Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSTRUCTION INDUSTRY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Nevada Renewable Energy Training Project: Geothermal Power Plant Operators

The purpose of this project was to develop and institute a training program for certified geothermal power plant operators (GPO). An advisory board consisting of subject matter experts from the geothermal energy industry and academia identified the critical skill sets required for this profession. A 34-credit Certificate of Achievement (COA), Geothermal Power Plant Operator, was developed using eight existing courses and developing five new courses. Approval from the Nevada System of Higher Education Board of Regents was obtained. A 2,400 sq. ft. geothermal/fluid mechanics laboratory and a 3,000 sq. ft. outdoor demonstration laboratory were constructed for hands-on training. Students also participated in field trips to geothermal power plants in the region. The majority of students were able to complete the program in 2-3 semesters, depending on their level of math proficiency. Additionally the COA allowed students to continue to an Associate of Applied Science (AAS), Energy Technologies with an emphasis in Geothermal Energy (26 additional credits), if they desired. The COA and AAS are stackable degrees, which provide students with an ongoing career pathway. Articulation agreements with other NSHE institutions provide students with additional opportunities to pursue a Bachelor of Applied Science in Management or Instrumentation. Job placement for COA graduates has been excellent.

15 GEOTHERMAL ENERGY↗

Licensing Modernization Project for Advanced Reactor Technologies: FY 2018 Project Status Report

The promise of new nuclear technology and the future of commercial power in the United States (U.S.) are linked to the existence of an efficient and safety-focused regulatory review and licensing process. With an appropriate regulatory framework, reactor suppliers and regulators can design, license, build, and export advanced reactor units more effectively and efficiently and thereby help meet the growing need for clean and reliable energy. To help address the challenge of maintaining compatibility between the regulatory environment and new commercial nuclear plant designs, the U.S. Department of Energy (DOE) is supporting an industry-led effort called the Licensing Modernization Project (LMP). This cost-shared initiative, started in 2016 and scheduled to continue through mid-2019, targets amendment to key elements of the U.S. nuclear power reactor regulatory framework to specifically address licensing barriers in advanced-reactor concepts. The project is focused on updating guidance for certain technical licensing requirements that are largely incompatible with non-light-water reactors (non-LWR) and establish a new pathway for design-safety evaluations and license-application development. Upon completion, the project will have created a new pathway, founded on modern probabilistic assessment techniques, that offers developers, suppliers, regulators, and owner/operatorowner-operators greater clarity and assurance in design and licensing decisions. The LMP employs a team of advanced reactor technology and licensing subject matter experts working closely with U.S. regulators, affected industries, and interested members of the public. The project is managed by Southern Company and supported through a cost share arrangement with DOE. Technical contributions are also provided to the project from the Idaho National Laboratory (INL) Regulatory Development area, the Nuclear Energy Institute (NEI), and the U.S. Nuclear Regulatory Commission (NRC). The LMP identified a suite of high priority issues that provided significant uncertainty within the regulated non-LWR community. It was determined that much of this uncertainty could be retired by issuing updated licensing guidance founded on safety performance demonstrations and modern probabilistic methodologies. The success criteria for the project were established as: • Generate sets of technology inclusive (TI), risk-informed, and performance-based (TI-RIPB) technical requirements, recommendations, and proposals that could be reviewed, amended, and adopted for use by both NRC staff and industry. The proposals would create an optional-use regulatory framework without imposing additional (i.e., mandatory) requirements. • Support LMP the recommended updates of LMP such that they can be finalized, endorsed by NRC, and used by applicants within 5 years. This also supports the DOE advanced- reactor development and deployment goal of completing licensing reviews for technically mature non-LWR concepts sufficient to allow construction to proceed by the early 2030’s. • Further overall programmatic objectives established by DOE’s Gateway for Accelerated Innovation in Nuclear (GAIN) initiative by resolving technology-inclusive policy issues that adversely impact regulatory reviews, siting, permitting, and/or licensing of non-LWRs. This would provide significantly more regulatory certainty for advanced reactor developers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

From Long-distance Entanglement to Building a Nationwide Quantum Internet: Report of the DOE Quantum Internet Blueprint Workshop

A Quantum Path Forward. Today, many scientific experts recognize that building and scaling quantum-protected and enhanced communication networks are among the most important technological frontiers of the 21st century. The international research community perceives the construction of a first prototype global quantum network-the Quantum Internet-to be within reach over the next decade. In February 2020, the U.S Department of Energy (DOE)'s Office of Advanced Scientific Computing Research hosted the Quantum Internet Blueprint workshop to define a potential roadmap toward building the first nationwide quantum Internet. The workshop participants included representatives from DOE national laboratories, universities, industry, and other U.S. agencies with serious interests in quantum networking. The goal was to provide an outline of the essential research needed, detail any engineering and design barriers, and suggest a path forward to move from today's limited local network experiments to a viable, secure quantum Internet.

97 MATHEMATICS AND COMPUTING↗

A Technology Roadmap for Advanced Geothermal Well Construction

Recent analysis has shown that by 2050, geothermal energy can supply up to 90 GW of power to the U.S. electrical grid. Reducing the lifecycle cost of geothermal wells is critical to achieving this level of adoption. While time-related costs of drilling remain an important issue, there is also a need to focus on the costs associated with casing and cementing of geothermal wells. This report provides a roadmap of R&D activities needed to reduce the life cycle cost of casing and cementing while improving life-of-well performance. The purpose of the roadmap is to develop priorities for R&D in the areas of (1) high-performance and cost-effective materials for target geothermal well conditions, (2) well construction methods and techniques to reduce construction costs, and (3) methods and techniques to decrease to decrease long-term operating costs. The roadmap sets targets for the next 10-year period and purposely excludes R&D efforts into improved rock reduction. The roadmap was developed by a joint working group of experts from Oak Ridge National Laboratory, Brookhaven National Laboratory, and Sandia National Laboratories as well as 35 experts from industry and academia. Input from a series of information gathering sessions was used to inform and guide the development of the roadmap.

15 GEOTHERMAL ENERGY↗

Summary of NASA Lewis Research Center solar heating and cooling and wind energy programs

Plans for the construction and operation of a solar heating and cooling system in conjunction with a office building being constructed at Langley Research Center, are discussed. Supporting research and technology includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. The areas of a wind energy program that are being conducted include: design and operation of a 100-kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.

Vernon, R. W.↗

Urban SAFE50: Modeling, Controlling, and Testing Safe UAS Operations in Low Altitude Settings

The research and development of UAVs (Unmanned Aerial Vehicles) are quickly progressing as industries and hobbyist societies recognize their utility. NASA is focused on the technology development and safety considerations surrounding commercial use of UAVs. Urban SAFE50 (Safe Autonomous Flight Environment within the notional last 50 feet of operation of 55 pound class UAS (Small Unmanned Aircraft Systems)) is focused on the necessary real-­time decision algorithms and flight models prevalent in low-­altitude, high-­density city environments. Construction of on-­board controls to respond to motor failure and wind dynamics as well as a database of computational flight models and battery discharge profiles will help policymakers to predict and regulate unmanned aircraft flight safely and effectively.

SAFE↗

From Long-distance Entanglement to Building a Nationwide Quantum Internet: Report of the DOE Quantum Internet Blueprint Workshop

A Quantum Path Forward. Today, many scientific experts recognize that building and scaling quantum-protected and enhanced communication networks are among the most important technological frontiers of the 21st century. The international research community perceives the construction of a first prototype global quantum network-the Quantum Internet-to be within reach over the next decade. In February 2020, the U.S. Department of Energy (DOE)'s Office of Advanced Scientific Computing Research hosted the Quantum Internet Blueprint workshop to define a potential roadmap toward building the first nationwide quantum Internet. The workshop participants included representatives from DOE national laboratories, universities, industry, and other U.S. agencies with serious interests in quantum networking. The goal was to provide an outline of the essential research needed, detail any engineering and design barriers, and suggest a path forward to move from today's limited local network experiments to a viable, secure quantum Internet.

Peters, Nicholas↗

Investigations of dual-purpose canister direct disposal feasibility - 15106

Direct disposal of commercial spent nuclear fuel (SNF) in dual-purpose canisters (DPCs) could avoid the cost and complexity of re-packaging spent fuel into smaller purpose-built containers, avoid disposing of the DPC hulls as low-level waste, and potentially decrease worker dose. Technical objectives for disposal are: 1) safety of workers and the public, 2) engineering feasibility; 3) thermal management; and 4) criticality control after permanent closure of a repository. The postclosure safety case for DPC direct disposal would resemble that for any repository-waste isolation would be enhanced by choosing host geology in which radionuclide transport is diffusion dominated, and for which transport properties and pathways are insensitive to the expected temperature history. Containment functions would be assigned to the disposal overpack, and published data show that suitable materials exist for most possible disposal environments. Earlier studies showed that DPC-based waste packages would be only slightly larger and heavier than those proposed for a repository in volcanic tuff. Engineered solutions are available for transporting and emplacing them underground, although some could be the largest of their kind. The cost of DPC direct disposal in various geologic settings has been compared to options involving a change to loading standardized multi-purpose canisters, or continuing to load DPCs and re-packaging all of them for disposal. In general DPC direct disposal would cost tens of billions of dollars less, in packaging and disposal costs. Calculations for emplacement in hard rock and sedimentary rock show that host rock peak temperature targets of 100 to 200 deg.C could be met by managing fuel age and burnup, with repository closure at up to 150 years from reactor discharge. For disposal in salt, DPC-based waste packages could be emplaced at only 50 to 100 years from discharge, depending on burnup. Sedimentary media such as shales pose special challenges especially if they have low thermal conductivity. If backfill is used around DPC-based packages its peak temperature could be 150 to 200 deg.C. Without flooding of waste packages with ground water, criticality can never occur. However, some small number of disposal overpacks could fail within the postclosure performance period due to corrosion or disruptive events. Once flooded, the aluminum-based neutron absorber materials used in most DPCs would readily degrade. Analysis has shown that even without neutron absorbers, virtually all DPCs could be subcritical if flooded with chloride brines such as would occur in a salt repository. The licensing basis for existing DPCs involves criticality analysis that may be conservative compared to fuel that is actually loaded, and the difference provides uncredited reactivity margin. Uncredited margin can offset increases in reactivity associated with flooding and basket degradation. For flooding with fresh water, with loss of neutron absorbers, many DPCs have been shown to be subcritical using uncredited margin. Significantly fewer are subcritical if the fuel basket also degrades. Thus, the materials of DPC basket construction (e.g., aluminum or carbon steel) could be deleterious if they fully corrode, along with the neutron absorbers, during the performance period. Logistical simulations are used to better understand the relationship between the needed DPC decay storage time for disposal, and the timing of future events such as the repository opening date, or a transition to loading multi-purpose (disposable) canisters at nuclear power plants. Results show that the maximum benefit from implementing a new canister design, with respect to shortening the cooling time for all SNF including that in DPCs, is associated with the earliest repository start date. As time passes more of the total SNF inventory will be in DPCs such that the value of a transition to multi-purpose canisters will decline, and the remaining options are DPC direct disposal and re-packaging in purpose-designed disposal canisters. Fuel age at emplacement is of interest to evaluate potential impacts from future changes in the fuel management system that could place fuel age limits on dry storage or transportation. The minimum fuel age at emplacement (best-case) is obtained by re-packaging all DPCs into smaller canisters for disposal, thus drastically decreasing the needed decay storage time for any geologic disposal setting. If the industry transitions to smaller, multi-purpose canisters, and without re-packaging, the fuel age at emplacement would be comparable to the best case if: 1) the emplacement power limit is high enough, or 2) both the transition and the repository start date occur early (e.g., 2036 was analyzed). Technical feasibility evaluation continues to show that direct disposal could be safe and cost effective, for some DPCs and in some geologic settings. Direct disposal of a substantial fraction of existing DPCs, limited mainly by thermal management, uncredited criticality margin, materials of DPC basket construction, and the salinity of ground water in the disposal environment, could be part of the overall waste management system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research and Development of a New Silica-Alumina Based Cementitious Material Largely Using Coal Refuse for Mine Backfill, Mine Sealing and Waste Disposal Stabilization

Coal refuse and coal combustion byproducts as industrial solid waste stockpiles have become great threats to the environment. To activate coal refuse is one practical solution to recycle this huge amount of solid waste as substitute for Ordinary Portland Cement (OPC). The central goal of this project is to investigate and develop a new silica-alumina based cementitious material largely using coal refuse as a constituent that will be ideal for durable construction, mine backfill, mine sealing and waste disposal stabilization applications. This new material is an environment-friendly alternative to Ordinary Portland Cement. The main constituents of the new material are coal refuse and other coal wastes including coal sludge and coal combustion products (CCPs). Compared with conventional cement production, successful development of this new technology could potentially save energy and reduce greenhouse gas emissions, recycle vast amount of coal wastes, and significantly reduce production cost. A systematic research has been conducted to seek for an optimal solution for enhancing pozzolanic reactivity of the relatively inert solid waste-coal refuse in order to improve the utilization efficiency and economic benefit as a construction and building material.

01 COAL, LIGNITE, AND PEAT↗

Light Water Reactor Sustainability Non-Destrustive Evaluation for Concrete Research and Development Roadmap

Materials issues are a key concern for the existing nuclear reactor fleet as material degradation can lead to increased maintenance, increased downtown, and increased risk. Extending reactor life to 60 years and beyond will likely increase susceptibility and severity of known forms of degradation. Additionally, new mechanisms of materials degradation are also possible. The purpose of the US Department of Energy Office of Nuclear Energy’s Light Water Reactor Sustainability (LWRS) Program is to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the operating lifetimes of nuclear power plants beyond 60 years. The intent of this LWRS Concrete nondestructive evaluation (NDE) roadmap is to define Research & Development (R&D) actions to address gaps between available NDE concrete techniques and the technology needed to make quantitative measurements to determine the durability and performance of concrete structures on our current NPP fleet. To assist in the development of this roadmap, a workshop (See Appendix B for Workshop Agenda) was held on July 31, 2012, at the Oak Ridge National Laboratory (ORNL) Conference Center with 28 attendees: three representatives from the Electrical Power Research Institute (EPRI), one representative from Electricité de France, two representatives from the US Nuclear Regulatory Commission (NRC), six representatives from universities (University of Tennessee-Knoxville, Georgia Tech, Iowa State University, University of Illinois, and University of Houston), one representative from industry (WesDyne), one representative from a non-USA nonprofit organization (Swiss Association for Technical Inspection), and 14 representatives from DOE national laboratories (ORNL, Pacific Northwest National Laboratory, Idaho National Laboratory, and Argonne National Laboratory). A multitude of concrete-based structures are typically part of a light water reactor (LWR) plant to provide foundation, support, shielding, and containment functions. Concrete has been used in the construction of nuclear power plants (NPPs) because of three primary properties—its inexpensiveness, its structural strength, and its ability to shield radiation. Examples of concrete structures important to the safety of LWR plants include the containment building, spent fuel pool, and cooling towers. This use has made its long-term performance crucial for the safe operation of commercial NPPs. With respect to the concrete structures, age-related degradation may affect engineering properties, structural resistance/capacity, failure mode, and location of failure initiation that in turn may affect the ability of a structure to withstand challenges in service. In order to ensure the safe operation of NPPs, it is essential that the effects of potential degradation of the plant structures, as well as systems and components, be assessed and managed during both the current operating license period as well as subsequent license renewal periods. In contrast to many mechanical and electrical components, replacement of many concrete structures is impractical. Therefore it is necessary that safety issues related to plant aging and continued service of the concrete structures are resolved through sound scientific and engineering understanding. Unlike most metallic materials, reinforced concrete is a nonhomogeneous material, a composite with low-density matrix, a mixture of cement, sand, aggregate and water, and a high-density reinforcement (typically 5% in NPP containment structures), made up of steel rebar or tendons. Plants have been typically built with local cement and aggregate fulfilling the design specification regarding strength, workability, and durability, but as a consequence, each plant’s concrete composition is unique and complex. In addition, NPP concrete structures are often inaccessible and contain large volumes of massively thick concrete. These structures are exposed to different environments (moisture, temperature) and a diversity of degradation mechanisms (high temperatures, radiation exposure, chemical reactions) at different plant sites, all of which adds to the complexity of determining the integrity/quality of the concrete.

Concrete↗

Advanced Membrane Separation Technologies for Energy Recovery from Industrial Process Streams

Recovery of energy from relatively low-temperature waste streams is a goal that has not been achieved on any large scale. Heat exchangers do not operate efficiently with low-temperature streams and thus require such large heat exchanger surface areas that they are not practical. Condensing economizers offer one option for heat recovery from such streams, but they have not been widely implemented by industry. A promising alternative to these heat exchangers and economizers is a prototype ceramic membrane system using transport membrane technology for separation of water vapor and recovery of heat. This system was successfully tested by the Gas Technology Institute (GTI) on a natural gas fired boiler where the flue gas is relatively clean and free of contaminants. However, since the tubes of the prototype system were constructed of aluminum oxide, the brittle nature of the tubes limited the robustness of the system and even limited the length of tubes that could be used.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Validation of Robustness in TCR Design Strategies

Advanced Manufacturing (AM) has been identified as one of key pathways in accelerating deployment of next generation of nuclear power plants. The nuclear industry continues to predominately rely on fabrication techniques and materials that their codes and standards were approved decades ago. This legacy approach in the highly regulated nuclear sector has brought uncertainty to commercial viability of nuclear energy in the U.S. The Transformational Challenge Reactor (TCR), sought to utilize AM methods for fabrication of a High Temperature Gas Reactor (HTGR). The program sought to leverage AM to construct a non-conventional geometry made up of TRISO fuel and hydride moderator in SiC matrix. This project objective was to provide independent analysis of the core configuration with separate set of tools and approaches than utilized by the TCR team in a 2-year time frame. This NEUP project also tackled a question: Can AM be a cost-effective tool in changing the commercial paradigm of nuclear. We investigated this question in-context of a micro HTGR. While respecting the inherit uncertainty in our input parameters, overall we saw that AM has potential in improving economic competitiveness of nuclear energy when employed on multiple fronts (i.e. few percentage cost improvement per component). Given realizing AM requires mass orders and large R&D investment for commercial utilization, Department of Energy should focus its support on few key enabling technologies and support their codes and standards development and qualification cost (including irradiation as applicable) rather than taking a diluted approach.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design of a SMART Valve Testbed for Nuclear Thermal Dispatch

By the year 2050, the United States aims to achieve net-zero carbon emissions. To achieve this target, the licensing of the Light Water Reactor (LWR) fleet has been extended for 20 more years. To stay economically competitive with other power sources such as renewable and fossil-fuel power plants, the U.S. Department of Energy has introduced a plan to modernize the existing LWR fleet and diversify the revenue stream. One of the plans is to dispatch thermal energy to endothermic industrial processes. SMART valves will play an important role in this initiative by efficiently balancing the load by regulating valves in a coordinated manner while monitoring the thermal-hydraulic systems to enhance safety and maintain the integrity of the power plant. This research aims to develop a facility to test the coordinated control algorithm and produce various test results for training the monitoring system. The constructed facility is capable of simulating various operational and accidental scenarios by coordinating all the valves (positions) and pump (flowrate). The facility is developed with an Internet of Things (IoT)-based custom system and a python-based valve position control and coordination mechanism. It has achieved stable sensor outputs, pump control, and coordinated valve regulation in all three valves with minimum obstruction in the system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

High-speed civil transport issues and technology program

A strawman program plan is presented, consisting of technology developments and demonstrations required to support the construction of a high-speed civil transport. The plan includes a compilation of technology issues related to the development of a transport. The issues represent technical areas in which research and development are required to allow airframe manufacturers to pursue an HSCT development. The vast majority of technical issues presented require flight demonstrated and validated solutions before a transport development will be undertaken by the industry. The author believes that NASA is the agency best suited to address flight demonstration issues in a concentrated effort. The new Integrated Test Facility at NASA Dryden Flight Research Facility is considered ideally suited to the task of supporting ground validations of proof-of-concept and prototype system demonstrations before night demonstrations. An elaborate ground hardware-in-the-loop (iron bird) simulation supported in this facility provides a viable alternative to developing an expensive fill-scale prototype transport technology demonstrator. Drygen's SR-71 assets, modified appropriately, are a suitable test-bed for supporting flight demonstrations and validations of certain transport technology solutions. A subscale, manned or unmanned flight demonstrator is suitable for flight validation of transport technology solutions, if appropriate structural similarity relationships can be established. The author contends that developing a full-scale prototype transport technology demonstrator is the best alternative to ensuring that a positive decision to develop a transport is reached by the United States aerospace industry.

Hewett, Marle D.↗

Demystify the 1.1 Factor for Ultimate Tensile Strength Above Room Temperature in Development of the Code Stress Tables

As the Boiler and Pressure Vessel Code increasingly gains popularity worldwide, it is not uncommon that many users are mystified by the 1.1 factor required for ultimate tensile strength above room temperature in developing the allowable design stresses of Section II Part D Stress Tables. Questions often arise about the origin and purpose of the factor, the reason for it not applied to the yield strength, its due considerations when evaluating an alloy for acceptance to construction use from the perspective of the alloy’s tested tensile strength value, and more. Not knowing reliable sources for explicit explanations, some users tend to misinterpret the factor, abuse its application, incorrectly define their alloy acceptance or qualification criteria, and mistakenly manipulate the safety margin in structural component design.To help the Code users who struggle with these frequent and confusing issues, particularly those in nuclear industry where rigorous criteria are required for component design and alloy acceptance or qualification, this paper is intended to demystify the 1.1 factor and facilitate knowledgeable interpretation and use of the Section II Part D Stress Tables as well as relevant Mandatory Appendices.A brief review is first given on the background of the 1.1 factor, followed by a summary of its application in the Stress Tables. The provenance and purpose of the factor are then discussed in detail with graphic examples. Finally, current applicability and necessity of the factor are considered through a demonstration using example alloys.

Ren, Weiju↗

New York Marcellus Shale: Industry boom put on hold

Key catalysts for Marcellus Shale drilling in New York were identified. New York remains the only state in the nation with a legislative moratorium on high-volume hydraulic fracturing, as regulators and state lawmakers work to balance the advantages of potential economic benefits while protecting public drinking water resources and the environment. New York is being particularly careful to work on implementing sufficiently strict regulations to mitigate the environmental impacts Pennsylvania has already seen, such as methane gas releases, fracturing fluid releases, flowback water and brine controls, and total dissolved solids discharges. In addition to economic and environmental lessons learned, the New York Department of Environmental Conservation (DEC) also acknowledges impacts to housing markets, security, and other local issues, and may impose stringent measures to mitigate potential risks to local communities. Despite the moratorium, New York has the opportunity to take advantage of increased capital investment, tax revenue generation, and job creation opportunities by increasing shale gas activity. The combination of economic benefits, industry pressure, and recent technological advances will drive the pursuit of natural gas drilling in New York. We identify four principal catalysts as follows: Catalyst 1: Pressure from Within the State. Although high-volume hydraulic fracturing has become a nationally controversial technology, shale fracturing activity is common in every U.S. state except New York. The regulatory process has delayed potential economic opportunities for state and local economies, as well as many industry stakeholders. In 2010, shale gas production accounted for $18.6 billion in federal royalty and local, state, and federal tax revenues. (1) This is expected to continue to grow substantially. The DEC is under increased pressure to open the state to the same opportunities that Alabama, Arkansas, California, Colorado, Kansas, Louisiana, Montana, New Mexico, North Dakota, Ohio, Oklahoma, Pennsylvania, South Dakota, Texas, Utah, West Virginia, and Wyoming are pursuing. Positive labor market impacts are another major economic draw. According to the Revised Draft SGEIS on the Oil, Gas and Solution Mining Regulatory Program (September 2011), hydraulic fracturing would create between 4,408 and 17,634 full-time equivalent (FTE) direct construction jobs in New York State. Indirect employment in other sectors would add an additional 29,174 FTE jobs. Furthermore, the SGEIS analysis suggests that drilling activities could add an estimated $621.9 million to $2.5 billion in employee earnings (direct and indirect) per year, depending upon how much of the shale is developed. The state would also receive direct tax receipts from leasing land, and has the potential to see an increase in generated indirect revenue. Estimates range from $31 million to $125 million per year in personal income tax receipts, and local governments would benefit from revenue sharing. Some landowner groups say the continued delay in drilling is costing tens of thousands of jobs and millions of dollars in growth for New York, especially in the economically stunted upstate. A number of New York counties near Pennsylvania, such as Chemung, NY, have experienced economic uptick from Pennsylvania drilling activity just across the border. Chemung officials reported that approximately 1,300 county residents are currently employed by the drilling industry in Pennsylvania. The Marcellus shale boom is expected to continue over the next decade and beyond. By 2015, gas drilling activity could bring 20,000 jobs to New York State alone. Other states, such as Pennsylvania and West Virginia, are also expected to see a significant increase in the number of jobs. Catalyst 2: Political Reality of the Moratorium. Oil and gas drilling has taken place in New York since the 19th century, and it remains an important industry with more than 13,000 currently active wells. The use of hydraulic fracturing in particular has been employed for decades. Yet, as technological advancements have enabled access to gas in areas where drilling is not common practice, public concern has ballooned. Opponents argue that more oversight is necessary to protect the environment and public health, while supporters believe the industry is already adequately regulated. Although it is important for New York to complete a thorough environmental and regulatory review, an extended ban could lead to litigation by property owners who have been stripped of the ability to lease their mineral rights. Other states are moving forward by implementing legislative guidelines or rules created by commissions to ensure that resources are developed safely. One of the most controversial issues in other states to date has revolved around the public disclosure of chemical additives in drilling fluid. While the industry is hesitant to reveal trade secrets, the public and many officials want the security of knowing what chemicals are pumped into the ground. Industry transparency could help mitigate the public concern and controversy that is delaying a lift of the moratorium. Currently, at least five other states have set chemical disclosure rules. Arkansas, Michigan, Montana, Texas, and Wyoming require disclosure of the chemical components of drilling fluid. Colorado has the most stringent rules, requiring not just the disclosure of the additives but of their concentrations as well. As more states continue to allow hydraulic fracturing, New York will likely lift the moratorium and instead implement more stringent regulations that help to alleviate public concern surrounding hydraulic fracturing. This will allow the state to safely pursue the expansive opportunities offered by the Marcellus shale without falling behind economically. Catalyst 3: Energy and Infrastructure Benefits. Natural gas provides a key source of energy in the Northeast. The DEC estimates the Marcellus shale gas resource potential to be between 168-516 Tcf. Even at the low end of this range, Marcellus alone could supply seven years of total U.S. energy consumption, and it would provide a local resource for New York. One report suggests that savings from lower natural gas costs would result in an average annual savings of $926 per household. (4) Industry growth is leading to lower natural gas and electric power prices, while decreasing reliance on Liquid Natural Gas (LNG) imports and enhancing domestic energy security. This makes development of the resources an even more attractive commitment to New York. In addition, the natural gas business is predominantly regional in scope. Drilling companies would be required to build new pipelines for gas development in New York, therefore State regulators face valuable ancillary benefits of natural gas development such as infrastructure improvements. Catalyst 4: Technology Improvements. Lastly, the moratorium itself does not prevent the use of alternative drilling technologies, such as non-hydraulic fracturing, for shale gas production. Developers are already using new systems in Texas and Canada, as well as in France where hydraulic fracturing is banned country-wide. Commercial viability of these new technologies could ultimately provide an alternative to jumpstart shale drilling in New York if necessary. The potential benefits from development of the Marcellus shale in New York are undeniable, though regulators are still working to balance the need to stimulate the economy with environmental protection and public health. Since closing the public comment period in January, the DEC has signaled that much more work is needed, making no promises to near-term completion. While, neighboring states are feeling the economic benefits of drilling, the political environment and the recession continues adding pressure to the process in New York state.

03 NATURAL GAS↗

A Study on the Use of XCT and FEA to Predict the Elastic Behavior of Additively Manufactured Parts of Cylindrical Geometry

Defining general criteria for the acceptability of defects within industrial components is often complicated, since the specific load conditions and the criticality of the given application should be considered individually. In order to minimize the risk of failure, high safety factors are commonly adopted during quality control. However this practice is likely to cause the rejection of components whose defects would be instead acceptable if a more sound knowledge of the component behaviour were achieved. Parts produced by additive manufacturing (AM) may suffer from various defects, including micro- or macro-holes, delamination and microstructural discontinuities. Such processes, which are specially suitable for one-off components, require robust and reliable inspection before a part is accepted or rejected, since the refusal of even a single part at the end of the production process represents a significant loss. For this reason, it would be very useful to simulate in a reliable way whether a certain defect is truly detrimental to the proper working of the part during operation or whether the component can still be used, despite the presence of a defect. To this purpose, the paper highlights the benefits of a synergistic interaction between Industrial X-ray computed tomography (XCT) and finite element analysis (FEA). Internal defects of additively manufactured parts can be identified in a non-destructive way by means of XCT. Then FEA can be performed on the XCT-based virtual model of the real component, rather than on the ideal CAD geometry. A proof of concept of this approach is proposed here for a reference construct produced in an Aluminium alloy by AM. Numerical results of the proposed combined XCT–FEA procedure are contrasted with experimental data from tensile tests. The findings sustain the reliability of the method and allow to assess its full provisional accuracy for parts of cylindrical geometry designed to operate in the elastic field. The paper moves a step beyond the present application limits of tomography as it is currently employed for AM parts and it evidences instead the possibility of extending the usage of tomography to acceptance testing and prediction of operative behaviour.

42 ENGINEERING↗

Health impact assessment in China: Emergence, progress and challenges

The values, concepts and approaches of health impact assessment (HIA) were outlined in the Gothenburg consensus paper and some industrialized countries have implemented HIA for many years. HIA has played an important role in environmental protection in China, however, the emergence, progress and challenges of HIA in China have not been well described. In this paper, the evolution of HIA in China was analyzed and the challenges of HIA were presented based on the author's experiences. HIA contributed to decision-making for large capital construction projects, such as the Three Gorges Dam project, in its emergence stage. Increasing attention has been given to HIA in recent years due to supportive policies underpinning development of the draft HIA guidelines in 2008. However enormous challenges lie ahead in ensuring the institutionalization of HIA into project, program and policy decision-making process due to limited scope, immature tools and insufficient professionals in HIA practice. HIA should broaden its horizons by encompassing physical, chemical, biological and socio-economic aspects and constant attempts should be made to integrate HIA into the decision-making process, not only for projects and programs but also for policies as well.

54 ENVIRONMENTAL SCIENCES↗