Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Hardware Aware Mitigation of Timing Side-Channel Vulnerabilities in Critical Infrastructure Software

Program runtime/timing attacks exploit variations in a program’s execution times to extract sensitive information from the program (e.g. encryption keys, sensitive variable data, intellectual property). State-of-the-art solutions to runtime sidechannel attacks attempt to balance the execution time of the sensitive code for different control flow paths to eliminate the timing leakage. However, during the mitigation process, most techniques do not consider the underlying hardware/device on which the target program is supposed to run on. This can lead to over-fixing (unnecessary extra operations), under-fixing (not solving the imbalance properly), and even failures. We propose DISARM, a joint hardware-software methodology (unlike any existing solution) for mitigating runtime side-channel vulnerabilities that utilizes timing values from real embedded devices to generate targeted software fixes. We implement DISARM to support C/C++/Java source codes and validate it across 22 standard benchmarks. DISARM outperforms state-of-the-art solutions such as PENDULUM and DifFuzzAR in terms of execution time overhead (up to −46%), code size overhead (up to −10%), and correctness (no failures) on five different embedded/edge devices.

Suha, Tasneem [University of Maine]↗

American Made Energy Infrastructure - Evolution of Federal Incentives and Requirements

This presentation, "Evolution of Federal Incentives and Requirements," explores the development and impact of federal cybersecurity regulations, tax credits, and domestic content requirements on the energy sector. It covers key legislation such as the ARRA of 2009, IIJA, and IRA, and their implications for grid modernization, manufacturing, and deployment of energy technologies. The presentation also addresses definitions and restrictions related to Foreign Entities of Concern (FEOC) and their impact on federal procurement. Additionally, it introduces the DOE's cybersecurity framework for energy supply chains and practical actions for compliance planning.

25 - ENERGY STORAGE↗

COMMUNITY AND INFRASTRUCTURE ADAPTION TO CLIMATE CHANGE

(SF-23-046) The CIACC tool labels a large number of documents using a weak-supervision-based NLP technique that makes use of semantic similarity between categories and documents. This method allows the labeling process to scale across multiple GPU's in a computing cluster at the Argonne Leadership Computing Facility.

Verner, Duane↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

HE-LHC: The High-Energy Large Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a high-energy hadron collider, which extends the current energy frontier by almost a factor 2 (27 TeV collision energy) and an integrated luminosity of at least a factor of 3 larger than the HL-LHC. In connection with four experimental detectors, this infrastructure will deepen our understanding of the origin of the electroweak symmetry breaking, allow a first measurement of the Higgs self-coupling, double the HL-LHC discovery reach and allow for in-depth studies of new physics signals arising from future LHC measurements. This collider would directly produce particles at significant rates at scales up to 12 TeV. The project re-uses the existing LHC underground infrastructure and large parts of the injector chain at CERN. This particle collider would succeed the HL-LHC directly and serve the world-wide physics community for about 20 years beyond the middle of the 21st century. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular high-energy hadron collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a High-Energy LHC can be brought to the technology readiness level required for construction within the coming ten years through a committed and focused R&D programme. The concept comprises a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. Re-use of the LHC underground civil infrastructure worth about 500 million CHF at the time of its construction, extension of the surface sites and use of the existing injector chain that also serve for a concurrently running physics programme are levers to come to a sustainable research infrastructure at the energy frontier. Strategic R&D for HE-LHC aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It needs to mitigate technology-related risks and ensure that industry can benefit from an acceptable economic utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan considering the constraints emerging from using the existing infrastructure and the host states’ requirements, optimising the use of land, resources and preparing the construction project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

5G Enabled Energy Innovation: Advanced Wireless Networks for Science (Workshop Report)

Rapidly expanding, new telecommunications infrastructure based on 5G technologies will disrupt and transform how we design, build, operate, and optimize scientific infrastructure and the experiments and services enabled by that infrastructure, from continental-scale sensor networks to centralized scientific user facilities, from intelligent Internet of Things devices to supercomputers. Concurrently, 5G will introduce, or exacerbate, challenges related to protecting infrastructure and associated scientific data as well as to fully leveraging opportunities related to expanded infrastructure scale and complexity. The U.S. Department of Energy (DOE) Office of Science operates scientific infrastructure, supporting some of the nation’s most advanced intellectual discoveries, spanning the country and including 30 world-class user facilities from supercomputers to accelerators. Along with field experiments and remote observatories, every aspect of DOE’s scientific enterprise will be affected by 5G, which amounts to a complete renovation of the underpinnings of the nation’s information infrastructure. In this report we explore the scientific opportunities and new research challenges associated with 5G, ranging from scalability to heterogeneity to cybersecurity. The rapid commercial deployment of 5G opens the opportunity to rethink and reinvent DOE’s scientific infrastructure and experimentation, from intelligent sensor networks at unprecedented scales to a digital continuum of cyberinfrastructure spanning low-power sensors, high-performance computing embedded within and at the edge of the network, and DOE’s large-scale user instrument and computing facilities. New programming paradigms, workflow and data frameworks, and AI-based system design, operation, and autonomous adaptation and optimization will be necessary in order to exploit these new opportunities. Field deployments and centralized scientific instruments can also be revolutionized, moving (without traditional performance penalties) from wired to wireless connectivity for data and control systems, improving flexibility, and opening new sensing modalities, including the use of the 5G electromagnetic spectrum itself as an environmental probe. For DOE science, in contrast to commercial 5G applications and settings, devices will be deployed in extreme environments such as cryogenically cooled instrument control systems and in remote settings with harsh conditions, requiring the design of new materials for RF communication and edge processing to operate in these regimes. Concurrently, 5G infrastructure comprises both hardware and sophisticated software systems - currently closed and proprietary. The cybersecurity challenges to 5G-empowered reinvention mirror the complexity and variety of new 5G features, from virtualization to private network slices to ubiquitous access. Research is also needed in order to accelerate the development of secure and open 5G software infrastructure, reducing reliance on hardware and software produced outside the United States and providing the transparency and rigorous evaluation and testing afforded through open software. Twelve broad research thrusts are laid out in four chapters, with a companion fifth chapter (and three additional research thrusts) underscoring the needs and opportunities for an aggressive testbed program co-designed by networking experts and scientists involved in the 15 research thrusts. The urgency of undertaking this research is fueled by a global, accelerating deployment of new telecommunications infrastructure that is designed for entertainment and commercial applications - barely scratching the surface of what 5G can do to extend U.S. leadership in scientific discovery.

42 ENGINEERING↗

TRAILS Output Files

Overview This data repository contains ZIP files that store compressed versions of the output of running the WaterPaths utility planning and management tool in the DU Re-Evaluation mode (to download the tool, please see this GitHub repository). The tool was used to simulate the six-utility North Carolina Research Triangle problem. Details on the contents of each ZIP file can be seen below. Data details Temporal range: Weekly data for 2,344 weeks from 2015 to 2060 (45 years). Spatial range: Six water utilities in the North Carolina Research Triangle region (0: Chapel Hil/OWASA, 1: Durham, 2: Cary, 3: Raleigh, 4: Pittsboro, and 5: Chatham) File types: CSV and OUT Different solutions available The solution numbers correspond to the different pathway strategies (henceforth referred to as "solutions") discussed in paper's main and supporting text (abstract and link to the paper here). They are as follows: Sol92: The Durham-focused pathway strategy Sol132: The Raleigh-focused pathway strategy Sol140: The regionally-robust pathway strategy Objectives files These files can be accessed by unzipping solXX_objectives_pathways.zip that contains 1,000 Objectives_RDMXX_solsXX_to_XX.csv files. Each CSV file will consist of a row representing all the objective values for that specific solution, while every six columns represents the reliability, restriction frequency, infrastructure net present value ($ mil), peak financial cost, worst-case cost, and unit cost ($ per MG; in that order) for each of the six utilities. There will be 1,000 such files, denoting the performance of the six utilities across the 1,000 deeply uncertain states of the world (DU SOWs). Pathway files These files can be accessed by unzipping solXX_objectives_pathways.zip that contains 1,000 Pathways_sXX_RDMXX.out file. Each OUT corresponds to the set of infrastructure being triggered in a specific DU SOW, and each file will have the name file will consist of four tab-delimited columns that are described as follows: Realization: The realization in which an infrastructure options being triggered utility: The utility currently triggering infrastructure week: The week in which a specific infrastructure option is being triggered infra.: The infrastructure option being triggered If the OUT file contains only the header line, no infrastructure was triggered for that specific DU SOW. Policies files These files can be obtained by unzipping Policies.zip. Each of the 1,000 CSV files within the unzipped folder will contain weekly water use restriction policies for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: 0rest_m: restriction multiplier for utility 0 (values between 0 and 1) 1rest_m: restriction multiplier for utility 1 (values between 0 and 1) 2rest_m: restriction multiplier for utility 2 (values between 0 and 1) 3rest_m: restriction multiplier for utility 3 (values between 0 and 1) 4rest_m: restriction multiplier for utility 4 (values between 0 and 1) 5rest_m: restriction multiplier for utility 5 (values between 0 and 1) 0transf: transfer volume for utility 0 (in MGD) 1transf: transfer volume for utility 1 (in MGD) 2transf: transfer volume for utility 2 (in MGD) 3transf: transfer volume for utility 3 (in MGD) 4transf: transfer volume for utility 4 (in MGD) 5transf: transfer volume for utility 5 (in MGD) Water Sources files These files can be obtained by unzipping WaterSources_subset.zip. Each of the 100 CSV files within the unzipped folder will contain weekly state variables at each water source for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: Xvolume: available water volume from source X (in MGD) Xs_area: surface area of source X (in ACF) Xdemand: demand drawn from a water source from source X (in MGD) Xup_spill: upstream spillage from source X (in MGD) Xww_inflow: wastewater inflow from source X (in MGD) Xcatch_inflow: upstream catchment inflow to source X (in MGD) Xevap: evaporation multiplier for source X (values between 0 and 1) Xds_spill: downstream spillage from source X (in MGD) X_Y_alloc_cap: the allocated capacity from source X to utility Y (values between 0 and 1) X_Y_alloc_dem: the allocated demand from source X to utility Y (values between 0 and 1) Xtrmt_alloc_Y: the allocated treatment capacity from source X to utility Y (values between 0 and 1) Utilities files These files can be obtained by unzipping Utilities_subset.zip. Each of the 100 CSV files within the unzipped folder will contain weekly state variables at each utility for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: Xst_vol: total available storage volume of utility X (in MG) Xcapacity: total storage capacity of utility X (in MG) Xnet_inf: : net inflow for all storage infrastructure for utility X (in MGD) Xst_rof: short term ROF for utility X (values between 0 and 1) Xst_stor_rof: short-term storage ROF for utility X (values between 0 and 1) Xst_trmt_rof: short-term treatment ROF for utility X (values between 0 and 1) Xlt_rof: long-term ROF for utility X (values between 0 and 1) Xlt_stor_rof: long-term storage ROF for utility X (values between 0 and 1) Xlt_trmt_rof: long-term treatment ROF for utility X (values between 0 and 1) Xrest_demand: restricted demand for utility X (in MGD) Xunrest_demand: unrestricted demand for utility X (in MGD) Xunfulf_demand: unfulfilled demand for utility X (in MGD) Xwastewater: wastewater return for utility X (in MGD) Xtreat_capacity: total treatment capacity for utility X (in MG) Xcont_fund: reserve (contingency) fund balance for utility X Xins_pout: insurance payout for utility X (% annual volumetric revenue) Xins_price: insurance price for utility X (% annual volumetric revenue) Xinfra_npv: infrastructure net present value for utility ($mil) Xst_vol: total available storage volume of utility X (in MG) Xdebt_serv: debt service for utility X (usually once per year if the infrastructure is triggered; % annual volumetric revenue) Xstor_vol: total stored volume (in MGD) Xobs_ann_dem: observed annual demand for utility X (in MGD) Xproj_dem: projected annual demand for utility X (in MGD) Xpv_debt_serv: present value of debt service payments for utility X (% annual volumetric revenue) Xgross_rev: gross revenue for utility X ($mil) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

Artificial Intelligence↗

FCC-hh: The Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a highest-energy hadron collider with a centre-of-mass collision energy of 100 TeV and an integrated luminosity of at least a factor of 5 larger than the HL-LHC. It will extend the current energy frontier by almost an order of magnitude. The mass reach for direct discovery will reach several tens of TeV, and allow, for example, to produce new particles whose existence could be indirectly exposed by precision measurements during the earlier preceding e+e– collider phase. This collider will also precisely measure the Higgs self-coupling and thoroughly explore the dynamics of electroweak symmetry breaking at the TeV scale, to elucidate the nature of the electroweak phase transition. WIMPs as thermal dark matter candidates will be discovered, or ruled out. As a single project, this particle collider infrastructure will serve the world-wide physics community for about 25 years and, in combination with a lepton collider (see FCC conceptual design report volume 2), will provide a research tool until the end of the 21st century. Collision energies beyond 100 TeV can be considered when using high-temperature superconductors. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular energy frontier collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy circular hadron collider can be brought to the technology readiness level required for constructing within the coming ten years through a focused R&D programme. The FCC-hh concept comprises in the baseline scenario a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. On a longer timescale, high-temperature superconductors can be developed together with industrial partners to achieve an even more energy efficient particle collider or to reach even higher collision energies.The re-use of the LHC and its injector chain, which also serve for a concurrently running physics programme, is an essential lever to come to an overall sustainable research infrastructure at the energy frontier. Strategic R&D for FCC-hh aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate technology-related risks and ensure that industry can benefit from an acceptable utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan in agreement with the host-states’ requirements, to optimise the disposal of land and underground volumes, and to prepare the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

Airports as Energy Nodes Activity Summary

Advanced aircraft concepts that use non-traditional aviation energy storage methods such as batteries or cryogenic hydrogen are in development and expected to enter regular service at airports worldwide within the next decade. The energy needs for these aircraft may quickly overwhelm the existing energy infrastructure at airports, particularly at smaller and more remote facilities. Without energy upgrades, these airports will not be able to host these advanced vehicles, but without the advanced vehicle traffic, these airports will not have the rationale or funding to build up their energy infrastructure. The Airports as Energy Nodes (ÆNodes) activity, a collaboration between the National Aeronautics and Space Administration (NASA) and the National Renewable Energy Laboratory (NREL), was executed to understand and model the energy needs that advanced aircraft concepts may levy on these smaller airports, determine cost-effective approaches to enhance the airport energy infrastructure, and demonstrate the enhanced resilience of these energy infrastructure upgrades to the airport and surrounding community via “digital twin” simulation at relevant energy and dynamic time scales. The ÆNodes team also investigated future reference aircraft designs and materials to enable cryogenic hydrogen storage for aircraft. The ÆNodes team conducted analysis at two U.S. airport partner sites — Winchester Regional Airport in Winchester, Virginia, and Tweed/New Haven Airport in New Haven, Connecticut. The goal of this partnership was to develop data and reference infrastructure designs that could accommodate advanced aircraft in the future at these airports while also enhancing the resiliency of the energy supply to the surrounding airport community, which could be used to capture funding to enable the infrastructure upgrades. Over the course of the study, a method was developed to estimate air traffic requiring advanced energy services over the course of a year using a mix of historical data and companion studies on advanced aircraft transportation networks. The study has concluded at NASA but continues at NREL, who will develop a final report discussing the energy infrastructure upgrades and digital twin results. Preliminary results indicate that unrestricted adoption of advanced battery-electric aircraft may double traffic at these airports and increase peak daily power usage by an order of magnitude, while increase electricity energy needs by a factor of two to four. The infrastructure upgrades necessary to accommodate these increased energy needs could be used to provide enhanced energy services to the airport community to offset the cost and increase the utility of the upgrades, which will be described in the NREL final report.

Airports↗

ESnet Requirements Review Program Through the IRI Lens: A Meta-Analysis of Workflow Patterns Across DOE Office of Science Programs (Final Report)

The Department of Energy (DOE) ensures America’s security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. The DOE’s Office of Science (SC) delivers groundbreaking scientific discoveries and major scientific tools that transform our understanding of nature and advance the energy, economic, and national security of the United States. The SC’s programs advance DOE mission science across a wide range of disciplines and have developed the research infrastructure needed to remain at the forefront of scientific discovery. The DOE SC’s world-class research infrastructure — exemplified by the 28 SC scientific user facilities — provides the research community with premier observational, experimental, computational, and network capabilities. Each user facility is designed to provide unique capabilities to advance core DOE mission science for its sponsor SC program and to stimulate a rich discovery and innovation ecosystem. Research communities gather and flourish around each user facility, bringing together diverse perspectives. A hallmark of many facilities is the large population of students, postdoctoral researchers, and early-career scientists who contribute as full-fledged users. These facility staff and users collaborate over years to devise new approaches to utilizing the user facility’s core capabilities. The history of the SC user facilities has many examples of wildly inventive researchers challenging operational orthodoxy to pioneer new vistas of discovery; for example, the use of the synchrotron X-ray light sources for study of proteins and other large biological molecules. This continual reinvention of the practice of science — as users and staff forge novel approaches expressed in research workflows — unlocks new discoveries and propels scientific progress. Within this research ecosystem, the high-performance computing (HPC) and networking user facilities stewarded by SC’s Advanced Scientific Computing Research (ASCR) program play a dynamic cross-cutting role, enabling complex workflows demanding high performance data, networking, and computing solutions. The DOE SC’s three HPC user facilities and the Energy Sciences Network (ESnet) high-performance research network serve all of the SC’s programs as well as the global research community. Argonne Leadership Computing Facility (ALCF), the National Energy Research Scientific Computing Center (NERSC), and Oak Ridge Leadership Computing Facility (OLCF) conceive, build, and provide access to a range of supercomputing, advanced computing, and large-scale data-infrastructure platforms, while ESnet interconnects DOE SC research infrastructure and enables seamless exchange of scientific data. All four facilities operate testbeds to expand the frontiers of computing and networking research. Together, the ASCR facilities enterprise seeks to understand and meet the needs and requirements across SC and DOE domain science programs and priority efforts, highlighted by the formal requirements reviews (RRs) methodology. In recent years, the research communities around the SC user facilities have begun experimenting with and demanding solutions integrated with HPC and data infrastructure. This rise of integrated-science approaches is documented in many community and high-level government reports. At the dawn of the era of exascale science and the acceleration of artificial intelligence (AI) innovation, there is a broad need for integrated computational, data, and networking solutions. In response to these drivers, DOE has developed a vision for an Integrated Research Infrastructure (IRI): To empower researchers to meld DOE’s world-class research tools, infrastructure, and user facilities seamlessly and securely in novel ways to radically accelerate discovery and innovation.

42 ENGINEERING↗

Integrated Modeling Approach for the Development of Climate-Informed, Actionable Information

Flooding is a prevalent natural disaster with both short and long-term social, economic, and infrastructure impacts. Changes in intensity and frequency of precipitation (including rain, snow, and rain on snow) events create challenges for the planning and management of resilient infrastructure and communities. While there is general acknowledgement that new infrastructure design should account for future climate change, no clear methods or actionable information is available to community planners and designers to ensure resilient design considering an uncertain climate future. This research used climate projections to drive high-resolution hydrology and flood models to evaluate social, economic, and infrastructure resilience for the Snohomish Watershed, WA, U.S.A. The proposed model chain has been calibrated and validated. Based on the established model chain, the peaks of precipitation and streamflows were found to shift from spring and summer to earlier winter season. The nonstationarity of peak discharges was discovered with more frequent and severe flood risks projected. The peak discharges were also projected to decrease for a certain period in the near future, which might be due to the reduced rain-on-snow events. This research was expected to provide a clear method for the incorporation of climate science in flood resilience analysis and to also provide actionable information relative to the frequency and intensity of future precipitation events.

54 ENVIRONMENTAL SCIENCES↗

Digital Twinning and Predictive Modeling of Traffic for Safe, Efficient, and Reliable Intersections

Over the last decade, the advances in connected and autonomous vehicles (CAVs) have far surpassed the technological realm of transportation infrastructure. There is a growing need to have a technologically commensurate transportation infrastructure to enable safe and reliable movement of goods and people. The recent creation of Advanced Research Projects Agency - Infrastructure (ARPA-I) through the Infrastructure Investment and Jobs Act by the U.S. Department of Transportation (USDOT) has further amplified the need to revolutionize the transportation infrastructure system in the US. This need is perhaps felt most at traffic intersections, as more than 50 percent of the combined total of fatal and injury crashes occur at or near intersections. The proposed concept of Infrastructure Perception and Control (IPC) is aimed at bridging this technological gap by building a real-time digital twin of traffic by fusing detections from sensors installed at the intersection. This digital twin can then empower a wide variety of applications such as smart traffic signals or infrastructure-to-everything (I2X) communications. Smart signaling can help avoid crashes through early-prediction, while I2X can augment the CAV sensors under uncertain driving conditions and provide connected vehicles (CVs) with traffic information they can use to optimize their travel.

connected vehicles↗