Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FLOODS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

WISE-CASING: Time Domain Reflectometry Data from Cymric Field, CA

The objective of this field test is to validate several technologies for non-invasive well integrity assessment using existing wells with a known completion. The tests were made at the Cymric oil field, which is a steam flood operation. The wells therefore undergo similar downhole conditions as geothermal wells. The Cymric field is mainly a cyclic steam operation where wells are 1000-15-00 ft in depth and the reservoir occupies the bottom 400ft. The maximum temperatures can exceed 500 degrees F and the well spacing is very close, often less than 50m. The field plan consisted of applying the Time Domain Reflectometry (TDR) method to the wells. The input voltages were set as 70 V shows the TDR responses at frequencies of 450 kHz, 2500 kHz, and 4500 kHz. There is a summary report will full information about the field tests.

15 GEOTHERMAL ENERGY↗

Surface water and groundwater FTICR-MS, NPOC, and TN from nine wetlands and three upland wells at the Tanglewood Biological Station, Alabama

This dataset supports a broader study examining wetland hydrobiogeochemical responses to flood disturbance and the subsequent impacts on watershed nutrient export. The study was designed following ICON (integrated, coordinated, open, and networked) principles. Samples were collected from nine wetlands and three upland wells at the Tanglewood Biological Station, Alabama in August 2024 and February 2025, during the dry and wet season, respectively. The contents include geochemistry (dissolved organic carbon measured as non-purgeable organic carbon; total dissolved nitrogen) and organic matter characterization (FTICR-MS). Related water level data from the same locations can be found at https://data.ess-dive.lbl.gov/view/doi:10.15485/2530253. Additional geochemistry will be published in a separate data package. For details on how to navigate this data package, see this infographic from the River Corridor SFA https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About. In addition to a readme, this data package also includes a file-level metadata (FLMD) file that describes each file and a data dictionary (DD) that describes all column/row headers and variable definitions.This dataset is comprised of (1) a folder containing environmental context photos; (2) file-level metadata; (3) data dictionary; (4) field metadata; (5) readme; (6) international generic sample number (IGSN) mapping file; (7) the field protocol; and (8) a subfolder with sample data. The sample data subfolder contains (1) dissolved organic carbon (DOC, measured as non-purgeable organic carbon, NPOC) data and averages; (2) total nitrogen data and averages; (3) methods codes; and (4) a subfolder of 12 Tesla (12T) Fourier-transform ion cyclotron resonance mass spectrometry (FTICR-MS) data. All files are .csv, .pdf, .jpeg, or .jpg.

54 ENVIRONMENTAL SCIENCES↗

Power Plant Water Risk and Adaptive Measures Database

Project objective was to understand water-related constraints affecting conventional powerplant operations, specifically coal-fired power plants. Of concern were threats related to drought and flood affecting both water supply and ability of plant to discharge wastewater. Also of interest were adaptive measures taken to mitigate identified threats. This spreadsheet contains the responses provided by the power plant operators and owners. Data have been "sanitized" (e.g., random plant ID, binned location and generation capacity information) to ensure anonymity of individual power plants.

Adaptive Measures↗

Analysis of the performance of different culvert boundary conditions in 2D shallow flow models

Culverts allow roads to safely traverse small streams or drainage ditches, and their proper design is critical to ensure a safe and reliable transportation network. A correct modelization of these hydraulic structures becomes crucial in the assessment of flood footprints or discharge peak estimation in a risk evaluation plan. The question of how to include culverts comes up frequently when assembling a hydraulic model that requires the presence of as many singular elements as possible. In this work, three different culvert integrations with the surface domain are studied and compared in the context of a 2D shallow water (SW) model. All of them are based on the Federal Highway Administration (FHWA) formulation for the culvert discharge estimation but differ in complexity and in the interaction with the numerical model for surface flow, some of them as internal boundary conditions. Several steady and unsteady validation test cases are presented and the numerical results are compared with the predictions from HEC-RAS 1D and HY-8 software. Furthermore, the culvert area, shape and their sensitivity to the 2D computational mesh is also analyzed.

54 ENVIRONMENTAL SCIENCES↗

INTERPRETATION OF AIRBORNE ELECTROMAGNETIC AND MAGNETIC DATA IN THE 600 AREA

As part of the 200-PO-1 Phase I geophysical surveys, Fugro Airborne Surveys was contracted to collect airborne electromagnetic (EM) and magnetic surveys of the Hanford Site 600 Area. Two helicopter survey systems were used with the HeliGEOTEM{reg_sign} time domain portion flown between June 19th and June 20th, 2008, and the RESOLVE{reg_sign} frequency domain portion was flown from June 29th to July 1st, 2008. Magnetic data were acquired contemporaneously with the electromagnetic surveys using a total-field cesium vapor magnetometer. Approximately 925 line kilometers (km) were flown using the HeliGEOTEM{reg_sign} II system and 412 line kilometers were flown using the RESOLVE{reg_sign} system. The HeliGEOTEM system has an effective penetration of roughly 250 meters into the ground and the RESOLVE system has an effective penetration of roughly 60 meters. Acquisition parameters and preliminary results are provided in SGW-39674, Airborne Electromagnetic Survey Report, 200-PO-1 Groundwater Operable Unit, 600 Area, Hanford Site. Airborne data are interpreted in this report in an attempt to identify areas of likely preferential groundwater flow within the aquifer system based on the presence of paleochannels or fault zones. The premise for the interpretation is that coarser-grained intervals have filled in scour channels created by episodic catastrophic flood events during the late Pleistocene. The interpretation strategy used the magnetic field anomaly data and existing bedrock maps to identify likely fault or lineament zones. Combined analysis of the magnetic, 60-Hz noise monitor, and flight-altitude (radar) data were used to identify zones where EM response is more likely due to cultural interference and or bedrock structures. Cross-sectional and map view presentations of the EM data were used to identify more electrically resistive zones that likely correlate with coarser-grained intervals. The resulting interpretation identifies one major northwest-southeast trending preferential flowpath with several minor units running along a similar trend. This presumed path of preferential flow is compared with the tritium concentration levels observed for the 600 Area. Analysis of the magnetic field data shows the location of potential bedrock faults and lineaments which may influence the horizontal and vertical flow of water. Faults lying within, or in the vicinity of preferential groundwater flow paths may allow flow into or out of the otherwise confined basalt layers.

54 ENVIRONMENTAL SCIENCES↗

Predictability and Diagnosis of Low-Frequency Climate Processes in the Pacific

Predicting the climate for the coming decades requires understanding both natural and anthropogenically forced climate variability. This variability is important because it has major societal impacts, for example by causing floods or droughts on land or altering fishery stocks in the ocean. Our results fall broadly into three topics: evaluating global climate model predictions; regional impacts of climate changes over western North America; and regional impacts of climate changes over the eastern North Pacific Ocean.

54 ENVIRONMENTAL SCIENCES↗

Prediction of Total Dissolved Gas Exchange at Hydropower Dams

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

13 HYDRO ENERGY↗

Performance Evaluation of a Hot-Humid Climate Community

This report describes the Project Home Again community in New Orleans, a new development for high-performance, affordable homes for residents who lost their homes to Hurricane Katrina. Building Science Corporation acted as a consultant for the project, advocating design strategies for durability, flood resistance, occupant comfort, and low energy use while maintaining cost effectiveness.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Light Water Reactor Sustainability Program: Reactor Safety Technologies Pathway Technical Program Plan

In the aftermath of the March 2011 multi-unit accident at the Fukushima Daiichi nuclear power plant (Fukushima), the nuclear community has been reassessing certain safety assumptions about nuclear reactor plant design, operations and emergency actions, particularly with respect to extreme events that might occur and that are beyond each plant’s current design basis. Because of our significant domestic investment in nuclear reactor technology (99 operating reactors in the fleet of commercial LWRs with five under construction), the United States has been a major leader internationally in these activities. The U.S. nuclear industry is voluntarily pursuing a number of additional safety initiatives. The NRC continues to evaluate and, where deemed appropriate, establish new requirements for ensuring adequate protection of public health and safety in the occurrence of low probability events at nuclear plants; (e.g., mitigation strategies for beyond design basis events initiated by external events like seismic or flooding initiators). The DOE has also played a major role in the U.S. response to the Fukushima accident. Initially, DOE worked with the Japanese and the international community to help develop a more complete understanding of the Fukushima accident progression and its consequences, and to respond to various safety concerns emerging from uncertainties about the nature of and the effects from the accident. DOE R&D activities are focused on providing scientific and technical insights, data, analyses methods that ultimately support industry efforts to enhance safety. These activities are expected to further enhance the safety performance of currently operating U.S. nuclear power plants as well as better characterize the safety performance of future U.S. plants. In pursuing this area of R&D, DOE recognizes that the commercial nuclear industry is ultimately responsible for the safe operation of licensed nuclear facilities. As such, industry is considered the primary “end user” of the results from this DOE-sponsored work. The response to the Fukushima accident has been global, and there is a continuing multinational interest in collaborations to better quantify accident consequences and to incorporate lessons learned from the accident. DOE will continue to seek opportunities to facilitate collaborations that are of value to the U.S. industry, particularly where the collaboration provides access to vital data from the accident or otherwise supports or leverages other important R&D work. The purpose of the Reactor Safety Technology R&D is to improve understanding of beyond design basis events and reduce uncertainty in severe accident progression, phenomenology, and outcomes using existing analytical codes and information gleaned from severe accidents, in particular the Fukushima Daiichi events. This information will be used to aid in developing mitigating strategies and improving severe accident management guidelines for the current light water reactor fleet.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of Mineral Deposits Along the Little Wind River, Riverton, WY, Processing Site

In 2012, the U.S.Department of Energy (DOE) began reassessing the former Riverton, Wyoming, Processing Site area for potential contaminant sources impacting groundwater. A flood in 2010 along the Little Wind River resulted in increases in groundwater contamination (DOE 2013).This investigation is a small part of continued efforts by DOE and other stakeholders to update human health and ecological risk assessments, to make a comprehensive examination of all exposure pathways to ensure that the site remains protective through established institutional controls. During field inspections at the Riverton Site in 2013, a white evaporitic mineral deposit was identified along the bank of the Little Wind River within the discharge zone of the groundwater contamination plume. In December 2013, Savannah River National Laboratory (SRNL) personnel collected a sample for analysis by X-ray fluorescence (Figure 1 shows the type of material sampled). The sample had a uranium concentration of approximately 64 to 73 parts per million. Although the uranium in this mineral deposit is within the expected range for evaporatic minerals in the western United States (SRNL 2014), DOE determined that additional assessment of the mineral deposit was warranted. In response to the initial collection and analysis of a sample of the mineral deposit, DOE developed a work plan (Work Plan to Sample Mineral Deposits Along the Little Wind River, Riverton, Wyoming, Processing Site [DOE 2014]) to further define the extent of these mineral deposits and the concentration of the associated contaminants (Appendix A). The work plan addressed field reconnaissance, mapping, sampling, and the assessment of risk associated with the mineral deposits adjacent to the Little Wind River.

54 ENVIRONMENTAL SCIENCES↗

Light Water Reactor Sustainability Program Industry Application External Hazard Analyses Problem Statement

Risk-Informed Margin Management Industry Application on External Events. More specifically, combined events, seismically induced external flooding analyses for a generic nuclear power plant with a generic site soil, and generic power plant system and structure. The focus of this report is to define the problem above, set up the analysis, describe the methods to be used, tools to be applied to each problem, and data analysis and validation associated with the above.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Demonstration of Coupled Multievent Scenario at a Subject Nuclear Power Plant

This report discusses how to perform a coupled, seismic and flooding, multievent risk-informed analysis. Presented in the following sections are the need for multievent risk-informed analysis, the tools needed to perform the analysis, and an example of solving a demonstration problem.

54 ENVIRONMENTAL SCIENCES↗

Numerical Modeling of Coupled Groundwater and Surface Water Interactions in an Urban Setting

The Dominguez Channel Watershed (DCW), located in the southern portion of Los Angeles County (Figure A.1), drains about 345 square miles into the Los Angeles Harbor. The cities and jurisdictions in DCW are shown in Figure A.2. The largest of these include the cities of Los Angeles, Carson, and Torrance. This watershed is unique in that 93% of its land area is highly developed (i.e. urbanized). The watershed boundaries are defined by a complex network of storm drains and flood control channels, rather than being defined by natural topography. Table (1) shows a summary of different land uses in the Dominguez Channel Watershed (MEC, 2004). The Dominguez Watershed has the highest impervious area of all watersheds in the Los Angeles region. The more impervious the surface, the more runoff is generated during a storm. Storm water runoff can carry previously accumulated contaminants and transport them into receiving water systems. Point sources such as industrial wastewater and municipal sewage as well as urban runoff from commercial, residential, and industrial areas are all recognized as contributors to water quality degradation at DWC. Section 303(d) of the 1972 Federal Clean Water Act (CWA) requires states to identify and report all waters not meeting water quality standards and to develop action plans to pursue the water quality objectives. These plans specify the maximum amount of a given pollutant that the water body of concern can receive and still meet water quality standards. Such plans are called Total Maximum Daily Loads (TMDLs). TMDLs also specify allocations of pollutant loadings to point and non-point sources taking into account natural background pollutant levels. This demonstrates the importance of utilizing scientific tools, such as flow and transport models, to identify contaminant sources, understand integrated flow paths, and assess the effectiveness of water quality management strategies. Since overland flow is a very important component of the water balance and hydrology of DCW, a parallel, distributed watershed model that treats flow in groundwater and surface water in a dynamically coupled manner will be used to build a flow model of the watershed. This coupled model forms the basis for modeling and understanding the transport of contaminants through the Dominguez Channel Watershed, which can be used in designing and implementing TMDLs to manage the water quality in this basin. In this report, the coupled surface water-groundwater flow model of DCW will be presented. This flow model was calibrated against a storm that occurred in February 21st, 2004. The model and approach are explained further in the following sections.

20 FOSSIL-FUELED POWER PLANTS↗

Mineral-Surfactant Interactions for Minimum Reagents Precipitation and Adsorption for Improved Oil Recovery

Chemical EOR can be an effective method for increasing oil recovery and reducing the amount of produced water; however, reservoir fluids are chemically complex and may react adversely to the polymers and surfactants injected into the reservoir. While a major goal is to alter rock wettability and interfacial tension between oil and water, rock-fluid and fluid-fluid interactions must be understood and controlled to minimize reagent loss, maximize recovery and mitigate costly failures. The overall objective of this project was to elucidate the mechanisms of interactions between polymers/surfactants and the mineral surfaces responsible for determining the chemical loss due to adsorption and precipitation in EOR processes. The role of dissolved inorganic species that are dependent on the mineralogy is investigated with respect to their effects on adsorption. Adsorption, wettability and interfacial tension are studied with the aim to control chemical losses, the ultimate goal being to devise schemes to develop guidelines for surfactant and polymer selection in EOR. The adsorption behavior of mixed polymer/surfactant and surfactant/surfactant systems on typical reservoir minerals (quartz, alumina, calcite, dolomite, kaolinite, gypsum, pyrite, etc.) was correlated to their molecular structures, intermolecular interactions and the solution conditions such as pH and/or salinity. Predictive models as well as general guidelines for the use of polymer/surfactant surfactant/surfactant system in EOR have been developed The following tasks have been completed under the scope of the project: (1) Mineral characterization, in terms of SEM, BET, size, surface charge, and point zero charge. (2) Study of the interactions among typical reservoir minerals (quartz, alumina, calcite, dolomite, kaolinite, gypsum, pyrite, etc.) and surfactants and/or polymers in terms of adsorption properties that include both macroscopic (adsorption density, wettability) and microscopic (orientation/conformation of the adsorbed layers), as well as precipitation/abstraction characteristics. (3) Investigation of the role of dissolved species, especially multivalent ions, on interactions between reservoir minerals and surfactants and/or polymers leading to surfactant precipitation or activated adsorption. (4) Solution behavior tests--surface tension, interaction, ultra filtration, and other tests. (5) Surfactant-mineral interactions relative to adsorption, wettability, and electrophoresis. (6) Work on the effects of multivalent ions, pH, temperature, salinity, and mixing ratio on the adsorption. Developments of adsorption models to explain interactions between surfactants/polymers/minerals. (7) General guidelines for the use of certain surfactants, polymers and their mixtures in micelle flooding processes.

02 PETROLEUM↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗

Spawning Habitat Studies of Hanford Reach Fall Chinook Salmon (Oncorhynchus tshawytscha), Final Report.

The Pacific Northwest National Laboratory conducted this study for the Bonneville Power Administration (BPA) with funding provided through the Northwest Power and Conservation Council(a) and the BPA Fish and Wildlife Program. The study was conducted in the Hanford Reach of the Columbia River. The goal of study was to determine the physical habitat factors necessary to define the redd capacity of fall Chinook salmon that spawn in large mainstem rivers like the Hanford Reach and Snake River. The study was originally commissioned in FY 1994 and then recommissioned in FY 2000 through the Fish and Wildlife Program rolling review of the Columbia River Basin projects. The work described in this report covers the period from 1994 through 2004; however, the majority of the information comes from the last four years of the study (2000 through 2004). Results from the work conducted from 1994 to 2000 were covered in an earlier report. More than any other stock of Pacific salmon, fall Chinook salmon (Oncorhynchus tshawytscha) have suffered severe impacts from the hydroelectric development in the Columbia River Basin. Fall Chinook salmon rely heavily on mainstem habitats for all phases of their life cycle, and mainstem hydroelectric dams have inundated or blocked areas that were historically used for spawning and rearing. The natural flow pattern that existed in the historic period has been altered by the dams, which in turn have affected the physical and biological template upon which fall Chinook salmon depend upon for successful reproduction. Operation of the dams to produce power to meet short-term needs in electricity (termed power peaking) produces unnatural fluctuations in flow over a 24-hour cycle. These flow fluctuations alter the physical habitat and disrupt the cues that salmon use to select spawning sites, as well as strand fish in near-shore habitat that becomes dewatered. The quality of spawning gravels has been affected by dam construction, flood protection, and agricultural and industrial development. In some cases, the riverbed is armored such that it is more difficult for spawners to move, while in other cases the intrusion of fine sediment into spawning gravels has reduced water flow to sensitive eggs and young fry. Recovery of fall Chinook salmon populations may involve habitat restoration through such actions as dam removal and reservoir drawdown. In addition, habitat protection will be accomplished through set-asides of existing high-quality habitat. A key component to evaluating these actions is quantifying the salmon spawning habitat potential of a given river reach so that realistic recovery goals for salmon abundance can be developed. Quantifying salmon spawning habitat potential requires an understanding of the spawning behavior of Chinook salmon, as well as an understanding of the physical habitat where these fish spawn. Increasingly, fish biologists are recognizing that assessing the physical habitat of riverine systems where salmon spawn goes beyond measuring microhabitat like water depth, velocity, and substrate size. Geomorphic features of the river measured over a range of spatial scales set up the physical template upon which the microhabitat develops, and successful assessments of spawning habitat potential incorporate these geomorphic features. We had three primary objectives for this study. The first objective was to determine the relationship between physical habitats at different spatial scales and fall Chinook salmon spawning locations. The second objective was to estimate the fall Chinook salmon redd capacity for the Reach. The third objective was to suggest a protocol for determining preferable spawning reaches of fall Chinook salmon. To ensure that we collected physical data within habitat that was representative of the full range of potential spawning habitat, the study area was stratified based on geomorphic features of the river using a two-dimensional river channel index that classified the river cross section into one of four shapes based on channel symmetry, depth, and width. We found that this river channel classification system was a good predictor at the scale of a river reach ({approx}1 km) of where fall Chinook salmon would spawn. Using this two-dimensional river channel index, we selected study areas that were representative of the geomorphic classes. A total of nine study sites distributed throughout the middle 27 km of the Reach (study area) were investigated. Four of the study sites were located between river kilometer 575 and 580 in a section of the river where fall Chinook salmon have not spawned since aerial surveys were initiated in the 1940s; four sites were located in the spawning reach (river kilometer [rkm] 590 to 603); and one site was located upstream of the spawning reach (rkm 605).

13 HYDRO ENERGY↗

Effects of Protective Plates and Stoplogs on Water Flow Through the Gleed Fish Screen Facility, April 2007 - September 2007.

In 2007, Pacific Northwest National Laboratory was asked by the U.S. Bureau of Reclamation to provide additional velocity measurements at Gleed fish screens site to support decisions on mitigating extreme flow fluctuations near the screens. The site consistently has had extreme water velocities in places and a strong back eddy at the downstream end in spring and summer. With the help of Washington Department of Fish and Wildlife staff, we measured the effects of different stoplog configurations behind the screens in May and July 2007. Protective metal plates in front of the trash racks were confirmed to be the cause of uneven and extreme water flow past the vertical traveling screens. Stoplogs were not sufficient to significantly reduce the effect of those metal plates on water velocities past and through the site. We provide a few suggestions including making it easier to raise and lower the metal plates and then adjusting them more often, constructing a new trash rack across the diversion entrance, and raising the control gate at the end of the site as long as possible in spring and during flood events.

13 HYDRO ENERGY↗

Libby Dam Hydro-electric Project Mitigation: Efforts for Downstream Ecosystem Restoration.

Construction of Libby Dam, a large hydropower and flood control dam occurred from 1966 to 1975 on the Kootenai River, near Libby, Montana in the Northwestern United States. Live reservoir storage is substantial, with water residence time of about 5 1/2 months (based on mean annual discharge of about 440 m{sup 3}/s). Downstream river discharge and thermal regimes and the dependent habitat conditions have been significantly altered by dam construction and operation relative to pre-dam conditions. Highly valued Kootenai River fish populations, including white sturgeon Acipenser transmontanus, burbot Lota lota and bull trout Salvelinus confluentus and their supporting ecological conditions have been deteriorating during post-dam years. Measurements of the presence of very low (ultraoligotrophic) concentrations of dissolved phosphorus in the river downstream from Libby Dam were identified as a critical limitation on primary production and overall ecosystem health. A decision was made to initiate the largest experimental river fertilization project to date in the Kootenai River at the Montana-Idaho border. Pre-treatment aquatic biomonitoring began in 2001; post-treatment monitoring began in 2005. A solar-powered nutrient addition system was custom designed and built to dose small releases of dissolved nutrients at rates from 10 to 40 L/hour, depending on river discharge, which averaged several hundred m3/s. Closely monitored experimental additions of ammonium polyphosphate solution (10-34-0) into the river occurred during the summers of 2005 through 2008. Targets for mixed in-river P concentrations were 1.5 {micro}g/L in 2005, and 3 {micro}g/L in subsequent years. Primary productivity and algal accrual rates along with invertebrate and fish community metrics and conditions were consistently measured annually, before and after experimental fertilization. Initial results from the program are very encouraging, and are reported.

13 HYDRO ENERGY↗