Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Validation of a Custom Ball-on-Ring Apparatus and Consideration of Common Issues for Use in Further Testing (SULI Deliverables)

Ceramic materials are well-known for their high hardness and strength but are limited in their application due to low toughness and sudden failure. As a potential solution, inspiration can be taken from dental enamel nanostructure, where undulating rods cause cracks to branch or deflect, increasing the energy needed to cause total fracture of a ceramic part. Following the dental enamel structure, a novel ceramic which uses 3D printed Yttria stabilized Zirconia rods in an alumina matrix was developed. To test this bio-inspired ceramic material, a proper testing apparatus needed to be created and tested to verify its accuracy. For this project, a bespoke ball on ring testing apparatus was created and tested using both conventionally sintered alumina disks and purchased alumina disks to validate its accuracy. By comparing the Weibull distribution of rupture strengths measured by the tests to literature values, it was shown that the testing frame had a wide distribution of strength which did not align with literature values on the lower end. Through fractography, it was found that some samples fractured from the contact stress induced by the ball indenter, which could not be used to calculate rupture strength. This fracture was often linked to low stress to failure, which was initiated by a flaw on the surface near the indenter which acted as a stress concentrator. Removal of these samples from the data set increased the accuracy of the reported rupture strength values for the ceramic. Considering the equations for the magnitude of contact and flexural strength, along with observations of initiating flaws, several measures can be taken for testing the bio-inspired composite. These measures include proper polishing of both sides of the sample, reducing sample thickness, and potentially using a softer indenter material.

36 - MATERIALS SCIENCE↗

Experimental and Sampling Design for the INL-2 Sample Collection Operational Test

This report describes the experimental and sampling design developed to assess sampling approaches and methods for detecting contamination in a building and clearing the building for use after decontamination. An Idaho National Laboratory (INL) building will be contaminated with BG (Bacillus globigii, renamed Bacillus atrophaeus), a simulant for Bacillus anthracis (BA). The contamination, sampling, decontamination, and re-sampling will occur per the experimental and sampling design. This INL-2 Sample Collection Operational Test is being planned by the Validated Sampling Plan Working Group (VSPWG). The primary objectives are: 1) Evaluate judgmental and probabilistic sampling for characterization as well as probabilistic and combined (judgment and probabilistic) sampling approaches for clearance, 2) Conduct these evaluations for gradient contamination (from low or moderate down to absent or undetectable) for different initial concentrations of the contaminant, 3) Explore judgment composite sampling approaches to reduce sample numbers, 4) Collect baseline data to serve as an indication of the actual levels of contamination in the tests. A combined judgmental and random (CJR) approach uses Bayesian methodology to combine judgmental and probabilistic samples to make clearance statements of the form "X% confidence that at least Y% of an area does not contain detectable contamination” (X%/Y% clearance statements). The INL-2 experimental design has five test events, which 1) vary the floor of the INL building on which the contaminant will be released, 2) provide for varying the amount of contaminant released to obtain desired concentration gradients, and 3) investigate overt as well as covert release of contaminants. Desirable contaminant gradients would have moderate to low concentrations of contaminant in rooms near the release point, with concentrations down to zero in other rooms. Such gradients would provide a range of contamination levels to challenge the sampling, sample extraction, and analytical methods to be used in the INL-2 study. For each of the five test events, the specified floor of the INL building will be contaminated with BG using a point-release device located in the room specified in the experimental design. Then quality control (QC), reference material coupon (RMC), judgmental, and probabilistic samples will be collected according to the sampling plan for each test event. Judgmental samples will be selected based on professional judgment and prior information. Probabilistic samples were selected with a random aspect and in sufficient numbers to provide desired confidence for detecting contamination or clearing uncontaminated (or decontaminated) areas. Following sample collection for a given test event, the INL building will be decontaminated. For possibly contaminated areas, the numbers of probabilistic samples were chosen to provide 95% confidence of detecting contaminated areas of specified sizes. For rooms that may be uncontaminated following a contamination event, or for whole floors after decontamination, the numbers of judgmental and probabilistic samples were chosen using the CJR approach. The numbers of samples were chosen to support making X%/Y% clearance statements with X = 95% or 99% and Y = 96% or 97%. The experimental and sampling design also provides for making X%/Y% clearance statements using only probabilistic samples. For each test event, the numbers of characterization and clearance samples were selected within limits based on operational considerations while still maintaining high confidence for detection and clearance aspects. The sampling design for all five test events contains 2085 samples, with 1142 after contamination and 943 after decontamination. These numbers include QC, RMC, judgmental, and probabilistic samples. The experimental and sampling design specified in this report provides a good statistical foundation for achieving the objectives of the INL-2 study.

59 BASIC BIOLOGICAL SCIENCES↗

Nuclear Test Scenarios for Discussion of On-Site Inspection Technologies

The purpose of the ISS OSI Invited Meeting being held in Vienna March 24-27, 2009 is to obtain a better understanding of the phenomenology of underground nuclear explosions for On-Site Inspection (OSI) purposes. In order to focus the technology discussions, we have developed two very general scenarios, or models, of underground nuclear test configurations and phenomena that will help us explore the application of OSI methodologies and techniques. The scenarios describe testing environments, operations, logistics, equipment, and facilities that might be used in conducting an underground nuclear test. One scenario involves emplacement of a nuclear device into a vertical borehole in an area with relatively flat terrain; the other involves emplacement within a tunnel (horizontally) in an area with mountainous terrain. Vertical borehole geometry The example for this scenario is an intermediate yield nuclear explosion carried out in a flat desert area. The ground was cleared and smoothed over a 200 X 200 m fenced area for operational support activities, access to the borehole, and in order to place a few structures to house diagnostics equipment and control functions. Power lines were provided for local electrical power. The vertical emplacement borehole was 2 m in diameter and bored to a depth of 350 m. The emplacement hole was lined with steel pipe in order to keep the hole open and to avoid cave-ins during emplacement of the nuclear device. Emplacement was above the local water table, and the top of the saturation zone is about 30 m below the bottom of the emplacement hole. The detonation point was at a depth of 340 m. All of the rock material removed while drilling the borehole was removed to another place. Diagnostics and control for the test were relatively simple: about 2 dozen high capacity coaxial cables feed from the down hole instruments to the surface and then about 100 m laterally to a diagnostics trailer. Two strong steel cables were used to emplace the device and diagnostic instruments and to support the down hole cables. The borehole was stemmed after the device was emplaced. The stemming material was relatively simple: the hole was backfilled with sand or gravel about 20-30 m above the nuclear experiment package, a grouted plug about 3 m thick is added, and the hole backfilled with a mixture of sand and gravel to the surface. After the test, the testing party removed all structures and power lines and covered the top of the borehole with a small building. Geologic environment before the test--The geology for the test consists of flat-lying alluvium and tuff, with 50 m of poorly consolidated alluvium near the surface and moderately welded tuff from 50 m depth to 50 m below the bottom of the hole. The upper tuff is underlain by a densely welded tuff unit, with basement Paleozoic sedimentary rock beginning at a depth of about 1000 m. The tuff is intact with a few fractures. There are no known faults located within 500 m of the borehole. Alteration of the underground environment--The blast created a spherical or near spherical cavity with a lens of vitrified material at the bottom. There are several zones surrounding the detonation point with decreasing levels of rock damage. The zones are: (1) the crushed zone (several tens of meters)where the rock has lost all prior integrity; (2) the fractured zone (out to a couple of hundred meters) characterized by radial and concentric fissures; and (3) the zone of irreversible strain (out to a couple of thousand meters) with local media deformation. A collapse chimney formed one hour after the detonation, in which overlying material fell into the explosion cavity. This chimney zone reached up to within 50 m of the surface and a small apical void formed (10 m high and 80 m in diameter) at the top of the rubble chimney. The rubble chimney is dry and density is about 20% less than the surrounding intact rock. Alteration at the surface--No surface depression formed, but there is significant 'fluffing' of the surface soil from the effects of the initial shock wave. A few radial and concentric fractures formed from the shock effects within a radius of 200 m of the borehole. Radionuclide environment--No particulates or aerosol radiological material reached the surface. However, the stemming is not completely impervious to gas release and a small amount of gas and vapor was released along the emplacement pipe immediately after the explosion and before the rubble chimney formed. Most of the gas venting stopped as soon as cavity collapse occurred. After the rubble chimney formed and the pressure in the explosion cavity reached equilibrium, gases began to migrate up through the rubble chimney aided by barometric pumping. There is also an unknown fault located 300 m from the explosion cavity that provided another gas migration pathway between the damage zone of the cavity and the surface.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

PEP Support: Laboratory Scale Leaching and Permeate Stability Tests

This report documents results from a variety of activities requested by the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The activities related to caustic leaching, oxidative leaching, permeate precipitation behavior of waste as well as chromium (Cr) leaching are: • Model Input Boehmite Leaching Tests • Pretreatment Engineering Platform (PEP) Support Leaching Tests • PEP Parallel Leaching Tests • Precipitation Study Results • Cr Caustic and Oxidative Leaching Tests. Leaching test activities using the PEP simulant provided input to a boehmite dissolution model and determined the effect of temperature on mass loss during caustic leaching, the reaction rate constant for the boehmite dissolution, and the effect of aeration in enhancing the chromium dissolution during caustic leaching. Other tests were performed in parallel with the PEP tests to support the development of scaling factors for caustic and oxidative leaching. Another study determined if precipitate formed in the wash solution after the caustic leach in the PEP. Finally, the leaching characteristics of different chromium compounds under different conditions were examined to determine the best one to use in further testing.

54 ENVIRONMENTAL SCIENCES↗

Enhanced climate reproducibility testing with false discovery rate correction

Simulating the Earth's climate is an important and complex problem, thus climate models are similarly complex, comprised of millions of lines of code. In order to appropriately utilize the latest computational and software infrastructure advancements in Earth system models running on modern hybrid computing architectures to improve their performance, precision, accuracy, or all three; it is important to ensure that model simulations are repeatable and robust. This introduces the need for establishing statistical or non-bit-for-bit reproducibility, since bit-for-bit reproducibility may not always be achievable. Here, we propose a short-simulation ensemble-based test for an atmosphere model to evaluate the null hypothesis that modified model results are statistically equivalent to that of the original model. We implement this test in version 2 of the US Department of Energy's Energy Exascale Earth System Model (E3SM). The test evaluates a standard set of output variables across the two simulation ensembles and uses a false discovery rate correction to account for multiple testing. The false positive rates of the test are examined using re-sampling techniques on large simulation ensembles and are found to be lower than the currently implemented bootstrapping-based testing approach in E3SM. We also evaluate the statistical power of the test using perturbed simulation ensemble suites, each with a progressively larger magnitude of change to a tuning parameter. The new test is generally found to exhibit more statistical power than the current approach, being able to detect smaller changes in parameter values with higher confidence.

Kelleher, Michael E. [Oak Ridge National Laborator↗

Secure Retrieval of FFTF Testing, Design, and Operating Information

One of the goals of the Advanced Fuel Cycle Initiative (AFCI) is to preserve the knowledge that has been gained in the United States on Liquid Metal Reactors (LMR). In addition, preserving LMR information and knowledge is part of a larger international collaborative activity conducted under the auspices of the International Atomic Energy Agency (IAEA). A similar program is being conducted for EBR-II at the Idaho Nuclear Laboratory (INL) and international programs are also in progress. Knowledge preservation at the FFTF is focused on the areas of design, construction, startup, and operation of the reactor. As the primary function of the FFTF was testing, the focus is also on preserving information obtained from irradiation testing of fuels and materials. This information will be invaluable when, at a later date, international decisions are made to pursue new LMRs. In the interim, this information may be of potential use for international exchanges with other LMR programs around the world. At least as important in the United States, which is emphasizing large-scale computer simulation and modeling, this information provides the basis for creating benchmarks for validating and testing these large scale computer programs. Although the preservation activity with respect to FFTF information as discussed below is still underway, the team of authors above is currently retrieving and providing experimental and design information to the LMR modeling and simulation efforts for use in validating their computer models. On the Hanford Site, the FFTF reactor plant is one of the facilities intended for decontamination and decommissioning consistent with the cleanup mission on this site. The reactor facility has been deactivated and is being maintained in a cold and dark minimal surveillance and maintenance mode until final decommissioning is pursued. In order to ensure protection of information at risk, the program to date has focused on sequestering and secure retrieval. Accomplishments include secure retrieval of: more than 400 boxes of FFTF information, several hundred microfilm reels including Clinch River Breeder Reactor (CRBR) information, and 40 boxes of information on the Fuels and Materials Examination Facility (FMEF). All information preserved to date is now being stored and categorized consistent with the IAEA international standardized taxonomy. Earlier information largely related to irradiation testing is likewise being categorized. The fuel test results information exists in several different formats depending upon the final stage of the test evaluation. In some cases there is information from both non-destructive and destructive examination while in other cases only non-destructive results are available. Non-destructive information would include disassembly records, dimensional profilometry, gamma spectrometry, and neutron radiography. Information from destructive examinations would include fission gas analysis, metallography, and photomicrographs. Archiving of FFTF data, including both the reactor plant and the fuel test information, is being performed in coordination with other data archiving efforts underway under the aegis of the AFCI program. In addition to the FFTF efforts, archiving of data from the EBR-II reactor is being carried out by INL. All material at risk associated with FFTF documentation has been secured in a timely manner consistent with the stated plan. This documentation is now being categorized consistent with internationally agreed upon IAEA standards. Documents are being converted to electronic format for transfer to a large searchable electronic database being developed by INL. In addition, selected FFTF information is being used to generate test cases for large-scale simulation modeling efforts and for providing Design Data Need (DDN) packages as requested by the AFCI program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

COMPARISON OF THREE TRACER TESTS AT THE RAFT RIVER GEOTHERMAL SITE

Three conservative tracer tests have been conducted through the Bridge Fault fracture zone at the Raft River Geothermal (RRG) site. All three tests were conducted between injection well RRG-5 and production wells RRG-1 (790 m distance) and RRG-4 (740 m distance). The injection well is used during the summer months to provide pressure support to the production wells. The first test was conducted in 2008 using 136 kg of fluorescein tracer. Two additional tracers were injected in 2010. The first 2010 tracer injected was 100 kg fluorescein disodium hydrate salt on June, 21. The second tracer (100 kg 2,6-naphthalene disulfonic acid sodium salt) was injected one month later on July 21. Sampling of the two productions wells is still being performed to obtain the tail end of the second 2010 tracer test. Tracer concentrations were measured using HPLC with a fluorescence detector. Results for the 2008 test, suggest 80% tracer recover at the two production wells. Of the tracer recovered, 85% of tracer mass was recovered in well RRG-4 indicating a greater flow pathway connection between injection well and RRG-4 than RRG-1. Fluorescein tracer results appear to be similar between the 2008 and 2010 tests for well RRG-4 with peak concentrations arriving approximately 20 days after injection despite the differences between the injection rates for the two tests (~950 gpm to 475 gpm) between the 2008 and 2010. The two 2010 tracer tests will be compared to determine if the results support the hypothesis that rock contraction along the flow pathway due to the 55 oC cooler water injection alters the flow through the ~140 oC reservoir.

15 GEOTHERMAL ENERGY↗

4 kW Test of Solid Oxide Electrolysis Stacks with Advanced Electrode-Supported Cells

A new test stand has been developed at the Idaho National Laboratory for multi-kW testing of solid oxide electrolysis stacks. This test stand will initially be operated at the 4 KW scale. The 4 kW tests will include two 60-cell stacks operating in parallel in a single hot zone. The stacks are internally manifolded with an inverted-U flow pattern and an active area of 100 cm2 per cell. Process gases to and from the two stacks are distributed from common inlet/outlet tubing using a custom base manifold unit that also serves as the bottom current collector plate. The solid oxide cells incorporate a negative-electrode-supported multi-layer design with nickel-zirconia cermet negative electrodes, thin-film yttria-stabilized zirconia electrolytes, and multi-layer lanthanum ferrite-based positive electrodes. Treated metallic interconnects with integral flow channels separate the cells and electrode gases. Sealing is accomplished with compliant mica-glass seals. A spring-loaded test fixture is used for mechanical stack compression. Due to the power level and the large number of cells in the hot zone, process gas flow rates are high and heat recuperation is required to preheat the cold inlet gases upstream of the furnace. Heat recuperation is achieved by means of two inconel tube-in-tube counter-flow heat exchangers. A current density of 0.3 A/cm2 will be used for these tests, resulting in a hydrogen production rate of 25 NL/min. Inlet steam flow rates will be set to achieve a steam utilization value of 50%. The 4 kW test will be performed for a minimum duration of 1000 hours in order to document the long-term durability of the stacks. Details of the test apparatus and initial results will be provided.

08 HYDROGEN↗

A One System Integrated Approach to Simulant Selection for Hanford High Level Waste Mixing and Sampling Tests

The Hanford Tank Operations Contractor (TOC) and the Hanford Waste Treatment and Immobilization Plant (WTP) contractor are both engaged in demonstrating mixing, sampling, and transfer system capabilities using simulated Hanford High-Level Waste (HLW) formulations. This represents one of the largest remaining technical issues with the high-level waste treatment mission at Hanford. Previous testing has focused on very specific TOC or WTP test objectives and consequently the simulants were narrowly focused on those test needs. A key attribute in the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2 is to ensure testing is performed with a simulant that represents the broad spectrum of Hanford waste. The One System Integrated Project Team is a new joint TOC and WTP organization intended to ensure technical integration of specific TOC and WTP systems and testing. A new approach to simulant definition has been mutually developed that will meet both TOC and WTP test objectives for the delivery and receipt of HLW. The process used to identify critical simulant characteristics, incorporate lessons learned from previous testing, and identify specific simulant targets that ensure TOC and WTP testing addresses the broad spectrum of Hanford waste characteristics that are important to mixing, sampling, and transfer performance are described.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wind turbine blade testing system using base excitation

An apparatus (500) for fatigue testing elongate test articles (404) including wind turbine blades through forced or resonant excitation of the base (406) of the test articles (404). The apparatus (500) includes a testing platform or foundation (402). A blade support (410) is provided for retaining or supporting a base (406) of an elongate test article (404), and the blade support (410) is pivotally mounted on the testing platform (402) with at least two degrees of freedom of motion relative to the testing platform (402). An excitation input assembly (540) is interconnected with the blade support (410) and includes first and second actuators (444, 446, 541) that act to concurrently apply forces or loads to the blade support (410). The actuator forces are cyclically applied in first and second transverse directions. The test article (404) responds to shaking of its base (406) by oscillating in two, transverse directions (505, 507).

42 ENGINEERING↗

Design and Laboratory Evaluation of Future Elongation and Diameter Measurements at the Advanced Test Reactor

New materials are being considered for fuel, cladding, and structures in next generation and existing nuclear reactors. Such materials can undergo significant dimensional and physical changes during high temperature irradiations. In order to accurately predict these changes, real-time data must be obtained under prototypic irradiation conditions for model development and validation. To provide such data, researchers at the Idaho National Laboratory (INL) High Temperature Test Laboratory (HTTL) are developing several instrumented test rigs to obtain data real-time from specimens irradiated in well-controlled pressurized water reactor (PWR) coolant conditions in the Advanced Test Reactor (ATR). This paper reports the status of INL efforts to develop and evaluate prototype test rigs that rely on Linear Variable Differential Transformers (LVDTs) in laboratory settings. Although similar LVDT-based test rigs have been deployed in lower flux Materials Testing Reactors (MTRs), this effort is unique because it relies on robust LVDTs that can withstand higher temperatures and higher fluxes than often found in other MTR irradiations. Specifically, the test rigs are designed for detecting changes in length and diameter of specimens irradiated in ATR PWR loops. Once implemented, these test rigs will provide ATR users with unique capabilities that are sorely needed to obtain measurements such as elongation caused by thermal expansion and/or creep loading and diameter changes associated with fuel and cladding swelling, pellet-clad interaction, and crud buildup.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A New Facility for Testing Superconducting Solenoid Magnets with Large Fringe Fields at Fermilab

Testing superconducting solenoid with no iron flux return can be problematic for a magnet test facility due to the large magnetic fringe fields generated. These large external fields can interfere with the operation of equipment while precautions must be taken for personnel supporting the test. The magnetic forces between the solenoid under test and the external infrastructure must also be taken under consideration. A new test facility has been designed and built at Fermilab specifically for testing superconducting magnets with large external fringe fields. This paper discusses the test stand design, capabilities, and details of the instrumentation and controls with data from the first solenoid tested in this facility: the Muon Ionization Cooling Experiment (MICE) coupling coil.

43 PARTICLE ACCELERATORS↗

IN-PILE MEASUREMENTS OF FUEL ROD DIMENSIONAL CHANGES UTILIZING THE TEST REACTOR LOOP PRESSURE FOR MOTION

Different types of materials are being considered for fuel, cladding, and structures in existing and advanced nuclear reactors. These materials can undergo significant dimensional and physical changes during irradiation. Currently in the US, such changes are measured with the ‘cook and look’ method (i.e. repeatedly irradiating a specimen for a specified period of time and then removing it from the reactor for evaluation). The time and labor to remove, examine, and return irradiated samples for each measurement makes this approach expensive. In addition, such techniques provide limited data, and handling may disturb the phenomena of interest. Therefore, in-pile detection of changes in geometry is sorely needed to understand real-time behavior during irradiation testing of fuels and materials in high flux US Material and Test Reactors (MTRs). This paper presents development results of an advanced Linear Variable Differential Transformer (LVDT)-based test rig capable of detecting real-time changes in diameter or length of fuel rods or other material samples during irradiation in US MTRs. This test rig is being developed at the Idaho National Laboratory (INL), and will provide experimenters with a unique capability to measure dimensional changes associated with fuel and clad swelling, pellet-clad interaction, and crud buildup. This novel LVDT design uses the MTR’s loop pressure to drive the test specimen at a constant rate. This leads to a simplified construction, that is, the use of fewer components than other diameter gauge test rigs. This simplified design only requires three pressure boundary penetrations. Further, a key component of this test rig is a leak tight hydraulic ram capable of actuating under low differential pressure, and is able to survive the high irradiation tests at Pressurized Water Reactor (PWR) conditions. The sensor has been proven on a benchtop scale, and shows repeatability and reliability. Measurement accuracies of ±3 µm for diameter and ±90 µm for length have been achieved.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

INTER-LABORATORY RESULTS AND ANALYSES OF MINI-C(T) SPECIMEN TESTING OF AN IRRADIATED LINDE 80 WELD METAL

An irradiated low-upper-shelf Linde 80 weld metal has been tested by four laboratories as part of an inter-laboratory assessment of use of the miniature compact tension [mini-C(T)] test specimen for Master Curve fracture toughness evaluation following ASTM E1921. The preliminary results from each of the laboratories have been compiled and evaluated together to assess the validity and use of the mini-C(T) specimen for an irradiated reactor pressure vessel material which can exhibit ductile crack growth at low temperatures relative to cleavage initiation fracture toughness. The preliminary results from this mini-C(T) testing can also be compared to extensive specimen test results from larger C(T) specimens of the same irradiated material. Comparisons of the results from each of the laboratories and some inter-laboratory differences in the fracture testing are assessed. The evaluations indicate reasonable agreement between the mini-C(T) and larger specimen results, but the selection of test temperature and the number of test specimens needed to obtain reliable results are more difficult when testing a low-upper-shelf toughness material.

Server, W. L.↗

Subtask 2.5 – Syngas Testing of NETL's Advanced Precombustion CO2 Capture Solvent

U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) on-site researchers have been examining and developing a novel solvent for precombustion capture that has the potential for improved performance and lower costs compared to Selexol™ and Rectisol®. In Subtask 2.5, the Energy & Environmental Research Center (EERC) conducted actual comparison tests on actual coal-derived syngas of a PEGDME (polyethylene glycol dimethyl ether) Selexol-type solvent and three other solvents provided by NETL. One was a new hybrid PEG–PDMS (poly[dimethylsiloxane]) solvent engineered by NETL. In addition, two commercially available chemicals that are projected to have good CO2 capture abilities were also selected for testing on actual coal-derived syngas. These tests were conducted in the EERC high-pressure fluid-bed gasifier (HPFBG) system utilizing an existing gas-sweetening absorption system (GSAS) to test the solvents. The four solvents tested were Solvent 1 – AGR II from Coastal Chemical Co., LLC, NETL Solvent 2 – XG-3229 Bis(methoxytriethyleneoxypropyl)hexamethyltrisiloxane, as manufactured by Gelast, Inc.; Solvent 3 – CASSH-1 (diethyl sebacate), procured from Sigma Aldrich; and Solvent 4 – TBP (tributyl phosphate), purchased from ThermoFisher Scientific. The solvents were all tested at a consistent syngas flow and composition at approximately 50 bar to make direct comparisons easier; two solvent flow rates which would bracket 90% CO2 capture; and, temperatures of 10°, 25°, 40°, and 55°C to determine the effects of temperature on CO2 uptake and CO2 to H2 selectivity. Figure E-1 shows the results for CO2 uptake and selectivity for the various solvents. These data show that the CO2 uptake for the Selexol-type solvent for the PEG-PDMS-3 and CASHH-1 solvents at higher operating temperatures around 40°C was better than the Selexol-type solvent was able to achieve at the lower operating temperature of 10°C. Selectivity of CO2 over H2 was at least as good as Selexol for the PEG-PDMS-3 solvent and even better than Selexol for the CASSH-1 solvent. The TBP solvent also displayed good CO2 uptake; however, CO2/H2 selectivity was worse than for the Selexol-type solvent. Operation of precombustion CO2 solvents at temperatures above ambient can provide a 2% process efficiency improvement along with a significant capital cost reduction since refrigeration and solvent dehydration equipment is not required. The excellent results from these tests warrant further longer-duration testing with one or both superior NETL-provided solvents to determine if longer-term exposure to any coal-derived syngas trace species may have an adverse impact on solvent performance. This project was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233.

01 COAL, LIGNITE, AND PEAT↗

Test Plan for Cyclic Heating of AGR-3/4 Compact 8-1

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 are in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015). The plan for the reirradiation in the Neutron Radiography Reactor (NRAD) and subsequent 1200°C heating test of AGR-3/4 Compact 8-1 in the Fuel Accident Condition Simulator (FACS) furnace was described previously in (Stempien 2019). One of the main goals of that test was to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 d) and Xe-133 (t1/2 = 5.2 d) in fuel kernels. Xe-133 release had ostensibly leveled off after approximately 80 hours. An issue with the condensation plate exchanges forced this test to be stopped after approximately 96 hours. The issue was resolved, and the test was restarted by heating FACS back up to 1200°C. During this reheating phase, an additional release of Xe-133, approximately equal in size to the release during the initial heating to 1200°C, was detected in the fission gas monitoring system (FGMS). To test whether this release is related to temperature transients (i.e. from heating and reheating), this new plan will describe three additional temperature cycles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR) 5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of the development and qualification of tri-structural isotropic (TRISO) low enriched fuel for use in high-temperature gas-cooled reactors (HTGR). The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR 5/6/7 experiment were to: 1. Irradiate reference-design fuel particles to support fuel qualification. 2. Establish operating margins for the fuel, beyond normal operating conditions. 3. Provide irradiated-fuel performance data and irradiated-fuel samples for post irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective is to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast (NE) flux trap of the ATR with a planned duration of 500 effective full-power days (EFPDs). The NE flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B?168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 EFPDs. Final burnup values, on a per-compact basis, ranged from 5.66% to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples (TC) had failed (the bottom three capsules lost all TCs). During the first five cycles (162B ? 165A), fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8?10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to the maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particle failures in Capsule 3, which was considered possible at the start of the irradiation, since the experiment was designed to operate beyond the high-temperature gas-cooled reactor (HTGR) normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

POST-TEST EXAMINATIONS OF A LOCA SAMPLE FROM AN IRRADIATED HIGH-BURNUP PWR M5 FUEL ROD

A LOCA integral test with high burnup PWR M5 fuel rod was conducted in the Irradiated Fuel Examination Laboratory through the complete LOCA sequence: heating the LOCA sample to 300ºC and pressurizing the internal pressure to 8.27 MPa, heating at 5ºC/s from 300 to 1200ºC, holding in steam for 90s at 1200ºC, cooling at 3ºC/s to 800ºC, followed by water quench and rapid cooling to 100ºC. After LOCA testing, examinations, such as the fuel fragmentation analysis, burst and ballooning characterization, axial strain measurement, and microstructural examinations were performed. Metallographic examinations of an as-irradiated high burnup sample adjacent to the LOCA test sample revealed a bonding layer between the fuel and cladding. The posttest LOCA examinations indicates the corrosion layer formed during normal operations in the commercial reactor might provide a protection against the steam oxidation at high temperatures for test times performed in this work. The microstructure of the as-irradiated fuel is compared to the microstructure of the post-LOCA test fuel. Posttest LOCA examination on unirradiated post-tests Zr cladding samples was conducted, which served as baseline data for in cell testing with irradiated samples. The results obtained with irradiated PWR high burnup M5 fuel rad were compared to the LOCA test data obtained with irradiated BWR high burnup Zircaloy-2 fuel rod at Argonne national Laboratory.

Yan, Yong↗