Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Puget Sound Tidal Energy In-Water Testing and Development Project (Final Technical Report)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

16 TIDAL AND WAVE POWER↗

Heavy and Overweight Vehicle Defects (Interim Report)

The Federal Highway Administration (FHWA), along with the Federal Motor Carrier Safety Administration (FMCSA), has an interest in overweight commercial motor vehicles, how they affect infrastructure, and their impact on safety on the nation’s highways. To assist both FHWA and FMCSA in obtaining more information related to this interest, data was collected and analyzed from two separate sources. A large scale nationwide data collection effort was facilitated by the Commercial Vehicle Safety Alliance as part of a special study on overweight vehicles and an additional, smaller set, of data was collected from the state of Tennessee which included a much more detailed set of data. Over a six-month period, 1,873 Level I inspections were performed in 18 different states that volunteered to be a part of this study. Of the 1,873 inspections, a vehicle out-of-service (OOS) violation was found on 44.79% of the vehicles, a rate significantly higher than the national OOS rate of 27.23%. The main cause of a vehicle being placed OOS was brake-related defects, with approximately 30% of all vehicles having an OOS brake violation. Only about 4% of vehicles had an OOS tire violation, and even fewer had suspension and wheel violations. Vehicle weight violations were most common on an axle group as opposed to a gross vehicle weight violation. About two thirds of the vehicles cited with a weight violation were overweight on an axle group with an average amount of weight over the legal limit of about 2,000 lbs. Data collection is scheduled to continue through January 2014, with more potentially more states volunteering to collect data. More detailed data collections similar to the Tennessee data collection will also be performed in multiple states.

99 GENERAL AND MISCELLANEOUS↗

Development of external and neutrally buoyant acoustic transmitters for turbine passage evaluation

Recent studies show transmitters surgically implanted into juvenile salmonids, for the purposes of estimating survival of fish passing through turbines, increases the risk of injury and mortality due to the presence of the tag and exposure to rapid turbine pressure changes. Neutrally buoyant external tags may instead be used to eliminate this bias. However, the externally tagged fish could be affected by other factors such as shear and turbulence which may also bias survival estimates. Studies have been conducted to examine the influence of shear and turbulence on non-tagged juvenile salmonids, however, tests have never been conducted in the laboratory or field to determine the influence of shear and turbulence on retention and injury related to attachment of external transmitters. We designed and manufactured two different configurations of neutrally buoyant (nearly zero g weight in water) external transmitters: Type A and Type B. The Type A transmitters weigh approximately 0.60 g in air and are attached to fish using two sutures anterior to the dorsal fin. The Type B transmitters weigh approximately 0.83 g in air and consist of battery part and transducer part with both parts neutrally buoyant. They are attached to both sides of the dorsal fin using two enamel coated 25 gauge magnet wires. This study provides a broad approach using evaluation measures such as holding, swimming performance, shear, turbulence, rapid decompression exposures, and predation to determine the efficacy of using neutrally buoyant external transmitters to estimate survival of juvenile salmonids passing through turbines. Preliminary results show the Type A design is a viable design for turbine passage evaluation and is being planned for field deployment in the near future.

Advanced turbine↗

Environmental Effects of Sediment Transport Alteration and Impacts on Protected Species: Edgartown Tidal Energy Project

The Islands of Martha's Vineyard and Nantucket are separated from the Massachusetts mainland by Vineyard and Nantucket Sounds; water between the two islands flows through Muskeget Channel. The towns of Edgartown (on Martha's Vineyard) and Nantucket recognize that they are vulnerable to power supply interruptions due to their position at the end of the power grid, and due to sea level rise and other consequences of climate change. The tidal energy flowing through Muskeget Channel has been identified by the Electric Power Research Institute as the strongest tidal resource in Massachusetts waters. The Town of Edgartown proposes to develop an initial 5 MW (nameplate) tidal energy project in Muskeget Channel. The project will consist of 14 tidal turbines with 13 providing electricity to Edgartown and one operated by the University of Massachusetts at Dartmouth for research and development. Each turbine will be 90 feet long and 50 feet high. The electricity will be brought to shore by a submarine cable buried 8 feet below the seabed surface which will landfall in Edgartown either on Chappaquiddack or at Katama. Muskeget Channel is located between Martha's Vineyard and Nantucket. Its depth ranges between 40 and 160 feet in the deepest portion. It has strong currents where water is transferred between Nantucket Sound and the Atlantic Ocean continental shelf to the south. This makes it a treacherous passage for navigation. Current users of the channel are commercial and recreational fishing, and cruising boats. The US Coast Guard has indicated that the largest vessel passing through the channel is a commercial scallop dragger with a draft of about 10 feet. The tidal resource in the channel has been measured by the University of Massachusetts-Dartmouth and the peak velocity flow is approximately 5 knots. The technology proposed is the helical Gorlov-type turbine positioned with a horizontal axis that is positively buoyant in the water column and held down by anchors. This is the same technology proposed by Ocean Renewable Power Company in the Western Passage and Cobscook Bay near Eastport Maine. The blades rotate in two directions capturing the tides energy both during flood and ebb tides. The turbines will be anchored to the bottom and suspended in the water column. Initial depth of the turbines is expected to be about 25 feet below the surface to avoid impacting navigation while also capturing the strongest currents. The Town of Edgartown was initially granted a Preliminary Permit by the Federal Energy Regulatory Commission (FERC) on March 1, 2008, and has recently received a second permit valid through August 2014. The Preliminary Permit gives Edgartown the exclusive right to apply for a power generation license for power generated from the hydrokinetic energy in the water flowing in this area. Edgartown filed a Draft Pilot License Application with FERC on February 1, 2010 and an Expanded Environmental Notification Form with the Massachusetts Environmental Policy Act (MEPA) Office at the same time. It expects to file a Final License Application in late 2013. Harris Miller Miller & Hanson (HMMH) of Burlington Massachusetts is acting as the Project Manager for the Town of Edgartown and collaborating with other partners of the project including the University of Massachusetts - Dartmouth's Marine Renewable Energy Center and the Massachusetts Clean Energy Center. HMMH was awarded a grant under the Department of Energy's Advanced Water Program to conduct marine science and hydrokinetic site-specific environmental studies for projects actively seeking a FERC License. HMMH, on behalf of the Town, is managing this comprehensive study of the marine environment in Muskeget Channel and potential impacts of the tidal project on indicator species and habitats. The University of Massachusetts School of Marine Science and Technology (SMAST) conducted oceanographic studies of tidal currents, tide level, benthic habitat, and potential for biofouling and foundation scouring. Woods Hole Oceanographic Institution, cooperating with SMAST, developed an oceanographic model to predict changes in sediment transport as a result of the proposed tidal energy project. Provincetown Center for Coastal Studies prepared background material on protected species - including whales, seals, and sea turtles - in the project area and implemented an initial tagging program to record location specific information on seals and sea turtles. HMMH communicated research plans and findings with local stakeholder groups, state and federal resource agency staff, and the ocean power industry. The information is being used to prepare environmental permit applications and obtain approvals for project construction.

16 TIDAL AND WAVE POWER↗

Environmental Baseline Survey Report for West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d in the Vicinity of the East Tennessee Technology Park, Oak Ridge, Tennessee

This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy’s (DOE’s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. The goal is to obtain all media no-further-investigation (NFI) determinations for the subject parcels considering existing soils. To augment the existing soils-only NFI determinations, samples of groundwater, surface water, soil, and sediment were collected to support all media NFI decisions. The only updates presented here are those that were made after the original issuance of the NFI documents. In the subject parcel where the soils NFI determination was not completed for approval (Parcel 21d), the full process has been performed to address the soils as well. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only NFI reports. Groundwater sampling was also conducted to support a Parcel 21d decision.

54 ENVIRONMENTAL SCIENCES↗

Pacific Northwest National Laboratory Site Environmental Report for Calendar Year 2011

The PNNL Site Environmental Report for Calendar Year 2011 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2011 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental managemePacific Northwest National Laboratory (PNNL), one of 10 national laboratories supporting the U.S. Department of Energy (DOE) Office of Science, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. DOE’s Pacific Northwest Site Office (PNSO) is responsible for PNNL oversight in Richland, Washington, as well as facilities in Sequim, Seattle, and North Bonneville, Washington, and Portland, Oregon. This site environmental report provides a synopsis of ongoing environmental management performance and compliance activities conducted during 2011. The report addresses the operations occurring on PNNL’s Richland campus, which includes PNSO’s PNNL Site facilities and Battelle-owned and -leased facilities. The report includes a description of the PNSO Site and setting; addresses compliance with all applicable DOE, federal, state, and local regulations; documents environmental monitoring efforts and status; presents potential radiation doses to staff and the public in the surrounding area; and data quality assurance methodsnt performance.

air quality↗

Idaho National Laboratory Cultural Resource Management Plan

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

99 GENERAL AND MISCELLANEOUS↗

Wisconsin Biodiesel Blending Program Final Report

The Wisconsin State Energy Office's (SEO) primary mission is to implement cost-effective, reliable, balanced, and environmentally-friendly clean energy projects. To support this mission the Wisconsin Biodiesel Blending Program was created to financially support the installation infrastructure necessary to directly sustain biodiesel blending and distribution at petroleum terminal facilities throughout Wisconsin. The SEO secured a federal directed award of $600,000 over 2.25 years. With these funds, the SEO supported the construction of inline biodiesel blending facilities at two petroleum terminals in Wisconsin. The Federal funding provided through the state provided a little less than half of the necessary investment to construct the terminals, with the balance put forth by the partners. Wisconsin is now home to two new biodiesel blending terminals. Fusion Renewables on Jones Island (in the City of Milwaukee) will offer a B100 blend to both bulk and retail customers. CITGO is currently providing a B5 blend to all customers at their Granville, WI terminal north of the City of Milwaukee.

09 BIOMASS FUELS↗

Production of High Value Cellulose from Tobacco

The Kentucky Rural Energy Supply Program was established in 2005 by a federal direct appropriation to benefit the citizens of the Commonwealth by creating a unified statewide consortium to promote renewable energy and energy efficiency in Kentucky. The U.S. Department of Energy's (DOE) Office of Biomass Programs initially funded the consortium in 2005 with a $2 million operational grant. The Kentucky Rural Energy Consortium (KREC) was formed at the outset of the program to advance energy efficiency and comprehensive research on biomass and bioenergy of importance to Kentucky agriculture, rural communities, and related industries. In recognition of the successful efforts of the program, KREC received an additional $1.96 million federal appropriation in 2008 for renewal of the DOE grant. From the beginning, KREC understood the value of providing a statewide forum for the discussion of Kentucky's long term energy needs and economic development potential. The new funding allowed KREC to continue to serve as a clearinghouse and support new research and development and outreach programs for energy efficiency and renewable energy.

Renewable Energy, Energy Efficiency↗

Transportation Energy Futures Series: Freight Transportation Modal Shares: Scenarios for a Low-Carbon Future

Truck, rail, water, air, and pipeline modes each serve a distinct share of the freight transportation market. The current allocation of freight by mode is the product of technologic, economic, and regulatory frameworks, and a variety of factors -- price, speed, reliability, accessibility, visibility, security, and safety -- influence mode. Based on a comprehensive literature review, this report considers how analytical methods can be used to project future modal shares and offers insights on federal policy decisions with the potential to prompt shifts to energy-efficient, low-emission modes. There are substantial opportunities to reduce the energy used for freight transportation, but it will be difficult to shift large volumes from one mode to another without imposing considerable additional costs on businesses and consumers. This report explores federal government actions that could help trigger the shifts in modal shares needed to reduce energy consumption and emissions. This is one in a series of reports produced as a result of the Transportation Energy Futures project, a Department of Energy-sponsored multi-agency effort to pinpoint underexplored strategies for reducing GHGs and petroleum dependence related to transportation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing

This report covers the third part of a larger U.S. Department of Energy (DOE) project to assess the life- cycle environmental and resource impacts associated with the manufacturing, transport, use, and disposal of light-emitting diode (LED) lighting products in relation to incumbent lighting technologies. All three reports are available on the DOE website (www.ssl.energy.gov/tech_reports.html). Part 1: Review of the Life-Cycle Energy Consumption of Incandescent, Compact Fluorescent and LED Lamps; Part 2: LED Manufacturing and Performance; Part 3: LED Environmental Testing. Parts 1 and 2 were published in February and June 2012, respectively. The Part 1 report included a summary of the life-cycle assessment (LCA) process and methodology, provided a literature review of more than 25 existing LCA studies of various lamp types, and performed a meta-analysis comparing LED lamps with incandescent and compact fluorescent lamps (CFLs). Drawing from the Part 1 findings, Part 2 performed a more detailed assessment of the LED manufacturing process and used these findings to provide a comparative LCA taking into consideration a wider range of environmental impacts. Both reports concluded that the life-cycle environmental impact of a given lamp is dominated by the energy used during lamp operation—the upstream generation of electricity drives the total environmental footprint of the product. However, a more detailed understanding of end-of-life disposal considerations for LED products has become increasingly important as their installation base has grown. The Part 3 study (reported herein) was undertaken to augment the LCA findings with chemical analysis of a variety of LED, CFL, and incandescent lamps using standard testing procedures. A total of 22 samples, representing 11 different models, were tested to determine whether any of 17 elements were present at levels exceeding California or Federal regulatory thresholds for hazardous waste. Notably, this type of testing does not provide an indication of product safety during use. Key findings include: • The selected models were generally found to be below thresholds for Federally regulated elements, although volatile mercury in the CFLs is presumed to have escaped detection; • Nearly all of the lamps (regardless of technology) exceeded at least one California threshold— typically for copper, zinc, antimony, or nickel; • The greatest contributors were the metal screw bases, drivers, ballasts, and wires or filaments— internal LED light sources generally did not cause LED lamps to exceed thresholds. This study was exploratory in nature and was not intended to provide a definitive indication of regulatory compliance for any specific lamp model or technology. Further study would be needed to more broadly characterize the various light source technologies; to more accurately and precisely characterize a specific model; or to determine whether product redesign would be appropriate. However, concentrations of regulated elements in LED lamps were found to be comparable to cell phones and other types of electronic devices, which like incandescent lamps and CFLs have also have been shown to exceed the stringent California thresholds for hazardous waste. Although LED lamps offer reduced life-cycle energy and environmental impacts when compared to CFLs and incandescent lamps, recycling will likely gain importance as consumer adoption of this emerging technology continues to increase.

bulb↗

Best Practices for Siting Solar Photovoltaics on Municipal Solid Waste Landfills. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The Environmental Protection Agency and the National Renewable Energy Laboratory developed this best practices document to address common technical challenges for siting solar photovoltaics (PV) on municipal solid waste (MSW) landfills. The purpose of this document is to promote the use of MSW landfills for solar energy systems. Closed landfills and portions of active landfills with closed cellsrepresent thousands of acres of property that may be suitable for siting solar photovoltaics (PV). These closed landfills may be suitable for near-term construction, making these sites strong candidate to take advantage of the 30% Federal Business Energy Investment Tax Credit. It was prepared in response to the increasing interest in siting renewable energy on landfills from solar developers;landfill owners; and federal, state, and local governments. It contains examples of solar PV projects on landfills and technical considerations and best practices that were gathered from examining the implementation of several of these projects.

14 SOLAR ENERGY↗

Solar Leasing Summary, Houston Texas

A relatively new option for homeowners looking to add solar to their home is the solar lease. At present, the solar lease option can be found in California, Arizona, Texas, Colorado, Hawaii, New York and Oregon. The most active companies currently offering solar leases are NRG Energy, Sungevity, Solar City and Sun Run. With the uncertainty and/or lack of subsidies the states participating in these programs have ebbed and flowed over the last few years. However, there is an expectation that in the current market solar leasing will make solar viable without the utility and federal subsidies. NRG Energy is currently testing this expectation in Houston, TX where currently no subsidies or incentives beyond the federal tax incentives, exist. Following is an explanation on the state of solar leasing in Houston, TX and explanation of the current financing options.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary Examination of Ethanol Fuel Effects on EPA’s R-factor for Vehicle Fuel Economy

The U.S. Department of Energy (DOE) supported a test program from 2007 through 2012 to evaluate the potential impacts of intermediate ethanol blends (also known as mid-level blends) on legacy vehicles and other engines. The purpose of the program was to assess the viability of using intermediate ethanol blends as a contributor to meeting national goals for the use of renewable fuels. Appendix A lists a bibliography of related studies. The catalyst durability program involved aging and emissions testing vehicles on a range of ethanol blends. The study was completed in 2011 and a final report issued shortly after. This report describes a preliminary analysis of the fuel economy data from the catalyst durability study, to determine the proper value for the R factor which is called out in the Code of Federal Regulations (CFR) for computing vehicle fuel economy on the certification cycle. The fuel economy equation that is specified in CFR for gasoline-fuelled vehicles is based on a carbon mass balance (CMB) approach to determine the amount of fuel consumed during the test by measuring the carbon-bearing emissions that are produced; however, it also incorporates a scaling factor (R factor) based on the net heating value of the fuel and the sensitivity of fuel economy to changes in the heating value. The impact of the R factor is a fixed ratio in the resultant fuel economy that is dependent upon fuel properties other than those required for a typical CMB calculation. This equation was put in place in 1988 to correct for differences between certification fuels to address corporate average fuel economy (CAFE) credit issues associated with fuel property variations. The algorithm adjusts the calculated fuel economy to compute what would have been measured had the 1975 certification fuel been used for the test. The R factor was defined as the sensitivity of the fuel economy result to changes in fuel energy content. When R equals 1.0, the fuel economy change exactly tracks the energy density difference between the fuels. If R is less than 1.0, the fuel economy change is smaller than the change in energy density. The R factor was defined to be 0.6 based on tests using 1980s vehicles. Since that time, the Auto/Oil test program has established that the R factor for 1990s vehicles is higher (about 0.93). More recently EPA analyzed the EPAct/V2/E-89 dataset to compute the R factor, resulting in an average of 0.82 to 0.86. It is important to note that the EPAct/V2/E89 test program used the LA92 test cycle, a cycle known to contain more aggressive accelerations than the FTP. To date, EPA has only required emissions and fuel economy testing of gasoline vehicles with a certification fuel that does not contain ethanol. However in 2013 EPA issued a Proposed Rule seeking comment on the establishment of an emissions certification fuel containing ethanol, such as E10 or E15. Calculating modern vehicle fuel economy with the existing CFR equation with an R factor of 0.6 when ethanol blends are used produces significant errors. For the catalyst durability program, a straightforward CMB approach was used to compute fuel economy, thereby allowing a straightforward evaluation of the impact of ethanol content on fuel economy. However, if an ethanol-containing fuel is to become the new certification fuel for light-duty vehicles, consistent application of the CFR equation needs to be considered for the benefit of manufacturers’ CAFE compliance. Analysis of city cycle Federal Test Procedure (FTP) fuel economy test results and fuel analyses from the catalyst durability study indicates that the average R-factor for modern vehicles is very close to unity at about 0.94±0.04. This result is very similar to the results of the 1993 Auto/Oil test program. Future work should examine other drive cycles, and advanced vehicle technologies which may reveal sensitivities to properties other than heating value.

intermediate ethanol blends↗

Technical and Economic Feasibility Assessment of Small Hydropower Development in the Deschutes River Basin

In March 2010, the U.S. Department of Energy (DOE), the U.S. Department of the Interior (Interior), and the U.S. Department of the Army [through the Army Corps of Engineers (USACE)] signed the Memorandum of Understanding (MOU) for Hydropower. The purpose of the MOU is to “help meet the nation’s needs for reliable, affordable, and environmentally sustainable hydropower by building a long-term working relationship, prioritizing similar goals, and aligning ongoing and future renewable energy development efforts.” Specifically, the MOU aims to “(1) support the maintenance and sustainable optimization of existing federal and non-federal hydropower projects, (2) elevate the goal of increased hydropower generation as a priority of each agency to the extent permitted by their respective statutory authorities, (3) promote energy efficiency, and (4) ensure that new hydropower generation is implemented in a sustainable manner.”

basin-scale opportunity assessment↗

Considerations of human intrusion in U.S. programs for deep geologic disposal of radioactive waste

Regulations in the United States that govern the permanent disposal of spent nuclear fuel and high-level radioactive waste in deep geologic repositories require the explicit consideration of hypothetical future human intrusions that disrupt the waste. Specific regulatory requirements regarding the consideration of human intrusion differ in the two sets of regulations currently in effect in the United States; one defined by the Environmental Protection Agency's 40 Code of Federal Regulations part 197, applied only to the formerly proposed geologic repository at Yucca Mountain, Nevada, and the other defined by the Environmental Protection Agency s 40 Code of Federal Regulations part 191, applied to the Waste Isolation Pilot Plant in New Mexico and potentially applicable to any repository for spent nuclear fuel and high-level radioactive waste in the United States other than the proposed repository at Yucca Mountain. This report reviews the regulatory requirements relevant to human intrusion and the approaches taken by the Department of Energy to demonstrating compliance with those requirements.

Swift, Peter N.↗

Pacific Northwest National Laboratory Site Radionuclide Air Emissions Report for Calendar Year 2012

This report documents radionuclide air emissions that result in the highest effective dose equivalent (EDE) to a member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and Washington Administrative Code (WAC) Chapter 246-247, Radiation Protection Air Emissions. The dose to the PNNL Site MEI due to routine major and minor point source emissions in 2012 from PNNL Site sources is 9E-06 mrem (9E-08 mSv) EDE. The dose from fugitive emissions (i.e., unmonitored sources) is 1E-7 mrem (1E-9 mSv) EDE. The dose from radon emissions is 2E-6 mrem (2E-08 mSv) EDE. No nonroutine emissions occurred in 2012. The total radiological dose for 2012 to the MEI from all PNNL Site radionuclide emissions, including fugitive emissions and radon, is 1E-5 mrem (1E-7 mSv) EDE, or 100,000 times smaller than the federal and state standard of 10 mrem/yr, to which the PNNL Site is in compliance.

Air Emission↗

Electric Vehicle Preparedness Task 2: Identification of Joint Base Lewis McChord Vehicles for Installation of Data Loggers

The U.S. Department of Energy and the U.S. Department of Defense signed a memorandum of understanding on July 22, 2010, for the purpose of strengthening the coordination of efforts to enhance national energy security and to demonstrate federal government leadership in transitioning America to a low-carbon economy. The memorandum of understanding included efforts in the areas of energy efficiency, fossil fuels, alternative fuels, efficient transportation technologies and fueling infrastructure, grid security, smart grid, and storage. In support of the memorandum of understanding, the Idaho National Laboratory, with funding provided by the U.S. Department of Energy’s Vehicle Technologies Office and Federal Energy Management Program, directed ECOtality North America to conduct several U.S. Department of Defense base studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of electric drive vehicles.

99 GENERAL AND MISCELLANEOUS↗