Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flight projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

HST Mission Operations

The Hubble Space Telescope Project at Goddard Space Flight Center has the overall HST Mission Operations responsibility. In carrying out this responsibility, the functions of mission operations are to fly the spacecraft properly, manage the HST support systems, monitor vehicle health and safety, and conduct the science program in the most efficient manner.

Ryan, Joseph E.↗

A spatial data handling system for retrieval of images by unrestricted regions of user interest

The Intelligent Data Management (IDM) project at NASA/Goddard Space Flight Center has prototyped an Intelligent Information Fusion System (IIFS), which automatically ingests metadata from remote sensor observations into a large catalog which is directly queryable by end-users. The greatest challenge in the implementation of this catalog was supporting spatially-driven searches, where the user has a possible complex region of interest and wishes to recover those images that overlap all or simply a part of that region. A spatial data management system is described, which is capable of storing and retrieving records of image data regardless of their source. This system was designed and implemented as part of the IIFS catalog. A new data structure, called a hypercylinder, is central to the design. The hypercylinder is specifically tailored for data distributed over the surface of a sphere, such as satellite observations of the Earth or space. Operations on the hypercylinder are regulated by two expert systems. The first governs the ingest of new metadata records, and maintains the efficiency of the data structure as it grows. The second translates, plans, and executes users' spatial queries, performing incremental optimization as partial query results are returned.

Dorfman, Erik↗

Issues in NASA program and project management

This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Prototype Backscatter Moessbauer Spectrometer for Measurement of Martian Surface Mineralogy

We have designed and successfully tested a prototype of a backscatter Moessbauer spectrometer (BaMS) targeted for use on the Martian surface to (1) determine oxidation states of iron, and (2) identify and determine relative abundances of iron-bearing mineralogies. No sample preparation is required to perform measurements; it is only necessary to bring sample and instrument into physical contact. The prototype meets our projected specification for a flight instrument in terms of mass, power, and volume. A Moessbauer spectrometer on the Martian surface would provide wide variety of information about the current state of the Martian surface, and this information is described.

Shelfer, T. D.↗

Atmospheric moisture measurements - A microwave radiometer-radiosonde comparison

Measurements of the thermal emission of the sky at three frequencies (20.7, 22.2, and 31.4 GHz) with the NASA/Goddard Space Flight Center Crustal Dynamics Project MW Water Vapor Radiometer are reported. These measurements are compared with brightness temperatures inferred from measurements from VAISALA radiosonde packages launched every 3 hr during the experiment period. An error analysis for the radiosonde-inferred brightness temperatures is performed under the assumption of reasonable random uncertainties for the pressure, temperature, and humidity measurements and propagation of these uncertainties through the analysis algorithm. For the assumed uncertainties, the dominant contribution to the total uncertainty comes from the temperature measurement (66-88 percent), whereas the relative humidity measurement contributes only 2-8 percent, except in the vicinity of the water vapor line, where the contribution is 10-20 percent.

England, Martin N.↗

Aeronautics and Space Report: Highlights 1968

These highlights include the end of the Surveyor Program, planetary studies, Pioneers, Orbiting Geophysical Observatory, sounding rockets, radio astronomy Explorer, Orbiting Astronomical Observatory, Nimbus, lifting bodies, X-15 Program, XB-70, V/TOL, model research, jet noise reduction, flight safety, nuclear engines, Project Apollo (testing and training), and Apollo 5, 6, 7, and 8.

Source record↗

Lunar Transportation Facilities and Operations Study, option 1

Throughout the Option I period of the Lunar Transportation Facilities and Operations Study (LTFOS), McDonnell Douglas Space Systems Company - Kennedy Space Center (MDSSC-KSC) provided support to both the Planetary Surface Systems (PSS) Office at the National Aeronautics and Space Administration (NASA) at the Johnson Space Center and to the Flight and Ground Systems Projects Office (Payload Projects Management) at the Kennedy Space Center. The primary objective of the Option I phase of the study was to assist the above NASA centers in developing Space Exploration Initiative (SEI) concepts. MDSSC-KSC conducted three analyses which provided launch and landing detail to the proposed exploration concepts. One analysis, the Lunar Ejecta Assessment, was conducted to determine the effects of launch and landing a vehicle in a dusty environment. A second analysis, the Thermal/Micrometeoroid Protection Trade Study, was refined to determine the impacts that Reference Architecture Option 5A would have on thermal/micrometeoroid protection approaches. The third analysis, the Centaur Prelaunch Procedure Analysis, used a Centaur prelaunch test and checkout flow to identify key considerations that would be important if a Lunar Excursion Vehicle (LEV) was to use an expander cycle liquid oxygen-liquid hydrogen engine. Several 'quick look' assessments were also conducted. One quick look assessment, the Storable Propellant Quick Look Assessment, was conducted to identify design considerations that should be made if storable propellants were to be used instead of liquid oxygen and liquid hydrogen. The LEV Servicer Maintenance Analysis provided an early look at the effort required to maintain an LEV Servicer on the lunar surface. Also, support was provided to the PSS Logistics Manager to develop initial LEV Servicer cost inputs. Consideration was given to the advanced development that must be provided to accomplish a lunar and/or Mars mission. MDSS-KSC also provided support to both MASE and PSS by reviewing and commenting on architecture documents and concept definitions to ensure adequate considerations were given to the launch and landing function of an exploration initiative.

Source record↗

Nickel cadmium battery operations on-orbit: Trials, tribulations, and success on the Upper Atmosphere Research Satellite

The Upper Atmosphere Research Satellite (UARS), designed, built, integrated, tested, and operated by NASA and Martin Marietta is a low-Earth orbiting, Earth-observing spacecraft which was launched via Space Shuttle Discovery on September 12, 1991 and deployed three days later. The Modular Power Subsystem (MPS) onboard the satellite is equipped with three NASA Standard 50 Ampere-hour (Ah) nickel-cadmium (NiCd) batteries. McDonnell Douglas Electronics Systems Company fabricated the MPS, and batteries from Gates Aerospace Batteries cells. Nominal battery performance was achieved for the first four months of spacecraft operation. First evidence of anomalous battery performance was observed in January 1992, after the first maximum beta angle (low Depth of Discharge) period. Since then, the Flight Operations Team (FOT), under the direction of Goddard Space Flight Center's UARS Project and Space Power Application Branch, has monitored and managed battery performance by adjusting solar array offset angle, conducting periodic deep discharge, and controlling battery recharge ratio. This paper covers a brief overview of the UARS, the FOT's operational battery management, and the observed spacecraft battery performance.

Rao, Gopalakrishna M.↗

Software Management Environment (SME) concepts and architecture, revision 1

This document presents the concepts and architecture of the Software Management Environment (SME), developed for the Software Engineering Branch of the Flight Dynamic Division (FDD) of GSFC. The SME provides an integrated set of experience-based management tools that can assist software development managers in managing and planning flight dynamics software development projects. This document provides a high-level description of the types of information required to implement such an automated management tool.

Hendrick, Robert↗

Task network models in the prediction of workload imposed by extravehicular activities during the Hubble Space Telescope servicing mission

In a joint effort with Brooks AFB, Texas, the Flight Crew Support Division at JSC has begun a computer simulation and performance modeling program directed at establishing the predictive validity of software tools for modeling human performance during spaceflight. This paper addresses the utility of task network modeling for predicting the workload that astronauts are likely to encounter in extravehicular activities (EVA) during the Hubble Space Telescope (HST) repair mission. The intent of the study was to determine whether two EVA crewmembers and one intravehicular activity (IVA) crewmember could reasonably be expected to complete HST Wide Field/Planetary Camera (WFPC) replacement in the allotted time. Ultimately, examination of the points during HST servicing that may result in excessive workload will lead to recommendations to the HST Flight Systems and Servicing Project concerning (1) expectation of degraded performance, (2) the need to change task allocation across crewmembers, (3) the need to expand the timeline, and (4) the need to increase the number of EVA's.

Diaz, Manuel F.↗

The servicing aid tool: A teleoperated robotics system for space applications

The Servicing Aid Tool (SAT) is a teleoperated, force-reflecting manipulation system designed for use on the Space Shuttle. The system will assist Extravehicular Activity (EVA) servicing of spacecraft such as the Hubble Space Telescope. The SAT stands out from other robotics development programs in that special attention was given to provide a low-cost, space-qualified design which can easily and inexpensively be reconfigured and/or enhanced through the addition of existing NASA funded technology as that technology matures. SAT components are spaceflight adaptations of existing ground-based designs from Robotics Research Corporation (RRC), the leading supplier of robotics systems to the NASA and university research community in the United States. Fairchild Space is the prime contractor and provides the control electronics, safety system, system integration, and qualification testing. The manipulator consists of a 6-DOF Slave Arm mounted on a 1-DOF Positioning Link in the shuttle payload bay. The Slave Arm is controlled via a highly similar, 6-DOF, force-reflecting Master Arm from Schilling Development, Inc. This work is being performed under contract to the Goddard Space Flight Center Code, Code 442, Hubble Space Telescope Flight Systems and Servicing Project.

Dorman, Keith W.↗

JPL space robotics: Present accomplishments and future thrusts

Complex missions require routine and unscheduled inspection for safe operation. The purpose of research in this task is to facilitate structural inspection of the planned Space Station while mitigating the need for extravehicular activity (EVA), and giving the operator supervisory control over detailed and somewhat mundane, but important tasks. The telerobotic system enables inspection relative to a given reference (e.g., the status of the facility at the time of the last inspection) and alerts the operator to potential anomalies for verification and action. There are two primary objectives of this project: (1) To develop technologies that enable well-integrated NASA ground-to-orbit telerobotics operations, and (2) to develop a prototype common architecture workstation which implements these capabilities for other NASA technology projects and planned NASA flight applications. This task develops and supports three telerobot control modes which are applicable to time delay operation: Preview teleoperation, teleprogramming, and supervised autonomy.

Weisbin, C. R.↗

Load measurement system with load cell lock-out mechanism

In the frame work of the project Shuttle Plume Impingement Flight Experiment (SPIFEX), a Load Measurement System was developed and fabricated to measure the impingement force of Shuttle Reaction Control System (RCS) jets. The Load Measurement System is a force sensing system that measures any combination of normal and shear forces up to 40 N (9 lbf) in the normal direction and 22 N (5 lbf) in the shear direction with an accuracy of +/- 0.04 N (+/- 0.01 lbf) Since high resolution is required for the force measurement, the Load Measurement System is built with highly sensitive load cells. To protect these fragile load cells in the non-operational mode from being damaged due to flight loads such as launch and landing loads of the Shuttle vehicle, a motor driven device known as the Load Cell Lock-Out Mechanism was built. This Lock-Out Mechanism isolates the load cells from flight loads and re-engages the load cells for the force measurement experiment once in space. With this highly effective protection system, the SPIFEX load measurement experiment was successfully conducted on STS-44 in September 1994 with all load cells operating properly and reading impingement forces as expected.

Le, Thang↗

Open Loop Simulation

My project is designing a flight control program utilizing 'C' language. It consists of paths made up of fixed radius arcs and straight lines. Arcs will be defined by a center, a radius and turn angle. Straight lines will be defined by an end way point and an inbound course. Way points will be pre-defined such that the location of the end of each leg accurately matches the beginning of the next leg. The simulation paths will closely match paths normally flown by the Transport System Research Vehicle (TSRV), but will necessarily be defined identically in terms of type and number of way points.

Thomas, Tamera L.↗

SWAS Spacecraft T/V Test, Unique In Chamber Tests Systems Actuation

The Sub-Millimeter Wave Astronomy Satellite (SWAS) is the third mission of the Small Explorer (SMEX) Project at Goddard Space Flight Center (GSFC). It is a path finding mission to study the chemical composition of interstellar galactic clouds to help determine the process of star formation. The spacecraft recently completed a month-long then-nal vacuum/thermal balance test in the Solar Environmental Simulator, the largest thermal vacuum facility at Goddard. Rather extensive fixturing was required for the test, considering the small size of the spacecraft, and two unusual deployments were completed in order to accomplish the goals of the test. This paper discusses the space simulation testing of the fully integrated SWAS spacecraft and the unique fixturing required.

Dunn, Jamie L.↗

Photogrammetric Assessment of the Hubble Space Telescope Solar Arrays During the Second Servicing Mission

This report documents the photogrammetric assessment of the Hubble Space Telescope (HST) solar arrays conducted by the NASA c Center Image Science and Analysis Group during Second Servicing Mission 2 (SM-2) on STS-82 in February 1997. Two type solar array analyses were conducted during the mission using Space Shuttle payload bay video: (1) measurement of solar array motion due to induced loads, and (2) measurement of the solar array static or geometric twist caused by the cumulative array loading. The report describes pre-mission planning and analysis technique development activities conducted to acquire and analyze solar array imagery data during SM-2. This includes analysis of array motion obtained during SM-1 as a proof-of-concept of the SM-2 measurement techniques. The report documents the results of real-time analysis conducted during the mission and subsequent analysis conducted post-flight. This report also provides a summary of lessons learned on solar array imagery analysis from SM-2 and recommendations for future on-orbit measurements applicable to HST SM-3 and to the International Space Station. This work was performed under the direction of the Goddard Space Flight Center HST Flight Systems and Servicing Project.

Sapp, C. A.↗

Real Time Data/Video/Voice Uplink and Downlink for Kuiper Airborne Observatory

LFS was an educational outreach adventure which brought the excitement of astronomical exploration on NASA's Kuiper Airborne Observatory (KAO) to a nationwide audience of children, parents and children through live, interactive television, broadcast from the KAO at an altitude of 41,000 feet during an actual scientific observing mission. The project encompassed three KAO flights during the fall of 1995, including a short practice mission, a daytime observing flight between Moffett Field, California to Houston, Texas, and a nighttime mission from Houston back to Moffett Field. The University of Chicago infrared research team participated in planning the program, developing auxiliary materials including background information and lesson plans, developing software which allowed students on the ground to control the telescope and on-board cameras via the Internet from the Adler Planetarium in Chicago, and acting as on-camera correspondents to explain and answer questions about the scientific research conducted during the flights.

Harper, Doyal A.↗

DC and Wave Electric Fields and Other Plasma Parameters Observed on Two Sounding Rockets in the Dark Cusp during IMF BZ North and South Conditions

Two Black Brant IX sounding rockets were launched into the dark, dayside cusp near magnetic noon on December 2 and 3, 1997, from Ny Alesund, Spitzbergen at 79degN reaching altitudes of approximately 450 km. Real-time ground-based and Wind (interplanetary magnetic field) IMF data were used to determine the launch conditions. The first launch, with Bz north conditions, crossed into and back out of an open field region with merging poleward of the projected trajectory. The second flight, into Bz south conditions, was timed to coincide with an enhancement in the merging rate from a increase in the negative Bz, while the (Defense Meteorological Satellite Program) DMSP F13 satellite was situated slightly to the north of the rocket trajectory. Each payload returned DC electric and magnetic fields, plasma waves, energetic particles, photometer data, and thermal plasma data. Data from both flights will be shown, with an emphasis on the DC electric field results. In particular, the data gathered on December 2, 1997 will be used to discuss ionospheric signatures of merging and the open/closed character of the the cusp/low latitude boundary layer. In contrast, the data gathered on December 3, 1997 shows evidence of pulsed electric field structures which will be examined in the context of cusp plasma entry processes. Both data sets returned a rich variety of plasma waves, as well as optical emissions and thermal plasma data.

Pfaff, R. F.↗