Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLANT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Impact of Space Radiation on Plant Seeds: from Arabidopsis thaliana to Crops

One of the major concerns for long-term exploration missions beyond the Earth’s magnetosphere is radiation risk, primarily from solar particle events (SPE) and galactic cosmic rays (GCR). With the goal of manned Mars exploration, the production of fresh food during long-duration space missions provides critical nutritional supplementation and may also benefit astronauts’ behavioral health. However, the effects of space radiation on plants and plant propagules have not been sufficiently investigated and characterized. This is the final report of our project to summarize the findings of the effect of space radiation exposure on plant seeds from morphometrics, nutritiaonal values, to molecular machenisms. In this study, we evaluated the effect of simulated GCR (using dry seeds) or SPE (using hydrated seeds) on seeds of Arabidopsis, Mizuna mustard, ‘Outredgeous’ red romaine lettuce, and ‘Red Robin’ dwarf tomato. Seeds were exposed to various doses of simulated space radiation scenarios, either acutely or at a low dose rate (LDR), using the NASA Space Radiation Laboratory (NSRL) facility at Brookhaven National Lab (BNL). Exposure to simulated GCR or SPE at the levels tested had no significant impact on the germination rate in Arabidopsis and crop seeds; however, GCR reduced the viability of lettuce and tomato seeds. Overall, the morphological changes of the seedlings cultured from irradiated seeds were dose- and ion quality- dependent, with heavier ions causing more severe damage. These changes ranged from cotyledon deformation, shortened root length, smaller seedling size, and other signs of stress, depending on the seed types. Both 40 and 80 cGy (LDR) exposures of GCR or SPE significantly affected tomato early seedling development, delayed tomato fruiting, and reduced the total yield of tomato. Altered nutritional values were also found in edible biomass, especially for the GCR 80 cGy (LDR) groups. Underlying mechanisms were furtherly evaluated using transcriptomic analysis. For both GCR and SPE, 40 cGy showed some effects, but to a much lesser extent compared with 80 cGy, which can be considered as the “maximum permissible exposure” for the seed types we evaluated in this study. The impact of space radiation on seeds potentially affects the ability of plants to adapt to other environmental stresses (e.g. microgravity, water stress, and hardware constraints) as well as susceptibility to plant diseases, which need to be furtherly investigated. This research is funded by NASA’s Human Research Program.

J.T. Richards↗

Contrasting colonization and plant growth promoting capacity between wild type and gfp-derative of the endophyte Pseudomonas putida W619 in hybrid poplar

This study aims to investigate the colonization of poplar by the endophyte Pseudomonas putida W619 and its capacity to promote plant growth. Poplar cuttings were inoculated with P. putida W619 (wild-type or gfp-labelled). The colonization of both strains was investigated and morphological, physiological and biochemical parameters were analyzed to evaluate plant growth promotion. Inoculation with P. putida W619 (wild-type) resulted in remarkable growth promotion, decreased activities of antioxidative defence related enzymes, and reduced stomatal resistance, all indicative of improved plant health and growth in comparison with the non-inoculated cuttings. In contrast, inoculation with gfp-labelled P. putida W619 did not promote growth; it even had a negative effect on plant health and growth. Furthermore, compared to the wildtype strain, colonization by the gfp-labelled P. putida W619::gfp1 was much lower; it only colonized the rhizosphere and root cortex while the wild-type strain also colonized the root xylem vessels. Despite the strong plant growth promoting capacity of P. putida W619 (wild-type), after gfp labelling its growth promoting characteristics disappeared and its colonization capacity was strongly influenced; for these reasons gfp labelling should be applied with sufficient caution.

09 BIOMASS FUELS↗

Biofuels from Sorghum: Plant-based Sesquiterpene Biofuels

PETRO Project: Chromatin will engineer sweet sorghum—a plant that naturally produces large quantities of sugar and requires little water—to accumulate the fuel precursor farnesene, a molecule that can be blended into diesel fuel. Chromatin’s proprietary technology enables the introduction of a completely novel biosynthetic process into the plant to produce farnesene, enabling sorghum to accumulate up to 20% of its weight as fuel. Chromatin will also introduce a trait to improve biomass yields in sorghum. The farnesene will accumulate in the sorghum plants—similar to the way in which it currently stores sugar—and can be extracted and converted into a type of diesel fuel using low-cost, conventional methods. Sorghum can be easily grown and harvested in many climates with low input of water or fertilizer, and is already planted on an agricultural scale. The technology will be demonstrated in a model plant, guayule, before being used in sorghum.

Advanced Fuels↗

Efficient CO2 Fixation Pathways: Energy Plant: High Efficiency Photosynthetic Organisms

PETRO Project: UCLA is redesigning the carbon fixation pathways of plants to make them more efficient at capturing the energy in sunlight. Carbon fixation is the key process that plants use to convert carbon dioxide (CO2) from the atmosphere into higher energy molecules (such as sugars) using energy from the sun. UCLA is addressing the inefficiency of the process through an alternative biochemical pathway that uses 50% less energy than the pathway used by all land plants. In addition, instead of producing sugars, UCLA’s designer pathway will produce pyruvate, the precursor of choice for a wide variety of liquid fuels. Theoretically, the new biochemical pathway will allow a plant to capture 200% as much CO2 using the same amount of light. The pathways will first be tested on model photosynthetic organisms and later incorporated into other plants, thus dramatically improving the productivity of both food and fuel crops.

Advanced Fuels↗

Introducing WISDEM:An Integrated System Modeling for Wind Turbines and Plant (Presentation)

The National Wind Technology Center wind energy systems engineering initiative has developed an analysis platform to leverage its research capabilities toward integrating wind energy engineering and cost models across wind plants. This Wind-Plant Integrated System Design & Engineering Model (WISDEM) platform captures the important interactions between various subsystems to achieve a better National Wind Technology Center wind energy systems engineering initiative has developed an analysis platform to leverage its research capabilities toward integrating wind energy engineering and cost models across wind plants. This Wind-Plant Integrated System Design & Engineering Model (WISDEM) platform captures the important interactions between various subsystems to achieve a better understanding of how to improve system-level performance and achieve system-level cost reductions. This work illustrates a few case studies with WISDEM that focus on the design and analysis of wind turbines and plants at different system levels.

17 WIND ENERGY↗

Demonstration of Active Power Controls by Utility-Scale PV Power Plant in an Island Grid: Preprint

The National Renewable Energy Laboratory (NREL), AES, and the Puerto Rico Electric Power Authority conducted a demonstration project on a utility-scale photovoltaic (PV) plant to test the viability of providing important ancillary services from this facility. As solar generation increases globally, there is a need for innovation and increased operational flexibility. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, it may mitigate the impact of its variability on the grid and contribute to important system requirements more like traditional generators. In 2015, testing was completed on a 20-MW AES plant in Puerto Rico, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to provide various types of new grid-friendly controls. This data showed how active power controls can leverage PV's value from being simply an intermittent energy resource to providing additional ancillary services for an isolated island grid. Specifically, the tests conducted included PV plant participation in automatic generation control, provision of droop response, and fast frequency response.

14 SOLAR ENERGY↗

Wind Energy Modeling and Simulation, Volume 1: Atmosphere and Plant

In order to optimise the yield of wind power from existing and future wind plants, the entire breadth of the system of a plant, from the wind field to the turbine components, needs to be modelled in the design process. The modelling and simulation approaches used in each subsystem as well as the system-wide solution methods to optimize across subsystem boundaries are described in this reference. Chapters are written by technical experts in each field, describing the current state of the art in modelling and simulation for wind plant design. This comprehensive, two-volume research reference will provide long-lasting insight into the methods that will need to be developed for the technology to advance into its next generation. Volume 1 covers the computing challenges in full turbine modelling, then discusses bridging scales in the atmosphere and turbulence modelling, wind forecasting, wind plant flow, and plant level controller design.

17 WIND ENERGY↗

Dynamic Human-in-the-Loop Simulated Nuclear Power Plant Thermal Dispatch System Demonstration and Evaluation Study

An Idaho National Laboratory research team performed a human-in-the-loop study with two formerly licensed retired operators to evaluate thermal power dispatch operations supported by the modified GSE Systems GPWR plant simulator. Virtual representations of the analog control panels were presented on touch-screen bays configured to mimic the control room layout in the newly renovated Human Systems Simulation Laboratory. The operators performed 15 scenarios covering normal evolutions to transition the plant from full turbine operation to joint turbine and thermal power dispatch operations in addition to transient response scenarios induced with simulated faults to evaluate the impact of thermal power dispatch system on operator and plant responses. A prototype human-system interface (HSI) was developed and displayed in tandem with the virtual analog panels to support the operators executing the procedurally drive evolutions and transient responses. An interdisciplinary team of operations experts, nuclear engineers, and human factors experts observed the operators performing the scenarios to evaluate the operations. Only a preliminary analysis of the results has been performed. The full analysis will be shared in a milestone report scheduled for release at the end of September; however, some high-level conclusions were readily available. Two high level findings for the system design were captured in the study. The manual control supported by the HSI to transition from standard operations to thermal power dispatch operation imposed a considerable amount of workload on the operators due to tedious manual valve manipulations and system monitoring required to verify their intended effect. An additional operator would be required in the control room to support the daily evolution. Automatic control for the transition was deemed a requirement for plant adoption without imposing additional staffing costs. The second finding was the necessity for an automatic thermal power dispatch system trip isolation function linked to a turbine and reactor trip signal. The operators completed scenarios with automatic isolation functionality and manually required actuation of the thermal power dispatch system. The operator response was sufficiently slower in the manual trip condition, such that operators were unable to manually actuate key post trip safety functions an indicate a degraded control capability that should be avoided. With an automatic trip signal little to no impact of the thermal power dispatch system was identified on the primary plant response and therefore the system could be readily and safely adopted. Together these two findings represent the need to support the adoption of thermal power dispatch capability into existing operations by leveraging automation to augment any additional operator tasking required to control and monitor an additional system beyond existing operations.

99 GENERAL AND MISCELLANEOUS↗

A Comparison of Preconstruction and Operational Wake Loss Estimates for Land-Based Wind Plants

Recent studies suggest that biases between wind plant pre-construction energy yield estimates and actual energy production are decreasing over time. However, variability in energy yield prediction accuracy across different projects and wind energy consultants remains high. Wake effects are one of the largest categories comprising the pre-construction energy yield assessment process. To assess the accuracy of wake loss predictions, we compare pre-construction wake loss estimates provided by 8 consultants to the estimated operational wake losses for 10 North American wind plants, as part of the Wind Plant Performance Prediction (WP3) Benchmark project. We estimate operational wake losses using supervisory control and data acquisition (SCADA) data by comparing total wind plant energy production to the potential energy production based on the power produced by freestream wind turbines. In the presentation, we will discuss the overall wake loss prediction bias as well as the project-to-project variability in the prediction accuracy. Further, we will highlight challenges encountered when estimating operational wake losses, including the impact of complex terrain and the presence of neighboring wind plants.

benchmark↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant: Preprint

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This paper presents recent updates on the Level 1 Probabilistic Risk Assessment (PRA) of Light Water Reactors (LWRs) coupled with a hydrogen production plant. It provides the overview of past results on the PRA for Pressurized Water Reactors (PWRs) and Boiling Water Reactors (BWRs) coupled to a 1150 MW High Temperature Electrolysis Facility (HTEF), as well as the latest research results for a smaller 100 MW HTEF facility. Differences between the two HTEF designs are listed. Key differences include the amount and quality of diverted LWR steam, complexity of the Heat Extraction System (HES), and the electrical power source for the HTEF plant. A Failure Mode and Effect Analysis (FMEA) was conducted for the new HTEF design, and the LWR PRA models were modified in the SAPHIRE risk assessment tool to account for the newly identified risk contributors. These include the steam loss event at the HES system, the electrical overcurrent event at the HTEF facility and at the transmission line from the LWR plant, and the hydrogen detonation event at the HTEF facility. The coupling of LWRs with a 100 MW HTEF increases the frequency of several initiating events. For the reference PWR, the largest frequency increase is for the steam line break event at 5.5%. While for the reference BWR, the largest frequency increase is for the switchyard-related Loss of Offsite Power (LOOP) event at 0.11%. The overall plant risk increases by 6.56% and 0.03% for PWR and BWR reference plants respectively. It is found that these risk metrics satisfy the safety criteria of both 10 CFR 50.59 and Regulatory Guide 1.174 licensing pathways.

08 HYDROGEN↗

A preliminary user-friendly, digital console for the control room parameters supervision in old-generation Nuclear Plants

Improvements in the awareness of a system status is an essential requirement to achieve safety in every kind of plant. In particular, in the case of Nuclear Power Plants (NPPs), a progress is crucial to enhance the Human Machine Interface (HMI) in order to optimize monitoring and analyzing processes of NPP operational states. Firstly, as old-fashioned plants are concerned, an upgrading of the whole console instrumentation is desirable in order to replace an analog visualization with a full-digital system. In this work, we present a novel instrument able to interface the control console of a nuclear reactor, developed by using CompactRio, a National Instruments embedded architecture and its dedicated programming language. This real-time industrial controller composed by a real-time processor and FPGA modules has been programmed to visualize the parameters coming from the reactor, and to storage and reproduce significant conditions anytime. This choice has been made on the basis of the FPGA properties: high reliability, determinism, true parallelism and re-configurability, achieved by a simple programming method, based on LabVIEW real-time environment. The system architecture exploits the FPGA capabilities of implementing custom timing and triggering, hardware-based analysis and co-processing, and highest performance control algorithms. Data stored during the supervisory phase can be reproduced by loading data from a measurement file, re-enacting worthwhile operations or conditions. The system has been thought to be used in three different modes, namely Log File Mode, Supervisory Mode and Simulation Mode. The proposed system can be considered as a first step to develop a more complete Decision Support System (DSS): indeed this work is part of a wider project that includes the elaboration of intelligent agents and meta-theory approaches. A synoptic has been created to monitor every kind of action on the plant through an intuitive sight. Furthermore, another important aim of this work is the possibility to have a front panel available on a web interface: CompactRio acts as a remote server and it is accessible on a dedicated LAN. This supervisory system has been tested and validated on the basis of the real control console for the 1-MW TRIGA reactor RC-1 at the ENEA, Casaccia Research Center. In this paper we show some results obtained by recording each variable as the reactor reaches its maximum level of power. The choice of a research reactor for testing the developed system relies on its training and didactic importance for the education of plant operators: in this context a digital instrument can offer a better user-friendly tool for learning and training. It is worthwhile to remark that such a system does not interfere with the console instrumentation, the latter continuing to preserve the total control. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Regulatory Challenges of Decommissioning Nuclear Power Plants in Korea - 13101

As of 2012, 23 units of nuclear power plants are in operation, but there is no experience of permanent shutdown and decommissioning of nuclear power plant in Korea. It is realized that, since late 1990's, improvement of the regulatory framework for decommissioning has been emphasized constantly from the point of view of International Atomic Energy Agency (IAEA)'s safety standards. And it is known that now IAEA prepare the safety requirement on decommissioning of facilities, its title is the Safe Decommissioning of Facilities, General Safety Requirement Part 6. According to the result of IAEA's Integrated Regulatory Review Service (IRRS) mission to Korea in 2011, it was recommended that the regulatory framework for decommissioning should require decommissioning plans for nuclear installations to be constructed and operated and these plans should be updated periodically. In addition, after the Fukushima nuclear disaster in Japan in March of 2011, preparedness for early decommissioning caused by an unexpected severe accident became also important issues and concerns. In this respect, it is acknowledged that the regulatory framework for decommissioning of nuclear facilities in Korea need to be improved. First of all, we identify the current status and relevant issues of regulatory framework for decommissioning of nuclear power plants compared to the IAEA's safety standards in order to achieve our goal. And then the plan is to be established for improvement of regulatory framework for decommissioning of nuclear power plants in Korea. After dealing with it, it is expected that the revised regulatory framework for decommissioning could enhance the safety regime on the decommissioning of nuclear power plants in Korea in light of international standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Purpose-Built UAVs for Physical Sampling of Trace Contamination at the Portsmouth Gaseous Diffusion Plant - 17331

The sampling of trace amounts of contamination, particularly of low-energy byproducts such as americium, presents a challenge for non-contact sensing. In many cases, such as determining the need for cleaning inside the exhaust shaft of the Waste Isolation Pilot Plant or sampling the walls of the enormous Gaseous Diffusion Plant at Portsmouth, it may be desirable to take physical swab samples at carefully distributed sample locations for analysis by mass spectrometry. Because of the danger posed to human workers in such scenarios, including risk of falls from lethal heights and exposure to low levels of radiation and the hassle of donning and doffing PPE, a low-cost robotic solution is desired. The inaccessibility of the heights involved suggest Unmanned Aerial Vehicle (UAV) solutions, rather than Unmanned Ground Vehicle (UGV) solutions, but conventional quadrotor UAVs are ill-suited to precise physical interaction with their surroundings. Quadrotors are under-actuated, rendering them non-holonomic and preventing the dexterous application of arbitrary generalized force/torques in interaction with the environment. At Purdue University, the authors have developed a number of novel UAV platforms suitable for dexterous interaction with the environment, making them ideal for such applications. These platforms can independently control forces in all directions, allowing for controlled application of the swab to the surface. Because of the scale of these structures (over 2 km in the case of the Gaseous Diffusion Plant), flight efficiency is of supreme importance. The Purdue team is took a variety of vehicles to the Gaseous Diffusion Plant for field trials on site in August, 2016. (With results available prior to the meeting.) The Purdue Dexterous Hexrotor is a fully-actuated Hexrotor capable of exerting forces in all six directions of force and torque. Operating alone or in swarms, the Dexterous Hexrotor can fly in free space, transition to contact through impact control, and sample the surface through force control. The Purdue I-BoomCopter is a tri-copter with an extra horizontal propeller that enables long-distance flight without pitching and the ability to apply closed-loop forces horizontally. Finally, the Purdue Tiltrotor VTOL is an under-actuated hybrid UAV that combines tilting rotors for vertical takeoff and landing, with a fixed-wing, flying-body design that is ultra-efficient for long-distance flight. The Dexterous Hexrotor provided two demonstrations of physical sampling of walls and crane rails. In sampling the large open sections of the inside of the plant, a small swarm of three UAVs is commanded to sample three distinct points on an internal map of the building. Human-supervised autonomy permits the UAVs to take off by themselves, find a clear elevation at which to fly through uncluttered space, navigate to their designated sampling points, and pause for confirmation by the human supervisor. The supervisor is presented with a video image of the intended sampling spot, which, if confirmed, the UAV will automatically approach and sample. The UAVs then autonomously return to the take-off spot. The second demo involved a single UAV searching upwards, then transitioning into 3-D SLAM mode to wait for a safe sampling spot on the 3-D scan to acquire the sample from the crane rail. The human supervisor, in this case, is responsible for ensuring the absence of cables and other obstacles. I-BoomCopter demonstrated its high-speed, long-distance coverage ability by making a few fast passes before homing in on a mock-up electrical panel with door, which it opened and closed. The dexterity of the I-BoomCopter results from its large propellers, which allow for controlled hovering and the horizontal thruster for applying forces of significant magnitude. Finally, the Tiltrotor VTOL is highly efficient in fixed-wing mode, but the tilt-rotor is under-actuated in hover. The tilt-rotor will take off vertically, then transition to high-speed, long-distance flight to make a number of passes inside the facility. The significance of these demos is the low-cost implementation of physical sampling over prescribable locations in difficult-to-reach areas of potentially contaminate facilities. To make this tractable over very large facilities, the demonstration of combinations of dexterous hovering ability and long-distance/high-speed flight is also in evidence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Activated Carbon, PVC, and Other Wastes using the THOR process - Pilot Plant Test Summary - 17399

This presentation will provide an overview of the first pilot plant study to be conducted for the Japanese Nuclear Market by Kobelco Studsvik Company (A new Joint Venture Company between Studsvik AB and Kobe Steel Ltd.). The test program was scheduled for October 2016, and it was designed to evaluate the treatment of activated carbon, PVC, and other waste types using Studsvik's THOR Process. This new study is being conducted to identify key design parameters required for application of the THOR process in the Japanese Waste Market and to confirm the effectiveness of the THOR technology in meeting the requirements for final waste acceptance. The findings of this pilot plant test will assist in the development of a revised THOR process in Japan that will treat not only spent ion exchange resins but other organic materials generated by Nuclear Power Plants (NPP) during normal operations and D and D activities. The information shared by this new pilot plant study will provide the audience with an understanding of the adaptability of the THOR process for treatment of various radioactive waste types and the results necessary to successful treat different types of carbon, plastic materials, and other waste types. In addition, it will share the lessons learned regarding how a pilot plant study should be planned and optimized to meet the specific requirements of the Japanese Nuclear waste market. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plant Operation and Control Strategy for the PGSFR

The plant operating strategy and control system design for the PGSFR plant are being developed to meet functional and design requirements for the plant. The functional requirements are derived from the mission of the reactor while the design requirements are related to the reactor technologies that underlie the PGSFR. This paper describes the operation and control strategy developed to meet these requirements and the implementation of that strategy. Representative results are presented for the dynamic behavior of the nuclear steam supply system (NSSS) during operational transients. A supervisory control system has been designed for the PGSFR for Startup, Reactor Leading, and Load Following modes and it performance assessed for operational transients in the Load Following mode. The control system extends into the balance of plant to include regulation of turbine inlet pressure and steam generator pressure and includes a feedwater pump with prototypic operating characteristics. The results indicate a very stable plant response with minimal deviation from quasi-static conditions for the transients simulated. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safeguards Lessons Learned from the Rokkasho Reprocessing Plant - 19502

Once operational, the Rokkasho Reprocessing Plant (RRP) will have an operating throughput of 800 MT of uranium in irradiated LWR fuel per year. In order to establish effective and efficient safeguards at RRP, the safeguards discussion with the IAEA was initiated in 1988. However, at that time there were no available models or guidelines that could be used as a reference and multiple difficulties were recognized for the implementation of safeguards into a large scale reprocessing plant. Therefore, from 1988 to 1992, a multinational forum, referred to as LASCAR (Large Scale Reprocessing Plant Safeguards) [1], provided the recommendations on how an effective safeguards approach could be implemented into a large scale reprocessing plant while efficiently using existing resources. During the course of safeguards discussions between the IAEA, the State, and JNFL, the use of operator's equipment and measurement systems (by signal splitting with authentication) for inspections was studied. JNFL also examined incorporating inspection requirements into the process design: to reduce the costs associated with system installation and future system maintenance and to ensure effective, efficient, and credible safeguards implementation into the RRP (this approach has essentially become the 'Safeguards by Design (SBD)' process). From these studies and JNFL's experience of implementing safeguards into a new plant [2], JNFL established and applied signal splitting from operator's equipment as a means for providing inspectors required safeguards information. In addition, the LASCAR findings were utilized to establish the safeguards implemented into the RRP. Safeguards implementation into RRP commenced March 31, 2006. On June 4, 2008, the IAEA approved the 'integrated safeguards approach' for RRP. This paper provides a high level overview of the major safeguards implemented at RRP and the lessons learned from this implementation that can be applied to existing or future similar facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AVANTech's Liquid Radwaste (LRW) Processing System Upgrade at the Farley Nuclear Plant - 20328

This paper looks at the Liquid Radioactive Waste (LRW) processing system configuration at Joseph M. Farley Nuclear Plant (Plant Farley). A combination of factors led the staff at Plant Farley to seek a better way to manage and process liquid waste. These factors were: - Reduce effluent activity; - Reduce waste volume; - Improve cost efficiency. The LRW processing system changes made at Plant Farley are identified and discussed. The information and technologies cited in this paper are directly applicable to other nuclear power plants who might contemplate an upgrade of LRW processing systems or of individual system components. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗