Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space flight software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Astrobee Free Flyers: Integrated and Tested. Ready for Launch!

As of March 2019, four Astrobee free-flying robots have been integrated, tested and shipped to NASA’s Johnson Space Center, Texas, ready to be launched to space. Two of these Astrobee units (Honey and Bumble) will be launched to the International Space Station (ISS) on April 17, 2019, on the Cygnus NG-11 (Northrop Grumman) cargo resupply spacecraft from the Mid-Atlantic Regional Spaceport (MARS) launch facility, at NASA's Wallops Flight Facility, in Virginia, while the third unit (Queen) will be launched in mid-July 2019, with the cargo resupply mission Space-X 18, from Cape Canaveral, at NASA’s Kennedy Space Center. The primary purpose of the Astrobee system is to provide an autonomous and flexible platform for research on zero-g free-flying robotics, with the ability to accommodate guest researchers looking to utilize the unique capabilities of this platform in the microgravity of low earth orbit, and to advance the state of the art of guest science software and research payloads, which range from gecko-inspired adhesives for perching on smooth surfaces, to augmented reality interfaces to help astronauts and robots work together effectively, to RFID reader, performing inventory of RFID tagged items inside the ISS. Astrobee will also serve utility functions, such as free-flying cameras to record video and provide assistance during astronaut activities, and as mobile sensor platforms to conduct surveys of the ISS. In this paper we will give an overview of the status of the Astrobee system, which includes the docking station already launched and mounted in the JAXA JEM module of the ISS, the Astrobee robots, the Astrobee robotic arms, the ground data system (GDS) and the development of the several guest science payloads.

Carlino, Roberto↗

GLAST and Suzaku: Study on Cosmic-Ray Acceleration And Interaction in the Cosmos

The Gamma-Ray Large Area Space Telescope (GLAST) is an international and multiagency mission scheduled for launch in the fall 2007. The Large Area Telescope (LAT), the primary instrument of the mission, will survey the high energy sky found to be very dynamic and surprisingly diverse by its predecessor the Energetic Gamma Ray Experiment Telescope (EGRET). GLAST-LAT will have a much improved sensitivity when compared with EGRET and extend the higher energy coverage to {approx} 300 GeV. The instrument is now mounted on the spacecraft and undergoing a suite of pre-flight tests. Data analysis software has been tried out by collaborators in two rounds of 'Data Challenges' using simulated observations including backgrounds. The instrument performance and observational data on selected sources presented here have been obtained through the Data Challenges in the collaborative efforts. There are features in the GLAST-LAT observation possibly unfamiliar to X-ray astronomers: (1) GLAST will operate mostly in the survey mode; (2) the foreground objects (gas, dust, and star-light) become gamma-ray sources; (3) multiple sources will be 'confused' because of the wide point-spread-function. The last two features will pose a challenge for analysis on extended Galactic sources such as supernova remnants and pulsar wind nebulae: multi-wavelength study with X-ray instruments like Suzaku and atmospheric Chrenkov telescopes will become essential to dig out the underlying physics.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

MarCO: Interplanetary Mission Development on a CubeSat Scale

Shortly after JPL’s Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) mission launches, separates, and commences its cruise phase, two CubeSats will deploy from the launch vehicle’s upper stage and begin independent flight to Mars (Fig. 1). During InSight’s entry, descent, and landing (EDL) sequence, these twin Mars Cube One (MarCO) spacecraft will fly 3,500 km above the Martian surface, recording and relaying InSight UHF radio data to the Deep Space Network (DSN) on Earth1. MarCO is a twin CubeSat mission developed by the NASA Jet Propulsion Laboratory (JPL) to accompany the InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) Mars mission lander. MarCO's primary mission objective is to launch with InSight and independently fly to Mars to serve as a communications relay during InSight's entry, descent, and landing (EDL) phase. MarCO represents a new type of deep space mission: CubeSats at Mars. Building on the development of JPL's first interplanetary CubeSat project, the Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment (INSPIRE), MarCO further refined the approach to hardware, software, and ground architecture development to solve the challenges of quickly building low-budget spacecraft to fly to Mars. The greatest constraint, beyond others typical of CubeSat missions, was time. The duration between MarCO's conception to completion of spacecraft assembly was less than two years - an unprecedented schedule for any planetary mission to date. Through necessity, MarCO has built on previous experience, procedures, systems, and development methodologies, defining a new niche for supporting larger primary missions. The MarCO spacecraft are poised to write a new chapter in deep space exploration. Originally slated to launch and reach Mars in 2016, the InSight mission schedule subsequently slipped to 2018. During the original landing of InSight, Earth would not be in view, and no orbiter around Mars would have been in position to both receive UHF EDL data and simultaneously relay it back to Earth. It was from this obstacle that MarCO was conceived. Regardless of any changes to InSight’s 2018 EDL configuration geometry, MarCO is still expected to fly and serve in the same capacity as originally designed: the first CubeSat mission to Mars. CubeSats have historically been firmly in the domain of universities and small companies. As first conceived, they served as a platform upon which to teach all aspects of the space mission lifecycle. JPL took on this mission type with Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment2 (INSPIRE), moving the concept into a new domain: deep space. Building from the INSPIRE platform and lessons learned, MarCO addressed new challenges in the domain of planetary missions: independent interplanetary flight and navigation, integration with a large-scale mission, long-distance and long-delay communication, short development time, and a small development team. Of these, the greatest constraint was schedule: only 18 months passed from conception of mission concept until delivery of fully assembled and tested flight hardware. Careful selection of mission team, along with extensive use of off-the-shelf equipment, and streamlining automated processes, was essential. This achievement represents the next step in the evolution of CubeSats beyond low-Earth orbit.

Werne, Thomas↗

The Electric Propulsion Interactions Code (EPIC): A Member of the NASA Space Environment and Effects Program (SEE) Toolset

Science Applications International Corporation is currently developing the Electric Propulsion Interactions Code, EPIC, as part of a project sponsored by the Space Environments and Effects Program at NASA Marshall Space Flight Center. Now in its second year of development, EPIC is an interactive computer toolset that allows the construction of a 3-D spacecraft model, and the assessment of a variety of interactions between its subsystems and the plume from an electric thruster. This paper reports on the progress of EPZC including the recently added ability to exchange results the NASA Charging Analyzer Program, Nascap-2k. The capability greatly enhances EPIC's range of applicability. Expansion of the toolset's various physics models proceeds in parallel with the overall development of the software. Also presented are recent upgrades of the elastic scattering algorithm in the electric propulsion Plume Tool. These upgrades are motivated by the need to assess the effects of elastically scattered ions on the SIC for ion beam energies that exceed loo0 eV. Such energy levels are expected in future high-power (>10 kW) ion propulsion systems empowered by nuclear sources.

Mikellides, Ioannis G.↗

The Wallops Flight Facility Rapid Response Range Operations Initiative

While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge becomes how can a launch site provide acceptably responsive mission services to a particular customer without dedicating extensive resources and while continuing to serve other projects? NASA's Wallops Flight Facility (WFF) is pursuing solutions to exactly this challenge. NASA, in partnership with the Virginia Commercial Space Flight Authority, has initiated the Rapid Response Range Operations Initiative (R3Ops). R3Ops is a multi-phased effort to incrementally establish and demonstrate increasingly responsive launch operations, with an ultimate goal of providing ELV-class services in a maximum of 7-10 days from initial notification routinely, and shorter schedules possible with committed resources. This target will be pursued within the reality of simultaneous concurrent programs, and ideally, largely independent of specialized flight system configurations. WFF has recently completed Phase 1 of R3Ops, an in-depth collection (through extensive expert interviews) and software modeling of individual steps by various range disciplines. This modeling is now being used to identify existing inefficiencies in current procedures, to identify bottlenecks, and show interdependencies. Existing practices are being tracked to provide a baseline to benchmark against as new procedures are implemented. This paper will describe in detail the philosophies behind WFF's R3Ops, the data collected and modeled in Phase 1, and strategies for meeting responsive launch requirements in a multi-user range environment planned for subsequent phases of this initiative.

Underwood, Bruce E.↗

Improvements to the Ionizing Radiation Risk Assessment Program for NASA Astronauts

To perform dosimetry and risk assessment, NASA collects astronaut ionizing radiation exposure data from space flight, medical imaging and therapy, aviation training activities and prior occupational exposure histories. Career risk of exposure induced death (REID) from radiation is limited to 3 percent at a 95 percent confidence level. The Radiation Health Office at Johnson Space Center (JSC) is implementing a program to integrate the gathering, storage, analysis and reporting of astronaut ionizing radiation dose and risk data and records. This work has several motivations, including more efficient analyses and greater flexibility in testing and adopting new methods for evaluating risks. The foundation for these improvements is a set of software tools called the Astronaut Radiation Exposure Analysis System (AREAS). AREAS is a series of MATLAB(Registered TradeMark)-based dose and risk analysis modules that interface with an enterprise level SQL Server database by means of a secure web service. It communicates with other JSC medical and space weather databases to maintain data integrity and consistency across systems. AREAS is part of a larger NASA Space Medicine effort, the Mission Medical Integration Strategy, with the goal of collecting accurate, high-quality and detailed astronaut health data, and then securely, timely and reliably presenting it to medical support personnel. The modular approach to the AREAS design accommodates past, current, and future sources of data from active and passive detectors, space radiation transport algorithms, computational phantoms and cancer risk models. Revisions of the cancer risk model, new radiation detection equipment and improved anthropomorphic computational phantoms can be incorporated. Notable hardware updates include the Radiation Environment Monitor (which uses Medipix technology to report real-time, on-board dosimetry measurements), an updated Tissue-Equivalent Proportional Counter, and the Southwest Research Institute Radiation Assessment Detector. Also, the University of Florida hybrid phantoms, which are flexible in morphometry and positioning, are being explored as alternatives to the current NASA computational phantoms.

Semones, E. J.↗

Facial Soft Tissue Measurement in Microgravity-induces Fluid Shifts

Fluid shifts are a well‐known phenomenon in microgravity, and one result is facial edema. Objective measurement of tissue thickness in a standardized location could provide a correlate with the severity of the fluid shift. Previous studies of forehead tissue thickness (TTf) suggest that when exposed to environments that cause fluid shifts, including hypergravity, head‐down tilt, and high‐altitude/lowpressure, TTf changes in a consistent and measurable fashion. However, the technique in past studies is not well described or standardized. The International Space Station (ISS) houses an ultrasound (US) system capable of accurate sub‐millimeter measurements of TTf. We undertook to measure TTf during long‐duration space flight using a new accurate, repeatable and transferable technique. Methods: In‐flight and post‐flight B‐mode ultrasound images of a single astronaut's facial soft tissues were obtained using a Vivid‐q US system with a 12L‐RS high‐frequency linear array probe (General Electric, USA). Strictly mid‐sagittal images were obtained involving the lower frontal bone, the nasofrontal angle, and the osseo‐cartilaginous junction below. Single images were chosen for comparison that contained identical views of the bony landmarks and identical acoustical interface between the probe and skin. Using Gingko CADx DICOM viewing software, soft tissue thickness was measured at a right angle to the most prominent point of the inferior frontal bone to the epidermis. Four independent thickness measurements were made. Conclusions: Forehead tissue thickness measurement by ultrasound in microgravity is feasible, and our data suggest a decrease in tissue thickness upon return from microgravity environment, which is likely related to the cessation of fluid shifts. Further study is warranted to standardize the technique with regard to the individual variability of the local anatomy in this area.

Marshburn, Thomas↗

Instrument Modeling Concepts for Tradespace Analysis of Satellite Constellations

Constellations are gaining popularity in government and commercial space-based missions for Earth Observation (EO) due to their risk tolerance and ability to improve observation sampling in space and time. NASA Goddard Space Flight Center (GSFC) is developing a pre-Phase A tool called Tradespace Analysis Tool for Constellations (TAT-C) to initiate constellation mission design. The tool will allow users to explore the tradespace between various performance, cost and risk metrics (as a function of their science mission) and select Pareto optimal architectures that meet their requirements. This paper will describe the concept of modeling the primary science instruments within TAT-C, using a radar as an example, but extendable to imagers, occulters and lidars. The modularity of TAT-C's software architecture allows for crisply defining the interface between TAT-C's user defined or internal variables and the payload variables. The described module will inform TAT-C users of payload-dependent performance differences among thousands of constellation architectures (e.g. revisit time of the sensor swath, differential signal to noise ratio (SNR), spatial resolution of measurements) and allow them to pick an appropriate constellation architecture for detailed development. The module may also inform operational decisions of satellite modes, based on ground optimization or onboard autonomy.

Nag, Sreeja↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Space Shuttle progress report

A status report on the development of the Space Shuttle system is presented, with emphasis on the system capability, the major objectives accomplished during the development period, the Orbital Flight Test program, and the STS-1 mission profile. The system incorporates virtually all of the characteristics and requirements initially established as design goals over a decade ago: both the system and the solid rocket booster are reusable; the orbiter, a delta wing vehicle, is capable of aerodynamic cross-range in excess of 1,100 nautical miles and has an approximate 4,000 nautical mile down-range capability; the flight control system and software provide various abort modes, and the orbiter crew compartment is designed for a shirt-sleeve environment; the main liquid fuel engines provide 470,000 pounds of thrust at vacuum, and the payload lift capacity is 65,000 pounds to a 150 nautical mile orbit.

Thompson, R. F.↗

Shuttle operational expectations

The results of orbital flight tests (OFT) of the Space Shuttle are reviewed, and modifications planned for upcoming operational flights are discussed. The performance of the solid rocket boosters, external tank, main engines, structural system, propulsion system, reaction control system, electric power system, heat rejection system, hydraulic system, avionics, and other systems is described and evaluated as generally highly satisfactory. Payload servicing and deployment were also successfully demonstrated by OFT. Additional facilities planned for the operational flights are briefly described, and improvements that will make the Challenger spacecraft lighter than Columbia, provide it with more thrust, and give it a larger payload are summarized. Some software modifications being introduced are also mentioned.

Abrahamson, J. A.↗

TDRSS Onboard Navigation System (TONS) flight qualification experiment

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing an operational Tracking and Data Relay Satellite (TDRS) System (TDRSS) Onboard Navigation System (TONS) to provide realtime, autonomous, high-accuracy navigation products to users of TDRSS. A TONS experiment was implemented on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, to flight qualify the TONS operational system using TDRSS forward-link communications services. This paper provides a detailed evaluation of the flight hardware, an ultrastable oscillator (USO) and Doppler extractor (DE) card in one of the TDRSS user transponders and the ground-based prototype flight software performance, based on the 1 year of TONS experiment operation. The TONS experiment results are used to project the expected performance of the TONS 1 operational system. TONS 1 processes Doppler data derived from scheduled forward-link S-band services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination and time maintenance. TONS 1 will be the prime navigation system on the Earth Observing System (EOS)-AM1 spacecraft, currently scheduled for launch in 1998. Inflight evaluation of the USO and DE short-term and long-term stability indicates that the performance is excellent. Analysis of the TONS prototype flight software performance indicates that realtime onboard position accuracies of better than 25 meters root-mean-square are achievable with one tracking contact every one to two orbits for the EP/EUVE 525-kilometer altitude, 28.5 degree inclination orbit. The success of the TONS experiment demonstrates the flight readiness of TONS to support the EOS-AM1 mission.

Gramling, C. J.↗

Portable Simulator for On-Board International Space Station Emergency Training

The crew on-board the International Space Station (ISS) have to be prepared for any possible emergency. The emergencies of most concern are a fire, depressurization or a toxic atmosphere. The crew members train on the ground before launch but also need to practice their emergency response skills while they are on orbit for 6 months. On-Board Training (OBT) events for emergency response proficiency used to require the crew and ground teams to use paper "scripts" that showed the path through the emergency procedures. This was not very realistic since the participants could read ahead and never deviate from this scripted path. The new OBT emergency simulator allows the crew to view dynamic information on an iPad only when it would become available during an event. The simulator interface allows the crew member to indicate hatch closures, don and doff masks, read pressures, and sample smoke or atmosphere levels. As the crew executes their actions using the on-board simulator, the ground teams are able to monitor those actions via ground display data flowing through the ISS Ku Band communication system which syncs the on-board simulator software with a ground simulator which is accessible in all the control centers. The OBT Working Group (OBT WG), led by the Chief Training Office (CTO) at Johnson Space center is a Multilateral working group with partners in Russia, Japan, Germany and U.S.A. The OBTWG worked together to create a simulator based on these principles: (a) Create a dynamic simulation that gives real-time data feedback; (b) Maintain real-time interface between Mission Control Centers and crew during OBTs; (c) Provide flexibility for decision making during drill execution; (d) Materially reduce Instructor and Flight Control Team man-hour costs involved with developing, updating, and maintaining emergency OBT cases/scenarios; and (e) Introduce an element of surprise to emergency scenarios so the team can't tell the outcome of the case by reading ahead in a paper script. This paper details some of the background as the project evolved with the International Partners. It also provides more details on how the simulator information for the crew is also shared with the ground teams. Finally, the paper will discuss how this remote simulator concept can be useful for future, longer term space missions.

Bolt, Kathy↗

Orion Optical Navigation Progress Toward Exploration: Mission 1

Optical navigation of human spacecraft was proposed on Gemini and implemented successfully on Apollo as a means of autonomously operating the vehicle in the event of lost communication with controllers on Earth. It shares a history with the "method of lunar distances" that was used in the 18th century and gained some notoriety after its use by Captain James Cook during his 1768 Pacific voyage of the HMS Endeavor. The Orion emergency return system utilizing optical navigation has matured in design over the last several years, and is currently undergoing the final implementation and test phase in preparation for Exploration Mission 1 (EM-1) in 2019. The software development is being worked as a Government Furnished Equipment (GFE) project delivered as an application within the Core Flight Software of the Orion camera controller module. The mathematical formulation behind the initial ellipse fit in the image processing is detailed in Christian. The non-linear least squares refinement then follows the technique of Mortari as an estimation process of the planetary limb using the sigmoid function. The Orion optical navigation system uses a body fixed camera, a decision that was driven by mass and mechanism constraints. The general concept of operations involves a 2-hour pass once every 24 hours, with passes specifically placed before all maneuvers to supply accurate navigation information to guidance and targeting. The pass lengths are limited by thermal constraints on the vehicle since the OpNav attitude generally deviates from the thermally stable tail-to-sun attitude maintained during the rest of the orbit coast phase. Calibration is scheduled prior to every pass due to the unknown nature of thermal effects on the lens distortion and the mounting platform deformations between the camera and star trackers. The calibration technique is described in detail by Christian, et al. and simultaneously estimates the Brown-Conrady coefficients and the Star Tracker/Camera interlock angles. Accurate attitude information is provided by the star trackers during each pass. Figure 1 shows the various phases of lunar return navigation when the vehicle is in autonomous operation with lost ground communication. The midcourse maneuvers are placed to control the entry interface conditions to the desired corridor for safe landing. The general form of optical navigation on Orion is where still images of the Moon or Earth are processed to find the apparent angular diameter and centroid in the camera focal plane. This raw data is transformed into range and bearing angle measurements using planetary data and precise star tracker inertial attitude. The measurements are then sent to the main flight computer's Kalman filter to update the onboard state vector. The images are, of course, collected over an arc to converge the state and estimate velocity. The same basic technique was used by Apollo to satisfy loss-of-comm, but Apollo used manual crew sightings with a vehicle-integral sextant instead of autonomously processing optical imagery. The software development is past its Critical Design Review, and is progressing through test and certification for human rating. In support of this, a hardware-in-the-loop test rig was developed in the Johnson Space Center Electro-Optics Lab to exercise the OpNav system prior to integrated testing on the Orion vehicle. Figure 2 shows the rig, which the test team has dubbed OCILOT (Orion Camera In the Loop Optical Testbed). Analysis performed to date shows a delivery that satisfies an allowable entry corridor as shown in Figure 3.

Holt, Greg N.↗

HTML 5 Displays for On-Board Flight Systems

During my Internship at NASA in the summer of 2016, I was assigned to a project which dealt with developing a web-server that would display telemetry and other system data using HTML 5, JavaScript, and CSS. By doing this, it would be possible to view the data across a variety of screen sizes, and establish a standard that could be used to simplify communication and software development between NASA and other countries. Utilizing a web- approach allowed us to add in more functionality, as well as make the displays more aesthetically pleasing for the users. When I was assigned to this project my main task was to first establish communication with the current display server. This display server would output data from the on-board systems in XML format. Once communication was established I was then asked to create a dynamic telemetry table web page that would update its header and change as new information came in. After this was completed, certain minor functionalities were added to the table such as a hide column and filter by system option. This was more for the purpose of making the table more useful for the users, as they can now filter and view relevant data. Finally my last task was to create a graphical system display for all the systems on the space craft. This was by far the most challenging part of my internship as finding a JavaScript library that was both free and contained useful functions to assist me in my task was difficult. In the end I was able to use the JointJs library and accomplish the task. With the help of my mentor and the HIVE lab team, we were able to establish stable communication with the display server. We also succeeded in creating a fully dynamic telemetry table and in developing a graphical system display for the advanced modular power system. Working in JSC for this internship has taught me a lot about coding in JavaScript and HTML 5. I was also introduced to the concept of developing software as a team, and exposed to the different types of programs that are used to simplify team coding such as GitLab. While in JSC, I took full advantage of and attended the lectures that were held here on site. I learned a lot about what it is NASA does and about the interesting projects that are conducted here. One of the lectures I attended was about the selection process and the criteria that is used to select future astronauts for flight missions. This truly had an impact on my future plans as it showed me that this path was a viable option for me. After this internship I plan on completing my undergraduate course work and plan to move on for a masters degree. However, during the time in which I will be completing my masters course work, I would like to apply for the NASA pathways graduate program and, if I am accepted, eventually move on to being a full time civil servant. Working in NASA has not only been enjoyable, but full of information and great experiences that have motivated me to seek a full time employment here in the near future.

Silva, Chandika↗

NASA Automated Rendezvous and Capture Review. Executive summary

In support of the Cargo Transfer Vehicle (CTV) Definition Studies in FY-92, the Advanced Program Development division of the Office of Space Flight at NASA Headquarters conducted an evaluation and review of the United States capabilities and state-of-the-art in Automated Rendezvous and Capture (AR&C). This review was held in Williamsburg, Virginia on 19-21 Nov. 1991 and included over 120 attendees from U.S. government organizations, industries, and universities. One hundred abstracts were submitted to the organizing committee for consideration. Forty-two were selected for presentation. The review was structured to include five technical sessions. Forty-two papers addressed topics in the five categories below: (1) hardware systems and components; (2) software systems; (3) integrated systems; (4) operations; and (5) supporting infrastructure.

Source record↗

Development of Secondary Archive System at Goddard Space Flight Center Version 0 Distributed Active Archive Center

The Goddard Space Flight Center (GSFC) version 0 Distributed Active Archive Center (DAAC) has been developed to support existing and pre Earth Observing System (EOS) Earth science datasets, facilitate the scientific research, and test EOS data and information system (EOSDIS) concepts. To ensure that no data is ever lost, each product received at GSFC DAAC is archived on two different media, VHS and digital linear tape (DLT). The first copy is made on VHS tape and is under the control of UniTree. The second and third copies are made to DLT and VHS media under a custom built software package named 'Archer'. While Archer provides only a subset of the functions available with commercial software like UniTree, it supports migration between near-line and off-line media and offers much greater performance and flexibility to satisfy the specific needs of a data center. Archer is specifically designed to maximize total system throughput, rather than focusing on the turn-around time for individual files. The commercial off the shelf software (COTS) hierarchical storage management (HSM) products evaluated were mainly concerned with transparent, interactive, file access to the end-user, rather than a batch-orientated, optimizable (based on known data file characteristics) data archive and retrieval system. This is critical to the distribution requirements of the GSFC DAAC where orders for 5000 or more files at a time are received. Archer has the ability to queue many thousands of file requests and to sort these requests into internal processing schedules that optimize overall throughput. Specifically, mount and dismount, tape load and unload cycles, and tape motion are minimized. This feature did not seem to be available in many COTS pacages. Archer also uses a generic tar tape format that allows tapes to be read by many different systems rather than the proprietary format found in most COTS packages. This paper discusses some of the specific requirements at GSFC DAAC, the motivations for implementing the Archer system, and presents a discussion of the Archer design that resulted.

Sherman, Mark↗