Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite s White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with landing and turnaround maintenance performed. The Flight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development (R&D). NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of this effort, the X-37 team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff R&D and provides valuable experience to implement the Vision for Space Exploration.

Turner, Susan↗

X-57 Traction Power and Command Systems Development

This paper describes the final, as-built design of the X‑57 Maxwell aircraft power and command system architecture that implements the electrified propulsion capability. The development of the traction power, command, and avionics power subsystems proceeded as planned at the initial project critical design review, but improvements to the design were identified following the development of detailed operations concepts and integrated subsystem and system testing. The redundant architecture with A‑side and B‑side buses provided a robust framework for a developmental system that would turn out to have a lower technology readiness than had been assumed upon project formulation. As the project team identified reliability or performance gaps in the electrified propulsion powertrain components and their interactions with the other vehicle systems, the traction power, command, and avionics architectures were modified to accommodate the modified systems. Following the publication of the planned design approach at the critical design review milestone [1], the project team developed the flight hardware and software, integrated the systems, and adjusted the design and qualification activities to address gaps in the components, system architecture, and requirements as the gaps were realized. In addition to inherent challenges in development of these subsystems, the integration of this new technology with adjacent critical systems in an aircraft configuration posed additional challenges that drove design considerations across the subsystem development and the other vehicle systems. Integration complications included electromagnetic compatibility, thermal performance, and tolerance of single-point failures internal and external to the powerplant. Development of a qualification program was required for the new motors, inverters, and batteries, and hardware performance during component qualification fed back into the development process and led lessons learned and redesign of key elements.

distributed propulsion↗

Useful Life Prediction for Payload Carrier Hardware

The Space Shuttle has been identified for use through 2020. Payload carrier systems will be needed to support missions through the same time frame. To support the future decision making process with reliable systems, it is necessary to analyze design integrity, identify possible sources of undesirable risk and recognize required upgrades for carrier systems. This project analyzed the information available regarding the carriers and developed the probability of becoming obsolete under different scenarios. In addition, this project resulted in a plan for an improved information system that will improve monitoring and control of the various carriers. The information collected throughout this project is presented in this report as process flow, historical records, and statistical analysis.

Ben-Arieh, David↗

Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

Simon, Tom↗

The Last Orbit: Planning Cassini's Plummet into Saturn

Cassini’s final orbit around Saturn will culminate in a dramatic ending as the spacecraft plunges into the ringed planet’s atmosphere, never to escape or be heard from again. The last hours of the mission prior to the final loss of signal have some of the most unique and valuable science to date. Cassini will take a unique trajectory to dive deep into the atmosphere on its approach to final disposal and no spacecraft, Cassini included, has entered these depths of Saturn’s atmosphere. The science community has placed heavy emphasis onthis once-in-a-lifetime opportunity to inspect these deeper regions of Saturn’s atmosphere. The Cassini project specifically aims to collect the very last bits of data during the final plunge to get samples of the deepest regions before the spacecraft is lost forever. The desire to collect the final bits of data presents several challenges. Cassini’s Mission Planning (MP) team has developed an End of Mission (EOM) scenario to tackle these demands. The EOM scenario outlines the framework for the entire last orbit of the mission and details thestrategy for data collection and transmission. Attaining near real-time transmission is key for the acquisition of the very last bits of data. The Cassini spacecraft will use a new mode of operations to successfully achieve this real-time transmission. In addition to this primary investigation and planning for telecommunications, key risks have been studied within the realm of the last orbit. Ultimately, this paper shows how the Cassini Project plans to ensurethe return of every last bit of data before the spacecraft is consumed by Saturn forever.

Bittner, Molly E.↗

NASA’s Moon-to-Mars Planetary Autonomous Construction Technology Project: Overview and Status

NASA plans to land the first woman and next man on the Moon by 2025 through the initial Artemis missions. NASA and its international partners plan to establish a sustainable long-term presence on the lunar surface and build up infrastructure in the subsequent Artemis missions. The Lunar Surface Innovation Initiative (LSII), within NASA’s Space Technology Mission Directorate, aims to spur the creation of novel technologies needed for lunar surface exploration and accelerate the technology readiness of key systems and components. The primary thrust areas of LSII include sustainable power; dust mitigation; in-situ resource utilization; surface excavation, construction, and outfitting; and extreme access/extreme environments. The Moon-to-Mars Planetary Autonomous Construction Technology (MMPACT) project was initiated to address the lunar surface construction thrust area of LSII. The goal of the MMPACT project is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms and blast shields using lunar regolith-based materials. The MMPACT project is leveraging technology derived from NASA’s 3D Printed Mars Habitat Challenge along with contributions from other Government agencies, and multiple partners within industry and academia. The MMPACT project is comprised of three interrelated elements, construction hardware and process development; feedstock materials development; and microwave structure construction capabilities. These elements are working together to address the multiple challenges of infrastructure construction on the surface of the Moon including increased autonomy of operations, hardware operation and manufacturing under lunar environmental conditions, long-duration operation of mechanisms and parts, scale of construction activities, and material and construction requirements and standards. This presentation will summarize the status of development activities in each of the three elements, including testing of the various candidate materials, preliminary design concepts for future lunar infrastructure elements, and the vision for future technology demonstrations on the lunar surface. These demonstrations, targeting the mid-to-late 2020’s, are expected to enable landing pad construction and habitat construction resulting in commercial capabilities early in the next decade.

Additive construction, regolith processing, lunar ↗

New Directions for NASA's Advanced Life Support Program

Advanced Life Support (ALS), an element of Human Systems Research and Technology s (HSRT) Life Support and Habitation Program (LSH), has been NASA s primary sponsor of life support research and technology development for the agency. Over its history, ALS sponsored tasks across a diverse set of institutions, including field centers, colleges and universities, industry, and governmental laboratories, resulting in numerous publications and scientific articles, patents and new technologies, as well as education and training for primary, secondary and graduate students, including minority serving institutions. Prior to the Vision for Space Exploration (VSE) announced on January 14th, 2004 by the President, ALS had been focused on research and technology development for long duration exploration missions, emphasizing closed-loop regenerative systems, including both biological and physicochemical. Taking a robust and flexible approach, ALS focused on capabilities to enable visits to multiple potential destinations beyond low Earth orbit. ALS developed requirements, reference missions, and assumptions upon which to structure and focus its development program. The VSE gave NASA a plan for steady human and robotic space exploration based on specific, achievable goals. Recently, the Exploration Systems Architecture Study (ESAS) was chartered by NASA s Administrator to determine the best exploration architecture and strategy to implement the Vision. The study identified key technologies required to enable and significantly enhance the reference exploration missions and to prioritize near-term and far-term technology investments. This technology assessment resulted in a revised Exploration Systems Mission Directorate (ESMD) technology investment plan. A set of new technology development projects were initiated as part of the plan s implementation, replacing tasks previously initiated under HSRT and its sister program, Exploration Systems Research and Technology (ESRT). The Exploration Life Support (ELS) Project, under the Exploration Technology Development Program, has recently been initiated to perform directed life support technology development in support of Constellation and the Crew Exploration Vehicle (CEV). ELS) has replaced ALS, with several major differences. Thermal Control Systems have been separated into a new stand alone project (Thermal Systems for Exploration Missions). Tasks in Advanced Food Technology have been relocated to the Human Research Program. Tasks in a new discipline area, Habitation Engineering, have been added. Research and technology development for capabilities required for longer duration stays on the Moon and Mars, including bioregenerative system, have been deferred.

Barta, Daniel J.↗

Informative Path Planning for Mapping Radiation

This project involves making measurements of contaminated areas using portable radiation detectors and small robots. Tasks involve operating detectors and small robots, combining data acquisition for the two systems, and automating the systems. The end result is a radiation map of contamination areas. Localization of radioactive sources and mapping of contamination distribution is essential when responding to emergencies, or when dealing with cleanup efforts. Radiation maps are used for situational awareness and for establishing a safe perimeter. However, it may be hazardous or impossible for humans to safely enter the site and survey the area. Informative Path Planning (IPP) is used to design a path for a robotic sensor platform to gather the most information about the radiation distribution while operating under the set of constraints given by the dynamics of the robot and other requirements such as minimizing the overall mission time. The key challenge for IPP is the tight coupling in multiple layers of decisions: Selection of locations to visit; Allocation of sensors to those locations; Processing of information gathered. Given a robot equipped with a basic gamma detector and Lidar sensor, how can we efficiently explore an unknown environment in such a way that we can satisfy the robot's constraints while simultaneously maximizing the accuracy of the map and minimizing the total runtime? This work presents a systematic procedure for IPP and environmental mapping that: Selects the best locations at which to sample; Finds the best path for robots; Estimates the measurement value at unknown locations using a Gaussian Process regression framework. Given a set of points where radiation measurements were taken, we are utilizing a Gaussian Process Regression with a Matern kernel to reconstruct the shape of the underlying ground truth. Mapping is done via the Robot Operating System's OpenSlam Gmapping package, which creates a 2D occupancy grid map. Simulated trials were run with a radiation source placed at random locations, and allowing the robot to select and move towards 20 samples at separate locations, as well as sampling along the path while moving. The simulated sensor model assumed an efficiency of 0.3, collection time of 1 second. Various weighting schemes were tested and compared. Quantitative evaluations often favored exploitation-heavy weighting schemes where μ was emphasized, with the Root Mean Squared Error (RMSE) quickly tending towards 2, whereas qualitative comparisons would favor exploration-biased schemes with greater weight on σ. The difference comes from operators often favoring knowing the general location of a source, rather than the exact properties of a source. Weighting of the path-length π often reduced the quality of the regression as less exploration occurred, however this may be deemed a worthwhile trade-off under certain circumstances, such as with sensitive robots. Successfully developed a methodology for informative path-planning for a robot to efficiently gather information and create a map of radiation. In the future, we would like to focus on: Hardware trials with integration of the robot platform and the IPP software; More refined sensor and environmental modeling; Multiple robot platforms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Augmented Reality Rendering of Computed Tomography 3-D Density Data

Overall Objectives: Purchase equipment and Software required to develop the technology; Import CT Data for viewing on an AR device; Develop the tools necessary to manipulate the data in AR. With Augmented and Virtual Reality technology becoming more common and affordable everyday, new visualization techniques need to be developed that can leverage this technology to visualize data in new and useful ways. Computed Tomography (CT) scans, are the result of a powerful X-ray machine taking multiple images of the same object. These images represent slices of the original object and have extremely high resolution. Because of the high resolution, CT scanning is often used in the medical field but is becoming increasingly predominate in diverse industrial fields as well. This is an example of a CT scan that shows an object with multiple items inside. These items are represented by different colors in gray scale to indicate different densities. This is also from the data set used for the duration of the project. The data sets usually contain hundreds of slides that looks like just like this. Visualizing these large data sets can be difficult. The general approach for this seedling was to identify the devices and software that are currently in use for data visualization and evaluate them for use in the project. After that a plan was made to convert the data into a format viewable in AR. Tools were then developed to manipulate that data. The project was a success, but there is plenty of room to advance the technology and create better visualizations.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NASA’s Moon-to-Mars Planetary Autonomous Construction Technology Project: Overview and Status

NASA plans to land the first woman and next man on the Moon by 2025 through the initial Artemis missions. NASA and its international partners plan to establish a sustainable long-term presence on the lunar surface and build up infrastructure in the subsequent Artemis missions. The Lunar Surface Innovation Initiative (LSII), within NASA’s Space Technology Mission Directorate, aims to spur the creation of novel technologies needed for lunar surface exploration and accelerate the technology readiness of key systems and components. The primary thrust areas of LSII include sustainable power; dust mitigation; in-situ resource utilization; surface excavation, construction, and outfitting; and extreme access/extreme environments. The Moon-to-Mars Planetary Autonomous Construction Technology (MMPACT) projectwas initiated to address the lunar surface construction thrust area of LSII. The goal of the MMPACT project is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms and blast shields using lunar regolith-based materials. The MMPACT project is leveraging technology derived from NASA’s 3D Printed Mars Habitat Challenge along with contributions from other Government agencies, and multiple partners within industry and academia. The MMPACT project is comprised of three interrelated elements, construction hardware and process development; feedstock materials development; and microwave structure construction capabilities. These elements are working together to address the multiple challenges of infrastructure construction on the surface of the Moon including increased autonomy of operations, hardware operation and manufacturing under lunar environmental conditions, long-duration operation of mechanisms and parts, scale of construction activities, and material and construction requirements and standards. This presentation will summarize the status of development activities in each of the three elements, including testing of the various candidate materials, preliminary design concepts for future lunar infrastructure elements, and the vision for future technology demonstrations on the lunar surface. These demonstrations, targeting the mid-to-late 2020’s, are expected to enable landing pad construction and habitat construction resulting in commercial capabilities early in the next decade.

lunar infrastructure↗

Automated treatment planning for a dedicated multi-source intracranial radiosurgery treatment unit using projected gradient and grassfire algorithms

Purpose: The purpose of this work is to develop a framework to the inverse problem for radiosurgery treatment planning on the Gamma Knife{sup Registered-Sign} Perfexion Trade-Mark-Sign (PFX) for intracranial targets. Methods: The approach taken in the present study consists of two parts. First, a hybrid grassfire and sphere-packing algorithm is used to obtain shot positions (isocenters) based on the geometry of the target to be treated. For the selected isocenters, a sector duration optimization (SDO) model is used to optimize the duration of radiation delivery from each collimator size from each individual source bank. The SDO model is solved using a projected gradient algorithm. This approach has been retrospectively tested on seven manually planned clinical cases (comprising 11 lesions) including acoustic neuromas and brain metastases. Results: In terms of conformity and organ-at-risk (OAR) sparing, the quality of plans achieved with the inverse planning approach were, on average, improved compared to the manually generated plans. The mean difference in conformity index between inverse and forward plans was -0.12 (range: -0.27 to +0.03) and +0.08 (range: 0.00-0.17) for classic and Paddick definitions, respectively, favoring the inverse plans. The mean difference in volume receiving the prescribed dose (V{sub 100}) between forward and inverse plans was 0.2% (range: -2.4% to +2.0%). After plan renormalization for equivalent coverage (i.e., V{sub 100}), the mean difference in dose to 1 mm{sup 3} of brainstem between forward and inverse plans was -0.24 Gy (range: -2.40 to +2.02 Gy) favoring the inverse plans. Beam-on time varied with the number of isocenters but for the most optimal plans was on average 33 min longer than manual plans (range: -17 to +91 min) when normalized to a calibration dose rate of 3.5 Gy/min. In terms of algorithm performance, the isocenter selection for all the presented plans was performed in less than 3 s, while the SDO was performed in an average of 215 min. Conclusions: PFX inverse planning can be performed using geometric isocenter selection and mathematical modeling and optimization techniques. The obtained treatment plans all meet or exceed clinical guidelines while displaying high conformity.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Collaborative Mission Design at NASA Langley Research Center

NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

Gough, Kerry M.↗

Solar Energy Extension Project

The town of Stratford plans to develop and own a 6 kilowatt (kW) solar array on the roof of a municipal-owned public pavilion on the town green. A SolarEdge level 2 EV charging station will be installed at the pavilion to be used by the public. The charging station will have one charging port. The town will install 3 air source heat pumps in the library located adjacent to the pavilion to reduce the use of propane to heat the library. The town will install 4 air source heat pumps in the Town Hall to reduce the use of #2 heating oil to heat the facility. The 6 kW solar array will provide electricity to the library to offset electricity usage, and when an EV plugs into the charging station the solar will provide electricity to the charging station. There is no ground disturbance or ground trenching associated with this project. The 6 kW solar array on the roof of the pavilion will include 20 (390) watt all black panels. A SolarEdge level 2 EV charger will be installed at the pavilion with the 240 V inverter. The solar array will provide electricity to the library and when a vehicle plugs into the EV charger the solar array will switch to power the charger. Any excess electricity that is generated by the array and not used by the library or the EV charger will be fed onto the grid and the town will receive a net metering credit applied towards future consumption. There is no ground disturbance associated with the EV charger or solar array, and the town will install signage to direct the public to the charger. The library will install 2 (18,000) BTU ductless air source heat pumps and 1 (24,000) BTU unit. This will significantly reduce the amount of propane required to heat the library. The Town Hall will install 2 (36,000) BTU ductless air source heat pumps and 2 (9,000) BTU units to reduce the amount of #2 heating oil required to heat the building.

14 SOLAR ENERGY↗

Positioning People for Effective Communication and Coordination - 18033

If the aim of people working together is to solve complex problems and develop creative solutions, would it make sense to position people to actually do this kind of work? A growing number of project teams span organizational boundaries: government agencies coordinate with other government agencies, private companies conduct major projects for government agencies, and public utilities coordinate decision-making with citizen groups. In such instances, these project teams are especially vulnerable to experiencing a gap in expectations in terms of how people should communicate and coordinate with one another. If these gaps are not addressed, communication bogs down, those involved in the project become frustrated and impatient, and solving complex problems and developing creative solutions becomes challenging if not impossible. However, it is possible to position people to effectively communicate and coordinate. One approach is to give attention to the discussion and development of a P3 Plan that describes how the project team agrees to coordinate its efforts and toward what ends. A P3 Plan is developed by the project team typically through one or more facilitated conversations. Multiple US government-to-government, government/contractor, and government/public citizen groups and teams have used this approach and have been successful moving beyond their own self-interests to deal with controversial issues. The project benefits because the work product combines the best thinking from everyone, eliminating potential political and turf battles from the start. (authors)

99 GENERAL AND MISCELLANEOUS↗