SEARCH · Engineering Papers
Results for “environmental analysis”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
EMP Attachment 1: DOE-SC PNNL Site Sampling and Analysis Plan
This Sampling and Analysis Plan (SAP) is written for the radiological environmental air surveillance program for the DOE-SC PNNL Site, Richland Washington. It provides the requirements for planning sampling events, and the requirements imposed on the analytical laboratory analyzing the air samples. The actual air sampling process is in procedure EPRP-AIR-029. The rationale for analyte selection, media, and sampling site location has been vetted through the data quality objectives (DQO) process (Barnett et al. 2010). The results from the DQO process have been reviewed and approved by the Washington State Department of Health. The DQO process (Barnett et al. 2010) identified seven specific radionuclides for analysis along with the need for gross alpha and gross beta radiological analyses. The analytes are 241<\sup>Am, 243<\sup>Am, 244<\sup>Cm, 60<\sup>Co, 238<\sup>Pu, 239<\sup>Pu, and 233<\sup>U. The report also determined that air samples for particulates are the only sample matrix required for the monitoring program. These samples are collected on 47-mm glass-fiber filters.
Toward industrial C8 production: oxygen intrusion drives renewable n -caprylate production from ethanol and acetate via intermediate metabolite production
A simplified open culture chain elongation process with ethanol and acetate to produce renewable n -caprylate without adding yeast extract showed a trophic hierarchy between aerobic, facultative anaerobic, and fully anaerobic microbial species.
DOE/EM Criticality Safety Needs Assessment
The issue of nuclear criticality safety (NCS) in Department of Energy Environmental Management (DOE/EM) fissionable material operations presents challenges because of the large quantities of material present in the facilities and equipment that are committed to storage and/or material conditioning and dispositioning processes. Given the uncertainty associated with the material and conditions for many DOE/EM fissionable material operations, ensuring safety while maintaining operational efficiency requires the application of the most-effective criticality safety practices. In turn, more-efficient implementation of these practices can be achieved if the best NCS technologies are utilized. In 2002, DOE/EM-1 commissioned a survey of criticality safety technical needs at the major EM sites. These needs were documented in the report Analysis of Nuclear Criticality Safety Technology Supporting the Environmental Management Program, issued May 2002. Subsequent to this study, EM safety management personnel made a commitment to applying the best and latest criticality safety technology, as described by the DOE Nuclear Criticality Safety Program (NCSP). Over the past 7 years, this commitment has enabled the transfer of several new technologies to EM operations. In 2008, it was decided to broaden the basis of the EM NCS needs assessment to include not only current needs for technologies but also NCS operational areas with potential for improvements in controls, analysis, and regulations. A series of NCS workshops has been conducted over the past years, and needs have been identified and addressed by EM staff and contractor personnel. These workshops were organized and conducted by the EM Criticality Safety Program Manager with administrative and technical support by staff at Oak Ridge National Laboratory (ORNL). This report records the progress made in identifying the needs, determining the approaches for addressing these needs, and assimilating new NCS technologies into EM fissionable material operations. In addition, the report includes projections of future EM needs and associted recommendations.
Design and analysis issues of integrated control systems for high-speed civil transports
A study was conducted to identify, rank, and define development plans for the critical guidance and control design and analysis issues as related to economically viable and environmentally acceptable high-speed civil transport. The issues were identified in a multistep process. First, pertinent literature on supersonic cruise aircraft was reviewed, and experts were consulted to establish the fundamental characteristics and problems inherent to supersonic cruise aircraft. Next, the advanced technologies and strategies being pursued for the high-speed civil transport were considered to determine any additional unique control problems the transport may have. Finally, existing technologies and methods were examined to determine their capabilities for the design and analysis of high-speed civil transport control systems and to identify the shortcomings and issues. Three priority levels - mandatory, highly beneficial, and desirable - were established. Within each of these levels, the issues were further ranked. Technology development plans for each issue were defined. Each plan contains a task breakdown and schedule.
Nuclear forensics: Soil content
Nuclear Forensics is a growing field that is concerned with all stages of the process of creating and detonating a nuclear weapon. The main goal is to prevent nuclear attack by locating and securing nuclear material before it can be used in an aggressive manner. This stage of the process is mostly paperwork; laws, regulations, treaties, and declarations made by individual countries or by the UN Security Council. There is some preliminary leg work done in the form of field testing detection equipment and tracking down orphan materials; however, none of these have yielded any spectacular or useful results. In the event of a nuclear attack, the first step is to analyze the post detonation debris to aid in the identification of the responsible party. This aspect of the nuclear forensics process, while reactive in nature, is more scientific. A rock sample taken from the detonation site can be dissolved into liquid form and analyzed to determine its chemical composition. The chemical analysis of spent nuclear material can provide valuable information if properly processed and analyzed. In order to accurately evaluate the results, scientists require information on the natural occurring elements in the detonation zone. From this information, scientists can determine what percentage of the element originated in the bomb itself rather than the environment. To this end, element concentrations in soils from sixty-nine different cities are given, along with activity concentrations for uranium, thorium, potassium, and radium in various building materials. These data are used in the analysis program Python.
MARSAME Radiological Release Report for Replacement Water Lines from TA-48 to TA-55
Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that only a portion of the soil associated with Replacement Water Lines from Technical Area (TA)-48 to TA55 (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). The remaining soil did not meet the criteria for unrestricted release and must be managed appropriately. These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.
MARSAME Radiological Release Report for Diamond Drive Widening and Roundabout Construction Projects, Revision 1
Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that the soil, concrete and asphalt associated with the Diamond Drive Widening/Roundabout Projects (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.
A life cycle analysis (LCA) primer for the agricultural community
Consumer demand for sustainably produced agricultural products is increasing. One approach that can be used to evaluate and compare product sustainability is to conduct a life cycle analysis (LCA). The term LCA is broadly used to describe a suite of analytical resources and standardized methods. Life cycle analyses are a transdisciplinary tool which can and are used by all professions but work best when conducted by teams with diverse skills and backgrounds. The objective of this paper is to provide a primer on LCAs for the agricultural community and for LCA practitioners unfamiliar with agronomy. Agricultural LCAs can differ greatly because agricultural products have multiple end uses, complex socio-economic and environmental trade-offs, and can be generated using a variety of different practices, resources, and production systems. Through worldwide agricultural marketing, intricate agronomic supply chains and support systems have been developed to produce, store, and distribute agricultural products. In many situations, the production practices are not linked to the products consumers purchase. This limitation can be partially overcome by conducting an LCA, which is a systematic summation of the multiple environmental impacts associated with the production, use, and disposal of a product. However, the large number and types of analyses can make it difficult for non-practitioners and decision-makers to use and interpret LCA results. Finally, it is important for members of the agricultural community to be aware of these analyses and how they can be used and how they affect product markets.
Hydropower Operations in the Colorado River Basin: Institutional Analysis of Opportunities and Constraints
The Colorado River Basin is facing an unprecedented drought. In ongoing drought management efforts, limited attention has been paid to hydropower generation. While some studies do exist on hydropower, they are quantitative in nature and focus on calculating the reduction in megawatts generated at dams in the Basin with declining water availability. These studies simplify the complex process of hydropower generation; water availability is but one factor that impacts hydropower generation. At a more fundamental level, formal institutional arrangements, that is, laws, policies, and rules create the framework within which dams are operated and hydropower is generated. This paper conducts a comparative institutional analysis of water, environment, and energy laws and policies and changes therein to understand the constraints and opportunities faced by hydropower generation in the Colorado River Basin. To tease out the nuances in how institutional arrangements affect dam operations and hydropower generation, the comparative analysis focuses on the two largest and strategically important dams in the Basin: Hoover and Glen Canyon. This paper uses Elinor Ostrom’s Institutional Analysis and Development Framework to analyze laws and policies at three levels: constitutional-choice, collective-choice, and operational levels. Constitutional-choice level laws and policies apply to the entire Basin, whereas collective-choice level and operational level laws and policies are dam specific. Hoover and Glen Canyon Dams face similar biophysical challenges by the virtue of their location in the same river basin. Yet, despite the similarity in the biophysical setting, the analysis in this study finds that the differences in the applicability of constitutional-choice level laws along with the differences in dam specific collective-choice and operational level institutional arrangements produce a distinct set of constraints for hydropower generation at Hoover and Glen Canyon Dams. Even without a drought, water and environmental laws at both the constitutionalchoice and collective-choice levels as well as power contracts constrain hydropower generation and limit the flexibility with which Glen Canyon Dam can be operated. Water and environmental laws also impose specific water release requirements that, at times, require off-peak power generation at Glen Canyon Dam. On the other hand, even with a drought, Hoover Dam faces limited hydropower generation constraints and can operate flexibly. This is because constitutional-choice level laws and dam-specific collective-choice and operational level laws pose limited constraints for flexible daily operations at Hoover. The result is that Hoover Dam can generate hydropower at the same level as it did three decades ago and operate flexibly to provide ancillary services and peaking generation. While water and environmental laws and policies pose constraints for hydropower generation, the analysis in this study further finds that specific historic provisions within energyrelated institutional arrangements and recent changes within power contracts have maintained and even enhanced the value of hydropower to power customers. Historic institutional provisions ensure that hydropower is sold ‘at cost’ making this resource economically competitive with wholesale electricity market rates. Recent power contract modifications have resulted in the amendment of an older resale prohibition clause to expand the flexibility available to power customers in using their capacity and/or energy allocation in RTOs, ISOs, and bulk power markets. This amendment has opened up an opportunity for customers, especially Hoover power customers, to use flexible generation and ancillary services in a market environment. In addition, the extension of power contract duration to the legally maximum term has enhanced the reliability and stability of this resource for customers. In the Colorado River Basin, despite the enduring economic responsibility of power customers—where laws require customers to pay for a large portion of construction and O&M costs whether or not they actually receive hydropower— the persistent threat of a drought-induced water shortage, and constraints imposed by water and environmental laws and policies, power customers continue to invest in this resource as energy-related institutional arrangements and power contract provisions protect the reasons why they value hydropower. Lastly, the analysis in this study finds that the consequences of changes in hydropower generation for energy users, irrigators, and environmental programs in the Basin depend on how specific institutional arrangements tie electricity revenues to irrigation aid and environmental programs, and how the power contracts themselves are set up. Collective-choice level institutional arrangements create a higher level of financial dependency of irrigation aid and environmental programs on electricity revenues in the Upper Basin—the legal subdivision of Colorado River where Glen Canyon Dam is located—compared to the Lower Basin—the legal subdivision of Colorado River where Hoover Dam is located. Therefore, changes in hydropower generation or the way its revenue is collected and used will have far reacting detrimental consequences for the Upper Basin. Likewise, differences in the nature of power contracts for Glen Canyon and Hoover Dams also creates differences in the financial impact incurred by energy users when there is a reduction in hydropower generation. While this study identifies the types of impacts on resource users as a result of specific institutional arrangements, the calculation of extent of impact warrants further attention. Hydropower in the United States is in a unique position today. The strategic importance of this resource for the nation’s electricity sector is rapidly growing even as its contribution to overall electricity generation remains fairly small. This strategic importance, however, is built hydropower’s ability to operate flexibly in order to support the integration of intermittent renewable generating sources and the expansion of electricity markets. As this study shows, such flexibility may not be available at certain plants not due to the lack of water availability but because of institutional constraints. Institutional arrangements may also require dam operators to first consider high priority water uses (such as irrigation or environmental needs), which in turn may limit the ability to generate hydropower when it is most valuable or useful. Engineering and quantitative models, such as production cost models, recognize policy constraints for hydropower operations but often inadequately capture or assume away such constraints in the models. A failure to account for policy constraints in these models runs the risk of inaccurate representation of the operational flexibility and capacity available at specific hydropower plants, which can result in over/underestimation of hydropower’s ability to support the integration of variable renewable resources and address grid reliability concerns. Against this background, this paper and the analysis herein serves as an example of how we can systematically identify institutional constraints (and opportunities) that influence the flexibility in not only generating electricity at specific dams but also using this hydropower once it is generated.
Soil Organic Matter (SOM): Mass Spectrometry Data Analysis
Considered a general purpose tool for characterization of samples at the molecular level in environmental and life sciences, mass spectrometry (MS) is commonly used for measuring organic matter in air, water and soil. Broad base of commercially available instrumentation and data analysis tools provide functional analytical platforms for molecular characterization for a variety of applications and samples. MS instrumentation with ultrahigh resolving power (m/ΔmFWHM > 200 000) is necessary for broad identification of thousands of molecular components present in organic matter samples. This article discusses basic principles of data analysis for ultrahigh resolution MS measurements of small molecules of organic matter.
Choosing the Right Tool: A Comparative Study of Wetland Assessment Approaches
There are over 700 aquatic ecological assessment approaches across the globe that meet specific institutional goals. However, in many cases, multiple assessment tools are designed to meet the same management need, resulting in a confusing array of overlapping options. Here, we look at six riverine wetland assessments currently in use in Montana, USA, and ask which tool (1) best captures the condition across a disturbance gradient and (2) has the most utility to meet the regulatory or management needs. We used descriptive statistics to compare wetland assessments (n = 18) across a disturbance gradient determined by a landscape development intensity. Factor analysis showed that many of the tools had internal metrics that did not correspond well with overall results, hindering the tool’s ability to act as designed. We surveyed regional wetland managers (n = 56) to determine the extent of their use of each of the six tools and how well they trusted the information the assessment tool provided. We found that the Montana Wetland Assessment Methodology best measured the range of disturbance and had the highest utility to meet Clean Water Act (CWA§ 404) needs. Montana Department of Environmental Quality was best for the CWA§ 303(d) & 305(b) needs. The US Natural Resources Conservation Service’s Riparian Assessment Tool was the third most used by managers but was the tool that had the least ability to distinguish across a disturbance, followed by the US Bureau of Land Management’s Proper Functioning Condition.
Results of the Analyses of SMECT Mercury Sample Collected During Mercury Pump (MB1) Functional Check
A pump added to remove mercury from the sump of the Slurry Mix Evaporator Condensate Tank (SMECT) in DWPF was successfully tested in 2020, resulting in a sample of contaminated mercury obtained from the Mercury Purification Process (MPP) cell. The mercury in the sump of the SMECT was present as a result of steam stripping of sludge slurry in the Sludge Receipt and Adjustment Tank (SRAT) at DWPF. A schematic of the MPP system provided by DWPF personnel is shown in Appendix A. DWPF personnel supplied the following detailed description of the Hg sampling: “The sample provided is the result of DWPF extraction of mercury by means of the Mercury Pump-Water Cart. The Mercury Pump extracted the sample from the SMECT mercury sump. The pump uses pressurized water to transfer a small amount of mercury to a leachate bucket located at the Lab Mercury cell. The mercury and water were allowed to be self separated, and mercury was gravity decanted from the leachate bucket.” DWPF personnel indicate that the leachate bucket is equipped with both a top stopcock/drain and a lower/bottom stopcock/drain from which the mercury was decanted or drained out, while the separated water layer remained above the mercury during draining. The DWPF customer requested SRNL to analyze the sample for the following: gross alpha/nonvolatile beta analysis and perform a Toxicity Characteristic Leaching Procedure (TCLP) per the Environmental Protection Agency's Test Methods for Evaluating Solid Waste: Physical/Chemical Methods, SW-846. While the TCLP was preferred, a Total Metals analysis of the eight Resource Conservation and Recovery Act (RCRA) metals was deemed acceptable.2 The analytical data collected on this mercury sample will be used in planning for sample disposition as well to start a profile for future Hg disposition of Hg collected from steam stripping.
MARSAME Radiological Release Report for Weapons Facility Operations #5 Decontamination and Demolition Project
Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has identified materials associated with Weapons Facility Operations (WFO) #5 that meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020) and materials in one building that did not meet the criteria for unrestricted release and are to be treated as low level waste (LLW). These conclusions are based on the known history of the area combined with radiation survey data data collected in 2022 and 2023. The findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.
Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]
This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.
Thermoeconomic Evaluation and Optimization of Using Different Environmentally Friendly Refrigerant Pairs for a Dual-Evaporator Cascade Refrigeration System
Applications of dual-evaporator refrigeration systems have recently gained much attention both in academia and industry due to their multiple benefits. In this study, a comprehensive thermodynamic and economic analysis is conducted to evaluate the potential of using several environmentally friendly refrigerant couples and identifies the most suitable one yielding the best economic results. To achieve this goal, a detailed parametric study is conducted, and an optimization process is performed using a particle swarm optimization (PSO) approach to minimize the unit production cost of cooling (UPCC) of the cascade refrigeration system. The results showed that among all selected 18 refrigerant pairs and for all ranges of examined operating parameters, the R170-R161 pair and R1150-R1234yf pair are identified as the best and worst pairs, respectively, from both thermodynamic and economic viewpoints. The results also confirm that R170-R161 pair has an improvement over R717-R744, used as a typical refrigerant pair of cascade refrigeration cycles. For a base case analysis, the COP of R170-R161 and R1150-R1234yf pairs is determined as 1.727 and 1.552, respectively, while their UPCC is found to be $0.395/ton-hr and $0.419/ton-hr, respectively, showing the influence of proper selection of refrigerant pairs on the cascade cycle’s performance. Overall, this study offers a useful thermodynamic and economic insight regarding the selection of proper refrigerant pairs for a dual-evaporator cascade vapor compression refrigeration system.
Site Identification framework and environmental compliance for floating ocean turbines in US Waters (Abstract)
Like all potential marine energy deployment sites, characterizing the site, understanding the environmental interactions with floating tidal technology, and mapping a pathway towards regulatory acceptance will be needed to site and permit ocean current development within the Florida Current. The proposed work will be based on a modeling analysis, a desk-top review and analysis, focusing on the characteristics of the ocean current technology and environmental monitoring information on the marine animals and habitats that are specific to the appropriate latitude, particularly those that are endemic to the offshore Florida area. The analysis will also describe the state and federal authorizations required for deploying a floating tidal energy technology, with an emphasis on how they differ from those in Washington, Alaska, and Maine. Environmentally compliant sites within Florida Current will be selected based on environmental, logistical, and regulatory criteria. Recommendations on monitoring needs and adaptive management practices will be provided. The need to acquire social acceptance for the Orbital Marine Power technology will also be explored and general recommendations prepared to encourage the best acceptance in the communities of interest.
Hydropower Vision: A New Chapter for America’s 1 st Renewable Electricity Source (Full Report)
Hydropower has provided clean, affordable, reliable, and renewable electricity in the United States for more than a century. Building on hydropower’s historical significance, and to inform the continued technical evolution, energy market value, and environmental performance of the industry, the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office has led a first-of-its-kind comprehensive analysis focused on a set of potential pathways for the environmentally sustainable expansion of hydropower (hydropower generation and pumped storage) in the United States.