Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Prediction of service life of aircraft structural components using the half-cycle method

The service life of aircraft structural components undergoing random stress cycling was analyzed by the application of fracture mechanics. The initial crack sizes at the critical stress points for the fatigue-crack growth analysis were established through proof load tests. The fatigue-crack growth rates for random stress cycles were calculated using the half-cycle method. A new equation was developed for calculating the number of remaining flights for the structural components. The number of remaining flights predicted by the new equation is much lower than that predicted by the conventional equation.

Ko, William L.↗

Design, development and deployment of public service photovoltaic power/load systems for the Gabonese Republic

Five different types of public service photovoltaic power/load systems installed in the Gabonese Republic are discussed. The village settings, the systems, performance results and some problems encountered are described. Most of the systems performed well, but some of the systems had problems due to failure of components or installation errors. The project was reasonably successful in collecting and reporting data for system performance evaluation that will be useful for guiding officials and system designers involved in village power applications in developing countries.

Kaszeta, William J.↗

Development of a standard connector for orbital replacement units for serviceable spacecraft

The current trend for spacecraft to be serviceable and repairable in orbit has led to a modular approach to satellite subsystem design. Spacecraft equipment, such as sensors, tape recorders, computers, transponders, batteries, etc., housed in discrete modular units, (Orbital Replacement Units(ORUs)) can be attached and detached to the spacecraft as needed. The interface between the ORU and the spacecraft is crucial. The projected use of robotics and the need for a common mechanism capable of performing several functions puts many constraints on the design of the interface. Such an interface mechanisms was designed and developed called the Standard Interface Connector (SIC) that mates the ORU to the spacecraft. The SIC also provides for the flow of fluids, data, and power between the module and spacecraft. The baseline design presented can be configured to provide various attachment schemes. Tests on SIC models have demonstrated the functionality of the design and its compatibility with current robotics.

Heath, Ellen F.↗

NASA's robotic servicing role for Space Station

Attention is given to evaluations of the relative impacts on and benefits to the Space Station Program of various levels of robotics devices for space servicing operations. The leading robotic candidate concept for the IOC Space Station, the Smart Front End, uses a small, stiff and highly dexterous work effector controlled by a human-in-the-loop from a remote control station. This configuration offers both a quality multifunctional performance capability at the work site as well as technology transparency through the ground teleoperation control mode.

Powell, L.↗

Concepts for on-orbit servicing of SIRTF

The usable lifetime of the Space Infrared Telescope Facility (SIRTF) has been assumed to be limited to about two years by the lifetime of the superfluid helium carried in the telescope dewar. Concepts are presented for extending the system life by replenishing the cryogen on orbit, and for replacing the focal plane instruments. The operational aspects and the modifications to the baseline SIRTF are examined. It appears to be feasible to perform these servicing operations based on either the Space Shuttle or on the Space Station.

Mord, A. J.↗

Ten years of flight service with DC-10 composite rudders - A backward glance

Carbon-epoxy upper aft rudders have been successfully evaluated on the DC-10 during 10 years of airline flight service. They have flown for more than 320,000 flight hours, with 36,000 flight hours flown by a single rudder. The rudder box is of thin-skin buckled construction and is cocured out-of-autoclave as a one-piece assembly. Weight saving can exceed the rudder weight if full advantage is taken of removing balance weight from the forward rudder.

Hawley, Arthur V.↗

A reliable pipelining protocol for the message service of the Mobile Satellite Experiment

This paper describes and analyzes a pipelining protocol for the data message communications of MSAT-X, a proposed experimental satellite-based mobile communications network. A demand assigned multiple access protocol using pure ALOHA for making reservation requests has been developed for MSAT-X under error-free assumptions. Preliminary propagation studies indicate that the short term bit error rate of satellite channels in a mobile environment can be as high as 0.001. Therefore, error-control schemes must be developed to ensure reliable transmissions. A retransmission scheme using selective repeat to minimize the end-to-end delay is proposed. Slotted ALOHA for making reservation requests is used to increase the overall system throughput. Since the number of channels available for reservation and data channels is essentially fixed for a given voice call blocking probability and a fixed call arrival rate, the analysis presented in this paper is also applicable to the integrated voice and data services of MSAT-X. Various operational scenarios have been investigated.

Li, V. O. K.↗

Battelle estimate of launch service demand

The annual non-NASA non-DOD demand for launches by non-Soviet services is estimated for the period 1986-2001 on the basis of currently available data. The assumptions and methods employed in generating the bottom-up Outside Users Payload Model, the data sources, and the use of equivalent Space Shuttle flights as a payload measure are explained in detail. The numerical results are presented in extensive tables and graphs and briefly characterized.

Conlon, R. J.↗

Space Assembly, Maintenance, and Servicing Study (SAMSS)

The goal is to define and establish Space Assembly, Maintenance, and Servicing (SAMS) capabilities to meet requirements for improved space systems. Consolidated requirements, hardware/tool concepts, systems analysis, related studies interaction, and schedule/milestones are outlined. This presentation is represented by charts and figures only.

Wong, Joseph↗

An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

Miller, Edward F.↗

Explorer Platform on-orbit servicing operations

Explorer Platform development and capabilities are outlined. The Explorer Platform extends the user provisions of the Multimission Modular Spacecraft to include power generation and distribution and on-orbit exchange of payload modules. The platform can be integrated with its payload and launched on an expendable launch vehicle or it can be carried separately from its payload on the Space Shuttle and assembled with its payload on-orbit. Later Shuttle flights can revisit the Platform to perform servicing or payload exchange. This capability to support several payloads in succession allows costs to be shared by several users over the 10 yr life of the platform.

Moe, Rud V.↗

The space station assembly phase: Flight telerobotic servicer feasibility. Volume 2: Methodology and case study

A methodology is described for examining the feasibility of a Flight Telerobotic Servicer (FTS) using two assembly scenarios, defined at the EVA task level, for the 30 shuttle flights (beginning with MB-1) over a four-year period. Performing all EVA tasks by crew only is compared to a scenario in which crew EVA is augmented by FTS. A reference FTS concept is used as a technology baseline and life-cycle cost analysis is performed to highlight cost tradeoffs. The methodology, procedure, and data used to complete the analysis are documented in detail.

Smith, Jeffrey H.↗

Orbiter processing facility service platform failure and redesign

In a high bay of the Orbiter Processing Facility (OPF) at the Kennedy Space Center, technicians were preparing the space shuttle orbiter Discovery for rollout to the Vehicle Assembly Building (VAB). A service platform, commonly referred to as an OPF Bucket, was being retracted when it suddenly fell, striking a technician and impacting Discovery's payload bay door. A critical component in the OPF Bucket hoist system had failed, allowing the platform to fall. The incident was thoroughly investigated by both NASA and Lockheed, revealing many design deficiencies within the system. The deficiencies and the design changes made to correct them are reviewed.

Harris, Jesse L.↗

Service offerings and interfaces for the ACTS network of Earth stations

The Advanced Communications Satellite (ACTS) is capable of two modes of communication. Mode 1 is a mesh network of Earth stations using baseband-switched, time-division multiple-access (BBS-TDMA) and hopping beams. Mode 2 is a mesh network using satellite-switched, time-division multiple-access (SS-TDMA) and fixed (or hopping) beams. The purpose of this paper is to present the functional requirements and the design of the ACTS Mode 1 Earth station terrestrial interface. Included among the requirements are that: (1) the interface support standard telecommunications service offerings (i.e., voice, video and data at rates ranging from 9.6 kbps to 44 Mbps); (2) the interface support the unique design characteristics of the ACTS communications systems (e.g., the real time demand assignment of satellite capacity); and (3) the interface support test hardware capable of validating ACTS communications processes. The resulting interface design makes use of an appropriate combination of T1 or T3 multiplexers and a small central office (maximum capacity 56 subscriber lines per unit).

Coney, Thom A.↗

National plans for aircraft icing and improved aircraft icing forecasts and associated warning services

Recently, the United States has increased its activities related to aircraft icing in numerous fields: ice phobics, revised characterization of icing conditions, instrument development/evaluation, de-ice/anti-ice devices, simulated supercooled clouds, computer simulation and flight tests. The Federal Coordinator for Meteorology is involved in two efforts, one a National Plan on Aircraft Icing and the other a plan for Improved Aircraft Icing Forecasts and Associated Warning Services. These two plans will provide an approved structure for future U.S. activities related to aircraft icing. The recommended activities will significantly improve the position of government agencies to perform mandated activities and to enable U.S. manufacturers to be competitive in the world market.

Pass, Ralph P.↗

Mobile satellite service for Canada

The Mobile Satellite (MSAT) system and a special program designed to provide interim mobile satellite services (IMSS) during the construction phase of MSAT are described. A mobile satellite system is a key element in extending voice and and data telecommunications to all Canadians.

Sward, David↗

AUSSAT mobile satellite services

An overview of AUSSAT's planned mobile satellite system is given. The development program which is being undertaken to achieve the 1992 service date is described. Both business and technical aspects of the development program are addressed.

Nowland, Wayne L.↗