Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mock”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

The FREYA project at VENUS-F - the next step towards MYRRHA

The VENUS-F reactor is a fast, zero-power research reactor. Since 2009 it has used 30% wt. metallic uranium as fuel and solid lead as reflector and coolant simulator. It can also be coupled to a particle accelerator with a neutron producing target and make up a subcritical Accelerator Driven System (ADS). Within the currently ongoing FREYA project, the main tasks being investigated are the validation of online reactivity monitoring of an ADS, the validation of nuclear data and neutronic codes, and the experimental characterization of fast critical and subcritical cores representative for MYRRHA. MYRRHA will be an ADS demonstrator with the option to be operated in critical mode too. So far the only critical core at VENUS-F was assembled using 97 fuel assemblies, each of them consisting of 9 U and 16 Pb rodlets. The core was thoroughly characterized: flux traverses, spectral indices, control rod worth, delayed neutron parameters were measured and compared with Monte Carlo and deterministic calculations. A sensitivity study was also performed focusing on the influence of material impurities, positioning uncertainties, structures and detectors around the core. It was a simple core without any perturbations in the active zone. In the next critical cores that are planned to be investigated in 2015 and 2016, additional elements will be introduced in order to become more representative for MYRRHA. As MYRRHA will use MOX fuel, oxygen will be added into the following core. This will be done by introducing Al{sub 2}O{sub 3} into the fuel assemblies. New fuel assemblies have been already made and are ready to be loaded. Each consists of 13 U, 8 Pb, and 4 Al{sub 2}O{sub 3} rodlets. The new critical core will consist of approximately 40 such fuel assemblies and will be loaded in January 2015. The first results of the characterization measurements will be presented. Additionally, it is planned to investigate coolant void effects. As MYRRHA will be a rather complex system using a number of in-pile sections and heterogeneous elements inside and around the active zone, the next cores will be step by step modified by loading new materials and perturbations with the aim to assemble a MYRRHA mock-up. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Monte-Carlo Simulations of the Nuclear Energy Deposition Inside the CARMEN-1P Differential Calorimeter Irradiated into OSIRIS Reactor

The nuclear heating measurements in Material Testing Reactors (MTRs) are crucial for the study of nuclear materials and fuels under irradiation. The reference measurements of this nuclear heating are especially performed by a differential calorimeter including a graphite sample material. These measurements are then used for other experimental conditions in order to predict the nuclear heating and thermal conditions induced in the irradiation devices. Nuclear heating is a great deal of interest at the moment as the measurement of such heating is an important issue for MTRs reactors. This need is especially generated by the new Jules Horowitz Reactor (JHR), under construction at CEA/Cadarache 'French Alternative Energies and Atomic Energy Commission'. This new reactor, that will be operational in late 2019, is a new facility for the nuclear research on materials and fuels. Indeed the expected nuclear heating rate is about 20 W/g for nominal capacity of 100 MW. The present Monte Carlo calculation works belong to the IN-CORE (Instrumentation for Nuclear radiation and Calorimetry On line in Reactor): a joint research program between the CEA and Aix- Marseille University in 2009. One scientific aim of this program is to design and develop a multi-sensors device, called CARMEN, dedicated to the measurements of main physical parameters simultaneously encountered inside JHR's experimental channels (core and reflector) such as neutron fluxes, photon fluxes, temperature, and nuclear heating. A first prototype was already developed. This prototype includes two mock-ups dedicated respectively to neutronic measurements (CARMEN-1N) and to photonic measurements (CARMEN-1P) with in particular a specific differential calorimeter. Two irradiation campaigns were performed successfully in the periphery of OSIRIS reactor (a MTR located at Saclay, France) in 2012 for nuclear heating levels up to 2 W/g. First Monte Carlo calculations reduced to the graphite sample of the calorimeter were carried out. A preliminary analysis shows that the numerical results overestimate the measurements by about 20 %. A new approach has been developed in order to estimate the nuclear heating by two methods (energy deposition or KERMA) by considering the whole complete geometry of the sensor. This new approach will contribute to the interpretation of the irradiation campaign and will be useful to improve the out-of-pile calibration procedure of the sensor and its thermal response during irradiations. The aim of this paper is to present simulations made by using MCNP5 Monte-Carlo transport code (using ENDF/B-VI nuclear data library) for the nuclear heating inside the different parts of the calorimeter (head, rod and base). Calculations into two steps will be realized. We will use as an input source in the model new spectra (neutrons, prompt-photons and delayed-photons) calculated with the Monte Carlo code TRIPOLI-4{sup R} inside different experimental channels (water) located into the OSIRIS periphery and used during the CARMEN-1P irradiation campaign. We will consider Neutrons- Photons-Electrons and Photons-Electrons modes. We will begin by a brief description of the differential-calorimeter device geometry. Then the MCNP5 model used for the calculations of nuclear heating inside the calorimeter elements will be introduced. The energy deposition due to the prompt-gamma, delayed-gamma and neutrons, the neutron-activation of the device will be considered. The different components of the nuclear heating inside the different parts of the calorimeter will be detailed. Moreover, a comparison between KERMA and nuclear energy deposition estimations will be given. Finally, a comparison between this total nuclear heating Calculation and Experiment in graphite sample will be determined. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Human machine interface to manually drive rhombic like vehicles such as transport casks in ITER

The Cask and Plug Remote Handling System (CPRHS) and the respective Cask Transfer System (CTS) are designed to transport activated components between the reactor and the hot cell buildings of ITER during maintenance operations. In nominal operation, the CPRHS/CTS shall operate autonomously under human supervision. However, in some unexpected situations, the automatic mode must be overridden and the vehicle must be remotely guided by a human operator due to the harsh conditions of the environment. The CPRHS/CTS is a rhombic-like vehicle with two independent steerable and drivable wheels along its longitudinal axis, giving it omni-directional capabilities. During manual guidance, the human operator has to deal with four degrees of freedom, namely the orientations and speeds of two wheels. This work proposes a Human Machine Interface (HMI) to manage the degrees of freedom and to remotely guide the CPRHS/CTS in ITER taking the most advantages of rhombic like capabilities. Previous work was done to drive each wheel independently, i.e., control the orientation and speed of each wheel independently. The results have shown that the proposed solution is inefficient. The attention of the human operator becomes focused in a single wheel. In addition, the proposed solution cannot assure that the commands accomplish the physical constrains of the vehicle, resulting in slippage or even in clashes. This work proposes a solution that consists in the control of the vehicle looking at the position of its center of mass and its heading in the world frame. The solution is implemented using a rotational disk to control the vehicle heading and a common analogue joystick to control the vector speed of the center of the mass of the vehicle. The number of degrees of freedom reduces to three, i.e., two angles (vehicle heading and the orientation of the vector speed) and a scalar (the magnitude of the speed vector). This is possible using a kinematic model based on the vehicle Instantaneous Center of Rotation (ICR): a geometric approach where, at each time instant, the vehicle describes a circumference (either with a finite or infinite radius). The inverse of the kinematic model transforms the three input parameters of the center of mass into the four parameters for the wheels, preserving the omni-directional capabilities. The solution is implemented and tested using a HMI with a control disk and an analog joystick with two axis. The control disk was specially designed for this solution and implemented using a programmable micro-controller. In the first set of experiments, the HMI communicates with a computer running a simulator of the CPRHS/CTS, with the vehicle kinematics and dynamics, moving in a map of the ITER buildings. In the second set of experiments, the HMI communicates with a scaled prototype of the CPRHS running in a mock-up scenario to obtain more realistic results. Several type of tests were performed to evaluate the usability of the HMI. Different human operators without knowledge neither experience with this interface were invited to test the HMI. The operators had to drive the vehicle from an initial place to a final destination under the following conditions: with a pre-computed path to help guidance, without any path, with the information of the closest obstacles and without any help. The performance was evaluated using the time duration of the operation, the energy required to perform the described path, the risk of collision and, in case of a pre-computed path, the comparison between paths. In addition, each operator tested the HMI several times to evaluate the performance along consecutive trials. (authors)

42 ENGINEERING↗

Preparation of liquid fuel test rig in Halden HBWR

Introduction of liquid nuclear fuel may open a way to develop new ideas for fuel engineers. The first action is a small step to develop bottle-shaped devices which encapsulate liquid fuels and enable safe irradiation in Halden Heavy Water Boiling Reactor (HBWR). Thermo-hydrodynamics 3D code calculations were made to evaluate heat removal performance of the device by natural convection. Preparation of mock-up testing and consideration of safety issues to use liquid fuel in water reactor are presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Water Cleaning System for the Exhaust Pipe of HLW Glass Melter (LFCM) - 17180

Vitrification technology has been generally applied to stabilize High-Level Radioactive Waste (HLW) generated from spent fuel reprocessing. In Japan, Joule Heated Liquid Fed Ceramic Melter (LFCM) system is selected for HLW vitrification and the recent active test has been successfully demonstrated its stable operation. The higher reliability of off-gas treatment system (OGTS) which consists of wet scrubber, absorbers and filters connected to the LFCM is also important to ensure long term system operation. The OGTS removes radioactive gases, mists and dust generated by LFCM and maintains radioactive containments by keeping negative pressure inside. In the past active and inactive tests, it was observed that differential pressure in the exhaust pipe attached to LFCM gradually increased during continuous operation and some deposits were observed inside the off-gas pipe. So the cleaning operation needs to be improved and more frequent in order to avoid the exhaust pipe clogging. Therefore we investigated several cleaning systems and operational methods for the exhaust pipe of LFCM. As a result, we have successfully developed the modified water cleaning system. In this presentation we will introduce our water cleaning system. In addition, we will present the result of inactive mock-up tests for the visualization of this water cleaning system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Decommissioning Success using the Tool of Virtual Reality; Increasing Worker Safety and Project Schedule Stability - 17193

operations, especially underwater, is essential. Equally essential is a precise game plan for disassembly which focuses attention on the skilled remote handling operators who must produce the results. Project success is based on clean, efficient cuts and take-aways, prepared paths for waste placement and containment, programmed return paths; and practice, practice, practice on the part of the operators. Recently, our Partner, WAK Ruackbau- und Entsorgungs- GmbH (Decommissioning and Waste Management Company) was tasked with dismantling and decommissioning the Karlsruhe Reprocessing Plant. The most difficult task in this project is the dismantling of the vitrification plant. Waelischmiller was selected to address this high-consequence project. Together, WAK and Waelischmiller determined that development of a virtual reality suite, where management and operators could create a virtual vitrification layout and subsequently map and rehearse their dismantling plan was essential. This approach, using Virtual Reality (VR) as a tool in streamlining operations and rehearsing difficult moves and cuts, will be a game changer for this and future projects. It will be a first-of-a-kind in Germany. The VR suite is contained in a room at the Karlsruhe facility with a large screen, control cabinet, simulation computer, a Waelischmiller Joyarm and Masterarm. To support the dismantling of the vitrification plant, WAK/HWM will conduct interactive feasibility studies for each dismantling step. All movements; cuts, take-aways and vessel segment insertion into transportation and disposal casks will be established, programed and practiced within virtual test suite. This allows savings in cost-intensive and complex construction of test rigs. Operating personnel can be trained in the VR suite, without taking the risk of damaging expensive remote handling equipment.While the operators are working on the operating element, they stand in front of a wide screen. Instead of a real TELBOT{sup R}, a virtual TELBOT{sup R} is moving on the screen in virtual reality. While practicing, the operators cannot damage the arm and the equipment, which is a big advantage. Moreover an interactive feasibility study can be realized without building a real test rig (mock-up). Consequently significant cost-expenses can be reduced. This paper will describe the virtual suite used by the WAK in Karlsruhe and the advantages of this new and innovative approach, which is unique in decommissioning of nuclear facilities. The viewpoint of each (WAK and HWM), and the decisions and benefits realized along the project path will be detailed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of 130 mSv/hr. Soil Contamination Under a Hot Cell - 17301

Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently engineering a system to safely remove and dispose of highly contaminated soil underneath Building 324 located adjacent to the Columbia River on the Hanford Site in Washington State. Cleaning up the waste site will allow for the eventual demolition of the building, which is a top priority for DOE and CH2M due to the proximity of the Columbia River and City of Richland. Building 324 at Hanford was originally constructed in 1966 and was operated for a number of years serving various missions. One of the missions involved development of treatment processes for liquid high activity waste. As of result of one particular mission, liquid high activity waste was spilled in one of the building's hot cells (known as 'B' Cell) and the liquid leaked from a breach in a sump and through construction joints in the hot cell floor and into the soil. Sampling efforts using borehole technology revealed significant under-building contamination with dose rates measuring has high as 130 mSv/hr (13,000 R/hr.). The Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) between the Washington State, Department of Ecology (Ecology), the U.S. Environmental Protection Agency and the DOE has established a 2021 milestone for demolition and removal of the Building 324. Before building demolition can be undertaken, the highly contaminated soil must be removed from beneath the hot cell while the hot cell structure remains in place to provide shielding and containment during the soil remediation. CH2M will fabricate and install remotely operated equipment that will remove debris and grout in the cell, the floor of the hot cell, and the contaminated soil beneath the hot cell and package that soil for disposal. To ensure that the structure remains intact and does not shift during soil removal, support for the building structure must also be constructed as a prerequisite for the planned work. CH2M will use a full-scale mock-up of the Building 324 B Cell and airlock area to assist in the testing of the remotely operated equipment and the training of the soil removal team in a contamination-free environment to ensure efficient and safe performance of the challenging work of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Purpose-Built UAVs for Physical Sampling of Trace Contamination at the Portsmouth Gaseous Diffusion Plant - 17331

The sampling of trace amounts of contamination, particularly of low-energy byproducts such as americium, presents a challenge for non-contact sensing. In many cases, such as determining the need for cleaning inside the exhaust shaft of the Waste Isolation Pilot Plant or sampling the walls of the enormous Gaseous Diffusion Plant at Portsmouth, it may be desirable to take physical swab samples at carefully distributed sample locations for analysis by mass spectrometry. Because of the danger posed to human workers in such scenarios, including risk of falls from lethal heights and exposure to low levels of radiation and the hassle of donning and doffing PPE, a low-cost robotic solution is desired. The inaccessibility of the heights involved suggest Unmanned Aerial Vehicle (UAV) solutions, rather than Unmanned Ground Vehicle (UGV) solutions, but conventional quadrotor UAVs are ill-suited to precise physical interaction with their surroundings. Quadrotors are under-actuated, rendering them non-holonomic and preventing the dexterous application of arbitrary generalized force/torques in interaction with the environment. At Purdue University, the authors have developed a number of novel UAV platforms suitable for dexterous interaction with the environment, making them ideal for such applications. These platforms can independently control forces in all directions, allowing for controlled application of the swab to the surface. Because of the scale of these structures (over 2 km in the case of the Gaseous Diffusion Plant), flight efficiency is of supreme importance. The Purdue team is took a variety of vehicles to the Gaseous Diffusion Plant for field trials on site in August, 2016. (With results available prior to the meeting.) The Purdue Dexterous Hexrotor is a fully-actuated Hexrotor capable of exerting forces in all six directions of force and torque. Operating alone or in swarms, the Dexterous Hexrotor can fly in free space, transition to contact through impact control, and sample the surface through force control. The Purdue I-BoomCopter is a tri-copter with an extra horizontal propeller that enables long-distance flight without pitching and the ability to apply closed-loop forces horizontally. Finally, the Purdue Tiltrotor VTOL is an under-actuated hybrid UAV that combines tilting rotors for vertical takeoff and landing, with a fixed-wing, flying-body design that is ultra-efficient for long-distance flight. The Dexterous Hexrotor provided two demonstrations of physical sampling of walls and crane rails. In sampling the large open sections of the inside of the plant, a small swarm of three UAVs is commanded to sample three distinct points on an internal map of the building. Human-supervised autonomy permits the UAVs to take off by themselves, find a clear elevation at which to fly through uncluttered space, navigate to their designated sampling points, and pause for confirmation by the human supervisor. The supervisor is presented with a video image of the intended sampling spot, which, if confirmed, the UAV will automatically approach and sample. The UAVs then autonomously return to the take-off spot. The second demo involved a single UAV searching upwards, then transitioning into 3-D SLAM mode to wait for a safe sampling spot on the 3-D scan to acquire the sample from the crane rail. The human supervisor, in this case, is responsible for ensuring the absence of cables and other obstacles. I-BoomCopter demonstrated its high-speed, long-distance coverage ability by making a few fast passes before homing in on a mock-up electrical panel with door, which it opened and closed. The dexterity of the I-BoomCopter results from its large propellers, which allow for controlled hovering and the horizontal thruster for applying forces of significant magnitude. Finally, the Tiltrotor VTOL is highly efficient in fixed-wing mode, but the tilt-rotor is under-actuated in hover. The tilt-rotor will take off vertically, then transition to high-speed, long-distance flight to make a number of passes inside the facility. The significance of these demos is the low-cost implementation of physical sampling over prescribable locations in difficult-to-reach areas of potentially contaminate facilities. To make this tractable over very large facilities, the demonstration of combinations of dexterous hovering ability and long-distance/high-speed flight is also in evidence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Sealing With NOH{sub 2}O on the Fukushima Site - 17477

The Fukushima Daiichi nuclear site is still recovering from the natural disaster of March 11, 2011. Much of the recent recovery work has been focused on mitigating ground water intrusion into the radioactively contaminated basements of the reactor and turbine buildings of units 1 - 4. Other recovery efforts involve potentially sealing the vent lines in the primary containment vessels of units 1 - 3 to maintain a flooded vessel for core cooling and shielding. This paper details preliminary test results of a proprietary grout - NOH{sub 2}O{sup TM} - in sealing/plugging those vent lines to allow flooding of the primary containment vessel. Several partial and full-scale tests were conducted on primary containment vessel vent line mock-ups between March and October 2015 to ascertain the effectiveness of NOH{sub 2}O in sealing vent lines that have flowing water, which is problematic for conventional cement-based grouts that require relatively protracted set times. In contrast, NOH{sub 2}O can be used with a proprietary accelerant to provide instant set. The other key advantage of NOH{sub 2}O is its ability to penetrate even the smallest of cracks and porous soils, following and moving with the water flow and creating a continuous, impermeable barrier. It is also extremely flexible once set, conforming to its enclosure as upstream water head increases. Finally, the material's extremely high radiation resistance and longevity make it an ideal candidate for a permanent solution in high rad environments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Humboldt bay power plant decommissioning transition to civil works - 15039

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR, completed the Plant Systems Removal Phase by removal of all radiologically significant plant systems from the buildings in June 2014. The HBPP historical design and construction, close proximity to the bay and associated tidal interactions poses unique challenges to an effective decommissioning effort as the Site transitions to a major earthwork project - designated as Civil Works. The last significant large component removal project remaining is segmentation and disposal of the reactor pressure vessel shell and this project is now integrated and executed under Civil Works with PG and E solely in an oversight role across the site beginning 2015. The value from run-up and mock-up testing of tooling to segment the HBPP reactor vessel will be discussed. Experience obtained, especially at error prone interfaces, during start-up, systemisation and operating phases for the First of a Kind (KOAK) tooling will be discussed. Implementation of the civil scope of work commenced July 2013. Its status and experience applicable to other decommissioning efforts will be provided from an owner's perspective. Implementation of the civil work scope includes development and implementation of oversight capability including policy, procedures and deployment of skilled, experienced and trained oversight staff in the field. Challenges encountered and solutions implemented during mobilization and ramp up of the civil contractor commensurate with demobilization of the self-perform staff will be covered. Partnering with the contractor to establish a good Client/Contractor relationship and tips on where to invest owner resources will be shared. Development of a solid baseline project schedule that incorporates regulatory constraints, client expectations and contract constraints and its importance to safe, compliant project execution will be shared. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Radium/Barium waste project - 15043

The treatment, shipping, and disposal of a highly radioactive radium/barium waste stream have presented a complex set of challenges requiring several years of effort. The project illustrates the difficulty and high cost of managing even small quantities of highly radioactive Resource Conservation and Recovery Act (RCRA)-regulated waste. Pacific Northwest National Laboratory (PNNL) research activities produced a Type B quantity of radium chloride low-level mixed waste (LLMW) in a number of small vials in a facility hot cell. The resulting waste management project involved a mock-up RCRA stabilization treatment, a failed in-cell treatment, a second, alternative RCRA treatment approach, coordinated regulatory variances and authorizations, alternative transportation authorizations, additional disposal facility approvals, and a final radiological stabilization process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of primary shielding with prototype machines in a compact sodium cooled reactor - 15463

The Compact Sodium Cooled Reactor Facility Karlsruhe (KNK), a prototype reactor to demonstrate the Fast Breeder Reactor Technology in Germany, was in operation from 1971 to 1991. The dismantling activities started in 1991. The project aim is the green field in 2020. Most of the reactor internals as well as the primary and secondary cooling loops have already been dismantled. The contaminated sodium inventory has already been disposed of completely. Only the highly activated reactor vessel shielding structures remain. Due to their high dose rates, these structures must be dismantled remotely. For the removal of the primary shielding of the reactor vessel, 12 stacked cast iron blocks with a total mass of 90 Mg and individual masses of up to 15.5 Mg, a remote-controlled multifunctional dismantling device (HWZ) was designed, manufactured and tested in a mock-up. Since it is not possible to remove the segments in one piece for offsite treatment, a special prototype band-saw (BWZ) had to be developed for sawing the segments both horizontally and vertically into smaller pieces. The resulting sub-segments are transferred directly into repository containers. After the successful approval of the test sequences by the authorities and intensive training of the operational staff, both prototype machines were installed inside the reactor building containment for final assembly. The dismantling started in 2013. The present paper covers the successful dismantling of the primary shielding as well as the experiences gained through the development, use and improvement of these prototype machines. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Importance of Upfront Preparatory Works for Vessel Internals Segmentation Projects - 16096

For more than thirty years, Westinghouse has been involved in reactor internals segmentation activities in the U.S. and Europe. Westinghouse completed in 2015 the segmentation of the reactor vessel and reactor vessel internals at the Jose Cabrera nuclear power plant in Spain and a similar project is on-going at Chooz A in France. Four more major reactor internals segmentation projects have been recently awarded in Sweden (Barsebaeck 1-2) and in Germany. (Philippsburg 1 and Neckarwestheim 1). For all reactor dismantling projects, it is essential that all activities are thoroughly planned and discussed upfront together with the customer. Detailed planning is crucial for achieving a successful project. One key activity in the preparation phase is the 'Segmentation and Packaging Plan' that documents the sequential steps required to segment, separate, and package each individual component, based on an activation analysis and component characterization study. Detailed procedures and specialized rigging equipment have to be developed to provide safeguards for preventing certain identified risks. The preparatory work can include some plant civil structure modifications for making the segmentation work easier and safer. Some original plant equipment is sometimes not suitable enough and need to be replaced. Before going to the site, testing and qualification are performed on full scale mock-ups in a specially designed pool for segmentation purposes. The mockup testing is an important step in order to verify the function of the equipment and minimize risk on site. This paper is describing the typical activities needed for preparing the reactor internals segmentation activities using under water mechanical cutting techniques. It will provide experiences and lessons learned that Westinghouse has collected from its recent projects and that will be applied for the new awarded projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating the Decommissioning of the Sellafield Pile Fuel Storage Pond Using Innovative Remote Tooling Developed with the Supply Chain - 16437

The Pile Fuel Storage Pond (PFSP) at Sellafield and adjoining de-canning building provided the storage, cooling and de-canning facility for used fuel and isotopes from the two Windscale reactors and later some Magnox fuel from the Calder Hall reactors. Operations ceased in the 1970's and the facilities are now undergoing a programme of accelerated decommissioning. The pond is a sub-divided outdoor storage pond containing skips of irradiated fuel and miscellaneous waste items and the building contains a series of sub-ponds, known as bays, connected underwater to the main pond. The radiation environment and access limitations necessitate the use of remote technology for the decommissioning programme. This paper describes the philosophy and approach and the technology and equipment adopted for the removal and export of key plant equipment and waste items from within the PFSP. In order to progress the project cost effectively and speedily, the Sellafield project team looked for partners in the supply chain with the required experience, expertise and facilities to supply and test 'commercial off-the-shelf' (COTS) or modified proprietary equipment. This COTS approach minimised the need for multiple, expensive and lengthy design and manufacturing tasks associated with bespoke equipment. Sellafield partnered with specialist remote handling contractor, James Fisher Nuclear, and the respective project teams worked closely together at every stage of the project from qualifying requirements, identifying potential solutions, through to development, testing, training and final deployment. Optioneering of potential solutions involved early 'proof of principle' trials in JFN rig hall facilities, utilising existing equipment and plant mock-ups, along with other equipment manufactured in-house. Together the project teams selected the best solution to take forward, adopting a practical and trials based approach, which allowed rapid and cost effective modification of the solution throughout the project with minimal impact on the programme. When the final solution was validated, plant operators then gained familiarity and training on the equipment so they could execute the work efficiently on plant and so minimise their dose uptake. The removal of a Large De-canner is described in detail. This was a significant obstruction to the emptying, modification and re-use of the bay and a key milestone in the clean-up of the PFSP. The de-canners are large and heavy pieces of equipment which weigh 6.5 t each and approximately 6.5 m long. Their removal was further complicated by limited equipment and man access, radiological contamination from de-canning fuel, challenging material properties, unknown equipment condition and complex lifting requirements. Sellafield Ltd and JFN project teams worked closely together to rapidly develop, trial and deploy a succession of adapted 'commercial off-the-shelf' (COTS) tools whilst addressing emerging challenges and completing the overall task on time and budget. The Sellafield and JFN project and design teams provided an underwater: wheel stop removal tool; towing trolley; grinder on a carbon fibre pole, chute cutting 600 mm circular saw and hydraulic 6 t winch. The suite of tools will be reused on the remaining de-canners in the PFSP and First Generation Magnox Fuel Storage Pond (FGMSP) giving cost and programme savings. Each of the tools can also be used, and some have already been, for other tasks in the bay retrievals such as the size reduction of support frames, large steel sections and chemical de-canner preparatory works. The 'learning from experience' acquired during the project was shared by the Sellafield project with other decommissioning projects across the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Multiple Remote Systems for Calcine Retrieval Operations at Idaho - 16592

There are approximately 5000 m{sup 3} of radioactive calcine material stored in six Calcine Solids Storage Facilities (CSSFs) at the DOE Idaho site. Each CSSF contains from three to twelve stainless steel tanks surrounded by a concrete vault. In accordance with the Idaho Settlement Agreement (ISA), this waste has to be retrieved and immobilized by December 31 2035 although no final decision has yet been made on how the calcine wastes are going to be retrieved from the CSSF's. One of the primary issues with the retrieval is that, in accordance with the ISA, any existing risers into the tanks have to be used 'to the maximum extent possible' in the retrieval process. Since these risers are only 6-8'' in diameter, this limits the types of systems that can be used for the retrieval. In addition, each bin containing the calcine has a series of obstructions which need to be navigated around and so inflexible systems such as conventional hose-based vacuum type systems are not feasible. In addition, the retrieval system selected has to be able to manage multiple forms of calcine (powder, granular, agglomerated, chunks etc) and operate in a very highly radioactive environment. This paper describes the progress made to date in developing an approach based on the use of multiple remote system platforms to gain entry into the bin-sets and to safely and cost-effectively retrieve the calcine wastes. Much of the work has focused on the application of the OC Robotic snake-arm robot system although significant effort has also been allocated to understanding the deployment mechanism of the snake-arm and to the ancillary supporting systems such as those for contamination control, cutting and welding new risers into the bin-sets and vacuum hose management within the bin-set. Future work will include the construction of a scaled mock up to demonstrate the field implementation of the system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the Reactor Pressure Vessels by Remote Controlled Thermal Cutting Segmentation Facilities of the ZION Nuclear Power Plant at ZION, USA - 16599

This paper presents the experiences for the segmentation of both reactor pressure vessels (RV) Units 1 and 2 at the ZION nuclear power plant. The Zion Station project was the first to use the large-scale application of thermal cutting (oxy-propane) technology in the USA. The elaborate planning and engineering was the basis for a quick, safe and flawless project execution without any aerosol migration or release of contamination. The used segmentation technology based on industry-tested methods with its big advantage of availability and spare parts inventory. For safeguarding Simulation (interfering edge analysis), animations and Trials with mock-ups dummies were executed prior. Also risk assessments and rescue concepts are part of the planning. Lean project organization for decommissioning and the flexibility, creativity, willingness to cooperate and willing for uninterrupted decisions of client and contractor are the essential basis for a successful project execution and a short project duration. The remote controlled segmentation of the RV of Unit 2 was performed in 3 month an in Unit 1 in less than 2 month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Steel-pipe Vertical Pipe Units - 18238

The 618-10 Burial Ground is approximately 485 feet by 470 feet and consisted of 12 trenches and 94 VPUs. It is located approximately 5 miles north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). The 618-10 Burial Ground contained approximately 94 VPUs (uncertain mix of first and second generation). There are different variants of VPUs. The first generation of VPUs was simply corrugated culverts or standard pipes, 14-in diameter and 10- to 15-ft long, buried vertically. The second generation of VPUs was 22-in diameter, 15-ft long waste receptacles constructed by welding five 55-gallon bottomless drums together end-to-end and burying them vertically, separated by approximately 10 feet on center in rows approximately 25 feet apart. A subset of the first generation VPUs consisted of the steel pipe VPUs represented by carbon-steel pipes, 10 to 24 in. in diameter with various wall thicknesses. This paper will present the remediation of the steel-pipe VPUs, which were the last of the VPUs remediated in this project. The remediation process developed for steel pipe VPUs included exposing a section of the VPU within an excavated trench, placing a mix box around the VPU, filling the mix box with grout, shearing the VPU and contents, and then removing the grout waste mixture into a waste box for disposal at the Hanford Environmental Restoration Disposal Facility (ERDF). Prior the start of remedial activities extensive mock-ups were performed on surrogate steel-pipe VPUs to ensure the effectiveness of the process before introducing the hazards of radioactive VPU waste. The critical steps in the process of size reducing steel-pipe VPUs and mixing the contents with grout was successfully demonstrated. This process was completed for each steel-pipe VPU in successive lifts until the entire set of steel-pipe VPUs were mixed in grout and removed from the excavation. The remediation of the steel-pipe VPUs proved be successful in that all the VPUs were removed and transported to ERDF without a release to the local environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Localization Method for Remotely Operated Robot in Harsh Environments - 18561

For decommissioning of the Fukushima Daiichi Nuclear Power Station (FDNPS), the primary containment vessel (PCV) internal survey for fuel debris spreading has been needed. Remotely operated robots have been used for the survey. Localization of the robots during their operation is necessary to adjust sensor positions. However, it is difficult to calculate the robot position because the survey target areas have an unknown environment. In this research, we proposed a localization method which combines a stereo camera-based method for absolute localization and a periodic structure tracking method for relative localization for application to the unknown environment. The position accuracy for the proposed method was verified in a mock-up test, and we confirmed that the position accuracy satisfied the required accuracy of 30 mm. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗