Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

WE-E-304-01: SBRT Credentialing: Understanding the Process From Inquiry to Approval

SBRT is having a dramatic impact on radiation therapy of early-stage, locally advanced cancers. A number of national protocols have been and are being developed to assess the clinical efficacy of SBRT for various anatomical sites, such as lung and spine. Physics credentialing for participating and implementation of trial protocols involve a broad spectrum of requirements from image guidance, motion management, to planning technology and dosimetric constrains. For radiation facilities that do not have extensive experiences in SBRT treatment and protocol credentialing, these complex processes of credentialing and implementation could be very challenging and, sometimes, may lead to ineffective even unsuccessful execution of these processes. In this proposal, we will provide comprehensive review of some current SBRT protocols, explain the requirements and their underline rationales, illustrate representative failed and successful experiences, related to SBRT credentialing, and discuss strategies for effective SBRT credentialing and implementation. Learning Objectives: Understand requirements and challenges of SBRT credentailing and implentation Discuss processes and strategies of effective SBRT credentailing Discuss practical considerations, potential pitfalls and solutions of SBRT implentation.

60 APPLIED LIFE SCIENCES↗

TU-CD-304-02: Planning and Delivery of Fully Dynamic Trajectory Modulated Arc Therapy On Pituitary Adenoma: Dosimetric Advantages Over Conventional Volumetric Modulated Arc Therapy

Purpose: To assess the potential benefit of trajectory modulated arc therapy (TMAT) for treatments of small benign intracranial tumor, pituitary adenoma. Methods: A TMAT planning platform that incorporates complex source motion trajectory involving synchronized gantry rotation with translational and rotational couch movement was used for the study. The platform couples an interactive trajectory generation tool with a VMAT algorithm that performs multi-resolution, progressive sampling MLC optimization on a user-designed trajectory. A continuous couch rotation of 160° angular span with ±20° mini gantry arcs was used to emulate a non-coplanar horizontal arc-like trajectory. Compared to conventional non-coplanar gantry arcs (60°-100° gantry rotation with couch kicks), TMAT limited the unnecessary low to medium dose spread in the anterior and posterior directions, where primary OARs (e.g., brainstem, optic chiasm, optic nerves, and lens) are in close proximity to the targeted pituitary tumor volume. For 5 standard fractionation pituitary adenoma cases (50.4Gy/28fractions), TMAT and non-coplanar VMAT plans were generated and compared under equivalent objectives/constraints. TMAT delivery was implemented and demonstrated on Varian TrueBeam via XML scripts. Results: Both techniques showed good target coverage while OARs were able to meet the constraints on QUANTEC guidelines. Notably, TMAT decreased the dose deposition in the anterior-to-posterior direction surrounding PTV. TMAT significantly reduced the mean doses on brainstem, optic nerves, eyes and lens by 47.29%±13.17%, 28.51%±8.68%, 80.82%±8.71% and 65.38%±19.99% compared with VMAT, all p≤0.01. Percentage reductions of maximum point dose in eyes and lens were 75.68%±10.30% and 70.72%±18.62% respectively for TMAT versus VMAT, all p≤0.01. A representative isocentric TMAT pituitary plan was delivered via an XML script with 200 control points and 282 MUs. Conclusion: Deliverable TMAT plans were achieved in developer mode in TrueBeam. TMAT was shown to be superior for pituitary adenoma irradiation in terms of OARs sparing.

60 APPLIED LIFE SCIENCES↗

Streamline, Organizational, Legislative and Administrative Response to Permitting, PV Market Share, and Solar Energy Costs (Broward Go SOLAR)

Broward County and its partners (the Go SOLAR Team), operating under a Department of Energy Rooftop Solar Challenge Agreement, designed, developed and implemented an online permitting system for rooftop solar PV systems. This is a single web based system with a single permit fee that will issue a permit, with a set of design plans preapproved by partner building officials, within one hour. The system is currently available at gosolar.broward.org for use within any of the partner Authorities Having [permitting] Jurisdiction (AHJ). Additionally, the Go SOLAR Team researched, developed and to the extent feasible, implemented three best management practices to make a fertile environment for the new online permit system. These included Net Metering and Interconnection Standards, Solar-Friendly Financing, and Planning and Zoning Ordinances. Finally, the team implemented a substantial outreach effort to advocate for the development of solar in Broward County, with an emphasis on Solar Rights, concluding with a Go SOLAR Fest day and a half conference with over 1,200 attendees and 50 exhibitors. The Go SOLAR project was completed on time, under DOE’s budgeted amount, and all project objectives were met or exceeded.

14 SOLAR ENERGY↗

SU-E-T-253: Development of a GDPM Monte Carlo Based Quality Assurance Tool for Cyberknife

Purpose: To develop a 3D quality assurance (QA) tool for Cyberknife plans using a GPU-based Monte Carlo dose calculation package, gDPM. The developed QA tool will be used as a secondary check for Cyberknife treatment planning software (TPS) reported dose distributions. Methods: Phase space files of the 5, 7.5, 10, 15, and 60 mm iris cones were downloaded from IAEA phase-space database. From the 60mm iris cone phase space file, we were able to generate raw phase space files for all other cones using a particle rejection method. The particles in the raw phase space files were binned with respect to the radial position and energy for commissioning. During the commissioning process, gDPM calculated percent depth dose and off-center ratios which were compared to those measured in the Blue Phantom. The off-axis data was measured with an SAD setup at depths of 15, 50, 100, 200, and 300 mm. At the commissioning stage, an optimization problem was solved to adjust the binned particles weights to minimize the difference between the calculated and measured ones. Commissioning validations will be performed by measuring point dose data of patient specific plans delivered to water phantoms. With commissioned phase space files, 3D patient-specific dose distributions will be calculated and compared against TPS reported dose. Results: Beyond the initial buildup region, the root mean square difference between the calculated and measured percent depth dose differences was less than 0.5%. The full-width half-max data from the off-axis ratio calculations was found to be within 0.1 mm of the measured data. Conclusion: Our current work showed excellent agreement between the gDPM calculated dose and the measured data for all cone sizes and types for the Cyberknife system. Implementation of a fast and accurate QA tool for patient specific plans will be feasible with this tool.

60 APPLIED LIFE SCIENCES↗

Accelerated iterative beam angle selection in IMRT

Purpose: Iterative methods for beam angle selection (BAS) for intensity-modulated radiation therapy (IMRT) planning sequentially construct a beneficial ensemble of beam directions. In a naïve implementation, the nth beam is selected by adding beam orientations one-by-one from a discrete set of candidates to an existing ensemble of (n − 1) beams. The best beam orientation is identified in a time consuming process by solving the fluence map optimization (FMO) problem for every candidate beam and selecting the beam that yields the largest improvement to the objective function value. This paper evaluates two alternative methods to accelerate iterative BAS based on surrogates for the FMO objective function value. Methods: We suggest to select candidate beams not based on the FMO objective function value after convergence but (1) based on the objective function value after five FMO iterations of a gradient based algorithm and (2) based on a projected gradient of the FMO problem in the first iteration. The performance of the objective function surrogates is evaluated based on the resulting objective function values and dose statistics in a treatment planning study comprising three intracranial, three pancreas, and three prostate cases. Furthermore, iterative BAS is evaluated for an application in which a small number of noncoplanar beams complement a set of coplanar beam orientations. This scenario is of practical interest as noncoplanar setups may require additional attention of the treatment personnel for every couch rotation. Results: Iterative BAS relying on objective function surrogates yields similar results compared to naïve BAS with regard to the objective function values and dose statistics. At the same time, early stopping of the FMO and using the projected gradient during the first iteration enable reductions in computation time by approximately one to two orders of magnitude. With regard to the clinical delivery of noncoplanar IMRT treatments, we could show that optimized beam ensembles using only a few noncoplanar beam orientations often approach the plan quality of fully noncoplanar ensembles. Conclusions: We conclude that iterative BAS in combination with objective function surrogates can be a viable option to implement automated BAS at clinically acceptable computation times.

61 RADIATION PROTECTION AND DOSIMETRY↗

Seismic monitoring of CO 2 geosequestration using multi-well 4D DAS VSP: Stage 3 of the CO2CRC Otway project

An important part of any CO 2 geosequestration project is to ensure CO 2 containment and conformance in the subsurface. This is generally done by implementing a comprehensive, risk-based Measurement, Monitoring and Verification plan, a key element of which is active time-lapse seismic monitoring. However, high cost and environmental impact of the standard surface seismic monitoring dictate the need for a cost-effective and environmentally friendly alternative. An opportunity to develop such method emerges with advances in distributed acoustic sensing (DAS) technology, which turns an optical fibre into a seismic sensor with dense spatial sampling. DAS can be permanently deployed in multiple wells across the geosequestration site providing a robust and non-intrusive network of seismic receivers. This approach was developed and tested in the CO2CRC Otway project, where injection of 15 kt of CO 2 at 1.5 km depth was monitored with a 4D vertical seismic profiling (VSP) using five borehole DAS arrays and mobile vibroseis sources. The 4D DAS VSP in each of the five wells provides broadly consistent images of the CO 2 plume with some differences due to different illumination of the target horizon, lateral variation of velocities, and seismic anisotropy. When the newly injected CO 2 reaches a CO 2 plume created as a result of an earlier injection into the same formation ~600 m updip, 4D DAS VSP shows a change in reflectivity in that area and beyond. Furthermore, this shows a potential of 4D DAS VSP for monitoring gas injection into gas-saturated reservoirs.

58 GEOSCIENCES↗

Flexibility Reserve Reductions from an Energy Imbalance Market with High Levels of Wind Energy in the Western Interconnection

The anticipated increase in variable generation in the Western Interconnection (WI) over the next several years has raised concerns about how to maintain system balance, especially in smaller Balancing Areas (BAs). Given renewable portfolio standards in the West, it is possible that more than 50 gigawatts (GW) of wind capacity will be installed by 2020. Significant quantities of solar generationare likely to be added as well. The consequent increase in variability and uncertainty that must be managed by the conventional generation fleet and responsive load make it attractive to consider ways in which Balancing Area Authorities (BAAs) can pool their variability and response resources, thus taking advantage of geographic and temporal diversity to increase overall operational efficiency.Our analysis considers several alternative forms of an Energy Imbalance Market (EIM) that have been proposed in the non-market areas of the WI. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: BAA cooperation and sub-hourly dispatch. As proposed, the EIM does not consider any form of coordinated unitcommitment; however, over time it is possible that BAAs would develop formal or informal coordination plans. This report examines the benefits of several possible EIM implementations, both separately and in concert.

17 WIND ENERGY↗

High-speed, multi-channel detector readout electronics for fast radiation detectors

In this project, we are developing a high speed digital spectrometer that a) captures detector waveforms at rates up to 500 MSPS b) has upgraded event data acquisition with additional data buffers for zero dead time operation c) moves energy calculations to the FPGA to increase spectrometer throughput in fast scintillator applications d) uses a streamlined architecture and high speed data interface for even faster readout to the host PC These features are in addition to the standard functions in our existing spectrometers such as digitization, programmable trigger and energy filters, pileup inspection, data acquisition with energy and time stamps, MCA histograms, and run statistics. In Phase I, we upgraded one of our existing spectrometer designs to demonstrate the key principle of fast waveform capture using a 500 MSPS, 12 bit ADC and a Xilinx Virtex-4 FPGA. This upgraded spectrometer, named P500, performed well in initial tests of energy resolution, pulse shape analysis, and timing measurements, thus achieving item (a) above. In Phase II, we are revising the P500 to build a commercial prototype with the improvements listed in items (b)-(d). As described in the previous report, two devices were built to pursue this goal, named the Pixie-500 and the Pixie-500 Express. The Pixie-500 has only minor improvements from the Phase I prototype and is intended as an early commercial product (its production and part of its development were funded outside the SBIR). It also allows testing of the ADC performance in real applications.The Pixie-500 Express (or Pixie-500e) includes all of the improvements (b)-(d). At the end of Phase II of the project, we have tested and debugged the hardware, firmware and software of the Pixie-500 Express prototype boards delivered 12/3/2010. This proved substantially more complex than anticipated. At the time of writing, all hardware bugs have been fixed, the PCI Express interface is working, the SDRAM has been successfully tested and the SHARC DSP has been booted with preliminary code. All new ICs and circuitry on the prototype are working properly, however some of the planned firmware and software functions have not yet been completely implemented and debugged. Overall, due to the unanticipated complexity of the PCI Express interface, some aspects of the project could not be completed with the time and funds available in Phase II. These aspects will be completed in self-funded Phase III.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Status of Federally Listed Threatened and Endangered Species at Los Alamos National Laboratory

Compliance with the Endangered Species Act at LANL is achieved through the implementation of the LANL Threatened and Endangered Species Habitat Management Plan (HMP; LANL 2017a). This plan is a formal agreement between the U.S. Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and the U.S. Fish and Wildlife Service for the management of endangered species and their habitats at LANL. Actions and activities approved in the HMP were reviewed by the U.S. Fish and Wildlife Service and do not require further consultations. Projects that cannot follow the HMP requirements must go through separate section 7 consultations. The controls for Endangered Species Act compliance are incorporated into an internal project review process through which all LANL projects are reviewed for environmental compliance (LANL 2017b).

54 ENVIRONMENTAL SCIENCES↗

Release 1.0 of MARMOT: A Mesoscale Fuel Performance Code

MARMOT is the mesoscale fuel performance code under development as part of the US DOE Nuclear Energy Advanced Modeling and Simulation Program. With this report, we release a new version of MARMOT, summarize its implemented capabilities, and document the ongoing development of new capabilities planned for the next release. The purpose of MARMOT is to predict the coevolution of microstructure and material properties of nuclear fuel and cladding due to stress, temperature, and irradiation damage. It accomplishes this using the phase field method coupled to solid mechanics and heat conduction. MARMOT is based on the Multiphysics Object-Oriented Simulation Environment (MOOSE), and much of its basic capability in the areas of the phase field method, mechanics, and heat conduction come directly from MOOSE modules.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated offsite doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL Richland Campus) and in Sequim, Washington, (PNNL Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in 2017.

61 RADIATION PROTECTION AND DOSIMETRY↗

System Dynamics Modeling of the Colorado Basin for Optimizing Operations, Reducing Risk, and Increasing Resiliency

This paper is the output from SNL’s involvement in the Western Area Power Administration (WAPA), the Colorado River Energy Distributors Association (CREDA), and the Upper Colorado River Commission’s (UCRC) sponsored Phase II work to establish market and non-market values (NMV’s) of water and hydropower associated with Glen Canyon Dam (GCD) operations and the Colorado River ecosystem. It describes the purpose and need to develop a systems model for the Colorado River Basin that includes valuations in the economic, hydrologic, environmental, social, and cultural sectors. It outlines the benefits and unique features associated with such a model and provides a roadmap of how a systems model would be developed and implemented. While not meant to serve as a full development plan, the ideas and concepts herein represent what the Sandia National Laboratories (SNL) research team believes is the most impactful and effective path forward to address an ever increasing complex set of problems that occur at the basin-scale and beyond.

13 HYDRO ENERGY↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; 40 CFR Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247 and 173-480 were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL-Richland Campus) and in Sequim, Washington, (PNNL-Sequim Campus, which formerly was known as the Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2021 for calendar year ending 2020.

40 CFR 61 Subpart H↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H↗

Powering Large Loads: Solutions Across Transmission, Utility, and Facility Scales

This report synthesizes current strategies for accommodating large load growth through a review of publicly available technical literature and media insights around the United States (U.S.). Solutions are organized across three implementation scales (transmission, utility, and facility) and categorized according to common implementation pathways (including structural expansion, operations and efficiency, upgrades, and planning and policy).

Valdez, Raquel Lynn [Sandia National Laboratories ↗

Optical Transition Radiation System for ATF2

In this paper we present the first measurements performed during the fall 2010 and early 2011 runs. Software development, simulations and hardware improvements to the Multi-Optical Transition Radiation System installed in the beam diagnostic section of the Extraction line of ATF2 are described. 2D emittance measurements have been performed and the system is being routinely used for coupling correction. Realistic beam simulations have been made and compared with the measurements. A demagnifier lens system to improve the beam finding procedure has been designed and will be implemented in a future run. We also discuss further work planned for the subsequent run periods.

43 PARTICLE ACCELERATORS↗