Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “uncertainties”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Probabilistic Structural Evaluation of Uncertainties in Radiator Sandwich Panel Design

The Jupiter Icy Moons Orbiter (JIMO) Space System is part of the NASA's Prometheus Program. As part of the JIMO engineering team at NASA Glenn Research Center, the structural design of the JIMO Heat Rejection Subsystem (HRS) is evaluated. An initial goal of this study was to perform sensitivity analyses to determine the relative importance of the input variables on the structural responses of the radiator panel. The desire was to let the sensitivity analysis information identify the important parameters. The probabilistic analysis methods illustrated here support this objective. The probabilistic structural performance evaluation of a HRS radiator sandwich panel was performed. The radiator panel structural performance was assessed in the presence of uncertainties in the loading, fabrication process variables, and material properties. The stress and displacement contours of the deterministic structural analysis at mean probability was performed and results presented. It is followed by a probabilistic evaluation to determine the effect of the primitive variables on the radiator panel structural performance. Based on uncertainties in material properties, structural geometry and loading, the results of the displacement and stress analysis are used as an input file for the probabilistic analysis of the panel. The sensitivity of the structural responses, such as maximum displacement and maximum tensile and compressive stresses of the facesheet in x and y directions and maximum VonMises stresses of the tube, to the loading and design variables is determined under the boundary condition where all edges of the radiator panel are pinned. Based on this study, design critical material and geometric parameters of the considered sandwich panel are identified.

Kuguoglu, Latife↗

Accommodating Sensor Uncertainty in the Cones Method: Polycones and Fuzzycones

The "cones method" is an analytical algorithm to combine a pair of angle observations into a common vector. Two new algorithms have been developed to optimize the "cones method" solutions when more than two observation angles are available and when estimates of measurement uncertainties can be made. The polycones algorithm consists of determining a simple weighted average of the solution vectors over all possible pairs of measurements with the weights determined from the measurement uncertainty. The Fuzzycones method finds the vector of maximum probability. Both of these methods have been implemented and tested and both reduce errors in computed vector positions.

Hashmall, Joseph A.↗

Cosmological Implications of the Uncertainty in Astrochemical Rate Coefficients

The cooling of neutral gas of primordial composition, or with very low levels of metal enrichment, depends crucially on the formation of molecular coolants, such as H2 and HD within the gas. Although the chemical reactions involved in the formation and destruction of these molecules are well known, the same cannot be said for the rate coefficients of these reactions, some of which are uncertain by an order of magnitude. Here we discuss two reactions for which large uncertainties exist the formation of H2 by associative detachment of H- with H and the destruction of H- by mutual neutralization with protons. We show that these uncertainties can have a dramatic impact on the effectiveness of cooling during protogalactic collapse.

Glover, S. C. O.↗

Uncertainty Analysis of Historical Hurricane Data

An analysis of variance (ANOVA) study was conducted for historical hurricane data dating back to 1851 that was obtained from the U. S. Department of Commerce National Oceanic and Atmospheric Administration (NOAA). The data set was chosen because it is a large, publicly available collection of information, exhibiting great variability which has made the forecasting of future states, from current and previous states, difficult. The availability of substantial, high-fidelity validation data, however, made for an excellent uncertainty assessment study. Several factors (independent variables) were identified from the data set, which could potentially influence the track and intensity of the storms. The values of these factors, along with the values of responses of interest (dependent variables) were extracted from the data base, and provided to a commercial software package for processing via the ANOVA technique. The primary goal of the study was to document the ANOVA modeling uncertainty and predictive errors in making predictions about hurricane location and intensity 24 to 120 hours beyond known conditions, as reported by the data set. A secondary goal was to expose the ANOVA technique to a broader community within NASA. The independent factors considered to have an influence on the hurricane track included the current and starting longitudes and latitudes (measured in degrees), and current and starting maximum sustained wind speeds (measured in knots), and the storm starting date, its current duration from its first appearance, and the current year fraction of each reading, all measured in years. The year fraction and starting date were included in order to attempt to account for long duration cyclic behaviors, such as seasonal weather patterns, and years in which the sea or atmosphere were unusually warm or cold. The effect of short duration weather patterns and ocean conditions could not be examined with the current data set. The responses analyzed were the storm latitude, longitude and intensity, as recorded in the data set, 24 or 120 hours beyond the current state. Several ANOVA modeling schemes were examined. Two forms of validation were used: 1) comparison with official hurricane prediction performance metrics and 2) cases studies conducted on hurricanes from the 2005 season, which were not included within the model construction and ANOVA assessment. In general, the ANOVA technique did not perform as well as the established official prediction performance metrics published by NOAA; still, the technique did remarkably well in this demonstration with a difficult data set and could probably be made to perform better with more knowledge of hurricane development and dynamics applied to the problem. The technique provides a repeatable prediction process that eliminates the need for judgment in the forecast.

Green, Lawrence L.↗

The Roles of Verification, Validation and Uncertainty Quantification in the NASA Standard for Models and Simulations

The National Aeronautics and Space Administration (NASA) recently issued an interim version of the Standard for Models and Simulations (M&S Standard) [1]. The action to develop the M&S Standard was identified in an internal assessment [2] of agency-wide changes needed in the wake of the Columbia Accident [3]. The primary goal of this standard is to ensure that the credibility of M&S results is properly conveyed to those making decisions affecting human safety or mission success criteria. The secondary goal is to assure that the credibility of the results from models and simulations meets the project requirements (for credibility). This presentation explains the motivation and key aspects of the M&S Standard, with a special focus on the requirements for verification, validation and uncertainty quantification. Some pilot applications of this standard to computational fluid dynamics applications will be provided as illustrations. The authors of this paper are the members of the team that developed the initial three drafts of the standard, the last of which benefited from extensive comments from most of the NASA Centers. The current version (number 4) incorporates modifications made by a team representing 9 of the 10 NASA Centers. A permanent version of the M&S Standard is expected by December 2007. The scope of the M&S Standard is confined to those uses of M&S that support program and project decisions that may affect human safety or mission success criteria. Such decisions occur, in decreasing order of importance, in the operations, the test & evaluation, and the design & analysis phases. Requirements are placed on (1) program and project management, (2) models, (3) simulations and analyses, (4) verification, validation and uncertainty quantification (VV&UQ), (5) recommended practices, (6) training, (7) credibility assessment, and (8) reporting results to decision makers. A key component of (7) and (8) is the use of a Credibility Assessment Scale, some of the details of which were developed in consultation with William Oberkampf, David Peercy and Timothy Trocano of Sandia National Laboratories. The focus of most of the requirements, including those for VV&UQ, is on the documentation of what was done and the reporting, using the Credibility Assessment Scale, of the level of rigor that was followed. The aspects of one option for the Credibilty Assessment Scale are (1) code verification, (2) solution verification, (3) validation, (4) predictive capability, (5) technical review, (6) process control, and (7) operator and analyst qualification.

Zang, Thomas A.↗

Finding Uncertainties that Cause the Age Dependence of Dose Limits to Be Immature

Space radiation permissible exposure limits (PEL) are intended to set acceptable levels of cancer risks, and avoid any clinical significant non-cancer effects. The 1989 recommendation of the National Council of Radiation Protection and Measurements (NCRP) recommended a strong age dependence of dose limits that departed drastically from the then mature 1970 dose limits recommendations from the National Academy of Science, which were independent of age. In 2000, the NCRP recommended revised limits that showed a similar trend of risk with age to the 1989 report. In this model, the cancer risk per Sv varies by more than 2-fold for ages between 30- and 50-yr. Therefore for galactic cosmic rays exposure, astronaut age has a larger influence on risk then radiation shielding mass or material composition, vehicle propulsion method, or position in the solar cycle. For considering the control of mission costs and resources, the possibility of using astronaut age as a trade variable in mission design could be considered. However, the uncertainties in describing the age dependence on risk have not been fully explored. We discuss biological factors that influence the age dependence of radiation risks, including susceptibility, expression and latency, and radiation quality. These factors depend not only on the individual s age, but also their genetic sensitivity and interaction with other environmental factors. Epidemiological data is limited in describing the age dependence on risk. The 2005, BEIR VII report recommends an age dependence for cancer risk attributable solely to the life-table disagreeing strongly with the NCRP model. However, BEIR VII also noted the limited power of human data for concomitantly describing both age and age after exposure dependences of cancer risks. Many experimental studies have shown that high LET radiation (e.g., high charge and energy (HZE) nuclei and neutrons) display reduced latency compared to low LET radiation, suggesting distinct biological factors are important. We discuss potential molecular mechanisms that would influence the age dependence of radiation risks. A probability distribution function for the uncertainties in age-dependence of risk models is described and predictions for Mars missions discussed. Our report suggests that theoretical considerations based on new experimental studies are needed to ensure the correct age dependence in space radiation risk models and the resulting Astronaut PEL.

Cucinotta, Francis A.↗

Propagation of Computational Uncertainty Using the Modern Design of Experiments

This paper describes the use of formally designed experiments to aid in the error analysis of a computational experiment. A method is described by which the underlying code is approximated with relatively low-order polynomial graduating functions represented by truncated Taylor series approximations to the true underlying response function. A resource-minimal approach is outlined by which such graduating functions can be estimated from a minimum number of case runs of the underlying computational code. Certain practical considerations are discussed, including ways and means of coping with high-order response functions. The distributional properties of prediction residuals are presented and discussed. A practical method is presented for quantifying that component of the prediction uncertainty of a computational code that can be attributed to imperfect knowledge of independent variable levels. This method is illustrated with a recent assessment of uncertainty in computational estimates of Space Shuttle thermal and structural reentry loads attributable to ice and foam debris impact on ascent.

DeLoach, Richard↗

Dynamic wake prediction and visualization with uncertainty analysis

A dynamic wake avoidance system utilizes aircraft and atmospheric parameters readily available in flight to model and predict airborne wake vortices in real time. A novel combination of algorithms allows for a relatively simple yet robust wake model to be constructed based on information extracted from a broadcast. The system predicts the location and movement of the wake based on the nominal wake model and correspondingly performs an uncertainty analysis on the wake model to determine a wake hazard zone (no fly zone), which comprises a plurality of wake planes, each moving independently from another. The system selectively adjusts dimensions of each wake plane to minimize spatial and temporal uncertainty, thereby ensuring that the actual wake is within the wake hazard zone. The predicted wake hazard zone is communicated in real time directly to a user via a realistic visual representation. In an example, the wake hazard zone is visualized on a 3-D flight deck display to enable a pilot to visualize or see a neighboring aircraft as well as its wake. The system substantially enhances the pilot's situational awareness and allows for a further safe decrease in spacing, which could alleviate airport and airspace congestion.

Holforty, Wendy L.↗

Aerospace Applications of Optimization under Uncertainty

The Multidisciplinary Optimization (MDO) Branch at NASA Langley Research Center develops new methods and investigates opportunities for applying optimization to aerospace vehicle design. This paper describes MDO Branch experiences with three applications of optimization under uncertainty: (1) improved impact dynamics for airframes, (2) transonic airfoil optimization for low drag, and (3) coupled aerodynamic/structures optimization of a 3-D wing. For each case, a brief overview of the problem and references to previous publications are provided. The three cases are aerospace examples of the challenges and opportunities presented by optimization under uncertainty. The present paper will illustrate a variety of needs for this technology, summarize promising methods, and uncover fruitful areas for new research.

Padula, Sharon↗

Detailed Uncertainty Analysis for Ares I Ascent Aerodynamics Wind Tunnel Database

A detailed uncertainty analysis for the Ares I ascent aero 6-DOF wind tunnel database is described. While the database itself is determined using only the test results for the latest configuration, the data used for the uncertainty analysis comes from four tests on two different configurations at the Boeing Polysonic Wind Tunnel in St. Louis and the Unitary Plan Wind Tunnel at NASA Langley Research Center. Four major error sources are considered: (1) systematic errors from the balance calibration curve fits and model + balance installation, (2) run-to-run repeatability, (3) boundary-layer transition fixing, and (4) tunnel-to-tunnel reproducibility.

Hemsch, Michael J.↗

Uncertainty Analysis for the Evaluation of a Passive Runway Arresting System

This paper considers the stopping distance of an aircraft involved in a runway overrun incident when the runway has been provided with an extension comprised of a material engineered to induce high levels of rolling friction and drag. A formula for stopping distance is derived that is shown to be the product of a known formula for the case of friction without drag, and a dimensionless constant between 0 and 1 that quantifies the further reduction in stopping distance when drag is introduced. This additional quantity, identified as the Drag Reduction Factor, D, is shown to depend on the ratio of drag force to friction force experienced by the aircraft as it enters the overrun area. The specific functional form of D is shown to depend on how drag varies with speed. A detailed uncertainty analysis is presented which reveals how the uncertainty in estimates of stopping distance are influenced by experimental error in the force measurements that are acquired in a typical evaluation experiment conducted to assess candidate overrun materials.

Deloach, Richard↗

The Multi-Sensor Aerosol Products Sampling System (MAPSS) for Integrated Analysis of Satellite Retrieval Uncertainties

Among the known atmospheric constituents, aerosols represent the greatest uncertainty in climate research. Although satellite-based aerosol retrieval has practically become routine, especially during the last decade, there is often disagreement between similar aerosol parameters retrieved from different sensors, leaving users confused as to which sensors to trust for answering important science questions about the distribution, properties, and impacts of aerosols. As long as there is no consensus and the inconsistencies are not well characterized and understood ', there will be no way of developing reliable climate data records from satellite aerosol measurements. Fortunately, the most globally representative well-calibrated ground-based aerosol measurements corresponding to the satellite-retrieved products are available from the Aerosol Robotic Network (AERONET). To adequately utilize the advantages offered by this vital resource,., an online Multi-sensor Aerosol Products Sampling System (MAPSS) was recently developed. The aim of MAPSS is to facilitate detailed comparative analysis of satellite aerosol measurements from different sensors (Terra-MODIS, Aqua-MODIS, Terra-MISR, Aura-OMI, Parasol-POLDER, and Calipso-CALIOP) based on the collocation of these data products over AERONET stations. In this presentation, we will describe the strategy of the MAPSS system, its potential advantages for the aerosol community, and the preliminary results of an integrated comparative uncertainty analysis of aerosol products from multiple satellite sensors.

Ichoku, Charles↗

Uncertainty in Analyzed Water and Energy Budgets at Continental Scales

Operational analyses and retrospective-analyses provide all the physical terms of mater and energy budgets, guided by the assimilation of atmospheric observations. However, there is significant reliance on the numerical models, and so, uncertainty in the budget terms is always present. Here, we use a recently developed data set consisting of a mix of 10 analyses (both operational and retrospective) to quantify the uncertainty of analyzed water and energy budget terms for GEWEX continental-scale regions, following the evaluation of Dr. John Roads using individual reanalyses data sets.

Bosilovich, Michael G.↗

Using MERRA Gridded Innovations for Quantifying Uncertainties in Analysis Fields and Diagnosing Observing System Inhomogeneities

MERRA is a NASA reanalysis for the satellite era using a major new version of the Goddard Earth Observing System Data Assimilation System Version 5 (GEOS-5). The project focuses on historical analyses of the hydrological cycle on a broad range of weather and climate time scales and places the NASA EOS suite of observations in a climate context. The characterization of uncertainty in reanalysis fields is a commonly requested feature by users of such data. While intercomparison with reference data sets is common practice for ascertaining the realism of the datasets, such studies typically are restricted to long term climatological statistics and seldom provide state dependent measures of the uncertainties involved. In principle, variational data assimilation algorithms have the ability of producing error estimates for the analysis variables (typically surface pressure, winds, temperature, moisture and ozone) consistent with the assumed background and observation error statistics. However, these "perceived error estimates" are expensive to obtain and are limited by the somewhat simplistic errors assumed in the algorithm. The observation minus forecast residuals (innovations) by-product of any assimilation system constitutes a powerful tool for estimating the systematic and random errors in the analysis fields. Unfortunately, such data is usually not readily available with reanalysis products, often requiring the tedious decoding of large datasets and not so-user friendly file formats. With MERRA we have introduced a gridded version of the observations/innovations used in the assimilation process, using the same grid and data formats as the regular datasets. Such dataset empowers the user with the ability of conveniently performing observing system related analysis and error estimates. The scope of this dataset will be briefly described. We will present a systematic analysis of MERRA innovation time series for the conventional observing system, including maximum-likelihood estimates of background and observation errors, as well as global bias estimates. Starting with the joint PDF of innovations and analysis increments at observation locations we propose a technique for diagnosing bias among the observing systems, and document how these contextual biases have evolved during the satellite era covered by MERRA.

da Silva, Arlindo↗

The Effects of Speed Uncertainty on a Separation Assurance Algorithm

Trajectory prediction is central to separation assurance, because it is necessary to accurately predict where an aircraft will be in the future to avoid losses of separation. In any system in the field there will always be uncertainty associated with trajectory prediction. This uncertainty is a product of many different sources including wind prediction errors, pilot intent, surveillance errors, navigation errors and aircraft weight. The purpose of this study is to parametrically analyze the effects of aircraft speed errors on conflict detection and to analyze the performance of a conflict resolution algorithm when these speed errors are present. Results show that a speed error of +/- 10% of the cruise speed can result in about 30% of the conflicts not being detected ten minutes before the loss of separation. It can also result in 50% more resolutions being performed to maintain separation.

Lauderdale, Todd A.↗

Uncertainty Assessment of the SeaWiFS On-Orbit Calibration

Ocean color climate data records require water-leaving radiances with 5% absolute and 1% relative accuracies as input. Because of the amplification of any sensor calibration errors by the atmospheric correction, the 1% relative accuracy requirement translates into a 0.1% long-term radiometric stability requirement for top-of-the atmosphere radiances. The rigorous on-orbit calibration program developed and implemented for SeaWiFS by the NASA Ocean Biology Processing Group (OBPG) Calibration and Validation Team (CVT) has allowed the CVT to maintain the stability of the radiometric calibration of SeaWiFS at 0.13% or better over the mission. The uncertainties in the resulting calibrated top-of-the-atmosphere (TOA) radiances can be addressed in terms of accuracy (biases in the measurements), precision (scatter in the measurements), and stability (repeatability of the measurements). The calibration biases of lunar observations relative to the USGS RObotic Lunar Observatory (ROLO) photometric model of the Moon are 2-3%. The biases from the vicarious calibration against the Marine Optical Buoy (MOBY) are 1-2%. The precision of the calibration derived from the solar calibration signal-tonoise ratios are 0.16%, from the lunar residuals are 0.13%, and from the vicarious gains are 0.10%. The long-term stability of the TOA radiances, derived from the lunar time series, is 0.13%. The stability of the vicariouslycalibrated TOA radiances, incorporating the uncertainties in the MOBY measurements and the atmospheric correction, is 0.30%. These results allow the OBPG to produce climate data records from the SeaWiFS ocean color data.

Eplee, Robert E., Jr.↗

Further Constraints and Uncertainties on the Deep Seismic Structure of the Moon

The Apollo Passive Seismic Experiment (APSE) consisted of four 3-component seismometers deployed between 1969 and 1972, that continuously recorded lunar ground motion until late 1977. The APSE data provide a unique opportunity for investigating the interior of a planet other than Earth, generating the most direct constraints on the elastic structure, and hence the thermal and compositional evolution of the Moon. Owing to the lack of far side moonquakes, past seismic models of the lunar interior were unable to constrain the lowermost 500 km of the interior. Recently, array methodologies aimed at detecting deep lunar seismic reflections found evidence for a lunar core, providing an elastic model of the deepest lunar interior consistent with geodetic parameters. Here we study the uncertainties in these models associated with the double array stacking of deep moonquakes for imaging deep reflectors in the Moon. We investigate the dependency of the array stacking results on a suite of parameters, including amplitude normalization assumptions, polarization filters, assumed velocity structure, and seismic phases that interfere with our desired target phases. These efforts are facilitated by the generation of synthetic seismograms at high frequencies (approx. 1Hz), allowing us to directly study the trade-offs between different parameters. We also investigate expected amplitudes of deep reflections relative to direct P and S arrivals, including predictions from arbitrarily oriented focal mechanisms in our synthetics. Results from separate versus combined station stacking help to establish the robustness of stacks. Synthetics for every path geometry of data were processed identically to that done with data. Different experiments were aimed at examining various processing assumptions, such as adding random noise to synthetics and mixing 3 components to some degree. The principal stacked energy peaks put forth in recent work persist, but their amplitude (which maps into reflector impedance contrast) and timing (which maps into reflector depth) depend on factors that are not well constrained -- most notably, the velocity structure of the overlying lunar interior. Thus, while evidence for the lunar core remains strong, the depths of imaged reflectors have associated uncertainties that will require new seismic data and observations to constrain. These results strongly advocate further investigations on the Moon to better resolve the interior (e.g., Selene missions), for the Moon apparently has a rich history of construction and evolution that is inextricably tied to that of Earth.

Lin, Pei-Ying Patty↗

Uncertainty Due to Unsteady Fluid/Structure Interaction for the Ares I Vehicle Traversing the Transonic Regime

Rapid reduced-order numerical models are being investigated as candidates to simulate the dynamics of a flexible launch vehicle during atmospheric ascent. There has also been the extension of these new approaches to include gust response. These methods are used to perform aeroelastic and gust response analyses at isolated Mach numbers. Such models require a method to time march through a succession of ascent Mach numbers. An approach is presented for interpolating reduced-order models of the unsteady aerodynamics at successive Mach numbers. The transonic Mach number range is considered here since launch vehicles can suffer the highest dynamic loads through this range. Realistic simulations of the flexible vehicle behavior as it traverses this Mach number range are presented. The response of the vehicle due to gusts is computed. Uncertainties in root mean square and maximum bending moment and crew module accelerations are presented due to assumed probability distributions in design parameters, ascent flight conditions, gusts. The primary focus is on the uncertainty introduced by modeling fidelity. It is found that an unsteady reduced order model produces larger excursions in the root mean square loading and accelerations than does a quasi-steady reduced order model.

Bartels, Robert E.↗