Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Service Quality”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Detroit Commuter Hydrogen Project

This project was undertaken to demonstrate the viability of using hydrogen as a fuel in an internal combustion engine vehicle for use as a part of a mass transit system. The advantages of hydrogen as a fuel include renew-ability, minimal environmental impact on air quality and the environment, and potential to reduce dependence on foreign energy sources for the transportation sector. Recognizing the potential for the hydrogen fuel concept, the Southeast Michigan Congress of Governments (SEMCOG) determined to consider it in the study of a proposed regional mass transit rail system for southeast Michigan. SEMCOG wanted to evaluate the feasibility of using hydrogen fueled internal combustion engine (H2ICE) vehicles in shuttle buses to connect the Detroit Metro Airport to a proposed, nearby rail station. Shuttle buses are in current use on the airport for passenger parking and inter-terminal transport. This duty cycle is well suited to the application of hydrogen fuel at this time because of the ability to re-fuel vehicles at a single nearby facility, overcoming the challenge of restricted fuel availability in the undeveloped hydrogen fuel infrastructure. A cooperative agreement between SEMCOG and the DOE was initiated and two H2ICE buses were placed in regular passenger service on March 29, 2009 and operated for six months in regular passenger service. The buses were developed and built by the Ford Motor Company. Wayne County Airport Authority provided the location for the demonstration with the airport transportation contractor, Metro Cars Inc. operating the buses. The buses were built on Ford E450 chassis and incorporated a modified a 6.8L V-10 engine with specially designed supercharger, fuel rails and injectors among other sophisticated control systems. Up to 30 kg of on-board gaseous hydrogen were stored in a modular six tank, 350 bar (5000 psi) system to provide a 150 mile driving range. The bus chassis and body were configured to carry nine passengers with luggage. By collecting fuel use data for the two H2ICE buses, with both written driver logs and onboard telemetry devices, and for two conventional propane-gasoline powered buses in the same service, comparisons of operating efficiency and maintenance requirements were completed. Public opinion about the concept of hydrogen fuel was sampled with a rider survey throughout the demonstration. The demonstration was very effective in adding to the understanding of the application of hydrogen as a transportation fuel. The two 9 passenger H2ICE buses accumulated nearly 50,000 miles and carried 14,285 passengers. Data indicated the H2ICE bus fuel economy to be 9.4 miles/ gallon of gasoline equivalent (m/GGE) compared to the 10 passenger propane-gasoline bus average of 9.8 m/GGE over 32,400 miles. The 23- passenger bus averaged 7.4 m/GGE over 40,700 miles. Rider feedback from 1050 on-board survey cards was overwhelmingly positive with 99.6% indicating they would ride again on a hydrogen powered vehicle. Minimal maintenance was required for theses buses during the demonstration project, but a longer duration demonstration would be required to more adequately assess this aspect of the concept.

08 HYDROGEN↗

2014 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2013, through October 31, 2014. The report contains, as applicable, the following information; Site description; Facility and system description; Permit required monitoring data and loading rates; Status of compliance conditions and activities; and Discussion of the facility’s environmental impacts. The current permit expires on March 16, 2015. A permit renewal application was submitted to Idaho Department of Environmental Quality on September 15, 2014. During the 2014 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. Seepage testing of the three lagoons was performed between August 26, 2014 and September 22, 2014. Seepage rates from Lagoons 1 and 2 were below the 0.25 inches/day requirement; however, Lagoon 3 was above the 0.25 inches/day. Lagoon 3 has been isolated and is being evaluated for future use or permanent removal from service.

2014 Annual Wastewater Reuse Report Central Facili↗

SALTSTONE 2QCY09 TCLP RESULTS

A Saltstone waste form was prepared in the Savannah River National Laboratory from a Tank 50H sample and Z-Area premix material for the second quarter of calendar year 2009 (2QCY09). After the prescribed 28 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents. These analyses met all quality assurance specifications of USEPA SW-846. The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the second quarter of the 2009 calendar year (2QCY09), Tank 50 accepted transfers of approximately 32 kgal from the Effluent Treatment Project (ETP) waste, approximately 4 kgal from Tank 710 - the H-Canyon General Purpose Evaporator, approximately 156 kgal from the Modular Caustic Side Solvent Extraction Unit (MCU) Decontaminated Salt Solution Hold Tank (DSS-HT), and approximately 484 kgal from Tank 23. The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). SRNL was asked to prepare saltstone from a sample of Tank 50H obtained May 20, 2009 during 2QCY09 to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&WTSGRACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals - arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver - analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&WTSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Elementary Particle Physics (Final Report)

vATLAS and the LHC are delivering on the promise of discovery physics at the high energy frontier. Using 4.8 fb -1 of 2011 $\sqrt{s}$=7 TeV data and the first 5.8 fb -1 of 2012 $\sqrt{s}$=8 TeV data, ATLAS published the observation of a new particle with a mass of 126 GeV with a significance of 5.9σ that is compatible with a Standard Model (SM) Higgs. The LHC is outperforming initial projections for the 2012 run, and ATLAS is on track to integrate ~20 fb -1 of proton-proton collisions in 2012 before Long Shutdown 1 (LS1) begins in Spring 2013. University of Texas at Dallas (UTD) physicists will complete work on two ATLAS analyses this fall. The first is the search for the gauge bosons of a hypothesized dark sector. For 2011 data, UTD is responsible for the dark photon search in the electron-jet channel, and we are looking forward to an expanded leadership role in the dark photon search using the full 2012 data set. Our second analysis interest is the study of X/Y/Z exotic states having cc content, which builds on our experience in this field from the BABAR experiment After completing a measurement of the Xc(3872) production cross section this fall, we will search for evidence of the Z(4430)+ which is reported by Belle but not confirmed by BABAR. The UTD group has played a strong role in ATLAS operations, with group members serving as Pixel Run Coordinator, ATLAS Shift Leader, and Pixel/Inner Detector Shifter. For most of the current 3-year funding cycle, a group member coordinated the development of the Pixel DAQ code, and another continues to build and maintain the data quality monitoring (DQM) application that is used by the Inner Detector control room shifter. Additionally, members of our group take Pixel on-call expert shifts for DQM and DAQ. We led an optoboard lifetime study to assess concerns of premature on-detector VCSEL failure using the Pixel working prototype detector at CERN. Physicists based at UTD participated through Pixel Offline DQM and ATLAS Distributed Computing Operations Shifts (ADCoS) During Summer 2012, UTD joined upgrade activities in preparation for LS1. We took a major role in the testing of Electro-Readout (ER) Bundle testing for new Service Quarter Panels (nSQPs), and we developed two utilities to measure the timing jitter and bit error rate of the Pixel readout chain for use commissioning Pixel detector upgrades. During BABAR's heyday, the UTD group pioneered the use of e + e - annihilation events with hard Initial State Radiation (ISR) to study the charm threshold region, and we carried out the first BABAR double-cc analysis. Our most recent ISR paper, written in collaboration with A. Palano (Bari) is Exclusive Production of Ds + Ds - , D S *+ Ds - , and Ds *+ Ds *- via e+ e- Annihilation with Initial-State-Radiation was published in Physical Review D 82, 052004 (2010). Work continues on a study of ISR Λc + Λc - production, and a new search to establish and study double-ss production is starting.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Building 151 NNMA Clean Laboratory Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 151 NNMA Clean Laboratory Project (project) located immediately south of Building 154. The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL, 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA, 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO. In addition to environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection of geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - 836 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 836 Complex (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

The Idyllic Workplace

How many of us have worked in organizations where the discipline was so rigid and unyielding that it would send even a Marine Corps Drill Instructor screaming into the night? How many of us have worked in organizations where sightings of senior management were sporadic and rare, and any other interactions were by appointment only? Or, how many of us have worked in organizations where your role, absent specific direction, was to be seldom seen and rarely heard? And how many of us have worked in organizations where seemingly light itself was not permitted to escape without the acquiescence and approval of the director? Sadly, there are organizations that embody some of these conditions, and the resultant adverse effects on employee productivity, creativity and morale are profound. But what if you could work in an organization in which there was little hierarchy, where rank and seniority played no part, where there were no closed meetings or doors, where everyone knows what was expected of them, and where creativity was not only tolerated but encouraged and celebrated? Was there ever such a place? There was, and it was known as NASA's Space Station Task Force. I was fortunate enough to work there for a time, and I would like to tell you how this organization with few apparent rules led to incredibly high levels of employee satisfaction and fulfillment, and yielded work products of enduring quality. On May 20, 1982, NASA Administrator James M. Beggs established the Space Station Task Force under the direction of John D. Hodge. The Task Force was charged with the responsibility for "the development of the programmatic aspects of a Space Station as they evolve, including mission analysis, requirements definition and program management," and was authorized to draw on Space Station activities at the NASA Program Offices and Field Centers. No additional conditions or directions were provided. Hodge knew that in order to accomplish the job he had been given, he was going to have to obtain the services of the "best and the brightest" and facilitate the unleashing of the full force of their creative capabilities. In order to avoid the stultifying effects of a typical hierarchical organization, he set up a loosely structured, horizontal organization with only one supervisor of record - himself. He populated this organization with detailees from Headquarters, the field Centers and the Jet Propulsion Lab, thereby assuring himself of the political and technical expertise with which to deal with Congress and the bureaucracy, and conduct the required engineering studies and analyses.

Schoenfelder, Tony E.↗

Challenges in Obtaining and Visualizing Satellite Level 2 Data in GIS

Satellite data products are important for a wide variety of applications that can bring far-reaching benefits to the science community and the broader society. These benefits can best be achieved if the satellite data are well utilized and interpreted. Unfortunately, this is not always the case, despite the abundance and relative maturity of numerous satellite data products provided by NASA and other organizations. One way to help users better understand the satellite data is to provide data along with Images, including accurate pixel coverage area delineation, and science team recommended quality screening for individual geophysical parameters. However, there are challenges of visualizing remote sensed non-gridded products: (1) different geodetics of space-borne instruments (2) data often arranged in a long-track and a cross-track axes (3) spatially and temporally continuous data chunked into granule files: data for a portion (or all) of a satellite orbit (4) no general rule of resampling or interpolations to a grid (5) geophysical retrieval only based on pixel center location without shape information. In this presentation, we will unravel a new Goddard Earth Sciences Data and Information Services Center (GES DISC) Level 2 (L2) visualization on-demand service. The service's front end provides various visualization and data accessing capabilities, such as overlay and swipe of multiply variables and subset and download of data in different formats. The backend of the service consists of Open Geospatial Consortium (OGC) standard-compliant Web Mapping Service (WMS) and Web Coverage Service. The infrastructure allows inclusion of outside data sources served in OGC compliant protocols and allows other interoperable clients, such as ArcGIS clients, to connect to our L2 WCS/WMS.

GI↗

SpaceX Dragon 1 Post Flight MMOD Inspection Campaign

Introduction The SpaceX Dragon 1 spacecraft performed 20 resupply missions to the International Space Station (ISS) between 2012 and 2020. After each mission, a team from the NASA John-son Space Center Hypervelocity Impact Technology Group inspected each Dragon 1 capsule for hypervelocity impact damage features. Data from these inspections are collected into a database that includes impact feature dimensions as well as the location on the vehicle. Additional details on the type and size of particle that produced the damage site are provided when sampling data and definitive spectroscopic analysis results are available. Observation data can be compared with impact estimates from risk assessment codes as a check on the micrometeoroid and orbital debris (MMOD) environment predictions. Scope A general description of the areas of the vehicle that were inspected are provided as well as mission details such as exposure duration and launch dates. The paper documents the general inspection procedure for collection of data and the post inspection data analysis process. It also provides details of the observation data collected as well as the results of analysis of intact samples collected for spectroscopic analysis to discern the source of the impacting particle. A comparison between observed impacts and the expected number of damage features calculated by Bumper 3 with the latest MMOD environments are also presented. Findings Statistics on the >300 impact features documented in the database will provide insight into the depth to diameter ratios and other relationships. The quality of the comparison between the observations and code predictions are dependent on several factors. The paper provides de-tails of each of these variables. (1) Damage equations (2) Impact condition assumptions a. Projectile density b. Impact speed c. Impact angle (3) Analysis results a. pre-flight vs. on-orbit damage b. MMOD vs. non-MMOD Conclusions and Recommendations The ISS visiting vehicle impact database is an ongoing project. SpaceX provides crew rotations as well as resupply and cargo return with the Dragon 2 spacecraft. Sierra Space is manifested for resupply and cargo return services starting in 2023. Boeing is expected to provide crew rotations as well. All of these spacecraft will provide additional opportunities for post flight MMOD inspections of space exposed hardware. Acknowledgements Over the course of the inspection campaign various personnel at the SpaceX Texas Test Site in McGregor and at the SpaceX headquarters in Hawthorne CA provided valuable support to this activity.

James L Hyde↗

The price of commitment in online stochastic vehicle routing

This paper considers online stochastic multiple vehicle routing with time windows in which requests arrive dynamically and the goal is to maximize the number of serviced customers. Early work has focused on very flexible routing settings where the decision to assign a vehicle to a customer is delayed until a vehicle is actually deployed to the customer. Motivated by real applications that require stability in the decision making, this paper considers a setting where the decision to assign a customer request to a vehicle must be taken when that request is accepted. Experimental results suggest that this constraint severely degrades the performance of existing algorithms. However, the paper shows how the use of stochastic information for vehicle assignment and request acceptance improves decision quality considerably. Moreover, the use of resource augmentation quantifies precisely the cost of commitment in online vehicle routing.

97 MATHEMATICS AND COMPUTING↗

SALTSTONE 2QCY08 TCLP RESULTS

A Saltstone waste form was prepared in the Savannah River National Laboratory from a Tank 50H sample and Z-Area premix material for the second quarter of calendar year 2008 (2QCY08). After the prescribed 28 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents. These analyses met all quality assurance specifications of USEPA SW-846. The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the second quarter of the 2008 calendar year (2QCY08), Tank 50 accepted transfers of approximately 21 kgal from the Effluent Treatment Project (ETP) waste, approximately 3 kgal from Tank 710--the H-Canyon General Purpose Evaporator, and approximately 23 kgal form the Modular Caustic Side Solvent Extraction Unit (MCU) Decontaminated Salt Solution Hold Tank (DSS-HT). The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). SRNL was asked to prepare saltstone from a sample of Tank 50H obtained June 5, 2008, during 2QCY08 processing to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&WTSG-RACL) to perform the Toxic Characteristic Leaching Procedure (TCLP)2 and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals-arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver-analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge.3 B&WTSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-G-IeP3-01: Better Kerma-Area-Product (KAP) Estimation Using the System Parameters in Radiography and Fluoroscopy

Purpose: Accurate values for Kerma-Area-Product (KAP) are needed for patient dosimetry and quality control for exams utilizing radiographic and/or fluoroscopic imaging. The KAP measured using a typical direct KAP meter built with parallel-plate transmission ionization chamber is not precise and depends on the energy spectrum of diagnostic x-rays. This study compared the accuracy and reproducibility of KAP derived from system parameters with values measured with a direct KAP meter. Methods: IEC tolerance for displayed KAP is specified up to ± 35% above 2.5 Gy-cm{sup 2} and manufacturer’s specifications are typically ± 25%. KAP values from the direct KAP meter drifts with time leading to replacement or re-calibration. More precise and consistent KAP is achievable utilizing a database of known radiation output for various system parameters. The integrated KAP meter was removed from a radiography system. A total of 48 measurements of air kerma were acquired at x-ray tube potential from 40 to 150 kVp with 10 kVp increment using ion chamber type external dosimeter at free-in-air geometry for four different types of filter combinations following the manufacturer’s service procedure. These data were used to create updated correction factors that determine air kerma computationally for given system parameters. Results of calculated KAP were evaluated against results using a calibrated ion chamber based dosimeter and a computed radiography imaging plate to measure x-ray field size. Results: The accuracy of calculated KAP from the system parameters was better within 4% deviation in all diagnostic x-ray tube potentials tested from 50 to 140 kVp. In contrast, deviations of up to 25% were measured from KAP displayed from the direct KAP meter. Conclusion: The “calculated KAP” approach provides the nominal advantage of improved accuracy and precision of displayed KAP as well as reduced cost of calibrating or replacing integrated KAP meters.

60 APPLIED LIFE SCIENCES↗

SALTSTONE 3QCY09 TCLP RESULTS

A Saltstone waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the third quarter of calendar year 2009 (3QCY09). After the prescribed 28 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents. These analyses met all quality assurance specifications of USEPA SW-846. The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the third quarter of the 2009 calendar year (3QCY09), Tank 50H accepted transfers of approximately 37 kgal from the Effluent Treatment Project (ETP) waste, approximately 5 kgal from Tank 710 - the H-Canyon General Purpose Evaporator, approximately 26 kgal from Tank 221H, approximately 319 kgal from the Modular Caustic Side Solvent Extraction Unit (MCU) Decontaminated Salt Solution Hold Tank (DSS-HT), and approximately 358 kgal from Tank 23H. The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). Savannah River National Laboratory (SRNL) was asked to prepare saltstone from a sample of Tank 50H obtained August 5, 2009 during 3QCY09 to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&WTSG-RACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals-arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver-analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&WTSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - Chem Mag Loop Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Chem Mag Loop (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

Site 300 Roadway Improvements - 834 Complex Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 834 Complex (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗