Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mock”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

A Prototype Dual Robot System to Perform Ultrasonic and Visual Inspection for the Bottom of Double-Shell Tanks - 18624

Up to this point, ultrasonic inspection-based condition data has only been available for double-shell tank (DST) sidewalls because direct inspection access to the primary tank bottom is limited to vent duct channels in an insulating refractory pad that the primary tank rests on. Probe access through the air slot would provide the opportunity to get information about the condition of the bottom of the primary tank, but it is a challenge to deploy a crawling robot that is capable of performing nondestructive ultrasonic and visual inspection through confined air slots. As such, a conceptual prototype of a deployable inspection robot system to enable ultrasonic and visual inspection for DST base through ventilation ducts was designed and fabricated. This prototype dual robot system consisting of the AnnulusBot and the MouseBot can be integrated with nondestructive evaluation (NDE) sensors to inspect and examine the physical properties of the underside of DSTs to enable status assessment. The AnnulusBot was designed to carry the MouseBot and to be deployed to the annulus space through a riser. To deploy the MouseBot to every ventilation channel in the annulus, the arm consisting of a boom and a forearm was used to place the MouseBot on the underside of the tank. The AnnulusBot used segmented wheels enable to traverse pipes and other potential obstacles. The cable management system utilized motorized wheels to feed the cable into the ventilation channel. This would reduce the amount of work that the MouseBot would have to do during inspection. This feeding mechanism would also be used to retrieve the MouseBot at the end of its inspection. Additionally, if the MouseBot fails, this mechanism would be used for retrieval. Once deployed, the MouseBot navigates to the center of the tank via the air ventilation channel beneath the inner shell (the primary tank) while inspecting the space. The MouseBot is then retrieved from the channel by a combination of its own drive power and the AnnulusBot retracting the attached umbilical cord. Compare with the AnnulusBot, the physical dimensional limitations of the MouseBot were a greater challenge. As the surface state of the concrete of the air channels could have variable texture, and may contain debris, it was decided not to travel along this surface. The ceiling of these channels is carbon steel and can be utilized throughout the channel. To use this travel surface, magnetic wheels were employed. A foreseeable problem with the use of magnets on this surface, is that they would preclude the use of eddy currents sensors. However, other technologies like ultrasonic technology sensors should be unaffected. Laboratory scale test was performed on a mock-up single wedge of the refractory pad to evaluate maneuverability of the MouseBot. The electronic components for the prototype would work in the ranges of 150-185 deg. F (65.6-85 deg. C). Both the AnnulusBot and MouseBot will be subject to constant radiation. All major printed circuit board (PCB) microcontroller components were designed to be situated outside of the annulus space and inside the main control panel to avoid radiation-induced failure. As future work, electronic components including the Arduinos that used Atmel commercial microcontrollers will be replaced with the high temperature rated Atmel microcontrollers so that the robots can be operated reliably at ambient temperatures up to 200 deg. F (93.3 deg. C). In addition, the robots will be service life tested to evaluate performance at elevated temperature and under gamma irradiation. (authors)

42 ENGINEERING↗

Feedback from Reactor Internals Segmentation Projects in Europe - 19141

Westinghouse has accumulated significant know-how in the reactor dismantling activities. The approach to internals segmentation and packaging has been continuously enhanced by incorporating lessons learned and best practices into each successive project. Building on the most recent successful experience at Jose Cabrera in Spain, Westinghouse has won several major awards with 13 reactors currently under contract at Chooz A (France), Barsebaeck 1-2 (Sweden), Bohunice V1 (two units in Slovakia), Neckarwestheim I, Philippsburg 1, and more recently at Unterweser, Grafenrheinfeld, Grohnde, Isar 1, Isar 2, Brokdorf (Germany). The primary challenges of a segmentation and packaging project are to separate the highly activated materials from the less-activated materials and package them into appropriate containers for disposal. The choice of the optimum cutting technology is important for a successful project implementation and depends on some specific constraints like disposal costs, project schedule, available work areas or safety. The selected technology for all recent Westinghouse projects is mechanical cutting with different types of designed cutting equipment (hydraulic shears, band saw, disc saw). All segmentation tools are remotely controlled due to the high radiation levels and ALARA and personal safety is the number one priority during the challenging site work. Training on mock-ups in the Westinghouse facility before going to the site is a very important step in order to optimize all procedures and thereby maximize the efficiency on site in order to finalize the project on time or before. The work covers the segmentation of reactor internals but also, in some cases, some replaced components during plant operation that were stored in the spent fuel pool. The cutting equipment proved to be reliable and flexible which is very valuable for the execution of such a challenging project. The Barsebaeck Unit 2 site work has been finished end of October 2017 and its lessons learned are taken into consideration for future activities. Site work is currently on-going simultaneously at Chooz A, Barsebaeck 1, Neckarwestheim I and Philippsburg 1. This paper will provide an overview of all these on-going segmentation projects and will focus on feedback from the first projects executed on site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiation Leakage and the Precision of Characterizing Nuclear Material Using Calorimetric Assay - 19233

For measuring a waste drum containing multi-nuclide radioactive material calorimetric assay is often combined with gamma ray and neutron measurements. To reduce the methodological uncertainties of the inventory determination in a multi-nuclide matrix, the escaping radiation must be quantized as much as the encapsulated gamma-rays and α-, β-, n- particles depositing radiological heat inside the drum. To differentiate the possible variety of heat sources in a radioactive waste drum, Monte Carlo simulations are utilized resembling the waste drum and the calorimeter in both, their geometries as well as the material compositions. MCNP6-based numerical imaging of the Large Volume Calorimeter (LVC) designed by KEP Nuclear(France) allows simulating various scenarios for different particles types, energies and source locations to accompany and support the interpretation of calorimetric KEP-LVC measurements anticipated within the CHANCE project. For the analyses, the particle flux and energy deposition in each layer of the calorimeter are displayed. The results yield that a significant part of the emitted radiation leaves the system and does not contribute to the heat deposited inside the drum. As an example, the particle flux study of a 200 L mock-up drum placed inside the KEP-LVC calorimeter is discussed. A tally 4 with mesh option for both gamma and neutrons up to 5 MeV simulates the mean flux in each cell and for various source location and source distribution patterns. The expected energy deposition is cumulated for each layer, and over the whole energy range it reveals that actually a small but well known fraction of particles escapes the LVC calorimeter. This makes it a very suitable apparatus for the anticipated experiments on large and heterogeneous waste drums. The results suggest that the most interesting cases would be polyethylene, bitumen and concrete matrices [3, 5]. However, it must be kept in mind that the high-energy part of the gamma and neutron radiation flux can reach the reference chamber of the calorimeter and deposit some energy there, which may compromise the calibration and cause double-bias. The simulations showed that, depending on source location and power, neutron and high-energy gamma radiation leakage can influence the heat measurements differently. In general, part of the simulation results suggest that for waste drums with a high emission rate the accuracy of calorimetric assay can be decreased due to radiation escape. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stabilization of Residual Contamination with Alternative Materials - 19404

Since 2015, Savannah River National Laboratory (SRNL) in conjunction with Florida International University (FIU) have been investigating the applicability of intumescent coatings as radiological contamination fixatives for stabilization of residual materials after decontamination efforts have concluded. Intumescent coatings are designed to prevent heat transfer to a protected substrate and are typically used in both the aerospace industry to protect components from thermal shock and in building design to protect building joints that may fail in the event of a fire. For this work, these materials are examined for their ability to reduce worker risk by fixating residual contamination and lower the impact of a release in a scenario that breaches containment of a contaminated building and subsequently induces a large-scale fire by crediting their fire-retardant attributes. Initial studies of intumescent coatings and commercial fixatives included performance in direct flame, varied environmental conditions (20-110 F or -6.67 C, 10-95% relative humidity), adhesion studies to stainless steel after curing in varied environmental conditions, and radiological exposure. Of all the materials tested, many were found to be inadequate in one or more of these areas. These materials failed in one or more of three characteristic ways: 1) through delamination at reduced temperatures (≤40 F or 4.44 C) or from even moderate handling, 2) melting off the substrate at elevated temperatures (≥90 F or 32.22 C), 3) proving to be flammable and promote smoke propagation. Failure in these ways results in the potential for a subsequent release of the fixated contamination in the event of water presence/absence or direct flame. Using these results as a platform for the best in class identified material that did not experience failure in any of these tests, SRNL and FIU targeted the plutonium-238 contaminated hot cells within Savannah River Site (SRS) Building 235-F as a characteristic test bed to benchmark an intumescent coating used as a contaminant fixative. Through discussion with the SRS 235-F Risk Reduction personnel, appropriate hazards and performance metrics were discussed and a cold demonstration was performed in a hot cell mockup located at SRS. The application methods were proven functional in the cold mock up, and these intumescent coatings were subsequently utilized in the Savannah River Site Building 235-F's Plutonium Fuel Form (PuFF) Facility to aid in stabilization of plutonium-238 in both a contaminated hot cell and Entry Hood in September 2018. Presented in this work is the overview of the application process, associated working considerations for introduction of equipment and materials into the facility, lessons learned, and lifetime monitoring data to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Collection of Radioactive Waste at Chalk River Laboratories - 19425

Remote handling of radioactive waste may be required during a variety of decommissioning and waste management activities. Based on the level of radiation and complexity of the application, the design, development and implementation of novel electromechanical systems can offer optimal solutions. At Canadian Nuclear Laboratories, current decommissioning and waste management projects routinely employ solutions including innovative and unique tools, test rigs, mock-ups, robotics, unmanned aerial vehicles, and automated systems. CNL ability to integrate an experienced team from a wide range of technical areas make such solutions possible. In this paper, we present an example of remotely controlled systems to collect highly radioactive waste materials from storage tanks at the Chalk River Laboratories. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Canada's Plan for the Long-Term Management of Used Nuclear Fuel - 19537

In June 2007, the Government of Canada approved the Nuclear Waste Management Organisation's (NWMO) recommended Adaptive Phased Management (APM) approach for the long-term management of Canada's used nuclear fuel. As per this approach, used nuclear fuel will be isolated and contained in a centralized Deep Geological Repository (DGR) located in a stable crystalline or sedimentary rock formation at a nominal depth of 500 metres below ground surface. The DGR concept contains multiple barriers to safely contain and isolate the used nuclear fuel over the long-term. The used nuclear fuel bundles will be encapsulated in a copper-coated steel Used Fuel Container (UFC) and pre-packaged in a bentonite clay buffer box above ground. The UFC and bentonite clay buffer box assemblies will then be emplaced in excavated tunnel openings and sealed with clay-based backfill material and room seals, which completes the primary Engineered Barrier System (EBS). Since 2011, the NWMO has executed a design-development program to validate the design and manufacturing technologies for the EBS. Currently, the NWMO are executing a proof test program for the EBS for the purpose of demonstrating serial production. As the prototypes are produced, they will be subject to full-scale in-room emplacement trials within a custom-built above-ground mock emplacement room. The proof test program will be executed using APM reference designs, materials, processes, and procedures. An overview of this program is discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Semi-autonomous Miniature Rover for Inspection of Double Shell Tank Floors - 19575

Leaks in the primary liner of double-shell tank (DST) 241-AY-102 at Hanford have prompted the need for the development of inspection tools that are able to access confined spaces around and underneath the tanks. Last year, Florida International University (FIU) has continued to improve inspection tools that were developed in the previous years, to ensure that the resultant tools are able to overcome the challenges posed by the DSTs. Experimental testing conducted last year at the full-scale sectional mock-up of the DST's refractory slots revealed some shortcomings of the miniature rover, particularly in traversing over weld seams of different heights. The weld seams are the results of welded steel plate-joints for the DST. It was advised by the site engineers that the weld seams height could range from 6.35 mm - 9.525 mm (1/4 to 3/8 inches), and with 12.7 mm (1/2 inches) width. As the rover traverses over a weld seam, the gap between the rover's magnets and tank surface increases, causing the adhesive force to drop. The rover loses its surface contact if this adhesive force drops below its weight, jeopardizing the inspection tasks. In this paper, we present the numerical studies to calculate the minimum magnetic force required for the miniature rover to traverse over weld seams with different heights and the corresponding modifications to the rover design. Initial bench scale tests were conducted using a steel bar with 5 welds of varying heights. The testing validated the results from the simulation studies and established the rover's capability in traversing weld seams. Another challenge for the miniature rover is the use of a joystick or keypad for manual control. Utilizing these controls will likely be difficult for the operators due to the tight channels underneath the tank. Having a semi-autonomous navigational capability would alleviate the complexity of the inspection tasks and allow the operator to focus on the channel inspection. The goal is to implement lane-keeping capability, akin to that of a driverless car, for the inspection tool, so that it will maintain its relative position with respect to the wall of the channels. Am image processing pipeline has been developed using both the Robot Operating System (ROS) and OpenCV to process the image stream coming from the onboard camera, for the purpose of lane identification. Additionally, a PID controller has been implemented to navigate the miniature rover along the central location of the detected lane, while allowing the operator to control the tool's forward and backward motion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval of Transuranic Drums with Deflagration to Detonation Potential from a Vault at the Oak Ridge National Laboratory - 20207

During the final phase of a long-term project, a total of 80 TRU waste drums at ORNL have been retrieved from a below-grade storage vault in which they have remained untouched for about 25 years. The drums, which house material generated from past ORNL operations, are now stored and ready for eventual transfer to the Transuranic Waste Processing Center, located on Highway 95 in Oak Ridge. The Transuranic Waste Processing Center will process and ship the drums to WIPP in Carlsbad, New Mexico, for disposal. Workers lifted the drums one-by-one from the underground storage vault with a 110-ton crane over a one-week period in October 2017. Although the physical work was performed in one week, years of detailed planning preceded the fieldwork. A key obstacle needed to be overcome before the project could safely proceed. This obstacle involved the need to ensure controls were developed for the Deflagration to Detonation Transition (DDT) potential. DDT refers to a phenomenon in ignitable mixtures of a flammable gas and air (or oxygen) when a sudden transition takes place from a deflagration type of combustion to a detonation type of explosion. Basically, these drums, under certain circumstances, have a potential to detonate and overpressurize. Extensive analysis of the drums verified that detonation, while unlikely, was possible. Of the total 103 drums that were retrieved or moved in preparation for retrieval, 18 had DDT potential. Extensive security requirements were also necessary, due to the nature of the material, and this added another layer of complexity to the fieldwork. Prior to retrieving the drums from the underground storage vault, space needed to be made for them within the various above-grade facilities. Inventory and security requirements dictated what could be stored where, and the first step of the field work involved a number of drum movements in preparation for storage of the newly retrieved drums. This effort involved moving 21 drums already in the storage area to facilitate the addition of the newly retrieved ones. The retrieval project required a total of 107 critical lifts using the 110-ton crane, under 3 critical lift plans. The TRU waste storage facility is a Category 2 Nuclear Facility and is managed under an extensive Documented Safety Analysis. The TRU retrieval project was conducted in accordance with DOE Order 425.1D and included three Implementation Verification Reviews, two Management Assessments, one Readiness Assessment, and seven mock-ups in preparation for the field work. Despite being stored for 25 years, the drums were in good shape due to the integrity of the facilities where the drums were stored. Of the 80 drums that were retrieved, 12 were placed in special containers called 'overpacks' based on their content. The drums were removed safely and without incident, thanks to a lot of preparation and the efforts of a highly skilled team. Lessons learned through the DDT control development and the drum retrieval and overpacking process could be beneficial to others having to manage similar drums of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification and Quantification of Beta-Emitters in Waste Packages by Segmented Gamma-Scanning - 20114

A commonly applied method for the non-destructive characterization of the radioactive inventory of waste packages (e.g. 200-l drums) is segmented gamma-scanning. The gamma-emitting inventory is identified via their characteristic lines in the measured spectra. The corresponding net peak areas allow for quantification applying appropriate models. The identification and quantification of beta-emitters present in the waste package require further evaluation. While some of them emit gamma-rays, too, which can be used for identification and quantification, pure beta-emitters contribute to the gamma-spectra only by their Bremsstrahlung-spectra. {sup 32}P, {sup 90}Sr and {sup 90}Y are typical representatives of these isotopes. A method is developed for identification and quantification of these pure beta-emitters in radioactive waste packages. Origin of the procedure is the evaluation of the measured gamma-spectrum. After the identification of all lines present in the spectrum (characteristic gamma-lines, single- and double-escape-lines, X-ray-lines, annihilation peak etc.) this information is used together with calibration data of the detection system and further a-priori information like matrix composition, cross-section data from databases etc. to simulate the spectra without the Bremsstrahlung-components by an appropriate method. This may be Monte Carlo simulations or, like in our case, a computer code taking into account mathematical descriptions of the physical effects like photo effect, (multiple) Compton scattering, backscattering etc. and the attenuation effects of the waste matrix. In any case, the resulting spectrum must simulate the real spectrum without its Bremsstrahlung-component as good as possible. Subtracting the simulated from the measured spectrum then results in the Bremsstrahlung-components caused by the beta-emitters. Prior to evaluation, a set of Bremsstrahlung-spectra is calculated and stored for different beta-emitters in different matrices using the Bethe-Heitler equation. This data set can be extended for new conditions, if necessary, and is allocated in a data base for future application. Applying a non-linear optimization using the generalized reduced gradient method for comparing the calculated with the derived Bremsstrahlung-spectra results in the identification of the beta-emitter and a factor, which is proportional to its activity. The proportionality is determined by previous calibration measurements. The application of the method is demonstrated by measurements on a 200-l mock-up drum and a real waste package. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Investigation of Process Emissions during Thermal Cutting of Clad Metals from the Nuclear Sector - 20183

Typically, reactor pressure vessels as well as steam generators comprising low alloyed steel with a cladding of stainless steel. Recently the permissible values for Cr (VI) in the air of the working areas have been reduced in Germany from 100 μg/m{sup 3} to 1 μg/m{sup 3} air. This results in the danger that even with low-alloy steel with claddings these limit values would be exceeded when using flame cutting technologies. In order to ensure compliance with the permissible limit values, exhaust gas systems with gas cleaning measures are provided. The process emission test shall replace the assumptions required for the design of these systems with measured values. NUKEM Technologies Engineering Services GmbH (NUKEM) has chosen autogenous flame cutting as an example of a thermal cutting system for process emission testing, as there are no proven values in the literature for the Cr (VI) and NiOx emissions produced. The autogenous flame cutting can be used for a variety of cutting tasks within decommissioning projects. In order to simulate the material to be cut, mock ups were generated and cut from information about the material specification for the reactor pressure vessel from existing nuclear power plants including possible claddings. The cutting length needed for analysis in the test will be maximum 100 mm. The airborne emissions from the thermal cutting process will be captured and analyzed as follows: - Dust emission: The generated particles will be collected by a hood equipped with strong suction device and suitable filter elements. The resulting filter is gravimetrically measured before and after the tests. - Particle Size Distribution: The airborne particle size distribution measurement will result in figures for the size and number of particles arising from the thermal cutting process. - Gas Analysis: The gas analysis enables the determination of e.g. CO{sub 2}, CO, O{sub 3}, NO, NO{sub 2}. - Cr (VI) and NiOx Analysis: For the Cr (VI) and NiOx analysis, samples of the filter residue will be taken. As a result Cr (VI) in relation to total Cr as well as the Ni content will be determined by ICP-optically emission spectroscopy and put in relation to the total dust amount. The process emissions test itself as well as the necessary gas analyses and spectroscopic analyses were carried out at the Institute of Materials Science (IW) of Leibniz Universitaet Hannover (LUH). The results of the process emission tests are used to confirm the design of the gas cleaning systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Problematic Reactive Metal Wastes Using the GeoMelt{sup R} In-Container Vitrification (ICV{sup TM}) Process - 20326

Decommissioning of sodium-cooled reactors and fast reactor technologies has generated a number of reactive metal waste configurations that are problematic to treat and typically lack cost effective treatment methods and disposition options. As a result, Veolia Nuclear Solutions, under contract with Idaho National Laboratory (owned by the U.S. Department of Energy and managed and operated by Battelle Energy Alliance, LLC) demonstrated its GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} technology to safely convert sodium metal to a non-reactive vitrified oxide form. The demonstration project, supported by glass formulation and crucible testing, consisted of a series of ICV{sup TM} melts that processed elemental sodium into stable non-reactive glass. INL is currently implementing GeoMelt{sup R} technology as a means to safely and reliably convert radioactive reactive metal residues that contaminate sodium cooled reactor components into waste forms that comply with existing disposition pathways. Reactive metal wastes require treatment in order to remove the Resource Conservation and Recovery Act (RCRA) reactivity and ignitability characteristics to comply with land disposal restrictions. GeoMelt{sup R}, which is an alternative to other potential treatment approaches, provides a robust approach that chemically converts the reactive metals to an inert oxide while also immobilizing radionuclides in a vitrified waste form with durability equal to or better than vitrified nuclear fuel reprocessing wastes (very robust and inert waste forms). Most other treatment approaches generate hydrogen gas which is problematic. In 2016, Veolia Nuclear Solutions first demonstrated the effectiveness of the GeoMelt{sup R} ICV{sup TM} process in deactivating reactive sodium metal. Crucible, bench-scale, and engineering-scale demonstrations were conducted on several surrogate waste configurations with various ratios of sodium metal and glass formers. Each ratio and configuration demonstrated complete deactivation of the surrogate sodium metal. Follow-on work in 2017 demonstrated the deactivation of reactive sodium by GeoMelt{sup R} ICV{sup TM} at a higher waste loading relative to previously demonstrated work performed in 2016; the higher waste loading optimized glass chemistry while enhancing the economical full-scale treatment of reactive metals. Additionally, follow-on demonstration testing in 2018 and 2019 focused on more complex shapes and other reactive-metals (mocked up Experimental Breeder Reactor II [EBR-II] subassembly, sodium filled heat exchanger, and a can containing sodium potassium alloy) which were all performed at engineering scale. Veolia Nuclear Solutions designed, installed, and commissioned in September 2018, at Perma-Fix Northwest in Richland Washington, a 10-metric ton full-scale GeoMelt unit (GeoMelt{sup R} Richland) for the treatment of reactive metal wastes. As of September 2019, over 900 55-gallon drums containing a total of around 3,500 lb of sodium with low levels of radioactivity have been treated at GeoMelt{sup R} Richland, with resulting glass monoliths disposed at the Nevada National Security Site (NNSS). A full-scale radiological demonstration melt on an actual EBR-II subassembly has also been performed using the full-scale melter in 2019. The GeoMelt{sup R} technology is a proven radioactive waste treatment technology capable of immobilizing radioactive wastes, including bulk rubble such as drums and other steel vessels usually without pretreatment. Utilizing the GeoMelt{sup R} technology to treat reactive metals eliminates pretreatment steps resulting from having to separate the reactive metal from steel containers or jackets as GeoMelt{sup R} can easily operate at temperatures sufficient to melt the steel and expose the reactive metal for treatment. Eliminating handling steps of reactive metals is a significant safety advantage since reactive metals are pyrophoric. The results generated as a part of the 2018-2019 demonstration program are presented in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Remote Cutting Tools for use at ATR - 20438

As a result of years of operations of the Advanced Test Reactor (ATR) at the Idaho National Lab (INL), the ATR canal has become congested due to the storage of materials including waste consisting of highly irradiated remote handled (RH) metals. In order to support its continuing nuclear mission the ATR requires canal space to support fuel storage and future core internal change out (CIC) components. INL staff determined that the canal must be cleaned out and waste removed to efficiently utilize the valuable canal floor space. It was determined that a methodology for processing, packaging, characterizing, and removing current and future irradiated hardware from the ATR canal is needed. Orano Federal Services (OFS) and its subcontractor Babcock Services Inc. (BSI) were selected to provide remote tooling in order to safely and efficiently size reduce the material currently stored in the ATR canal. INL developed detailed requirements that established the design and performance requirements for the tooling. Orano TN and BSI had recently successfully completed similar tasks in clearing highly activated materials from spent fuel pools and canals at commercial nuclear plants. That experience directly translated into a proven approach that could be used at the ATR thereby saving time and money and lowering risks. Based on BSI's demonstrated proficiency in the design and deployment of remote size reduction specialty tooling at comparable commercial facilities, Orano Federal Services was confident that a solution to INL's requirements could be delivered. The tooling had to be designed to be compatible with the operational requirements of the ATR canal as well as the functionality needed by the facility operators that will use the equipment. Some of the major design requirements and functions of the equipment included remote operations, capability to shear highly irradiated sections of aluminum and steel tubing, pipe, and components ranging in size from 0.6 cm to 16.5 cm diameter into 1.5 m -1.8 m lengths, utilizing buoyancy compensation to assist with underwater operations, and use commercially available existing technology and components as much as practical. The design team evaluated and selected commercially available equipment that could be modified to meet the design and performance specifications. In addition, a waste sizing table (WST) was designed and fabricated to further ensure the size reduction equipment would perform as expected and give the facility operators a stable and usable remote, underwater work platform. After successful development of the tooling, a mock up test and operator training was conducted to ensure the tooling performed as expected and met the requirements of INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Phase Neutronic and Thermal Analyses for the LEU Conversion of the Transient Reactor Test Facility (TREAT)

The Transient Reactor Test Facility (TREAT) is an experimental reactor designed for transient testing of nuclear reactor fuels and other materials. TREAT is located at the Idaho National Laboratory (INL). It was operated from 1959 until 1994, when it was placed on nonoperational standby. Preparations for the restart of TREAT are now underway. Simultaneously, work is being performed to support the conversion of TREAT from its current high enriched uranium (HEU) fuel to low enriched uranium (LEU, defined as uranium with less than 20% {sup 235}U) fuel, under the support of the Department of Energy (DOE) National Nuclear Security Administration (NNSA) Material Management and Minimization (M{sup 3}) reactor conversion program. Following the pre-conceptual phase of the TREAT conversion project (which included assessments of conversion feasibility, including LEU fuel element fabrication feasibility), conceptual phase work was performed to evaluate potential LEU fuel element designs for TREAT. Simultaneously, activities including scale-up development work for fuel fabrication and mock-up element production were performed by the INL Fuel Engineering and Design (FED) team. Utilizing the lessons learned in the analysis and fabrication work, an LEU conceptual design description was collaboratively established and evaluated in detail. A summary of this work and corresponding example results are presented here. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experimental Study of Molten Metallic Fuel Relocation in Sodium-Filled Fuel Structures

The Prototype Generation-IV Sodium-cooled Fast Reactor (PGSFR) is being developed by Korea Atomic Energy Research Institute (KAERI). While their design incorporates inherent safety features demonstrated in the landmark Shutdown Heat Removal Test (SHRT) conducted at EBR-II including a large pool configuration and uranium alloy fuel, it is still necessary to evaluate metal fuel relocation and theirs consequences in case of postulated core disruptive accidents. Extensive data regarding fuel relocation in sodium from both in-pile and out-of-pile tests were obtained for oxide fuels in the 1960's - 1970's, while few studies of metallic fuel behavior were performed because of concerns that metallic fuel could not achieve high burnup due to the irradiation induced swelling problem. Following new metal fuel design development that mitigated the swelling problem, experiments regarding interaction of molten metal fuels and liquid sodium have been conducted by several researchers. Most studies that were conducted using metal simulants in various liquids concluded that the molten metals were heavily fragmented after liquid contact and the dominant factors governing the fragmentation were superheating and latent heat of fusion of the molten metal fuel. Gabor et al. conducted experiments using kilogram quantities of various molten uranium alloys in an open sodium pool configuration. They found that the metal fuel fragments were basically in forms of filaments and sheets with a high bed voidage in the order of 0.9. Their calculation indicated that the debris beds formed by relocated metal fuels in an open sodium pool would be largely coolable by conduction heat transfer; and even if deep beds were to form, convective heat transfer and boiling heat transfer could preclude further melt penetration. Although Gabor's tests are useful in evaluating the coolability of relocated metal fuels during a postulated accident in a SFR, they focused on late phase behavior in which the core material relocates downward through the core support plate into the inlet plenum where the structures are more open and thus consistent with the open pool configuration. There is still a knowledge gap related to nature of metal fuel fragmentation and relocation within the fuel assembly structures. Argonne National Laboratory (ANL) is planning to conduct experiments regarding metal fuel relocation in the core structures which mock up the PGSFR's fuel assembly design. In the present study, preliminary tests for demonstration of melting and injecting the metal fuel were conducted using copper. Metal fuel relocation experiments with single fuel pin test section are planned to be conducted for understanding the flow and freezing behavior of the molten metal fuel in a narrow sodium channel and for evaluating the coolability of the relocated fuel. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DC Arc Flash on Photovoltaic Equipment

Protection from arc flash on ac systems is relatively well understood. Calculation approaches have been applied across many equipment types and voltages in many industries. These approaches are backed by a wide range of industry tests. Arc flash on dc systems such as photovoltaic systems is relatively unknown. Several calculation approaches have been proposed, but these have not been backed by any industry tests on equipment. Here, this report provides an overview of arc-flash hazard in terms of incident energy and arc-flash energy on photovoltaic equipment. The experiment site is a utility-owned ground-mount photovoltaic plant with a 1-MWdc nameplate capacity located at Sturbridge, MA. Three equipment arrangements were tested: a 20 × 20 × 20-in. (51 × 51 × 51-cm) box, a combiner box, and a mocked-up inverter cabinet. The results from the box testing helped to establish the characteristics of the dc source and to allow comparison to industry-standard ac testing. The results from the combiner box and inverter cabinet provided real-world results. The results were also compared with industry models of dc arc flash, and a new model was developed based on the test results.

14 SOLAR ENERGY↗

Probing intergalactic intergalactic magnetic fields with LOFAR LoTSS DR2 data

We use Faraday rotation measurements from the latest catalog LoTSS DR2 from LOFAR to probe intergalactic magnetic fields. To identify the extragalactic component of the observed rotation measure (RM) we use two different techniques: residual rotation measure (RRM) and close radio pairs. For the RRM approach, we conclude that, despite smaller measurement errors in the LOFAR data, robust and conservative treatment of the systematic uncertainties in the Galactic contribution to RM results in the constraint on a homogeneous volume-filling magnetic field at the level 2.4 nG, slightly weaker than previous constraints from NVSS data, and does not allow to probe the presence of over-magnetized bubbles predicted by the AGN feedback model of the IllustrisTNG. Analyzing close radio pairs we found that in only 0.5% of our mock realizations of observed data, the expected contribution from the over-magnetized bubbles does not exceed LoTSS DR2 data.

79 ASTRONOMY AND ASTROPHYSICS↗