SWS Building Electric Demand Profile
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains GSE daily energy consumption for each airport.
This dataset contains the required number of chargers for GSE at each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6).
This dataset contains GPS locations for each airport.
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
This dataset contains data on the electric use of the building in 15-minute increments (kilowatt-hours and average kilowatts).
The CABle ANAlysis (CABANA) portion of the EMPHASIS{trademark} suite is designed specifically for the simulation of cable system-generated electromagnetic pulse (SGEMP). The code can be used to evaluate the response of a specific cable design to threat or to compare and minimize the relative response of difference designs. This document provides user-specific information to facilitate the application of the code to cables of interest. It solves the electrical portion of a cable SGEMP simulation. It takes specific results from the deterministic radiation-transport code CEPTRE as sources and computes the resulting electrical response to an arbitrary cable load. The cable geometry itself is also arbitrary and is limited only by the patience of the user in meshing and by the available computing resources for the solution. The CABANA simulation involves solution of the quasi-static Maxwell equations using finite-element method (FEM) techniques.
Energy management in a commercial facility can be segregated into two areas: energy efficiency and demand response (DR). Energy efficiency focuses on steady-state load minimization. Demand response reduces load for event driven periods during the peak load. Demand response driven changes in electricity use are designed to be short-term in nature, centered on critical hours during the day when demand is high or, utilized when the electricity supplier's reserve margins are low. Due to the recent Federal Energy Regulatory Commission (FERC) Order 745, Demand Response Compensation in Organized Wholesale Energy Markets, the potential annual compensation to Sandia National Laboratories (SNL) from performing DR ranges from $\$$200K to $\$$1,800K. While the current energy supply contract does not offer any compensation for participating in DR, there is benefit in understanding the issues and potential value in performing a DR event. This Report will be helpful in upcoming energy supply contract negotiations to quantify the energy savings and power reduction potential from DR at SNL. On August 25, 2011 and August 9, 2012 the Facilities Management and Operations Center (FMOC) performed the first and second DR pilot events at SNL/NM. This report describes the details and results of these DR events.