Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Decommissioning the Belgonucleaire Dessel MOX plant: presentation of the project and situation end august 2013

Belgonucleaire has been operating the Dessel MOX plant at an industrial scale between 1986 and 2006. During this period, 40 metric tons of plutonium (HM) have been processed into 90 reloads of MOX fuel for commercial light water reactors. The decision to stop the production in 2006 and to decommission the MOX plant was the result of the shrinkage of the MOX fuel market due to political and commercial factors. As a significant part of the decommissioning project of the Dessel MOX plant, about 170 medium-sized glove-boxes and about 1.200 metric tons of structure and equipment outside the glove-boxes are planned for dismantling. The license for the dismantling of the MOX plant was granted by Royal Decree in 2008 and the dismantling started in March 2009. The dismantling works are carried out by an integrated organization under leadership and responsibility of Belgonucleaire; this organization includes 3 main contractors, namely Tecnubel N.V., the THV ('Tijdelijke HandelsVereniging') Belgoprocess / SCK-CEN and Studsvik GmbH and Tractebel Engineering as project manager. In this paper, after having described the main characteristics of the project, the authors review the different organizational and technical options considered for the decommissioning of the glove-boxes; thereafter the main decision criteria (qualification of personnel and of processes, confinement, cutting techniques and radiation protection, safety aspects, alpha-bearing waste management) are analyzed as well. Finally the progress, the feedback and the lessons learned at the end of August 2013 are presented, giving the principal's and contractors point of view. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fundamental study on mitigation of rocking motion of a cask system by a gyro system

In Japan, ensuring the structural integrity of cask systems during seismic events is becoming increasingly important. Cask systems, which are free-standing cylindrical structures that contain spent fuel assemblies, are believed to exhibit rocking motions under strong seismic excitations. Thus far, analytical studies conducted by the authors have indicated that cask systems subjected to strong seismic motions, undergo large rocking motions, and, in the worst case, may overturn and collapse. Therefore, reducing the rocking motions of casks to avoid overturning and consequent contamination of radioactive substances is critical. To suppress rocking motions for heavy free-standing structures such as cask systems, we propose a rocking motion suppression system that employs a gyro system. This system is installed in the free-standing structure. A previous analytical study showed that this system largely mitigates rocking motion. In the present study, we fabricated a fundamental cask system model and a gyro system. By using the cask system model without a gyro system, free vibration tests and shaking table tests were conducted to understand the basic characteristics of rocking motion and responses under base excitations. Analyses were also conducted to confirm the validity of the analytical model for rocking motion comparing with the experimental data. Moreover, analyses for the cask system with the gyro system were conducted. From these results, we evaluated the ability of the gyro system to mitigate rocking motion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring critical facilities by using advanced RF devices

The ability to monitor critical environment parameters of nuclear plants at all times, particularly during and after a disruptive accident, is vital for the safety of plant personnel, rescue and recovery crews, and the surrounding communities. Conventional hard-wired assets that depend on supplied power may be decimated as a result of such events, as witnessed in the Japanese Fukushima nuclear power plant in March 2011. Self-powered monitoring devices operating on a wireless platform, on the other hand, may survive such calamity and remain functional. The devices would be pre-positioned at strategic locations, particularly where the dangerous build-up of contamination and radiation may preclude subsequent manned entrance and surveillance. Equipped with sensors for β-γ radiation, neutrons, hydrogen gas, temperature, humidity, pressure, and water level, as well as with criticality alarms and imaging equipment for heat, video, and other capabilities, these devices can provide vital surveillance information for assessing the extent of plant damage, mandating responses (e.g., evacuation before impending hydrogen explosion), and enabling overall safe and efficient recovery in a disaster. A radio frequency identification (RFID)-based system - called ARG-US - may be modified and adapted for this task. Developed by Argonne for DOE, ARG-US (meaning 'watchful guardian') has been used successfully to monitor and track sensitive nuclear materials packages at DOE sites. It utilizes sensors in the tags to continuously monitor the state of health of the packaging and promptly disseminates alarms to authorized users when any of the preset sensor thresholds is violated. By adding plant-specific monitoring sensors to the already strong sensor suite and adopting modular hardware, firmware, and software subsystems that are tailored for specific subsystems of a plant, a Remote Area Modular Monitoring (RAMM) system, built on a wireless sensor network (WSN) platform, is being developed by Argonne National Laboratory. ARG-US RAMM, powered by on-board battery, can sustain extended autonomous surveillance operation during and following an incident. The benefits could be invaluable to such critical facilities as nuclear power plants, research and test reactors, fuel cycle manufacturing centers, spent-fuel dry-cask storage facilities, and other nuclear installations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

'Strategy is a commodity, implementation is an art' - 2 years of implementation of the UK national LLW strategy

The Low Level Waste Repository (LLWR) is the primary facility for disposal of Low Level Waste (LLW) in the United Kingdom (UK), serving the UK nuclear industry and a diverse range of other sectors. Management of LLW in the UK historically was dominated by disposal to the LLWR. The value of the LLWR as a national asset was recognised by the 2007 UK Governmental Policy on management of solid LLW. At this time, analysis of the projected future demand for disposal at LLWR against facility capacity was undertaken identifying a credible risk that the capacity of LLWR would be insufficient to meet future demand if existing waste management practices were perpetuated. To mitigate this risk a National Strategy for the management of LLW in the UK was developed by the Nuclear Decommissioning Authority (NDA), partnered with LLW Repository Ltd. (the organisation established in 2008 to manage the LLWR on behalf of NDA). This strategy was published in 2010 and identified three mechanisms for protection of the capacity of LLWR - application of the Waste Hierarchy by waste producers; optimised use of existing assets for LLW management; and opening of new waste treatment and disposal routes to enable diversion of waste away from the LLWR. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety aspects of dry spent fuel storage and spent fuel management

As with the storage of all radioactive materials, the storage of spent nuclear fuel (SF) and high-level radioactive waste (HLW) must conform to safety requirements. Safety aspects like safe enclosure of radioactive materials, safe removal of decay heat, nuclear criticality safety and avoidance of unnecessary radiation exposure must be achieved throughout the storage period. The implementation of these safety requirements can be achieved by dry storage of SF and HLW in casks as well as in other systems such as dry vault storage systems or spent fuel pools, where the latter is neither a dry nor a passive system. After the events of Fukushima, the advantages of passively and inherently safe dry storage systems have become more obvious. TUV and BAM, who work as independent experts for the competent authorities, present the licensing process for sites and casks and inform about spent nuclear fuel management and issues concerning dry storage of spent nuclear fuel, based on their long experience in these fields. All safety relevant issues like safe enclosure, shielding, removal of the decay heat or behavior of cask and building under accident conditions are checked and validated with state-of-the-art methods and computer codes before the license approval. It is shown how dry storage systems can ensure the compliance with the mentioned safety criteria over a long storage period. Exemplarily, the process of licensing, erection and operation of selected German dry storage facilities is presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the safety of mobile units for the conditioning of radioactive waste

In Germany mobile units are used to treat and condition radioactive waste. On behalf of the relevant authorities TUV SUD Industrie Service GmbH evaluates their safety. In this paper we outline the general procedure we apply and point out typical results. Generally, a generic safety case evaluates the effects of incidents and accidents and its consequences for the workers and the public. Special care is necessary to define the radioactive inventory, the nuclide composition and the mobility of the radioactive substances. A systems analysis is carried out. Typical aspects to be considered are the handling procedures, the measurement devices and automatic actions. From the various possible malfunctions the critical ones have to be identified. Generally one or only a few scenarios have to be considered in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using probabilistic criteria in an assessment of the potential radiological consequences of the decommissioning of a nuclear research reactor

In order to assess the risk of radiological consequences of incidents and accidents in nuclear facilities it is important to contemplate their frequency of occurrence. It has to be shown that incidents and accidents occur sufficiently seldom according to their radiological consequences i. e. the occurrence frequency of radiological doses has to be limited. This is even demanded by the German radiation protection ordinance (StrlSchV), which says that in nuclear facilities other than nuclear power plants (NPP) in operation and for decommissioning, the occurrence frequency of incidents and accidents shall be contemplated in order to prove the design of safety measures and safety installations. Based on the ideas of the ICRP64, we developed a risk based assessment concept for nuclear facilities, which fulfils the requirements of the German regulations concerning dose limits in normal operation and design basis accidents. The general use of the concept is dedicated to nuclear facilities other than nuclear power plants (NPP) in operation and for decommissioning, where the regulation of risk assessment is less sophisticated. The concept specifies occurrence frequency limits for radiation exposure dose ranges, i. e. the occurrence frequency of incidents and accidents has to be limited according to their radiological effects. To apply this concept, scenarios of incidents and accidents are grouped in exposition classes according to their resulting potential effective dose to members of the general public. The occurrence frequencies of the incidents and accidents are summarized in each exposition class whereas the sum must not exceed the frequency limits mentioned above. In the following we introduce the application of this concept in the assessment of the potential radiological consequences of the decommissioning of a nuclear research reactor. We carried out this assessment for the licensing process of the decommissioning on behalf of German authorities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The impact of council directive 2011/70/EURATOM and IAEA joint convention review meetings on the ongoing establishment of the Portuguese regulatory framework and on the future of national radioactive waste

Council Directive 2011/70/EURATOM of 19 July 2011, establishing a Community framework for the responsible and safe management of spent fuel and radioactive waste will enter in force August 2013 in all EU Member States. Portugal has already started preparing its legislative framework to accommodate the new legislative piece. However, the first report of Portugal to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management of the IAEA, in Vienna, 2012, has shown that Portugal still has many steps to overcome to establish a successful and effective basic regulatory framework. The existence of many competent authorities related to the radiological protection area and a newly independent commission that is still looking on how to fulfill its regulator role in other areas such as the radioactive waste management makes quite challenging the full application of the new directive as well as compliance that Portugal will have to show in the next Joint Convention review meeting in order to meet the obligations of the Convention. In this paper, the reality of the regulatory Portuguese framework on radiological protection, nuclear safety and radioactive waste management is presented. Discussion of the future impact of the new legislation and its consequences such as the need to setup the national program on radioactive waste management is critical discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential scenarios for broadening stakeholder involvement in the implementing geological disposal technology platform

This paper analyses the potential for the involvement of different types of stakeholders in the Implementing Geological Disposal Technology Platform (IGD-TP). This analysis was conducted as part of the InSOTEC project, a three-year (2011- 2014) collaborative research project funded under the 7. Euratom Framework Programme (Grant Agreement nr. 269906). In our analysis, we consider the extent to which the IGDTP's practice as regards to stakeholder involvement matches its discourse, and what potential for improvement exists given its structural organisation as a European Technology Platform (ETPs). Technology Platforms (TPs) can be understood as knowledge networks, deliberately set up to influence (research) policy in a specific domain. We therefore use knowledge networks as a conceptual approach and look at the IGD-TP as a complex network which includes actors, knowledge and practices across different countries, focusing on a very specific topic (i.e. implementing geological disposal). We compare the way different stakeholders are involved in the IGD-TP to the practice of other ETPs, and explore how the IGD-TP is viewed by its members and by outsiders to the platform Applying Callon's framework of knowledge co-production (1999) we come to define different degrees of interaction between science, society and policy in view of defining research and development (R and D) priorities [1]. Subsequently we describe how these interactions could be conceptualised and interpreted for the IGD-TP. The current approach of the IGDTP can be mainly understood as classical model involving mainly expert stakeholders and scientists. Where there seems to be a good representation among IGD-TP members of industry, research institutes, and some members of the academic community this is not the case for other types of stakeholders, such as public authorities or civil society. At this stage, the overall approach of the IGD-TP would seem to restrict the scope of stakeholder involvement, as it narrows participation down to uniquely technology experts, hindering socio-technical manifestations. Our analysis nevertheless shows that there is room for engaging with a broader range of stakeholders in the field of radioactive waste management, if this is the intention of the IGD-TP. However, this would require a commitment to developing a common knowledge base including other stakeholders through a process of mutual adjustment and negotiation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How an integrated change programme has accelerated the reduction in high hazard nuclear facilities at Sellafield

For over five decades the Sellafield Site has been central to the UK's nuclear programme. Now operated by Sellafield Ltd, under the management of Parent Body Organisation Nuclear Management Partners (NMP), a consortium of URS Washington Division, AMEC and AREVA is focussed on the decommissioning of historical facilities. When Decommissioning commenced in the late 1980's the site focus at that time was on commercial reprocessing and waste management. Now through the implementation of a company change programme, emphasis has shifted towards accelerated risk and hazard reduction of degraded legacy plants with nuclear inventory whilst ensuring value for money for the customer, the Nuclear Decommissioning Authority. This paper will describe the management success by the Site owners in delivering a successful change programme. The paper will explain how the site has transitioned to the INPO Standard Nuclear Performance Model (SNPM) and how through the use of a change maturity matrix has contributed to the accelerated reduction in high risk high hazard nuclear facilities. The paper will explain in detail how the Decommissioning Programme Office has facilitated and coordinated the Governance and assured delivery of the change plan and how successful application of visual management has aided the communication of its progress. Finally, the paper will discuss how the Delivery Schedules have proved critical for presenting the change plan to Key Stakeholders, Government Owners and Powerful Regulators. Overall, this paper provides an insight into how a massive change programme is being managed within one of the world's highest regulated industries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory framework for NORM residues in Belgium

The Belgian radiation protection authority (Federal Agency for Nuclear Control - FANC) has published in March 2013 a decree regulating the acceptance of NORM residues by nonradioactive waste treatment facilities. This regulation is based on the concept of 'work activities involving natural radiation sources' in the sense of article 40 of the 96/29/EURATOM directive. The disposal or processing facilities which accept NORM residues with an activity concentration above a generic exemption level will be considered as 'work activities' and submitted to declaration according to the Belgian radiation protection regulations. On basis of this declaration, specific acceptance criteria for the different types of processing/ disposal of the residues (disposal on landfill, recycling into building materials, etc.) are imposed. FANC has drafted guidelines for these acceptance criteria. A methodological guide for the operators of the concerned facilities was also published. Moreover, sites where significant quantities of NORM residues are or have been disposed, are subjected to an environmental monitoring in the framework of the national program of radiological surveillance of FANC. FANC also introduced in its regulations the concept of anthropogenic radon-prone areas: e.g. former phosphogypsum stacks have been defined as anthropogenic radon-prone areas, which allows some form of regulatory control of these sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of the decommissioning of the Thetis reactor

The Thetis research reactor on the site of the Nuclear Sciences Institute of the Ghent University has been in operation from 1967 until December 2003. This light-water moderated graphite-reflected low-enriched uranium pool-type reactor has been used for various purposes e.g. the production of radioisotopes and activation analyses. During the first years its core power was 15 kW. In the early '70, a core enlargement allowed for operation at typically 150 kW, while the maximum was allowed to be 250 kW In September 2007, Ghent University entrusted to SCK-CEN the management of the back-end of the spent fuel and the decommissioning of the reactor. In 2010, the spent fuel was removed from the reactor and transported to Belgoprocess for cementation in 400 l drums and interim storage awaiting final disposal. This activity allows tackling the decommissioning of the reactor. The objective is to complete its decommissioning by the end of 2014. In the framework of the decommissioning of the Thetis reactor, SCK-CEN set-up the final decommissioning plan and the decommissioning licensing file. These documents include among others a radiological inventory of the reactor. The graphite moderator blocks, the control and the safety pates, the liner of the pool were modeled to assess the activation products (isotopic vector and intensity). At the end of the unloading of the reactor in 2010 a brief mapping of the equipment's and internals of the reactor pool was performed. In 2012, we realized a more detailed mapping. These results confirmed those performed earlier and allowed to confirm the assumptions made in the final decommissioning plan. We set-up the terms of reference for the first decommissioning phase of the reactor namely the dismantling of the reactor i.e. reactor pool, circuits and rabbit system, equipment's and ventilation ducts. The removal of asbestos is also included into this phase. We conducted the selection process and the awarding of this decommissioning job. We gained the decommissioning license in May 2012. We also prepared the software tool allowing managing the decommissioning project by updating the inventory and recording the progress, the characterization measurements and the material and waste production. This software allows also to trace all the material streams and to report to the Authorities. This software is a simplified release of the ones developed by SCK-CEN in the framework of other decommissioning projects like BR3 and Belgonucleaire. The dismantling of the reactor i.e. reactor pool, circuits and rabbit system, will be performed in 2013. In 2014, it is planned to map all the surfaces of the infrastructure to highlight residual contamination of floor, walls and ceiling. The contaminated surfaces will be decontaminated and controlled. The objective is to reach the free release of the reactor building and laboratories by the end of 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brennilis decommissioning - the case of the treatment station and the discharge channel remediation

The site of the Monts d'Arree located in Brennilis in the area of Brittany in France is a former 70 MWe heavy water reactor, that was jointly operated by CEA and EDF from 1967 until 1985. It was an industrial prototype. EDF is now in charge of its decommissioning. This paper presents the management plan and the remediation objectives that were approved by the French Nuclear Authority for the channel remediation and the first studies carried out for the future Treatment Station remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upstream Optioneering: Optimising Higher Activity Waste Management

The Upstream Optioneering project was created by the Nuclear Decommissioning Authority (NDA) Radioactive Waste Management Directorate (RWMD) to support the development and implementation of opportunities to optimise the management of UK higher activity waste, spent fuel and other materials that may be disposed of in a geological disposal facility. The project works in an integrative manner with the NDA, RWMD and waste producers, and was split into three phases: - In Phase 1 waste management opportunities were identified and collated from across the NDA estate. - In Phase 2, opportunities collated during Phase 1, were further consolidated, analysed and prioritised to develop a three year work programme. Prioritisation ensured that resources were deployed appropriately and opportunities can be realised before the potential benefit diminishes. - Phase 3, which began in April 2012, comprises a three year work programme to address the prioritised opportunities. Work varies from direct implementation of opportunities to scoping studies that may pave the way for more detailed subsequent work by Site Licence Companies. The work programme is flexible and, subject to change control, varies depending on the needs of project sponsors (RWMD, NDA Strategy and NDA Delivery). This paper provides an overview of the Upstream Optioneering project (focusing particularly on Phases 2 and 3), summarises work carried out to date within the three year work programme, and provides some examples of the main findings concerning specific opportunities from Year One of the Phase 3 work programme. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An integrated approach to geological disposal of UK wastes containing carbon-14

Carbon-14 is a key radionuclide in the assessment of the safety of a geological disposal facility for radioactive waste because of the calculated assessment of the radiological consequences of gaseous carbon-14 bearing species [i]. It may be that such calculations are based on overly conservative assumptions and that better understanding could lead to considerably reduced assessment of the radiological consequences from these wastes. Alternatively, it may be possible to mitigate the impact of these wastes through alternative treatment, packaging or design options. The Radioactive Waste Management Directorate of the UK's Nuclear Decommissioning Authority (NDA RWMD) has established an integrated project team in which the partners are working together to develop a holistic approach to carbon-14 management in the disposal system [ii]. For a waste stream containing carbon-14 to be an issue: There must be a significant inventory of carbon-14 in the waste stream; and That waste stream has to generate carbon-14 bearing gas; and a bulk gas phase has to entrain the carbon-14 bearing gas: and these gases must migrate through the engineered barriers in significant quantities; and these gases must migrate through the overlying geological environment (either as a distinct gas phase or as dissolved gas); and these gases must interact with materials in the biosphere (i.e. plants) in a manner that leads to significant doses and risks to exposed groups or potentially exposed groups. The project team has developed and used this 'and' approach to structure and prioritise the technical work and break the problem down in a manageable way. We have also used it to develop our approach to considering alternative treatment, packaging and design options. For example, it may be possible to pre-treat some wastes to remove some of the inventory or to segregate other wastes so that they are removed from any bulk gas phase which might facilitate migration through the geosphere. Initially, the project team has undertaken a six month programme of work to examine the current understanding of these aspects and has captured this in the Phase 1 report [ii], in a modelling basis spreadsheet and in scoping assessments, which help us better understand the potential significance of carbon-14. Using the current modelling basis, but ignoring any potential benefits from the geosphere in retarding or preventing gas from reaching the surface, the calculated release of carbon- 14 is dominated by: corrosion of irradiated reactive metals (in the operational and early post-closure time frame); corrosion of irradiated stainless steel and leaching of irradiated graphite (in the longer term). The Phase 1 work has shown that there is considerable scope for reducing the calculated radiological consequence for these wastes and a roadmap has been developed for a second Phase of work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a concept for a national used fuel interim storage facility in the United States

In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a 'Monitored Retrievable Storage' facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to build a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE's goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proven Technologies for the Solidification of Complex Liquid Radioactive Waste (LRW): Global Case Studies of Applications and Disposal Options - 20424

Legacy radioactive waste streams from the Cold War still exist and newly generated waste streams from nuclear power plants and research institutes go untreated and expose environmental hazards at many nuclear sites. The nature of the waste is diverse, depending upon the source or the process from which it originated. The most problematic waste streams include complex liquids such as organic (tri-butyl-phosphate TBP) solutions contaminated with Pu and U isotopes, mixed sludge types, high acid radioactive waste, H-3 contaminated organic and aqueous streams, etc. Technological, environmental and economic challenges exist for the treatment and disposal of such waste streams. A proven technology that has been applied to LRW on a global basis provides one option as a low-cost solution to legacy streams and small volume, highly complex LRW frequently found during decommissioning at nuclear power plants and weapons sites. The engineered polymer technology from Nochar, USA, is capable of solidifying standard and highly complex LLW and ILW waste streams for interim or final storage, or for incineration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Theoretical Solutions to a Bottom-Raised Oscillating Surge Wave Energy Converter (OSWEC) Through Experimental and Parametric Studies

Experiments were conducted on a wave tank model of a bottom raised oscillating surge wave energy converter (OSWEC) model in regular waves. The OSWEC model shape was a thin rectangular flap, which was allowed to pitch in response to incident waves about a hinge located at the intersection of the flap and the top of the supporting foundation. Torsion springs were added to the hinge in order to position the pitch natural frequency at the center of the wave frequency range of the wave maker. The flap motion as well as the loads at the base of the foundation were measured. The OSWEC was modeled analytically using elliptic functions in order to obtain closed form expressions for added mass and radiation damping coefficients, along with the excitation force and torque. These formulations were derived and reported in a previous publication by the authors. While analytical predictions of the foundation loads agree very well with experiments, large discrepancies are seen in the pitch response close to resonance. These differences are analyzed by conducting a sensitivity study, in which system parameters, including damping and added mass values, are varied. The likely contributors to the differences between predictions and experiments are attributed to tank reflections, standing waves that can occur in long, narrow wave tanks, as well as the thin plate assumption employed in the analytical approach.

analytical↗