Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Investigation of Bearing Fatigue Damage Life Prediction Using Oil Debris Monitoring

Research was performed to determine if a diagnostic tool for detecting fatigue damage of helicopter tapered roller bearings can be used to determine remaining useful life (RUL). The taper roller bearings under study were installed on the tail gearbox (TGB) output shaft of UH- 60M helicopters, removed from the helicopters and subsequently installed in a bearing spall propagation test rig. The diagnostic tool was developed and evaluated experimentally by collecting oil debris data during spall progression tests on four bearings. During each test, data from an on-line, in-line, inductance type oil debris sensor was monitored and recorded for the occurrence of pitting damage. Results from the four bearings tested indicate that measuring the debris generated when a bearing outer race begins to spall can be used to indicate bearing damage progression and remaining bearing life.

Dempsey, Paula J.↗

Advanced Fiber Optic-Based Sensing Technology for Unmanned Aircraft Systems

This presentation provides an overview of fiber optic sensing technology development activities performed at NASA Dryden in support of Unmanned Aircraft Systems. Examples of current and previous work are presented in the following categories: algorithm development, system development, instrumentation installation, ground R&D, and flight testing. Examples of current research and development activities are provided.

Richards, Lance↗

Acoustic Characterization of Compact Jet Engine Simulator Units

Two dual-stream, heated jet, Compact Jet Engine Simulator (CJES) units are designed for wind tunnel acoustic experiments involving a Hybrid Wing Body (HWB) vehicle. The newly fabricated CJES units are characterized with a series of acoustic and flowfield investigations to ensure successful operation with minimal rig noise. To limit simulator size, consistent with a 5.8% HWB model, the CJES units adapt Ultra Compact Combustor (UCC) technology developed at the Air Force Research Laboratory. Stable and controllable operation of the combustor is demonstrated using passive swirl air injection and backpressuring of the combustion chamber. Combustion instability tones are eliminated using nonuniform flow conditioners in conjunction with upstream screens. Through proper flow conditioning, rig noise is reduced by more than 20 dB over a broad spectral range, but it is not completely eliminated at high frequencies. The low-noise chevron nozzle concept designed for the HWB test shows expected acoustic benefits when installed on the CJES unit, and consistency between CJES units is shown to be within 0.5 dB OASPL.

Doty, Michael J.↗

Payload Utilization in NASA's Space Launch System

A revitalized National Space Council has directed NASA to return to the moon, with a series of preparatory missions paving the way for eventual human exploration. NASA's new deep space exploration system -- the heavy-lift Space Launch System (SLS), the Orion crew spacecraft and revitalized launch facilities at Kennedy Space Center -- will enable NASA and its commercial and international partners to meet these goals for human deep space exploration. SLS will be the most capable launch vehicle for these efforts, with an initial Block 1 capability of at least 26 metric tons (t) to trans-lunar injection (TLI). A more powerful Block 1B, available in crew and cargo configurations, with have the power to loft more than 37 t to TLI; the ultimate Block 2 variant will lift more than 45 t to TLI. For payload utilization, the Block 1 vehicle will carry 13 6U CubeSats as secondary payloads while the Block 1B crew vehicle will provide as much volume as the space shuttle payload bay in a Universal Stage Adapter (USA). Block 1B cargo vehicles will offer 8.4 m fairings in 19.1 m and 27.4 m lengths, with enough volume to accommodate habitat modules and landers. For missions beyond the Earth-moon system, SLS offers greater characteristic energy (C3), enabling faster transit or heavier payloads to the outer planets. The first mission of SLS and Orion, launching no earlier than December 2019, will send Orion into lunar distant retrograde orbit (DRO) on an approximately 25-day shakedown cruise known as Exploration Mission-1 (EM-1), enabling NASA to verify and validate new systems before sending astronauts to deep space on the next exploration mission. The SLS program and its prime contractors have made significant progress toward first launch, with several major components of the vehicle completed and delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center. Major forward work includes integrating tanks, engines and other major sections into the EM-1 core stage at Michoud Assembly Facility and then shipping the entire core stage assembly to Stennis Space Center. There, it will be installed in the refurbished B-2 test stand for a series of integrated stage tests culminating in a green run hotfire test. The Program's Spacecraft Payload Integration and Evolution (SPIE) Office, responsible for the in-space stage, adapters and payload interfaces, has largely completed its effort on the Block 1 vehicle and is supporting manufacture of the first Block 1B vehicle. This paper will provide an overview of the Block 1 vehicle, its expected capabilities, secondary payload accommodations and manufacturing status, including structural testing and the challenges of developing a new launch vehicle. A lookahead to the Block 1B vehicle and the payload utilization opportunities it will provide in the 2020s will also be discussed, including the unique capabilities of the vehicle.

Creech, Stephen D.↗

IN-LINE CHEMICAL SENSOR DEPLOYMENT IN A TRITIUM PLANT

The Savannah River Tritium Plant (TP) relies on well understood but aging sensor technology for process gas analysis. Though new sensor technologies have been brought to various readiness levels, the TP has been reluctant to install technologies that have not been tested in tritium service. This gap between sensor technology development and incorporating new technologies into practical applications demonstrates fundamental challenges that exist when transitioning from status quo to state-of-the-art in an extreme environment such as a tritium plant. These challenges stem from three root obstacles: 1) The need for a comprehensive assessment of process sensing needs and requirements; 2) The lack of a pick-list of process-compatible sensor technologies; and 3) The need to test technologies in a tritium-contaminated process environment without risking production. At Savannah River, these issues are being addressed in a two phase project. In the first phase, TP sensing requirements were determined by a team of process experts. Meanwhile, Savannah River National Laboratory sensor experts identified candidate technologies and related them to the TP processing requirements. The resulting roadmap links the candidate technologies to actual plant needs. To provide accurate assessments of how a candidate sensor technology would perform in a contaminated process environment, an instrument demonstration station was established within a TP glove box. This station was fabricated to TP process requirements and designed to handle high activity samples. The combination of roadmap and demonstration station provides the following assets: Creates a partnership between the process engineers and researchers for sensor selection, maturation, and insertion, Selects the right sensors for process conditions Provides a means for safely inserting new sensor technology into the process without risking production, and Provides a means to evaluate off normal occurrences where and when they occur. This paper discusses the process to identify and demonstrate new sensor technologies for the Savannah River TP.

07 ISOTOPE AND RADIATION SOURCES↗

The Equivalent Thermal Resistance of Tile Roofs with and without Batten Systems

Clay and concrete tile roofs were installed on a fully instrumented attic test facility operating in East Tennessee s climate. Roof, attic and deck temperatures and heat flows were recorded for each of the tile roofs and also on an adjacent attic cavity covered with a conventionally pigmented and direct-nailed asphalt shingle roof. The data were used to benchmark a computer tool for simulation of roofs and attics and the tool used to develop an approach for computing an equivalent seasonal R-value for sub-tile venting. The approach computed equal heat fluxes through the ceilings of roofs having different combinations of surface radiation properties and or building constructions. A direct nailed shingle roof served as a control for estimating the equivalent thermal resistance of the air space. Simulations were benchmarked to data in the ASHRAE Fundamentals for the thermal resistance of inclined and closed air spaces.

attic↗

BioSig-Air-Force

1) Configured servers: In coordination with the INSIGHT team, a hardware configuration was selected. Two nodes were purchased, configured, and shipped with compatible OS and database installation. The servers have been stress tested for reliability as they use leading edge technologies. Each node has two CPUs and 12 cores per CPU with maximum onboard memory for high performance. 2) LIM and Experimental module: The original BioSig system was developed for cancer research. Accordingly, the LIM system its corresponding web pages are being modified to facilitate (i) pathogene-donor interactions, (ii) media composition, (iii) chemical and siRNA plate configurations. The LIM system has been redesigned. The revised system allows design of new media and tracking it from lot-to-lot so that variations in the phenotypic responses can be tracked to a specific media and lot number. Similar associations are also possible with other experimental factors (e.g., donor-pathoge, siRNA, and chemical). Furthermore, the design of the experimental variables has also been revised to (i) interact with the newly developed LIM system, (ii) simplify experimental specifications, and (iii) test for potential operator's error during the data entry. Part of the complication has been due to the handshake between multiple teams that provide the small molecule plates and the team that creates assay plates. Our efforts have focused to harmonize these interactions (e.g., various data formats) so that each assay plate can be mapped to its source so that a correct set of experimental variables can be associated with each image. For example, depending upon the source of the chemical plates, they may have different formats. We have developed a canonical representation that registers SMILES code, for each chemical compound, along with its physiochemical properties. The schema for LIM conjunction with customized Web pages. 3) Import of Images and computed descriptors module: In coordination with the INSIGHT team, policies were designed to route images and computed representation into BioSig. This module (i) examines for completion of image analysis, and imports images, computed masks, and descriptors into BioSig. A database API for efficient retrieval of selection of descriptors (among thousands) was designed and implemented. 4) Computed segmentation masks from external software were imported, boundaries computed, and overlaid on images for quality control.

Source record↗

250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Babcock & Wilcox Company and The Ohio State University have constructed a 250 kWt coal direct chemical looping pilot facility at the Babcock & Wilcox Research Center in Barberton, Ohio. Testing was conducted on the facility to support installation of a 10 MWe coal direct chemical looping large pilot facility at the Dover Light & Power Plant in Dover, Ohio. Results of the testing and their impact on the design of the large pilot facility are discussed.

20 FOSSIL-FUELED POWER PLANTS↗

Hanford building 324 REC hot cell decommissioning approach - 15484

The 324 Building is a facility located at the Hanford Site and is undergoing decontamination and demolition (D and D) activities by Washington Closure Hanford (WCH). In October 1986, an in-cell leak of approximately 1.3 million curies occurred with a substantial fraction being lost into the subsurface soil beneath the floor of a large hot cell complex. Sampling under the hot cell floor revealed hot spots in the soil and cobble reading in excess of 10,000 R. In January of 2014, WCH contracted an AREVA lead team with Kurion as primary design agent to remove the B-Cell floor and highly contaminated underlying soils. The objective of this project is to remove the contaminated debris and soil and repackage them into the existing adjacent hot cells for final disposition as monoliths. The approach to this project uses an innovate combination of existing cell equipment, commercial equipment, and special tools to perform a series of completely remote operations. Also, a novel waste handling approach allows all the highly radioactive waste to remain within the existing cells. The remote handling approach to this project is to use customized off-the-shelf excavators which are mounted and operated remotely inside the cell. These can be moved and replaced remotely with a -Plug-and-Play- connection method. All the cables and utilities for the excavator and tools are managed through this cell connection with connections in a worker-accessible gallery space. The remote excavators are wall-mounted, which frees up the floor for the excavator work. The design also includes a transfer barrier which allows the B-Cell door to remain open during waste transfers while preventing spread of contamination between cells. The project balances the use of existing cell equipment such as cranes and shield doors, with the use of new remote equipment Existing equipment will be removed from the floor of the hot cell to adjacent cells. The concrete floor and stainless steel liner will then be remotely cut and removed, revealing the contaminated soil beneath the cell. The contaminated soil will be mixed with grout in the cell using the excavators and then placed in rigid bins. These bins will then be placed in the adjacent cells using existing overhead cranes. The waste containers allow optimal utilization of the limited adjacent hot cell space and improve the characteristics of the final waste monolith package. The system will use each bin once which significantly decreases the risk of contamination spread. The project includes a full-scale mockup facility in which all installation and operational activities will be tested and proven prior to hot cell construction activities. The mockup facility will also be used for operator training before actual hot work starts. This facility will remain available for use during operations with a full set of spares for redundancy and to support operations modeling during construction and remediation activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SPC-70791 Rev 0 MARVEL Inert Gas Subsystem, Secondary Coolant Management Subsystem, and Secondary Coolant Cover Gas Subsystem Tubing and Valve Specification

This specification covers the requirements and details for the selection, testing, cleaning, marking, shipping, inspection and installation (including welding) of the Inert Gas Subsystem, Secondary Coolant Management Subsystem, and Secondary Cover Gas Management Subsystem from the Valve Panel up to the classification division, the patch panel of the upper confinement. Including NaK, argon, eutectic gallium indium tin (eGaInSn), and helium fill tubing, valves, and hangers. These systems consist of the necessary straight lengths, elbows, reducers, fittings, tube connections, instrument taps, and valves called for by applicable drawings. All components shall be procured as ASME Section III Class 2 unless otherwise modified hereinafter. Pressure relief valves have been sized to prevent overpressure in the event there is full regulator flow. This is documented in ECAR-7365.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70792 Rev 0 MARVEL Primary Coolant Management Subsystem Tubing Specification

This specification covers the requirements and details for the selection, fabrication, testing, cleaning, marking, shipping, inspection and installation of the Inert Gas System, and Primary Coolant Management System. This applies to tubing from the upper confinement patch panel to the upper plenum, including NaK and argon fill tubing, valves, and hangers. These systems consist of the necessary straight lengths, elbows, reducers, fittings, tube connections, instrument taps, and valves called for by applicable drawings. All components shall be procured as ASME Section III Class 1.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Commissioning of the CMS Forward Pixel Detector

The Compact Muon Solenoid (CMS) experiment is scheduled for physics data taking in summer 2009 after the commissioning of high energy proton-proton collisions at Large Hadron Collider (LHC). At the core of the CMS all-silicon tracker is the silicon pixel detector, comprising three barrel layers and two pixel disks in the forward and backward regions, accounting for a total of 66 million channels. The pixel detector will provide high-resolution, 3D tracking points, essential for pattern recognition and precise vertexing, while being embedded in a hostile radiation environment. The end disks of the pixel detector, known as the Forward Pixel detector, has been assembled and tested at Fermilab, USA. It has 18 million pixel cells with dimension 100 x 150 {micro}m{sup 2}. The complete forward pixel detector was shipped to CERN in December 2007, where it underwent extensive system tests for commissioning prior to the installation. The pixel system was put in its final place inside the CMS following the installation and bake out of the LHC beam pipe in July 2008. It has been integrated with other sub-detectors in the readout since September 2008 and participated in the cosmic data taking. This report covers the strategy and results from commissioning of CMS forward pixel detector at CERN.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Static test of a large scale swivel nozzle thrust deflector

Experimental results from a swivel nozzle thrust deflector test program are presented. The deflector was installed behind a 36-inch fan with a tip turbine hot gas drive. The maximum nozzle pressure ratio was 1.2. Nozzle thrust and flow coefficients are presented for a range of vectoring angles. The results are also compared to small scale cold flow test results. The comparison suggests a need for accurate simulation of nozzle entry pressure and temperature profiles on model tests.

Federspiel, J. F.↗

Simulated Space Environmental Testing on Thin Films

An exploratory program has been conducted, to irradiate some mature commercial and some experimental polymer films with radiation simulating certain Earth orbits, and to obtain data about the response of each test film's reflective and tensile properties. Protocols to conduct optimized tests were considered and developed to a "prototype" level during this program. Fifteen polymer film specimens were arranged on a specially designed test fixture. The fixture featured controlled exposure areas, and protected the ends of the samples for later gripping in tensile tests. The fixture featured controlled exposure areas, and protected the ends of the samples for later gripping in tensile tests. The fixture containing the films was installed in a clean vacuum chamber where protons, electrons and solar ultraviolet (UV) radiation could simultaneously irradiate the specimens. Near realtime UV rates were used, whereas proton and electron rates were accelerated appreciably to simulate 5 years in orbit during a two month test. Periodically, the spectral reflectance of each film was measured in situ. After the end of the irradiation, final reflectance measurements were made in situ, and solar absorptance values were derived for each specimen. These samples were then measured in air for thermal emittance and for tensile strength. Most specimens withstood the irradiation intact, but with reduced reflectance (increased solar absorptance). Thermal emittance changed slightly in several materials, as did their tensile strength and elongation at break. Conclusions are drawn about the performance of the films. Simulated testing to an expected 5 year dose of electrons and protons consistent with those expected at L2 and 0.98 AU orbits and 100 equivalent solar hours exposure.

Russell, Dennis A.↗

The results of low-speed wind tunnel tests to investigate the effects of the NASA refan JT8D engine nacelles on the stability and control characteristics of the Boeing 727-200

The results from two low-speed wind tunnel tests of the Boeing 727-200 airplane as configured with the NASA refan JT8D-109 turbofan engines are presented. The objective of these tests was to determine the effects of the refan installation on the low-speed stability and control characteristics of the 727 airplane. Four side nacelle locations were tested to insure that aerodynamic interactions of the nacelles and empennage would be optimized. The optimum location was judged to be the same as that of the production JT8D-9 engines; the current production engine mounts can be used for this location. Some small changes in the basic airplane characteristics are attributable to the refan nacelles. The flaps up longitudinal and lateral-directional stability are both slightly increased for low angles of attack and sideslip respectively. The longitudinal stability at stall is improved for both the flaps up and landing flap configurations. The high attitude characteristics of the basic airplane are not significantly altered by the refan nacelle installation. Directional control capability is not affected by the refan nacelles.

Shirkey, M. D.↗

Solar Heater in a West Virginia College

Solar space-heating and hot water system installed at Alderson-Broaddus College, Philippi, West Virginia, is described in 87-page document. Report contains description of building and its solar-energy system; specifications for solar-energy system, including collectors, coolant, storage tanks, circulation equipment, piping, controls, and insulation; acceptance test data; and discussion of problems with installation, their solution, and recommendations for dealing with excess solar energy.

Source record↗