Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technological readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Trials and Tribulations of Implementing Intranet Technology: The Cassini Information Access System

The Cassini Information Access System (IAS) was built to provide Cassini Integration and Test engineers with ready access to current technical and logistical project information. World Wide Web (WWW) technology was used to provide a consistent user interface to pre-existing interactive systems as well as new repositories and interactive services developed specifically for Cassini.

Cassini↗

Precision Departure Release Capability (PDRC) Concept of Operations

After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demandcapacity imbalances. When demand exceeds capacity Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in DallasFort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Concept of Operations. Companion papers include the Final Report and a Technology Description. ? SUBJECT:

tactical departure scheduling↗

Advanced Ultra-Supercritical Component Test (ComTest) Project for 760*C Steam Conditions

ComTest is a $27M Department of Energy-funded project. Phase I, which began in November 2015, served to identify the technology gaps, as well as the scope and cost of required testing. Phase II, which was awarded in December 2018, includes an advanced manufacturing effort to complete U.S. based supply chain development for full commercial scale (800-850 MWe) AUSC components made of nickel-based alloys, components operating at up to 760°C. Completion of Phase II scheduled for September 30, 2021. Strategic Objectives of U.S. AUSC Project include: Power Plant Efficiency Improvements –Develop cost-effective, reliable technologies to improve the efficiency of new and existing high-temperature advanced generation power plants. Close gaps to achieve readiness for commercial scale demonstration of Advanced Ultra-Supercritical (AUSC) technology. Fabricate full-scale versions of key nickel-based alloy components. Validate capabilities of US supply chain for cost certainty. Support cross-cutting high-temperature generation technologies. Obtain ASME Code approval for new materials, components and processes. Increase power plant steam temperatures for higher cycle efficiency (Note: Average efficiency of US coal-fired fleet = 33% HHV; A-USC plant efficiency over 47% HHV at 1,400°F (760°C) steam temperature).

fireside corrosion↗

Energy Efficient Engine Program: Technology Benefit/Cost Study, Volume II

The Benefit/Cost Study portion of the NASA-sponsored Energy Efficient Engine Component Development and Integration program was successful in achieving its objectives: identification of air transport propulsion system technology requirements for the years 2000 and 2010, and formulation of programs for developing these technologies. It is projected that the advanced technologies identified, when developed to a state of readiness, will provide future commercial and military turbofan engines with significant savings in fuel consumption and related operating costs. These benefits are significant and far from exhausted. The potential savings translate into billions of dollars in annual savings for the airlines. Analyses indicate that a significant portion of the overall savings is attributed to aerodynamic and structure advancements. Another important consideration in acquiring these benefits is developing a viable reference technology base that will permit engines to operate at substantially higher overall pressure ratios and bypass ratios. Results have pointed the direction for future research and a comprehensive program plan for achieving this was formulated. The next major step is initiating the program effort that will convert the advanced technologies into the expected benefits.

Gray, D. E.↗

X-ray Cryogenic Facility (XRCF) Handbook

The X-ray & Cryogenic Facility (XRCF) Handbook is a guide for planning operations at the facility. A summary of the capabilities, policies, and procedures is provided to enhance project coordination between the facility user and XRCF personnel. This handbook includes basic information that will enable the XRCF to effectively plan and support test activities. In addition, this handbook describes the facilities and systems available at the XRCF for supporting test operations. 1.2 General Facility Description The XRCF was built in 1989 to meet the stringent requirements associated with calibration of X-ray optics, instruments, and telescopes and was subsequently modified in 1999 & 2005 to perform the challenging cryogenic verification of Ultraviolet, Optical, and Infrared mirrors. These unique and premier specialty capabilities, coupled with its ability to meet multiple generic thermal vacuum test requirements for large payloads, make the XRCF the most versatile and adaptable space environmental test facility in the Agency. XRCF is also recognized as the newest, most cost effective, most highly utilized facility in the portfolio and as one of only five NASA facilities having unique capabilities. The XRCF is capable of supporting and has supported missions during all phases from technology development to flight verification. Programs/projects that have benefited from XRCF include Chandra, Solar X-ray Imager, Hinode, and James Webb Space Telescope. All test programs have been completed on-schedule and within budget and have experienced no delays due to facility readiness or failures. XRCF is currently supporting Strategic Astrophysics Technology Development for Cosmic Origins. Throughout the years, XRCF has partnered with and continues to maintain positive working relationships with organizations such as ATK, Ball Aerospace, Northrop Grumman Aerospace, Excelis (formerly Kodak/ITT), Smithsonian Astrophysical Observatory, Goddard Space Flight Center, University of Alabama Huntsville, and more.

XRCF↗

Quantum Computing Strategy 2026

Quantum computing (QC) is a rapidly maturing technology with the potential for revolutionary impacts on stockpile stewardship science and national security. Recent developments in fault-tolerant architectures have compressed vendor roadmaps, and predictions of a production-ready quantum computer by the mid-2030s are becoming increasingly credible. This strategy provides a roadmap for integrating QC into the Advanced Simulation and Computing (ASC) program by investing in four strategic focus areas: 1. Develop Capabilities in Mission-Relevant Quantum Applications: ASC will prioritize developing quantum-ready applications in mission areas that have shown significant promise for quantum advantage, including simulations of materials in extreme environments, nuclear dynamics, solving linear and nonlinear partial differential equations, and uncertainty quantification. These applications directly support stockpile stewardship science and modernization objectives. 2. Conduct R&D in Algorithms, Software, and Hardware: Sustained research into quantum algorithms, robust software tools, and quantum hardware is essential. ASC will develop efficient quantum algorithms; invest in quantum compilers, debuggers, and performance tools; and explore specialized quantum hardware tailored to NNSA’s unique requirements. 3. Engage with Vendors and Partners: Early and active collaboration with commercial quantum hardware vendors and academic partners is critical. Through testbeds, co-design agreements, and quantum demonstration facilities, ASC will influence hardware design, gain early access to emerging technologies, and ensure that quantum platforms evolve to meet mission needs. 4. Build Knowledge, Experience, and Workforce: Expanding and upskilling the quantum-trained workforce is essential to long-term success. This includes hiring, internal training, university outreach, and postdoctoral support to ensure ASC maintains the expertise required to operate, program, and integrate quantum systems as they become available. While quantum computing will never replace classical computing, it has the potential to solve certain problems with speed and accuracy that would be unachievable using any conceivable classical high-performance computing (HPC) system. By investing strategically in QC, ASC will help propel the emergent QC industry, maintain U.S. technological leadership, ensure mission readiness, and position itself to rapidly adopt quantum technologies as they mature.

97 MATHEMATICS AND COMPUTING↗

Temporal Investment Strategy to Enable JPL Future Space Missions

The Jet Propulsion Laboratory (JPL) formulates and conducts deep space missions for NASA (the National Aeronautics and Space Administration). The Chief Technologist of JPL has the responsibility for strategic planning of the laboratory's advanced technology program to assure that the required technological capabilities to enable future JPL deep space missions are ready as needed; as such he is responsible for the development of a Strategic Plan. As part of the planning effort, he has supported the development of a structured approach to technology prioritization based upon the work of the START (Strategic Assessment of Risk and Technology) team. A major innovation reported here is the addition of a temporal model that supports scheduling of technology development as a function of time. The JPL Strategic Technology Plan divides the required capabilities into 13 strategic themes. The results reported here represent the analysis of an initial seven.

investment strategy↗

Radioisotope Power Systems Program: A Program Overview

NASA's Radioisotope Power Systems (RPS) Program continues to plan, mature research in energy conversion, and partners with the Department of Energy (DOE) to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet potential future mission needs. Recent programs responsibilities include providing investment recommendations to NASA stakeholders on emerging thermoelectric and Stirling energy conversion technologies and insight on NASA investments at DOE in readying a generator for the Mars 2020 mission. This presentation provides an overview of the RPS Program content and status and the approach used to maintain the readiness of RPS to support potential future NASA missions.

Nuclear↗

EV Champion Training Webinar 1: ZEV and EV Charging Fundamentals [Slides]

The Electric Vehicle (EV) Champion Training Series, hosted by the National Renewable Energy Laboratory (NREL), is tailored for fleet managers, facility managers, and other stakeholders involved in the deployment of EVs and charging stations. This series equips participants with the skills and knowledge necessary to become subject matter experts in EV implementation. This is the first training in a four-part series and serves as an introductory training. This training covers fundamental topics such as EV and charging technology, utility basics, and financial considerations for EVs. Additionally, this session introduces the Federal Fleet ZEV Ready Center framework, a one-stop location for federal fleet electrification resources. Participants will gain a solid foundation to support the effective deployment and management of EVs and their infrastructure. Visit the Federal Fleet ZEV Ready Center website to learn more about the ZEV Ready Center process. EV Champion Training Webinar 1: ZEV and EV Charging Fundamentals will enable attendees to: Identify EV and EV charging technology fundamentals; Recognize EV market and GSA Schedule options; Identify utility basics, incentives, and rates as they relate to EV charging; and Identify methods to calculate life cycle costs for EVs and gasoline vehicles.

30 DIRECT ENERGY CONVERSION↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preparing Distribution Utilities for Utility-Scale Storage and Electric Vehicles: A Novel Analytical Framework

Emerging distributed energy resources (DERs)—such as solar photovoltaics (PV), battery energy storage systems (BESS), and electric vehicles (EVs)—are expected to increase substantially in India in the coming years following policy-driven targets of the Government of India to modernize its electricity system, reduce greenhouse gas emissions (GHGs), and improve air quality. These emerging technologies can pose challenges to distribution utilities, forcing overhauls in planning and operational practices. They can also create challenges in power system infrastructure planning and cause more frequent system operational violations (e.g., network voltage bounds and loading thresholds) if not properly integrated. The impacts on the localized power distribution grid from these emerging technologies manifest in increased infrastructure investments and erratic shifts in demand patterns. These impacts are not yet well understood, and analytic solutions are not readily available. To address these challenges, the National Renewable Energy Laboratory (NREL), in collaboration with BSES Rajdhani Power Ltd. (BRPL), developed an advanced power distribution system impact analysis framework of BRPL’s distribution system. This framework helps analyze the readiness of the power distribution network to accommodate emerging technologies and the potential opportunities they might introduce. The framework has been predominantly set up to evaluate distributed PV, BESS, and EVs. In this collaboration between NREL and BRPL, we developed and evaluated the framework on two distribution feeders in the BRPL territory for various scenarios of BESS and EVs. BESS are evaluated for their effectiveness on the grid to mitigate present and future feeder overloading scenarios, and they are subsequently analyzed for their costs compared to the costs of traditional upgradation measures. Scenarios include assessing the effects of EV density on grid infrastructure upgrades and interlinking EV management with BESS integration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AS12-AS101-3 Breakthrough Capability for the NASA Astrophysics Explorer Program: Reaching the Darkest Sky

We describe a mission architecture designed to substantially increase the science capability of the NASA Science Mission Directorate (SMD) Astrophysics Explorer Program for all AO proposers working within the near-UV to far-infrared spectrum. We have demonstrated that augmentation of Falcon 9 Explorer launch services with a 13 kW Solar Electric Propulsion (SEP) stage can deliver a 700 kg science observatory payload to extra-Zodiacal orbit. Over the above wavelength range, observatory performance is limited by zodiacal light. This new capability enables up to 10X increased photometric sensitivity and 160X increased observing speed relative to a Sun-Earth L2, Earth-trailing, or Earth orbit with no increase in telescope aperture. All enabling SEP stage technologies for this launch service augmentation have reached sufficient readiness (TRl-6) for Explorer Program application in conjunction with the Falcon 9. We demonstrate that enabling Astrophysics Explorers to reach extra-zodiacal orbit will allow this small payload program to rival the Science performance of much larger long development time systems; thuS, providing a means to realize major science objectives while increasing the SMD Astrophysics portfolio diversity and resiliency to external budget pressure. The SEP technology employed in this study has strong applicability to SMD Planetary Science community-proposed missions and is a stated flight demonstration priority for NASA's Office of the Chief Technologist (OCT). This new mission architecture for astrophysics Explorers enables an attractive realization of joint goals for OCT and SMD with wide applicability across SMD science disciplines.

Greenhouse, Matthew↗

Breakthrough Capability for the NASA Astrophysics Explorer Program: Reaching the Darkest Sky

We describe a mission architecture designed to substantially increase the science capability of the NASA Science Mission Directorate (SMD) Astrophysics Explorer Program for all AO proposers working within the near-UV to far-infrared spectrum. We have demonstrated that augmentation of Falcon 9 Explorer launch services with a 13 kW Solar Electric Propulsion (SEP) stage can deliver a 700 kg science observatory payload to extra-Zodiacal orbit. This new capability enables up to ~13X increased photometric sensitivity and ~160X increased observing speed relative to a Sun- Earth L2, Earth-trailing, or Earth orbit with no increase in telescope aperture. All enabling SEP stage technologies for this launch service augmentation have reached sufficient readiness (TRL-6) for Explorer Program application in conjunction with the Falcon 9. We demonstrate that enabling Astrophysics Explorers to reach extra-zodiacal orbit will allow this small payload program to rival the science performance of much larger long development time systems; thus, providing a means to realize major science objectives while increasing the SMD Astrophysics portfolio diversity and resiliency to external budget pressure. The SEP technology employed in this study has strong applicability to SMD Planetary Science community-proposed missions. SEP is a stated flight demonstration priority for NASA's Office of the Chief Technologist (OCT). This new mission architecture for astrophysics Explorers enables an attractive realization of joint goals for OCT and SMD with wide applicability across SMD science disciplines.

capabiity↗

TCF Base Commercialization Enabling Final Report: Lab Making Advanced Technology Commercialization Harmonized (MATCH) Prize

The Lab MATCH prize, funded by the Office of Technology Commercialization through the Technology Commercialization Fund, was designed to accelerate the commercialization of national laboratory intellectual property (IP) by incentivizing for-profit companies and startups to license lab IP aiming to enable more affordable, available, reliable and secure energy solutions. The Lab MATCH prize program offers both technical and commercial benefits, aligning with the Department of Energy's (DOE) mission to advance energy solutions through innovation, commercialization, and market-ready deployment. In summary, the Lab MATCH Prize promotes DOE's objectives by marrying technical innovation with commercialization expertise, resulting in scalable, market-ready solutions that strengthen the U.S. economy, advance energy technologies, and reaffirm U.S. leadership in energy innovation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wastewater hydrogen nexus (WwHeN): Greening the wastewater industry via integration with the hydrogen economy

As industries rally toward achieving net zero emissions, hydrogen and hydrogen-based fuels are emerging as key players in decarbonization efforts. Although the primary technology for producing renewable natural gas has been well implemented in the wastewater industry, the “decarbonization based goal setting” is trailing. This perspective assimilates existing literature presented in other contexts to highlight the need for framing the decarbonization dialog by using green hydrogen as a potential pathway for the wastewater industry. Specifically, we note the importance of (a) developing the decarbonization or net zero focus in the wastewater industry, and (b) colocating the wastewater industry with hydrogen production facilities. Finally, we also delve into technological, cost, and operational considerations to understand the readiness level of key stakeholders to identify future research and development opportunities for the wastewater hydrogen nexus.

08 HYDROGEN↗

Additive Manufactured Metallic 3D Ox-Ox CMC Integrated Structures for 65% Combined Cycle Efficient Gas Turbine Components

To support the FOA objectives for the Area of interest “Advanced Combustion Turbines for Combined Cycle Applications”, Phase I initially targeted the integration of Metallic Additive Manufacturing (AM) and 3D Oxide-Oxide Ceramic Matrix Composites (3D Ox-Ox CMC) based design for an Advanced Vane design in support of 65% efficient gas turbines. Application of an AM-CMC-TBC vane was expected to significantly reduce cooling air consumption and result in emissions and/or performance improvements beyond the current SOTA metallic vane technology. The primary deliverable was a design concept ready for fabrication and test in a follow-on (Phase II) project.

03 NATURAL GAS↗

Airport Ground Support Equipment Infrastructure & Logistics Electrification Assessment Tool: 2025 Data Development, Modeling and Analysis for DFW

The aviation industry is increasingly turning to modernize freight facilities by integrating electric Ground Support Equipment (eGSE) to enhance operational efficiency of freight facility moving vehicles and equipment. Airports worldwide are adopting eGSE to streamline cargo movement, reduce fuel and maintenance costs, and improve logistics coordination.1 North America, with its advanced aviation infrastructure, leads this transition, leveraging Internet of things (IoT)-enabled automation and zero emission technologies to boost reliability and reduce human errors.2 Electrification of freight facility moving vehicles and equipment boosts turnaround times, improves equipment reliability, and optimizes logistics coordination, giving operators a competitive advantage. With rising fuel price volatility and the pressure to meet stringent performance benchmarks, airports are focusing on cost-effective, scalable solutions for long-term financial and operational gains. To further accelerate electrification, airports are integrating Zero Emission Vehicles (ZEVs) into rental car fleets and deploying electric baggage carts, requiring strategic investments in charging infrastructure. 3 The shift, however, presents challenges, such as limited technical expertise, high capital costs, and complex procurement processes. By forging strategic partnerships, leveraging advanced technologies, and optimizing infrastructure investments, airports can create a resilient, future-ready ecosystem that enhances the movement of people and goods through electrification-driven efficiency. Supported by the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO), this electrification effort provides a scalable, cost-effective solution to improve airport freight operations. Through targeted investments and innovation, airports enhance efficiency, reduce costs, and meet performance benchmarks while advancing toward a resilient, electrified future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Industrial Electrification Assessment Framework

Electrification refers to the process of transitioning from fuel-powered systems to electric-powered systems, or electrotechnologies. This document first provides an overview of industrial electrification, including possible advantages and common applications. Next, it provides a comprehensive, step-by-step framework for assessing the potential for electrification at an individual industrial facility. The steps in this framework include inventorying current fuel-powered systems, evaluating a manufacturing facility’s electrification readiness, and identifying, evaluating, and prioritizing strategies and technologies. This document also contains information about project implementation, and the appendices provide tools and resources to support organizations pursuing electrification.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗