Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BOOSTER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

NASA Engineering and Safety Center Technical Bulletin No. 10-02: Potential Failure of Dual Simultaneously Initiated Pyrotechnic Operated Valves

The NASA Engineering and Safety Center (NESC) Technical Bulletin No. 09-01 reported an independent investigation of four pyrovalve failures that occurred while using aluminum (Al) pyrovalve primer chamber assemblies (PCAs) during ground testing. The investigation revealed that simultaneous firing (within a few microseconds) of the NASA Standard Initiators (NSIs) was the primary reason why the booster charge failed to ignite and the pyrovalves subsequently failed to operate. A second investigation of a new stainless steel (SS) PCA design with separate flame channels was completed in 2010. The new SS configuration was found to be improved in most respects; however, no improvement was noted in the temperature delivered to ignite the booster during dual simultaneous NSI firings. Simultaneous firings should be avoided when using either the Al or the SS PCA design.

Potential Failure↗

PERFORMANCE OF THE DIAGNOSTICS FOR NSLS-II LINAC COMMISSIONING

The National Synchrotron Light Source II (NSLS-II) is a state of the art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The transfer lines not only provide a means to deliver the beam from one machine to another, they also provide a suite of diagnostics and utilities to measure the properties of the beam to be delivered. In this paper we discuss the suite of diagnostics that will be used to commission the NSLS-II linac and measure the beam properties. The linac to booster transfer line can measure the linac emittance with a three screens measurement or a quadrupole scan. Energy and energy spread are measured in a dispersive section. Total charge and charge uniformity are measured with wall current monitors in the linac and transformers in the transfer line. We show that the performance of the diagnostics in the transfer line will be sufficient to ensure the linac meets its specifications and provides a means of trouble shooting and studying the linac in future operation.

200 MeV linac↗

Commissioning of the EBIS-based heavy ion preinjector at Brookhaven

The status is presented of the commissioning of a new heavy ion preinjector at Brookhaven National Laboratory. This preinjector uses an Electron Beam Ion Source (EBIS), and an RFQ and IH Linac, both operating at 100.625 MHz, to produce 2 MeV/u ions of any species for use, after further acceleration, at the Relativistic Heavy Ion Collider (RHIC) and the NASA Space Radiation Laboratory (NSRL). Among the increased capabilities provided by this preinjector are the ability to produce ions of any species, and the ability to switch between multiple species in 1 second, to simultaneously meet the needs of both science programs. For initial setup, helium beam from EBIS was injected and circulated in the Booster synchrotron. Following this, accelerated Au{sup 32+} and Fe{sup 20+} beams were transported to the Booster injection point, fulfilling DOE requirements for project completion.

43 PARTICLE ACCELERATORS↗

Transport from the Recycler Ring to the Antiproton Source Beamlines

In the post-NOvA era, the protons are directly transported from the Booster ring to the Recycler ring rather than the Main Injector. For Mu2e and g-2 project, the Debuncher ring will be modified into a Delivery ring to deliver the protons to both Mu2e and g-2 experiments. Therefore, it requires the transport of protons from the Recycler Ring to the Delivery ring. A new transfer line from the Recycler ring to the P1 beamline will be constructed to transport proton beam from the Recycler Ring to existing Antiproton Source beamlines. This new beamline provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. This paper presents the Conceptual Design of this new beamline.

43 PARTICLE ACCELERATORS↗

An Accumulator/Pre-Booster for the Medium-Energy Electron Ion Collider at Jlab

Future nuclear physics facilities such as the proposed electron ion collider (MEIC) will need to achieve record high luminosities in order to maximize discovery potential. Among the necessary ingredients is the ability to generate, accumulate , accelerate, and store high current ion beams from protons to lead ions. One of the main components of this ion accelerator complex for MEIC chain is the accumulator that also doubles as a pre-booster, which takes 200 MeV protons from a superconducting linear accelerator, accumulates on the order of 1A beam, and boosts its energy to 3GeV, before extraction to the next accelerator in the chain, the large booster. This paper describes its design concepts, and summarizes some preliminary results, including linear optics, space charge dynamics, and spin polarization resonance analysis.

43 PARTICLE ACCELERATORS↗

RF Input Power Couplers for High Current SRF Applications

High current SRF technology is being explored in present day accelerator science. The bERLinPro project is presently being built at HZB to address the challenges involved in high current SRF machines with the goal of generating and accelerating a 100 mA electron beam to 50 MeV in continuous wave (cw) mode at 1.3 GHz. One of the main challenges in this project is that of handling the high input RF power required for the photo-injector as well as booster cavities where there is no energy recovery process. A high power co-axial input power coupler is being developed to be used for the photo-injector and booster cavities at the nominal beam current. The coupler is based on the KEK–cERL design and has been modified to minimise the penetration of the coupler tip in the beam pipe without compromising on beam-power coupling (Qext ~105). Herein we report on the RF design of the high power (115 kW per coupler, dual couplers per cavity) bERLinPro (BP) coupler along with initial results on thermal calculations. We summarise the RF conditioning of the TTF-III couplers (modified for cw operation) performed in the past at BESSY/HZB. A similar conditioning is envisaged in the near future for the low current SRF photo-injector and the bERLinPro main linac cryomodule.

Khan, V. F.↗

NSLS-II Digital RF Controller Logic and Applications

The National Synchrotron Light Source II (NSLS-II) accelerator consists of the Storage Ring, the Booster Ring and Linac along with their associated cavities. Given the number, types and variety of functions of these cavities, we sought to limit the logic development effort by reuse of parameterized code on one hardware platform. Currently there are six controllers installed in the NSLS-II system. There are two in the Storage ring, two in the Booster ring, one in the Linac and one in the Master Oscillator Distribution system.

43 PARTICLE ACCELERATORS↗

Design of a Marx-Topology Modulator for FNAL Linac

The Fermilab Proton Improvement Plan (PIP) was formed in late 2011 to address important and necessary upgrades to the Proton Source machines (Injector line, Linac and Booster). The goal is to increase the proton flux by doubling the Booster beam cycle rate while maintaining the same intensity per cycle, the same uptime, and the same residual activation in the enclosure. For the Linac, the main focus within PIP is to address reliability. One of the main tasks is to replace the present hard-tube modulator used on the 200 MHz RF system. Plans to replace this high power system with a Marx-topology modulator, capable of providing the required waveform shaping to stabilize the accelerating gradient and compensate for beam loading, will be presented, along with development data from the prototype unit.

43 PARTICLE ACCELERATORS↗

MEIC Proton Beam Formation with a Low Energy Linac

The MEIC proton and ion beams are generated, accumulated, accelerated and cooled in a new green-field ion injector complex designed specifically to support its high luminosity goal. This injector consists of sources, a linac and a small booster ring. In this paper we explore feasibility of a short ion linac that injects low-energy protons and ions into the booster ring.

43 PARTICLE ACCELERATORS↗

Transition Crossing in the Main Injector for PIP-II

Proton Improvement Plan-II (PIP-II) [1] is Fermilab’s plan for providing powerful, high-intensity proton beams to the laboratory’s experiments. PIP II will include upgrades to the Booster, Recycler and Main Injector which will be required to accelerate 50% more beam as well as increasing the Booster repetition rate from 15 to 20 Hz. To accommodate the faster rate, the momentum separation of the slip stacking beams in the Recycler must increase which will result in in larger longitudinal emittance bunches in MI. In order to cross transition without losses, it is expected a gamma-t jump will be needed. Gamma-t jump schemes for the MI are investigated.

Ainsworth, R.↗

MicroBooNE and its Cross Section Measurement

MicroBooNE (the Micro Booster Neutrino Experiment) is a short-baseline neutrino experiment based on the technology of a liquid-argon time-projection chamber (LArTPC), and has recently completed its first year of data-taking in the Fermilab Booster Neutrino Beam. It aims to address the anomalous excess of events with an electromagnetic final state in MiniBooNE, to measure neutrino-argon interaction cross sections, and to provide relevant R\&D for the future LArTPC experiments, such as DUNE. In these proceedings, we present the first reconstructed energy spectrum of Michel electrons from cosmic muon decays, the first kinematic distributions of the candidate muon tracks from $\nu_{\mu}$-argon charged-current interactions, and a demonstration of an electromagnetic shower reconstruction from $\pi^0$s produced by $\nu_{\mu}$-argon charged-current interactions. The results demonstrate the first fully automated reconstruction and selection algorithms in a large LArTPC and serve as foundations for future measurements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Transition Crossing in the Main Injector for PIP-II

Proton Improvement Plan-II (PIP-II) is Fermilab’s plan for providing powerful, high-intensity proton beams to the laboratory’s experiments. PIP II will include upgrades to the Booster, Recycler and Main Injector which will be required to accelerate 50% more beam as well as increasing the Booster repetition rate from 15 to 20 Hz. To accommodate the faster rate, the momentum separation of the slip stacking beams in the Recycler must increase which will result in in larger longitudinal emittance bunches in MI. In order to cross transition without losses, it is expected a gammat jump will be needed. Gamma-t jump schemes for the MI are investigated

43 PARTICLE ACCELERATORS↗

Development of the electron cooling simulation program for MEIC

In the medium energy electron ion collider (MEIC) project at Jefferson Lab, the traditional electron cooling technique is used to reduce the ion beam emittance at the booster ring, and to compensate the intrabeam scattering effect and maintain the ion beam emittance during collision at the collider ring. A DC cooler at the booster ring and a bunched beam cooler at the collider ring are proposed. To fulfil the requirements of the cooler design for MEIC, we are developing a new program, which allows us to simulate the following cooling scenarios: DC cooling to coasting ion beam, DC cooling to bunched ion beam, bunched cooling to bunched ion beam, and bunched cooling to coasting ion beam. The new program has been benchmarked with existing code in aspect of accuracy and efficiency. The new program will be adaptive to the modern multicore hardware. We will present our models and some simulation results.

Zhang, He↗

A COST-EFFECTIVE RAPID-CYCLING SYNCHROTRON

The present Fermilab proton Booster is an early example of a rapidly-cycling synchrotron (RCS). Build in 1960s, it features a design in which the combined-function dipole magnets serve as vacuum chambers. Such a design is quite cost-effective, and it does not have the limitations associated with the eddy currents in a metallic vacuum chamber. However, an important drawback of that design is a high impedance, as seen by a beam, because of the magnet laminations. More recent RCS designs (e.g. J-PARC) employ large and complex ceramic vacuum chambers in order to mitigate the eddycurrent effects and to shield the beam from the magnet laminations. Such a design, albeit very successful, is quite costly because it requires large-bore magnets and large-bore rf cavities. In this article, we will consider an RCS concept with a thin-wall metallic vacuum chamber as a compromise between the chamber-less Fermilab Booster design and the large-bore design with ceramic chambers.

43 PARTICLE ACCELERATORS↗

Rapid-Cycling Synchrotron for Multi-Megawatt Proton Facility at Fermilab

The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment (DUNE) and Long Baseline Neutrino Facility (LBNF) program there is strong motivation for a 2.4 MW beam power upgrade of the Fermilab proton facility. We show the Fermilab proton facility can achieve 2.4~MW with a new rapid-cycling synchrotron (RCS) to replace the Fermilab Booster and we provide a comprehensive technical analysis of the RCS-based facility design. Past design efforts and operational experience at the Fermilab Booster, J-PARC RCS, and Oak Ridge SNS are leveraged to provide strong empirical precedent for the design. We provide a parametric study of slip-stacking accumulation, RCS extraction energy, space-charge limits, beampipe aperture, eddy current heating, injection foil heating, and lattice optics. The 2.4 MW benchm ark for the long baseline neutrino program is achieved independently of a previously proposed multi-GeV linac program, but we assess the impact the linac upgrade would have on RCS performance.

43 PARTICLE ACCELERATORS↗

Rapid-Cycling Synchrotron for Multi-Megawatt Proton Facility at Fermilab

The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment (DUNE) and Long Baseline Neutrino Facility (LBNF) program there is strong motivation for a 2.4 MW beam power upgrade of the Fermilab proton facility. We show the Fermilab proton facility can achieve 2.4~MW with a new rapid-cycling synchrotron (RCS) to replace the Fermilab Booster and we provide a comprehensive technical analysis of the RCS-based facility design. Past design efforts and operational experience at the Fermilab Booster, J-PARC RCS, and Oak Ridge SNS are leveraged to provide strong empirical precedent for the design. We provide a parametric study of slip-stacking accumulation, RCS extraction energy, space-charge limits, beampipe aperture, eddy current heating, injection foil heating, and lattice optics. The 2.4 MW benchmark for the long baseline neutrino program is achieved independently of a previously proposed multi-GeV linac program, but we assess the impact the linac upgrade would have on RCS performance.

43 PARTICLE ACCELERATORS↗

MiniBooNE-DM: a dark matter search in a proton beam dump

In a dedicated run where protons from the Fermilab Booster were delivered directly to the steel beam dump of the Booster Neutrino Beamline (BNB), the MiniBooNE detector was used to search for the production of sub-GeV dark matter particles via vector-boson mediators. The signal searched for was the elastic scattering of dark matter particles off nucleons in the detector mineral oil, with neutrinos being an irreducible background. A review of the experiment, its analysis methods, its results and future perspectives are summarized, demonstrating that beam dump experiments provide a novel and promising approach to dark matter searches. This contribution was written for the TAUP 2017 proceedings.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Studies of Single-Transverse Kinematic Variables for Neutrino Interactions on Argon

It is now well-known that a variety of theoretically-challenging nuclear effects play an important role in determining neutrino-nucleus interaction cross sections. Deficiencies in existing models of these effects represent a leading source of systematic uncertainty for neutrino oscillation experiments. In recent neutrino cross section measurements published by the T2K and MINERvA experiments, the study of kinematic observables called Single-Transverse (Kinematic) Variables (STVs) in the plane transverse to the neutrino beam have been demonstrated to provide a powerful tool on nuclear modeling uncertainties. In the near future, the SBN and DUNE experiments will both leverage the novel Liquid Argon Time Projection Chamber technology to pursue high-precision measurements of neutrino oscillations. As the interpretation of the results from these measurements will require a detailed understanding of neutrino-argon scattering cross sections and given the scarcity of available neutri no-argon data, a measurement of Single-Transverse Kinematic Variables distributions in neutrino-argon scattering is of high interest for the neutrino physics community. This thesis presents the first detailed comparison of model predictions for distributions of these observables obtained using four standard neutrino event simulation tools (GENIE, NuWro, GiBUU and NEUT). Results are shown for simulations of muon neutrinos from the Fermilab Booster Neutrino Beam interacting in the MicroBooNE LArTPC. Opportunities for discrimination between nuclear models with respect to future measurements is highlighted. Furthermore, first calculations of STVs from experimental argon data are shown. Data corresponding to 4.449x10^19 POT of exposure were collected using the MicroBooNE LArTPC in the Fermilab Booster Neutrino Beam.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗