Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Initial Mechanical Testing of Superalloy Lattice Block Structures Conducted

The first mechanical tests of superalloy lattice block structures produced promising results for this exciting new lightweight material system. The testing was performed in-house at NASA Glenn Research Center's Structural Benchmark Test Facility, where small subelement-sized compression and beam specimens were loaded to observe elastic and plastic behavior, component strength levels, and fatigue resistance for hundreds of thousands of load cycles. Current lattice block construction produces a flat panel composed of thin ligaments arranged in a three-dimensional triangulated trusslike structure. Investment casting of lattice block panels has been developed and greatly expands opportunities for using this unique architecture in today's high-performance structures. In addition, advances made in NASA's Ultra-Efficient Engine Technology Program have extended the lattice block concept to superalloy materials. After a series of casting iterations, the nickel-based superalloy Inconel 718 (IN 718, Inco Alloys International, Inc., Huntington, WV) was successfully cast into lattice block panels; this combination offers light weight combined with high strength, high stiffness, and elevated-temperature durability. For tests to evaluate casting quality and configuration merit, small structural compression and bend test specimens were machined from the 5- by 12- by 0.5-in. panels. Linear elastic finite element analyses were completed for several specimen layouts to predict material stresses and deflections under proposed test conditions. The structural specimens were then subjected to room-temperature static and cyclic loads in Glenn's Life Prediction Branch's material test machine. Surprisingly, the test results exceeded analytical predictions: plastic strains greater than 5 percent were obtained, and fatigue lives did not depreciate relative to the base material. These assets were due to the formation of plastic hinges and the redundancies inherent in lattice block construction, which were not considered in the simplified computer models. The fatigue testing proved the value of redundancies since specimen strength was maintained even after the fracture of one or two ligaments. This ongoing test program is planned to continue through high-temperature testing. Also scheduled for testing are IN 718 lattice block panels with integral face sheets, as well as specimens cast from a higher temperature alloy. The initial testing suggests the value of this technology for large panels under low and moderate pressure loadings and for high-risk, damage-tolerant structures. Potential aeropropulsion uses for lattice blocks include turbine-engine actuated panels, exhaust nozzle flaps, and side panel structures.

Krause, David L.↗

A description of hardware and mission planning for the Apollo-Soyuz Test Project

The Apollo-Soyuz Test Program (ASTP) is scheduled for flight in July 1975. This paper will describe briefly the mission planning and hardware associated with the program. Of interest are modifications to the basic Apollo and Soyuz vehicles as well as the newly developed docking module and docking system. Joint aspects of the mission profile are explained. Science objectives and corresponding experiments are described. Utilization of the ATS-6 Satellite for relay of TV, voice, and data to the ground is also a topic. The paper concludes with a discussion of the joint flight control interface.

Littleton, F. C.↗

Telemetry Tracking & Control (TT&C) - First TDRSS, then Commercial GEO & Big LEO and Now Through LEO

The advent of low earth orbit (LEO) commercial communication satellites provides an opportunity to dramatically reduce Telemetry, Tracking and Control (TT&C) costs of launch vehicles, Unpiloted Aerial Vehicles (UAVs), Research Balloons and spacecraft by reducing or eliminating ground infrastructure. Personnel from the Goddard Space Flight Center's Wallops Flight Facility (GSFC\WFF) have successfully used commercial Geostationary Earth Orbit (GEO) and Big LEO communications satellites for Long Duration Balloon Flight TT&C. The Flight Modem is a GSFC\WFF Advanced Range Technology initiative (ARTI) designed to streamline TT&C capability in the user community of these scientific data gathering platforms at low cost. Making use of existing LEO satellites and adapting and ruggedized commercially available components; two-way, over the horizon communications may be established with these vehicles at great savings due to reduced infrastructure. Initially planned as a means for permitting GPS data for tracking and recovery of sounding rocket and balloon payloads, expectations are that the bandwidth can soon be expanded to allow more comprehensive data transfer. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem and a single board computer with custom software is described and technical challenges are discussed along with the plan for their resolution. A three-phase testing and development plan is outlined and the current results are reported. Results and status of ongoing flight tests on aircraft and sounding rockets are reported. Future applications on these platforms and the potential for satellite support are discussed along with an analysis of cost effectiveness of this method vs. other tracking and data transmission schemes.

Morgan, Dwayne R.↗

An Overview of Integration and Test of the James Webb Space Telescope Integrated Science Instrument Module

The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approx.40K). The JWST Observatory architecture includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The SIs and Guider are mounted to a composite metering structure with outer dimensions of 2.1x2.2x1.9m. The SI and Guider units are integrated to the ISIM structure and optically tested at NASA/Goddard Space Flight Center as an instrument suite using a high-fidelity, cryogenic JWST telescope simulator that features a 1.5m diameter powered mirror. The SIs are integrated and aligned to the structure under ambient, clean room conditions. SI performance, including focus, pupil shear and wavefront error, is evaluated at the operating temperature. We present an overview of the ISIM integration within the context of Observatory-level construction. We describe the integration and verification plan for the ISIM element, including an overview of our incremental verification approach, ambient mechanical integration and test plans and optical alignment and cryogenic test plans. We describe key ground support equipment and facilities.

Drury, Michael↗

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗

Combined TREAT-LOC & SATS Integral LOCA Experiment Plan

The Transient Reactor Test Facility (TREAT) loss-of-coolant (LOC) and highburnup (HBu) experiment series, along with the Severe Accident Test Station (SATS) HBu experiment series, are integral LOC accident (LOCA) experiments planned under the Department of Energy (DOE) Advanced Fuels Campaign (AFC) program, which aims to support burnup extension needs by addressing identified R&D priorities in order to achieve an improved understanding of fuel fragmentation, relocation, and dispersal (FFRD) of HBu fuel during LOCA events. Priorities have been identified by the Electric Power Research Institute (EPRI)’s Collaborative Research on Advanced Fuel Technologies (CRAFT) Fuel Performance and Testing Technical Experts Group (FPTTEG). The data produced under this plan will be used to further validate and confirm existing models and inform future R&D and model development. The experimental program was specifically developed to address data gaps and opportunities identified via detailed review of the existing public knowledge base on LOCA FFRD, as well as reviewing specific experimental development activities regarding prototypic LOCA conditions for light-water reactor (LWR) systems. The test program relies on a unique combination of in- and out-of-pile experimental approaches to provide a clear tieback to the existing integral and semi-integral LOCA experiment database, using state-of-the-art facilities. More importantly, the program will systematically investigate the impacts of prototypic HBu fuel/cladding thermomechanical behaviors under postulated LWR LOCA conditions not yet fully investigated. These conditions correspond with prototypic decay-energy heatup (DEH) and stored-energy heatup (SEH) conditions. First, TREAT’s unique capability will enable the first evaluation of the impact of SEH conditions on HBu fuels. The test program will emphasize the development of an improved mechanistic understanding of key phenomena through independent experimental systems, development of a database to support fuel performance modeling tools, world-leading advanced materials characterization, and the most advanced approach to in situ diagnostics ever deployed to evaluate FFRD. The results will represent a significant leap forward in evaluating prototypic conditions and novel data to support modeling development and validation, as well as to inform the technical basis for LOCA-induced FFRD.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

UNCERTAINTIES FOR IN-REACTOR TESTING OF TRITIUM LOADED GETTERS WITH TEMPERATURE CONTROL

The fourth experiment in TPBAR Materials Irradiation Separate-Effects Test (TMIST) series (TMIST-4) is planned to experimentally determine the effect of neutron irradiation on the equilibrium vapor pressure of tritium over a tritium loaded Nickel-Plated Zirconium (NPZ) getter in a simulated TPBAR service environment. This pressure will be used to estimate the tritium permeation rate. In the thermal design in the TMIST-4, two evaluations are required. 1) The cladding temperature is calculated to estimate the feasibility of detecting potential irradiation enhancement of the partial pressure for an NPZ getter. This work is required to obtain a precise cladding temperature for measurement of a low tritium partial pressure. This work has been completed and indicated that the required/target cladding temperatures based on the TMIST-4 test plan can be satisfied under the test condition range by modifying the capsule component shapes and inserting a thermally conductive metal sleeve. 2) The evaluation of uncertainties associated with the test design and operation is performed. This includes fabrication tolerances, and power and nuclear operating conditions. These factors will impact the component temperatures inside capsules and resulting the tritium partial pressure. The tritium permeation rate is a function of temperature and tritium partial pressure. The prediction of tritium permeation rates affects the feasibility of obtaining measurement resolutions required to reach reasonable conclusion for potential irradiation enhanced performance. This work will investigate the uncertainties.

TTP, TPBAR, TMIST-4, TPBAR Materials Irradiation S↗

Preliminary Plan for Evaluation of Reactor Pressure Vessel Surveillance Materials from Palisades Nuclear Generating Station

The Palisades Nuclear Generating Station (PNGS), located in Michigan, is owned and operated by Entergy. It is a Combustion Engineering 2-loop pressurized water reactor (PWR) producing 805 MWe (2,565 MWth). The PNGS was built between 1967 and 1970, with approval to operate at full power in 1973; the plant’s original license was due to expire on March 24, 2011. An application for 20-year extension was filed in 2005 with the Nuclear Regulatory Commission and was granted on January 18, 2007. Although the plant was scheduled for decommissioning by 2031, Entergy currently plans to close the PNGS in 2022. The PNGS included in its reactor pressure vessel (RPV) surveillance program a capsule, designated A-60, containing specimens of one of the vessel plates and a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. This capsule was irradiated to a fluence of 1.8 x 10 20 n/cm 2 . The capsule was removed from its surveillance position in 1995 and has been resident in the spent fuel pool since that time. The material is also of special interest because of its very high nickel content and because of the potential for development of NiMnSi (nickel-manganese-silicon) precipitates, dubbed “late blooming phases.” The surveillance program also includes a capsule, designated T-150, dedicated specifically for thermal aging, which would provide results for at least 33 effective full power years, which is beyond the current thermal-aging database for such materials. Given that license extensions to 60 years of operation have been approved by the US Nuclear Regulatory Commission for most of the currently operating light water reactors in the United States, and that the first extension to 80 years was recently approved, there exists the probability that some RPVs will reach and possibly exceed a fast neutron fluence (> 1 MeV) of 1 x 10 20 n/cm 2 . This is a fluence regime with no US surveillance data and very little test reactor data, except for the Light Water Reactor Sustainability Program–sponsored University of California Santa Barbara Advanced Test Reactor (ATR) ATR-2 project. Thus, the materials in the A-60 capsule represent a valuable resource for directly exploring the effects of commercial surveillance irradiation on a typical plate and a high-nickel weld with similar materials irradiated in the ATR-2 test reactor project. This report provides background information for the surveillance program, previous results of surveillance materials testing, the preliminary plan for capsule retrieval and disassembly, and the plan for testing and microstructural examination of the mechanical test specimens of these unique materials to assess the features induced by very high irradiation fluence or very long thermal aging time

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 technology demonstration mission led by GSFC of NASA's New Millennium Program managed by JPL consisted of three micro satellites (approximately 30 kg each) deployed into orbit from the Pegasus XL launch vehicle. In order to meet the launch date schedule of ST5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center. It was determined that there was insufficient time in the schedule to perform three spacecraft I&T activities in series using standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus had the experience and knowledge to safely execute I&T for spacecraft #2 and #3. The integration team was extremely versatile; each member could perform many different activities or work any spacecraft, when needed. ST5 was successfully integrated, tested and shipped to the launch site per the I&T schedule that was planned three years previously. The I&T campaign was completed with ST5's successful launch on March 22, 2006.

Sauerwein, Timothy A.↗

Heat load measurements for the PIP-II pHB650 cryomodule

This study presents a brief overview of the 1st and 2nd phases and an in-depth analysis of the 3rd phase heat load testing performed on the pHB650 (prototype High Beta 650 MHz) cryomodule at PIP2IT (PIP-II Injector Test Facility), with a focus on both the results and the methodological advancements that have improved testing efficiency and accuracy. A key challenge identified in the testing campaign is the higher-than-expected heat loads observed in the first PIP-II (Proton Improvement Plan II) prototype cryomodules (pSSR1 and pHB650) tested at PIP2IT. Elevated heat loads are concerning given the fixed capacity of the PIP-II cryoplant that is currently being installed at Fermilab. However, understanding the sources of these elevated heat loads offers a critical opportunity to implement effective heat load mitigations on upcoming PIP-II cryomodules to stay within the available capacity of the PIP-II cryoplant. The study includes a summary of test results, descriptions of measurement procedures, and key observations on parameters directly and indirectly related to heat load measurements. Direct observations include measured heat loads and the effectiveness of JT heat exchanger under varying conditions, while indirect observation analyze factors such as the temperature distribution on the two-phase pipe and relief piping under varying conditions. Thermal acoustic oscillations (TAO) were identified during testing, which was mitigated by replacing the original G10 stem with a stainless steel stem equipped with wipers for the cryomodule cooldown valve. A major innovation during pHB650 Phase 3 testing was the development of an automated Python script to streamline data acquisition, analysis, and reporting of heat load results. This script automatically retrieved data from ACNET (Accelerator Control Network), performed heat load calculations, and generated detailed reports featuring plots and tables. This advancement significantly reduced manual labor and enhanced the thoroughness of data analysis compared to earlier campaigns. The heat load test reports were promptly uploaded to the electronic logbook shortly after each test, enabling rapid feedback and collaboration between the SRF and cryogenic teams. The heat load measurements included various components: HTTS (high-temperature thermal shield), LTTS (low-temperature thermal shield), 2K isothermal and non-isothermal heat loads. Results were recorded both within the cryomodule and between the bayonet can supply and return. Measurements were conducted under different operating conditions such as "standard", "linac", and "simulated dynamic". Additionally, HTTS and LTTS heat loads were calculated in real time, allowing for the tracking of thermal stability and identification of changes during testing, both in steady-state and transient conditions. The results of this testing campaign not only provide valuable insights into the performance of the pHB650 cryomodule but also highlight best practices and lessons learned that will inform future cryomodule testing at PIP2IT. These include adopting automated tools for data analysis, refining real-time measurement capabilities, and emphasizing detailed pre-test planning. The framework established in this campaign aims to set an improved standard for cryomodule testing and heat load reporting in future cryomodule test campaigns.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗

Experimental uncertainty survey and assessment

An uncertainty analysis and assessment of the specific impulse determination during Space Shuttle Main Engine testing is reported. It is concluded that in planning and designing tests and in interpreting the results of tests, the bias and precision components of experimental uncertainty should be considered separately. Recommendations for future research efforts are presented.

Coleman, Hugh W.↗

A Multi-Purpose Modular Electronics Integration Node for Exploration Extravehicular Activity

As NASA works to develop an effective integrated portable life support system design for exploration Extravehicular activity (EVA), alternatives to the current system s electrical power and control architecture are needed to support new requirements for flexibility, maintainability, reliability, and reduced mass and volume. Experience with the current Extravehicular Mobility Unit (EMU) has demonstrated that the current architecture, based in a central power supply, monitoring and control unit, with dedicated analog wiring harness connections to active components in the system has a significant impact on system packaging and seriously constrains design flexibility in adapting to component obsolescence and changing system needs over time. An alternative architecture based in the use of a digital data bus offers possible wiring harness and system power savings, but risks significant penalties in component complexity and cost. A hybrid architecture that relies on a set of electronic and power interface nodes serving functional models within the Portable Life Support System (PLSS) is proposed to minimize both packaging and component level penalties. A common interface node hardware design can further reduce penalties by reducing the nonrecurring development costs, making miniaturization more practical, maximizing opportunities for maturation and reliability growth, providing enhanced fault tolerance, and providing stable design interfaces for system components and a central control. Adaptation to varying specific module requirements can be achieved with modest changes in firmware code within the module. A preliminary design effort has developed a common set of hardware interface requirements and functional capabilities for such a node based on anticipated modules comprising an exploration PLSS, and a prototype node has been designed assembled, programmed, and tested. One instance of such a node has been adapted to support testing the swingbed carbon dioxide and humidity control element in NASA s advanced PLSS 2.0 test article. This paper will describe the common interface node design concept, results of the prototype development and test effort, and plans for use in NASA PLSS 2.0 integrated tests.

Hodgson, Edward↗

Digital terrain mapping by the OSIRIS-REx mission

The Origins, Spectral Interpretation, Resource Identification, Security–Regolith Explorer mission will return a sample to Earth from asteroid (101955) Bennu. Digital terrain models (DTMs) of the asteroid, and products enabled by them, are key to understanding the origin and evolution of the asteroid, providing geological and geophysical context for the sample, maximizing the amount of sample returned, navigating the spacecraft, and ensuring the safety of the spacecraft during sampling. The mission has two approaches for producing these DTMs: a camera-based approach and a lidar-based approach. We provide an overview of the methods used for these two approaches and how they fit into the originally planned mission. We also discuss a summary of tests using these plans to evaluate the expected performance of the DTMs and describe the data products derived from them.

O. S. Barnouin↗

Description and calibration of the Langley unitary plan wind tunnel

The two test sections of the Langley Unitary Plan Wind Tunnel were calibrated over the operating Mach number range from 1.47 to 4.63. The results of the calibration are presented along with a a description of the facility and its operational capability. The calibrations include Mach number and flow angularity distributions in both test sections at selected Mach numbers and tunnel stagnation pressures. Calibration data are also presented on turbulence, test-section boundary layer characteristics, moisture effects, blockage, and stagnation-temperature distributions. The facility is described in detail including dimensions and capacities where appropriate, and example of special test capabilities are presented. The operating parameters are fully defined and the power consumption characteristics are discussed.

Jackson, C. M., Jr.↗

Radial Deconsolidation and Leach-Burn-Leach of AGR-3/4 Compact 1-4 and 10-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined in one test train for irradiation in the Advanced Test Reactor at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011 and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both focused on obtaining data on fission product transport to support the improvement of modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and postirradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite (Petti et al. 2005). These two goals were combined in the AGR-3/4 irradiation, which consisted of twelve independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. There were two capsule types: a standard capsule and a “fuel body”, in which the outer graphite ring included a floor and cap that fully enclosed the fuel (Stempien et al. 2018a). The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to provide data on fission product transport and release from matrix and graphite at accident temperatures (Demkowicz 2017).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radial Deconsolidation and Leach-Burn-Leach of AGR-3/4 Compacts 8-4 and 7-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined into one test train for irradiation in the Advanced Test Reactor at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011, and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both to be focused on obtaining fission product transport data to support improvements in modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and postirradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite (Petti et al. 2005). These goals were combined in the AGR-3/4 irradiation experiment, which consisted of twelve independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. There were two capsule types: a standard capsule and a fuel body, in which the outer graphite ring included a floor and cap to fully enclose the fuel (Stempien et al. 2018a). The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to obtain data on fission product transport and release from matrix and graphite at accident temperatures (Demkowicz 2017).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Internal Electrostatic Discharge Tests of Micro-D Connectors for Planned Europa Mission

NASA has planned a mission to study Jupiter’s moon, Europa. The mission would place a spacecraft into orbit around Jupiter, performing nominally 45 flybys of the moon. The suite of instruments onboard the spacecraft would investigate Europa’s potential to sustain life, studying the moon’s atmosphere, water-ice crust, suspected subsurface ocean, and rocky interior. The radiation environment at Europa’s orbit is severe and presents a significant threat to the spacecraft. There are several radiation effects that could be problematic, one of which is internal charging. Problems due to internal charging arise when high energy electrons penetrate the spacecraft and deposit within onboard dielectrics or floating metals. These charges can build up over time, generating electric fields that exceed the breakdown strength of materials in the region. A rapid discharge of the stored charges may occur, sending current pulses into electronics and potentially damaging them. An Internal Electrostatic Discharge (IESD) design environment was created for the planned Europa mission [Kim et al, in press]. The IESD design environment is meant to characterize the part of the radiation environment that poses the largest threat to the spacecraft with respect to internal charging. The environment was based off of electron data gathered by the Galileo spacecraft. Over the past year, the internal charging threat to several hardware components of the planned Europa Clipper spacecraft have been characterized using simulations and/or tests. The subject report documents one such test on Micro-D connectors.

Smithfield, Marianne↗

Determination of Average Burnup in AGR-3/4 Compacts 1-4 and 7-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined in one test train for irradiation in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011, and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both focused on obtaining data on fission product transport to support the improvement of modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and post-irradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite. These two goals were combined in the AGR-3/4 irradiation, which consisted of 12 independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. Two capsule types were used: a standard capsule and a so-called fuel body, in which the outer graphite ring included a floor and cap that fully enclosed the fuel. The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to provide data on fission product transport and release from the matrix and graphite at accident temperatures.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗