Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

The Chandra X-Ray Observatory

The Chandra X-Ray Observatory is the X-ray component of NASA's Great observatories which also includes the recently decommissioned Compton Gamma Ray Observatory, the Hubble Space Telescope, and the soon to be launched Space Infra Red Telescope Facility. Chandra is a unique X-ray astronomy facility for high-resolution imaging and for high-resolution spectroscopy. Chandra's performance advantage over other X-ray observatories is analogous to that of the Hubble Space Telescope over ground-based observatories. Chandra is a NASA facility that provides scientific data to the international astronomical community in response to proposals for its use. Data becomes public one year after the observation. The Observatory is the product of the efforts of many commercial, academic, and government organizations in the United States and Europe. NASA's Marshall Space Flight Center (MSFC) manages the Project and provides Project Science; TRW Space and Electronics Group served as prime contractor responsible for providing the spacecraft, the telescope, and assembling and testing the observatory; the Smithsonian Astrophysical Observatory (SAO) provides technical support and is responsible for ground operations.

Weisskopf, M. C.↗

Diverse Studies in the Reactivated NASA/Ames Radiation Facility: From Shock Layer Spectroscopy to Thermal Protection System Impact

NASA/Ames' Hypervelocity Free-Flight Radiation Facility has been reactivated after having been decommissioned for some 15 years, first tests beginning in early 1994. This paper discusses two widely different studies from the first series, one involving spectroscopic analysis of model shock-layer radiation, and the other the production of representative impact damage in space shuttle thermal protection tiles for testing in the Ames arc-jet facilities. These studies emphasize the interorganizational and interdisciplinary value of the facility in the newly-developing structure of NASA.

Miller, Robert J.↗

My Summer Experience as an Administrative Officer Assistant

The motto of the Safety and Assurance Directorate (SAAD) at NASA Glenn Research Center is "mission success starts with safety." SAAD has the functions of providing reliability, quality assurance, and system safety management to all GRC projects, programs and offices. Product assurance personnel within SAAD supervise the product assurance efforts by contractors on major contracts within GRC. The directorate includes five division offices and the Plum brook Decommissioning Office. SAAD oversees Glenn's Emergency Preparedness Program which handles security, hazmat, and disaster response and supervision.

Jones, Janelle C.↗

NASA Lewis Launch Collision Probability Model Developed and Analyzed

There are nearly 10,000 tracked objects orbiting the earth. These objects encompass manned objects, active and decommissioned satellites, spent rocket bodies, and debris. They range from a few centimeters across to the size of the MIR space station. Anytime a new satellite is launched, the launch vehicle with its payload attached passes through an area of space in which these objects orbit. Although the population density of these objects is low, there always is a small but finite probability of collision between the launch vehicle and one or more of these space objects. Even though the probability of collision is very low, for some payloads even this small risk is unacceptable. To mitigate the small risk of collision associated with launching at an arbitrary time within the daily launch window, NASA performs a prelaunch mission assurance Collision Avoidance Analysis (or COLA). For the COLA of the Cassini spacecraft, the NASA Lewis Research Center conducted an in-house development and analysis of a model for launch collision probability. The model allows a minimum clearance criteria to be used with the COLA analysis to ensure an acceptably low probability of collision. If, for any given liftoff time, the nominal launch vehicle trajectory would pass a space object with less than the minimum required clearance, launch would not be attempted at that time. The model assumes that the nominal positions of the orbiting objects and of the launch vehicle can be predicted as a function of time, and therefore, that any tracked object that comes within close proximity of the launch vehicle can be identified. For any such pair, these nominal positions can be used to calculate a nominal miss distance. The actual miss distances may differ substantially from the nominal miss distance, due, in part, to the statistical uncertainty of the knowledge of the objects positions. The model further assumes that these position uncertainties can be described with position covariance matrices. With these, and some additional simplifying assumptions, a closed-form solution for the probability of collision is obtained. This solution provides clear insights into how each of the independent parameters affects the probability of collision. It shows that for a given maximum probability of collision and prior knowledge of the objects position uncertainties and sizes, only knowledge of the nominal closest approach distance is required to make the launch/no launch decision. The model was completed and used for the mission assurance COLA analysis for the Cassini spacecraft, which was launched on a Titan IV/Centaur rocket on October 15, 1997. Although the model was specifically developed for the Cassini mission, it is clearly applicable for other launches as well. The effect of COLA closures on the launch window is shown. The bar represents the entire 140-min launch window on October 15, 1997; the blackened areas represent the loss of launch opportunities due to the potential for a collision with an orbiting object.

Bollenbacher, Gary↗

ACTS Operations Extended Through a University-Based Consortium

The Advanced Communications Technology Satellite (ACTS) program was slated for decommissioning in October 2000. With plans in place to move the spacecraft to an orbital graveyard and then shut the system down, NASA was challenged to consider the feasibility of extending operations for education and research purposes provided that an academic organization would be willing to cover operations costs. This was determined to be viable, and in the fall of 2000, NASA announced that it would consider extending operations. On March 19, 2001, NASA, the Ohio Board of Regents, and the Ohio University signed a Space Act Agreement to continue ACTS operations for 2 more years with options to extend operations up to a total of 4 years. To accomplish this, the Ohio University has formed a university-based consortium, the Ohio Consortium for Advanced Communications Technology (OCACT), and acts as the managing member. The Ohio University is responsible for the full reimbursement of NASA's operations costs, and does this through consortium membership. NASA retains the operating license of the spacecraft and has two contractors supporting spacecraft and master control station operations. This flexible arrangement between NASA and academia allows the education community to access a large communications satellite for learning about spacecraft operations and to use the system's transponders for communications applications. It also allows other organizations, such as commercial companies, to become consortium members and use the ACTS wideband Ka-band (30/20 GHz) payload. From the consortium members, six areas of interest have been identified.

Bauer, Robert A.↗

Forecasting the Impact of an 1859-calibre Superstorm on Satellite Resources

We have assembled a database of operational satellites in orbit as of 2004, and have developed a series of simple models to assess the economic impacts to this resource caused by various scenarios of superstorm events possible during the next sunspot cycle between 2010 and 2014. Despite the apparent robustness of our satellite assets against the kinds of storms we have encountered during the satellite era, our models suggest a potential economic loss exceeding $10(exp 11) for satellite replacement and lost profitability caused by a once a century single storm similar to the 1859 superstorm. From a combination of power system and attitude control system (the most vulnerable) failures, we estimate that 80 satellites (LEO, MEO, GEO) may be disabled as a consequence of a superstorm event. Additional consequences may include the failure of many of the GPS, GLONASS and Galileo satellite systems in MEO. Approximately 98 LEO satellites that normally would not have re-entered for many decades, may prematurely de-orbit in ca 2021 as a result of the temporarily increased atmospheric drag caused by the superstorm event occurring in 2012. The $10(exp 11) International Space Station may lose at least 15 kilometers of altitude, placing it in critical need for re-boosting by an amount that is potentially outside the range of typical Space Shuttle operations during the previous solar maximum in ca 2000, and at a time when NASA plans to decommission the Space Shuttle. Several LEO satellites will unexpectedly be placed on orbits that enter the ISS zone of avoidance, requiring some action by ground personnel and ISS astronauts to avoid close encounters. Radiation effects on astronauts have also been considered and could include a range of possibilities from acute radiation sickness for astronauts inside spacecraft, to near-lethal doses during EVAs. The specifics depends very sensitively on the spectral hardness of the accompanying SPE event. Currently, the ability to forecast extreme particle events and coronal mass ejections, or predict their fluences and geo-severity in the 24-hrs prior to the event, appears to be no better than 50/50. If the events of the 1859 superstorm serve as a guide, the scope of a contemporary superstorm will most certainly be an awesome event, but one that the vast majority of our other satellite resources may reasonably be expected to survive.

Odenwald, Sten↗

Science in Flux: NASA's Nuclear Program at Plum Brook Station 1955-2005

Science in Flux traces the history of one of the most powerful nuclear test reactors in the United States and the only nuclear facility ever built by NASA. In the late 1950's NASA constructed Plum Brook Station on a vast tract of undeveloped land near Sandusky, Ohio. Once fully operational in 1963, it supported basic research for NASA's nuclear rocket program (NERVA). Plum Brook represents a significant, if largely forgotten, story of nuclear research, political change, and the professional culture of the scientists and engineers who devoted their lives to construct and operate the facility. In 1973, after only a decade of research, the government shut Plum Brook down before many of its experiments could be completed. Even the valiant attempt to redefine the reactor as an environmental analysis tool failed, and the facility went silent. The reactors lay in costly, but quiet standby for nearly a quarter-century before the Nuclear Regulatory Commission decided to decommission the reactors and clean up the site. The history of Plum Brook reveals the perils and potentials of that nuclear technology. As NASA, Congress, and space enthusiasts all begin looking once again at the nuclear option for sending humans to Mars, the echoes of Plum Brook's past will resonate with current policy and space initiatives.

Bowles, Mark D.↗

Global Distortion of GPS Networks Associated with Satellite Antenna Model Errors

Recent studies of the GPS satellite phase center offsets (PCOs) suggest that these have been in error by approx.1 m. Previous studies had shown that PCO errors are absorbed mainly by parameters representing satellite clock and the radial components of site position. On the basis of the assumption that the radial errors are equal, PCO errors will therefore introduce an error in network scale. However, PCO errors also introduce distortions, or apparent deformations, within the network, primarily in the radial (vertical) component of site position that cannot be corrected via a Helmert transformation. Using numerical simulations to quantify the effects of PC0 errors, we found that these PCO errors lead to a vertical network distortion of 6-12 mm per meter of PCO error. The network distortion depends on the minimum elevation angle used in the analysis of the GPS phase observables, becoming larger as the minimum elevation angle increases. The steady evolution of the GPS constellation as new satellites are launched, age, and are decommissioned, leads to the effects of PCO errors varying with time that introduce an apparent global-scale rate change. We demonstrate here that current estimates for PCO errors result in a geographically variable error in the vertical rate at the 1-2 mm/yr level, which will impact high-precision crustal deformation studies.

Cardellach, E.↗

Orbital Debris Quarterly News: No. 1 - Volume 13

Topics discussed include: new debris from a decommissioned satellite with a nuclear power source; debris from the destruction of the Fengyun-1C meteorological satellite; quantitative analysis of the European Space Agency's Automated Transfer Vehicle 'Jules Verne' reentry event; microsatellite impact tests; solar cycle 24 predictions and other long-term projections and geosynchronus (GEO) environment for the Orbital Debris Engineering Model (ORDEM2008). Abstracts from the NASA Orbital Debris Program Office, examining satellite reentry risk assessments and statistical issues for uncontrolled reentry hazards, are also included.

Liou, J.-C.↗

Kepler: NASA's First Mission Capable of Finding Earth-Size Planets

Kepler, a NASA Discovery mission, is a spaceborne telescope designed to search a nearby region of our galaxy for Earth-size planets orbiting in the habitable zone of stars like our sun. The habitable zone is that region around a start where the temperature permits water to be liquid on the surface of a planet. Liquid water is considered essential forth existence of life. Mission Phases: Six mission phases have been defined to describe the different periods of activity during Kepler's mission. These are: launch; commissioning; early science operations, science operations: and decommissioning

Borucki, William J.↗

Review of Alpha-Ketoglutaric Acid (AKGA) Hydrazine and Monomethylhydrazine (MMH) Neutralizing Compound

The Johnson Space Center (JSC) White Sands Test Facility (WSTF) and NASA Engineering and Safety Center (NESC) were requested by NASA Associate Administrator for Space Operations to perform an evaluation of a proposed hydrazine/monomethylhydrazine (MMH) fuel treatment method using alpha-ketoglutaric acid (AKGA). This evaluation request was prompted by preliminary tests at the Kennedy Space Center (KSC), suggesting cost and operational benefits to NASA for the Space Shuttle Program (SSP) and other hardware decontamination and decommissioning, in addition to hydrazine and MMH waste treatment activities. This paper provides the team's position on the current KSC and New Mexico Highlands University (NMHU) efforts toward implementing the AKGA treatment technology with flight hardware, ground support equipment (GSE), hydrazine and MMH spills, and vapor control. This evaluation is current to the last data examined (approximately September 2008).

Dibbern, Andreas W.↗

Marshall Application Realignment System (MARS) Architecture

The Marshall Application Realignment System (MARS) Architecture project was established to meet the certification requirements of the Department of Defense Architecture Framework (DoDAF) V2.0 Federal Enterprise Architecture Certification (FEAC) Institute program and to provide added value to the Marshall Space Flight Center (MSFC) Application Portfolio Management process. The MARS Architecture aims to: (1) address the NASA MSFC Chief Information Officer (CIO) strategic initiative to improve Application Portfolio Management (APM) by optimizing investments and improving portfolio performance, and (2) develop a decision-aiding capability by which applications registered within the MSFC application portfolio can be analyzed and considered for retirement or decommission. The MARS Architecture describes a to-be target capability that supports application portfolio analysis against scoring measures (based on value) and overall portfolio performance objectives (based on enterprise needs and policies). This scoring and decision-aiding capability supports the process by which MSFC application investments are realigned or retired from the application portfolio. The MARS Architecture is a multi-phase effort to: (1) conduct strategic architecture planning and knowledge development based on the DoDAF V2.0 six-step methodology, (2) describe one architecture through multiple viewpoints, (3) conduct portfolio analyses based on a defined operational concept, and (4) enable a new capability to support the MSFC enterprise IT management mission, vision, and goals. This report documents Phase 1 (Strategy and Design), which includes discovery, planning, and development of initial architecture viewpoints. Phase 2 will move forward the process of building the architecture, widening the scope to include application realignment (in addition to application retirement), and validating the underlying architecture logic before moving into Phase 3. The MARS Architecture key stakeholders are most interested in Phase 3 because this is where the data analysis, scoring, and recommendation capability is realized. Stakeholders want to see the benefits derived from reducing the steady-state application base and identify opportunities for portfolio performance improvement and application realignment.

Belshe, Andrea↗

Product Lifecycle Management and the Quest for Sustainable Space Explorations

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decision-making. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful concept to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting.

Caruso, Pamela W.↗

Product Lifecycle Management and the Quest for Sustainable Space Exploration Solutions

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decisionmaking. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful tool to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting. Sustainable space exploration solutions demand that all lifecycle phases be optimized. Adopting PLM, which has been used by the automotive industry for many years, for aerospace applications provides a foundation for strong, disciplined systems engineering and accountable return on investment by making lifecycle considerations variables in an iterative decision-making process. This paper combines the perspectives of the founding father of PLM, along with the experience of Engineering leaders who are implementing these processes and practices real-time. As the nation moves from an industrial-based society to one where information is a valued commodity, future NASA programs and projects will benefit from the experience being gained today for the exploration missions of tomorrow.

Caruso, Pamela W.↗

Effects of Low Activity Solar Cycle on Orbital Debris Lifetime

Long duration of low solar activity in the last solar minimum has an undesirable consequence of extending the lifetime of orbital debris. The AFRL TacSat-2 satellite decommissioned in 2008 has finally re-entered into the atmosphere on February 5th after more than one year overdue. Concerning its demise we have monitored its orbital decay and monthly forecasted Tacsat-2 re-entry since September 2010 by using the Orbital Element Prediction (OEP) model developed by the AFRL Orbital Drag Environment program. The model combines estimates of future solar activity with neutral density models, drag coefficient models, and an orbit propagator to predict satellite lifetime. We run the OEP model with solar indices forecast by the NASA Marshall Solar Activity Future Estimation model, and neutral density forecast by the MSIS-00 neutral density model. Based on the two line elements in 2010 up to mid September, we estimated at a 50% confidence level TacSat-2's re-entry time to be in early February 2011, which turned out to be in good agreement with Tacsat-2's actual re-entry date. The potential space weather effects of the coming low activity solar cycle on satellite lifetime and orbital debris population are examined. The NASA long-term orbital debris evolutionary model, LEGEND, is used to quantify the effects of solar flux on the orbital debris population in the 200-600 km altitude environment. The results are discussed for developing satellite orbital drag application product.

Cable, Samual B.↗

Product Lifecycle Management and the Quest for Sustainable Space Exploration Solutions

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Marshall Space Flight Center (MSFC) Engineering Directorate, total lifecycle costs are important variables for critical decision-making. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful concept to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This briefing will demonstrate how the MSFC Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions and how that strategy aligns with the Agency and Center systems engineering policies and processes. Sustainable space exploration solutions demand that all lifecycle phases be optimized, and engineering the next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. Adopting PLM, which has been used by the aerospace and automotive industry for many years, for spacecraft applications provides a foundation for strong, disciplined systems engineering and accountable return on investment. PLM enables better solutions using fewer resources by making lifecycle considerations in an integrative decision-making process.

Caruso, Pamela W.↗

UARS Re-Entry Prediction and Analysis

The National Aeronautics and Space Administration (NASA) deployed the Upper Atmosphere Research Satellite (UARS) from the Space Shuttle payload bay during the STS-48 mission in September, 1991. The 5700 kg satellite was decommissioned in December, 2005 and was maneuvered into a lower altitude orbit to shorten its on-orbit lifetime to reduce the probability of a debris producing accidental collision. The satellite reentered the Earth s atmosphere over the Pacific Ocean on September 24, 2011. Analysis by NASA s Orbital Debris Program Office using the ORSAT software predicted that approximately two dozen fragments from UARS would survive reentry to reach the ground. This presentation will discuss the reentry predictions made in the days prior to the reentry and compare the UARS reentry with other historical reentries. It will also present the results of the ORSAT analysis showing predicted surviving reentry objects

Stansbery, Eugene G.↗