consumption. This paper describes the HISTEC methodology, presents an aircraft test bed description (including HISTEC-specific modifications) and verification and validation ground tests. Additionally, flight test safety considerations, test plan and technique design and approach, and flight operations are addressed. Some illustrative results are presented to demonstrate the type of analysis and results produced from the flight test program.

Orme, John S.↗

NASA Software Documentation Standard

The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.

Source record↗

Lockheed Martin Skunk Works Single Stage to Orbit/Reusable Launch Vehicle

Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. This portion of the report is comprised of a status report of Lockheed Martin's contribution to the program. The following is a summary of the Lockheed Martin Centers involved and work reviewed under their portion of the agreement: (1) Lockheed Martin Skunk Works - Vehicle Development, Operations Development, X-33 and RLV Systems Engineering, Manufacturing, Ground Operations, Reliability, Maintainability/Testability, Supportability, & Special Analysis Team, and X-33 Flight Assurance; (2) Lockheed Martin Technical Operations - Launch Support Systems, Ground Support Equipment, Flight Test Operations, and RLV Operations Development Support; (3) Lockheed Martin Space Operations - TAEM and A/L Guidance and Flight Control Design, Evaluation of Vehicle Configuration, TAEM and A/L Dispersion Analysis, Modeling and Simulations, Frequency Domain Analysis, Verification and Validation Activities, and Ancillary Support; (4) Lockheed Martin Astronautics-Denver - Systems Engineering, X-33 Development; (5) Sanders - A Lockheed Martin Company - Vehicle Health Management Subsystem Progress, GSS Progress; and (6) Lockheed Martin Michoud Space Systems - X-33 Liquid Oxygen (LOX) Tank, Key Challenges, Lessons Learned, X-33/RLV Composite Technology, Reusable Cyrogenic Insulation (RCI) and Vehicle Health Monitoring, Main Propulsion Systems (MPS), Structural Testing, X-33 System Integration and Analysis, and Cyrogenic Systems Operations.

Source record↗

Proceedings of the Twenty-Third Annual Software Engineering Workshop

The Twenty-third Annual Software Engineering Workshop (SEW) provided 20 presentations designed to further the goals of the Software Engineering Laboratory (SEL) of the NASA-GSFC. The presentations were selected on their creativity. The sessions which were held on 2-3 of December 1998, centered on the SEL, Experimentation, Inspections, Fault Prediction, Verification and Validation, and Embedded Systems and Safety-Critical Systems.

Source record↗

Crack Growth Prediction Methodology for Multi-Site Damage: Layered Analysis and Growth During Plasticity

A finite element program has been developed to perform quasi-static, elastic-plastic crack growth simulations. The model provides a general framework for mixed-mode I/II elastic-plastic fracture analysis using small strain assumptions and plane stress, plane strain, and axisymmetric finite elements. Cracks are modeled explicitly in the mesh. As the cracks propagate, automatic remeshing algorithms delete the mesh local to the crack tip, extend the crack, and build a new mesh around the new tip. State variable mapping algorithms transfer stresses and displacements from the old mesh to the new mesh. The von Mises material model is implemented in the context of a non-linear Newton solution scheme. The fracture criterion is the critical crack tip opening displacement, and crack direction is predicted by the maximum tensile stress criterion at the crack tip. The implementation can accommodate multiple curving and interacting cracks. An additional fracture algorithm based on nodal release can be used to simulate fracture along a horizontal plane of symmetry. A core of plane strain elements can be used with the nodal release algorithm to simulate the triaxial state of stress near the crack tip. Verification and validation studies compare analysis results with experimental data and published three-dimensional analysis results. Fracture predictions using nodal release for compact tension, middle-crack tension, and multi-site damage test specimens produced accurate results for residual strength and link-up loads. Curving crack predictions using remeshing/mapping were compared with experimental data for an Arcan mixed-mode specimen. Loading angles from 0 degrees to 90 degrees were analyzed. The maximum tensile stress criterion was able to predict the crack direction and path for all loading angles in which the material failed in tension. Residual strength was also accurately predicted for these cases.

James, Mark Anthony↗

Operational Considerations when Designing New Ground Systems

The Hubble Space Telescope (HST) launched in April of 1991 with a nominal 15-year old mission. Since then, the HST mission life has been extended to 2010. As is true for all NASA missions, HST is being asked to decrease its operational costs for the remainder of its mission life. Various techniques are being incorporated for cost reductions, with one of the core means being the design of a new and more efficient ground system for HST operations. This new ground system, "Vision 2000", will reduce operational and maintenance costs and also provide the HST Project with added flexibility to react to future changes. Vision 2000 began supporting HST Operations in January of 1999 and will support the mission for the remainder of the mission life. Upgrading a satellite's ground system is a popular approach for reducing costs, but it is also inherently risky. Validating a new ground system can be a severe distraction to a flight team while operating a satellite. Mission data collection and health and safety requirements are rarely, if ever, relaxed during this validation period, forcing flight teams to undertake an additional task while operating the satellite. Additionally, flight teams must usually undergo extensive training to effectively utilize the new system. Once again, this training usually occurs as an additional task, in addition to the nominal satellite operations. While operating the spacecraft, the Flight Team typically assists in the design, validation, and verification of a new ground system. This is a distraction and strain on the Flight Team, but the benefit of using the Flight Team in all phases of ground system development far outweigh the negative aspects. Finally, above the cost of the new system, the integration into the facility with the current control center system are resources and costs not normally taken into account in the design phase of the new system. In addition to the standard issues faced by a Project when upgrading its ground system, the HST Project also must continue to support Space Shuttle servicing missions, which occur approximately every two to three years. This paper will address many of the issues common to all missions when re-hosting ground systems, and those faced by the HST Project in particular.

Walyus, Keith↗

Software IV and V Research Priorities and Applied Program Accomplishments Within NASA

The mission of this research is to be world-class creators and facilitators of innovative, intelligent, high performance, reliable information technologies that enable NASA missions to (1) increase software safety and quality through error avoidance, early detection and resolution of errors, by utilizing and applying empirically based software engineering best practices; (2) ensure customer software risks are identified and/or that requirements are met and/or exceeded; (3) research, develop, apply, verify, and publish software technologies for competitive advantage and the advancement of science; and (4) facilitate the transfer of science and engineering data, methods, and practices to NASA, educational institutions, state agencies, and commercial organizations. The goals are to become a national Center Of Excellence (COE) in software and system independent verification and validation, and to become an international leading force in the field of software engineering for improving the safety, quality, reliability, and cost performance of software systems. This project addresses the following problems: Ensure safety of NASA missions, ensure requirements are met, minimize programmatic and technological risks of software development and operations, improve software quality, reduce costs and time to delivery, and improve the science of software engineering

Blazy, Louis J.↗

The Impact of Autonomous Systems Technology on JPL Mission Software

This paper discusses the following topics: (1) Autonomy for Future Missions- Mars Outposts, Titan Aerobot, and Europa Cryobot / Hydrobot; (2) Emergence of Autonomy- Remote Agent Architecture, Closing Loops Onboard, and New Millennium Flight Experiment; and (3) Software Engineering Challenges- Influence of Remote Agent, Scalable Autonomy, Autonomy Software Validation, Analytic Verification Technology, and Autonomy and Software Software Engineering.

Doyle, Richard J.↗