Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed control and estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,522 records · Page 85

Wind power forecasting : state-of-the-art 2009.

Many countries and regions are introducing policies aimed at reducing the environmental footprint from the energy sector and increasing the use of renewable energy. In the United States, a number of initiatives have been taken at the state level, from renewable portfolio standards (RPSs) and renewable energy certificates (RECs), to regional greenhouse gas emission control schemes. Within the U.S. Federal government, new energy and environmental policies and goals are also being crafted, and these are likely to increase the use of renewable energy substantially. The European Union is pursuing implementation of its ambitious 20/20/20 targets, which aim (by 2020) to reduce greenhouse gas emissions by 20% (as compared to 1990), increase the amount of renewable energy to 20% of the energy supply, and reduce the overall energy consumption by 20% through energy efficiency. With the current focus on energy and the environment, efficient integration of renewable energy into the electric power system is becoming increasingly important. In a recent report, the U.S. Department of Energy (DOE) describes a model-based scenario, in which wind energy provides 20% of the U.S. electricity demand in 2030. The report discusses a set of technical and economic challenges that have to be overcome for this scenario to unfold. In Europe, several countries already have a high penetration of wind power (i.e., in the range of 7 to 20% of electricity consumption in countries such as Germany, Spain, Portugal, and Denmark). The rapid growth in installed wind power capacity is expected to continue in the United States as well as in Europe. A large-scale introduction of wind power causes a number of challenges for electricity market and power system operators who will have to deal with the variability and uncertainty in wind power generation when making their scheduling and dispatch decisions. Wind power forecasting (WPF) is frequently identified as an important tool to address the variability and uncertainty in wind power and to more efficiently operate power systems with large wind power penetrations. Moreover, in a market environment, the wind power contribution to the generation portofolio becomes important in determining the daily and hourly prices, as variations in the estimated wind power will influence the clearing prices for both energy and operating reserves. With the increasing penetration of wind power, WPF is quickly becoming an important topic for the electric power industry. System operators (SOs), generating companies (GENCOs), and regulators all support efforts to develop better, more reliable and accurate forecasting models. Wind farm owners and operators also benefit from better wind power prediction to support competitive participation in electricity markets against more stable and dispatchable energy sources. In general, WPF can be used for a number of purposes, such as: generation and transmission maintenance planning, determination of operating reserve requirements, unit commitment, economic dispatch, energy storage optimization (e.g., pumped hydro storage), and energy trading. The objective of this report is to review and analyze state-of-the-art WPF models and their application to power systems operations. We first give a detailed description of the methodologies underlying state-of-the-art WPF models. We then look at how WPF can be integrated into power system operations, with specific focus on the unit commitment problem.

17 WIND ENERGY↗

Surgically Implanted JSATS Micro-Acoustic Transmitters Effects on Juvenile Chinook Salmon and Steelhead Tag Expulsion and Survival, 2010

The purpose of this study was to evaluate survival model assumptions associated with a concurrent study - Acoustic Telemetry Evaluation of Dam Passage Survival and Associated Metrics at John Day, The Dalles, and Bonneville Dams, 2010 by Thomas Carlson and others in 2010 - in which the Juvenile Salmonid Acoustic Telemetry System (JSATS) was used to estimate the survival of yearling and subyearling Chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss) migrating through the Federal Columbia River Power System (FCRPS). The micro-acoustic transmitter used in these studies is the smallest acoustic transmitter model to date (12 mm long x 5 mm wide x 4 mm high, and weighing 0.43 g in air). This study and the 2010 study by Carlson and others were conducted by researchers from the Pacific Northwest National Laboratory and the University of Washington for the U.S. Army Corps of Engineers, Portland District, to meet requirements set forth by the 2008 FCRPS Biological Opinion. In 2010, we compared survival, tag burden, and tag expulsion in five spring groups of yearling Chinook salmon (YCH) and steelhead (STH) and five summer groups of subyearling Chinook salmon (SYC) to evaluate survival model assumptions described in the concurrent study. Each tagging group consisted of approximately 120 fish/species, which were collected and implanted on a weekly basis, yielding approximately 600 fish total/species. YCH and STH were collected and implanted from late April to late May (5 weeks) and SYC were collected and implanted from mid-June to mid-July (5 weeks) at the John Day Dam Smolt Monitoring Facility. The fish were collected once a week, separated by species, and assigned to one of three treatment groups: (1) Control (no surgical treatment), (2) Sham (surgical implantation of only a passive integrated transponder [PIT] tag), and (3) Tagged (surgical implantation of JSATS micro-acoustic transmitter [AT] and PIT tags). The test fish were held for 30 days in indoor circular tanks at the Bonneville Dam Juvenile Monitoring Facility. Overall mortality ranged weekly from 45 to 72% for YCH, 55 to 83% for STH, and 56 to 84% for SYC. The high background mortality in all groups and species made it difficult to discern tag effects. However, for YCH, STH, and SYC, the Tagged treatment groups had the highest overall mean mortality - 62%, 79%, and 76%, respectively. Fungal infections were found on 35% of all fish. Mean tag burden for the Tagged treatment group was relatively low for YCH (1.7%) and moderate for SYC (4.2%), while STH had a very low mean tag burden (0.7%). Tag burden was significantly higher in the Tagged treatment group for all species when compared to the Sham treatment group because of the presence of two tags. Surgeon performance did not contribute to the difference in mortality between the Sham and Tagged treatment groups. Tag expulsion from fish that survived to the end of the 30-day experiment was low but occurred in all species, with only two PIT tags and one AT lost, one tag per species. The high background mortality in this experiment was not limited to a treatment, temperature, or month. The decreased number of surviving fish influenced our experimental results and thus analyses. For future research, we recommend that a more natural exposure to monitor tag effects and other factors, such as swimming ability and predator avoidance, be considered to determine the effects of AT- and PIT- implantation on fishes.

13 HYDRO ENERGY↗

Groundwater Monitoring and Control Before Decommissioning of the Research Reactor VVR-S from Magurele-Bucharest

The research reactor type VVR-S (tank type, water is cooler, moderator and reflector, thermal power- 2 MW, thermal energy- 9. 52 GW d) was put into service in July 1957 and, in December 1997 was shout down. In 2002, Romanian Government decided to put the research reactor in the permanent shut-down in order to start the decommissioning. This nuclear facility was used in nuclear research and radioisotope production for 40 years, without events, incidents or accidents. Within the same site, in the immediate vicinity of the research reactor, there are many other nuclear facilities: Radioactive Waste Treatment Plant, Tandem Van der Graaf heavy ions accelerator, Cyclotron, Industrial Irradiator, Radioisotope Production Center. The objectives of this work were dedicated on the water underground analyses described in the following context: - presentation of the approaches in planning the number of drillings, vertical soil profiles (characteristics, analyses, direction of the flow of underground water, uncertainties in measurements); - presentation of the instrumentation used in analyses of water, soil and vegetation samples - analyses and final conclusions on results of the measurements; - comparison of the results of measurements on underground water from drillings with the measurements results on samples from the town and the system of drinking water - supplied from the second level of underground water. According to the analysis, in general, no values higher than the Minimum Detectable Activity were detected in water samples (MDA) for Pb{sup 212}, Bi{sup 214}, Pb{sup 214}, Ac{sup 228}, but situated under values foreseen in drinking water. Distribution of Uranium As results of the Uranium determination, values higher than 0,004 mg/l (4 ppb) were detected, values that represent the average contents in the underground water. The higher values, 2-3 times higher than background, were detected in the water from the drillings F15, F12, F5, F13, drillings located between RWTP (Radioactive Waste Treatment Plant) - the 300 m{sup 3} tanks and the Spent Filters Storage (SFS). At south of this area, on the leaking direction of the underground water layer, in the drillings F1, F2, F3, F18 and at east, in F6, F7, the natural Uranium values are within the background for the underground-water. Distribution of Radon For the Radon determination with RAD 7 equipment, water samples were taken from the same piezo-metrical drilling, 2 or 4 times during of six months period, and then, the average contents were calculated, which varied between 0,35 - 2,1 Bq/l. The values higher than 1,1 -1,2 Bq/l were detected in the water taken from the drillings located in the northern part (F10, F11) and in the eastern part (F6, F8) of the Institute fences (around of the radioactive waste storage facilities). The concentrations of 0,3 - 0,5 Bq/l are in the underground-water layer 'intercepted' by the piezo-metrical drillings (F1, F2, F3) located near the Nuclear Reactor. Concentration of heavy metals: 0.04-0.08 mg/l Pb in F5, F14, F7, F8 exceeding MCA-Maximum Admissible Concentration (0.01 mg/l) for Pb, and for Zn in F5, F7, F8, F14 are 0.2-0.5 mg/l situated under MCA , and 0.18 mg/l in F18, in accordance with tendency of decreasing of concentration of contaminants. After 50 years of deploying nuclear activities on the site the underground water quality is in very good condition. Taking into consideration the direction of the underground water flow, it results that, only in the area of underground pipe, around of the research reactor and radioactive waste treatment plant, the quality of water is influenced, and remediation actions are not necessary. Based on measurements executed in F18, the water quality is the same with any other part of the region. During the decommissioning of the Research Reactor, the samples from 18 drillings will be analysed monthly, and the contents of the heavy metals, Pb and Zn, will be monitored carefully, together with all the factors: air, soil, vegetation, subsoil, water surface and underground water. A great attention will be paid to the dismantlement of the underground structures, the 30 m{sup 3} tank, that collects all the liquid radioactive waste from the reactor, the pipes that connects this tank to the other two 300 m{sup 3} tanks, from RWTP, the ventilation ducts between the Spent Filters Storage and reactor's stack, in order to prevent contamination of surface and underground water. Engineering Absorbent Barriers will be used both for hydrophilic substances and for hydrophobic substances, tents will be used for preventing the spread of possible contaminants from the pipes and tanks, owing to the precipitation or wind, and the tanks and pipes will be drained to eliminate the spills. Since we are dealing with a multinuclear facility site, the on site and off site Monitoring Program of Institute will be properly upgraded, taking into account the values of the derived emission limit approved by Regulatory Body, before, during and after the completion of the works with impact on underground water. In another work will be presented radiological map of land associated of decommissioning project (on surface, at 0.15 m and 0.30 m in depth of soil) and estimation of migration rate in soil up to ground water level. Applying these measures, taking account of the radiological status at the beginning of the project, will mean savings and a good protection of the environment in completing the decommissioning project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Industrial Scale Demonstration of Smart Manufacturing, Achieving Transformational Energy Productivity Gains

While many U.S. manufacturing operations utilize optimization for individual unit processes, smart manufacturing (SM) systems that integrate manufacturing intelligence in real time across an entire production operation are rare in large companies and virtually nonexistent in smaller organizations. One example of an area where SM systems can be applied is in the management of waste heat. A smart system that not only seeks to recover waste heat, but also to use energy more efficiently, is a more cost-effective approach because energy use, waste energy loss and product output are optimized together. The overall objective of this project was to develop an industry-accepted SM Platform that enables smart systems by accelerating and lowering the cost of development and implementation scales for use in diverse sets of manufacturing industry sectors, manufacturing operations and company sizes. Specifically, the project (1) designed and demonstrated the application of a prototype SM Platform for two diverse commercial test beds, (2) demonstrated at one and estimated for the other test bed the potential reduction in waste heat generation, and (3) worked with leading automation vendors to catalyze low-cost commercialization of the technology developed. The Smart Manufacturing Application and Data Platform (SM Platform) developed during this project is an innovative approach that marries IT virtualization technologies with operational data and modeling system requirements to construct a ready-to-go platform for enabling sensor – data – modeling – actuation systems, driven by real-time plant data and performance metrics. This SM Platform allows manufacturing organizations, regardless of their industry or size, to assemble new operational systems at a much lower cost, optimizing process knowledge and improving energy productivity by integrating with existing process control and automation systems. Also developed during this project is a methodology for developing energy productivity metrics that use real-time process information and provide comparisons for potential, practical, and actual performance, as well as examples and the methodology for provisioning of an Energy Dashboard that displays alternatives to optimize energy use within specific business contexts aimed at helping improve energy productivity and reduce emissions in U.S. manufacturing. The SM Platform designed utilizes current manufacturing, operational and IT industry standards. The platform can be used to expedite sensor – data – model – actuation system development and deployment in a cloud-based environment using a novel end-to-end workflow as a service capability that is already integrated with data connection, ingestion, and contextualization services. In addition, the methodology for development of energy productivity metrics and reusable application templates called Toolkits have been defined so that they can be tailored to a specific business situation. The project’s two test beds, one in a hydrogen production plant and the other in a forging, heat treatment, and machining operation, utilize sensor-driven modeling, measurement, and simulation systems. In these two test beds, the implementation of these as a comprehensive system has made it possible for energy productivity to be managed in real-time throughout the plant and enterprise using an energy dashboard. The development pathway to direct machine actuation was articulated. During the first year, the project team developed the most highly instrumented steam-methane reformer (SMR) in the U.S. using infrared cameras and thermocouples. Real-time data are streamed to high fidelity and reduced-order models for analysis. A high fidelity CFD model, parallelized in the SM Platform cloud environment, was demonstrated for operational use. This is the first real-time operational productivity system of a steam methane reformer using both high fidelity and data-driven models together in a real time situation to balance natural gas flow to the reformer tubes. An infrared camera system was developed and shown to outperform thermocouples in coverage, accuracy, reliability, and cost effectiveness for use in a high temperature, harsh environment. A forging, heat-treating, machining line operation test bed includes new instrumentation for data capture analysis, modeling, and simulation and will be integrated into SM Platform workflows so that business performance can be managed in real-time. Composable metrics were developed using the SM Platform to drive improvements in energy productivity, environmental performance, safety, asset management, costs, and overall operations. A major focus of the SM systems developed was optimization of energy productivity at the enterprise level, which resulted in reductions in waste heat generation for the two project test beds. Reductions in the waste heat generated will result in greater energy savings than will waste heat recovery due to inefficiencies in the heat transfer process. For the SMR test bed an efficiency improvement of 1 – 2% with a corresponding waste heat reduction of 5% were demonstrated. It should be noted that the test bed SMR unit had an efficiency of more than 90% as compared to 70 to 80% efficiencies of most SMR units. So implementation of similar SM systems at typical SMR units could yield more than 15 to 25% waste heat reductions. Similarly the forging, heat-treating, machining line operation test bed is a DOE AMO Platinum Level Superior Energy Performance plant with a much higher than typical overall operating efficiency. For this test bed heat integration using recuperators is estimated to result in fuel savings of 15.9% due to waste heat recovery compared to the base case without recuperators with negligible changes in part exit conditions. This results in an 18.9% energy efficiency improvement. The project team estimates that broad multi-sector adoption of the developed technology could reduce waste heat generation by an amount equivalent to 1.3% of total U.S. energy use. This waste heat reduction is associated with 69 million tons reduction in annual carbon dioxide emissions. Other potential benefits include reducing process times, solid and liquid wastes, environmental impacts, and water use. It is estimated that this investment has an anticipated payback period of less than one year in energy-intensive applications. The SM Platform could also reduce the costs of deploying SM systems by 50% in manufacturing operations. Commercialization of the SM Platform will require significant cross-industry collaboration and technology provider market changes. Steps taken toward commercialization included 1) analyzing savings from deployment of the SM Platform and 2) holding SM Platform workshops, webinars, and conferences with targeted individual industry segments, with a focus on small and medium-sized organizations. An upgraded community website has been established as a portal for accessing and distributing information. Most importantly, the SM platform enabling technology developed during this project and its commercialization will continue, evolve and expand under the Clean Energy Smart Manufacturing Innovation Institute (CESMII).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Techniques for Power System Identification from Measured Data

Time-synchronized measurements provide rich information for estimating a power-system's electromechanical modal properties via advanced signal processing. This information is becoming critical for the improved operational reliability of interconnected grids. A given mode's properties are described by its frequency, damping, and shape. Modal frequencies and damping are useful indicators of power-system stress, usually declining with increased load or reduced grid capacity. Mode shape provides critical information for operational control actions. This project investigated many advanced techniques for power system identification from measured data focusing on mode frequency and damping ratio estimation. Investigators from the three universities coordinated their effort with Pacific Northwest National Laboratory (PNNL). Significant progress was made on developing appropriate techniques for system identification with confidence intervals and testing those techniques on field measured data and through simulation. Experimental data from the western area power system was provided by PNNL and Bonneville Power Administration (BPA) for both ambient conditions and for signal injection tests. Three large-scale tests were conducted for the western area in 2005 and 2006. Measured field PMU (Phasor Measurement Unit) data was provided to the three universities. A 19-machine simulation model was enhanced for testing the system identification algorithms. Extensive simulations were run with this model to test the performance of the algorithms. University of Wyoming researchers participated in four primary activities: (1) Block and adaptive processing techniques for mode estimation from ambient signals and probing signals, (2) confidence interval estimation, (3) probing signal design and injection method analysis, and (4) performance assessment and validation from simulated and field measured data. Subspace based methods have been use to improve previous results from block processing techniques. Bootstrap techniques have been developed to estimate confidence intervals for the electromechanical modes from field measured data. Results were obtained using injected signal data provided by BPA. A new probing signal was designed that puts more strength into the signal for a given maximum peak to peak swing. Further simulations were conducted on a model based on measured data and with the modifications of the 19-machine simulation model. Montana Tech researchers participated in two primary activities: (1) continued development of the 19-machine simulation test system to include a DC line; and (2) extensive simulation analysis of the various system identification algorithms and bootstrap techniques using the 19 machine model. Researchers at the University of Alaska-Fairbanks focused on the development and testing of adaptive filter algorithms for mode estimation using data generated from simulation models and on data provided in collaboration with BPA and PNNL. There efforts consist of pre-processing field data, testing and refining adaptive filter techniques (specifically the Least Mean Squares (LMS), the Adaptive Step-size LMS (ASLMS), and Error Tracking (ET) algorithms). They also improved convergence of the adaptive algorithms by using an initial estimate from block processing AR method to initialize the weight vector for LMS. Extensive testing was performed on simulated data from the 19 machine model. This project was also extensively involved in the WECC (Western Electricity Coordinating Council) system wide tests carried out in 2005 and 2006. These tests involved injecting known probing signals into the western power grid. One of the primary goals of these tests was the reliable estimation of electromechanical mode properties from measured PMU data. Applied to the system were three types of probing inputs: (1) activation of the Chief Joseph Dynamic Brake, (2) mid-level probing at the Pacific DC Intertie (PDCI), and (3) low-level probing on the PDCI. The Chief Joseph Dynamic Brake is a 1400 MW disturbance to the system and is injected for a half of a second. For the mid and low-level probing, the Celilo terminal of the PDCI is modulated with a known probing signal. Similar but less extensive tests were conducted in June of 2000. The low-level probing signals were designed at the University of Wyoming. A number of important design factors are considered. The designed low-level probing signal used in the tests is a multi-sine signal. Its frequency content is focused in the range of the inter-area electromechanical modes. The most frequently used of these low-level multi-sine signals had a period of over two minutes, a root-mean-square (rms) value of 14 MW, and a peak magnitude of 20 MW. Up to 15 cycles of this probing signal were injected into the system resulting in a processing gain of 15. The resulting measured response at points throughout the system was not much larger than the ambient noise present in the measurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Port Graham Community Building Biomass Heating Design Project

Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to accommodate hot water from the proposed wood-burning GARN Boiler, once installed, and rely on the existing fuel oil-fired hot water heating equipment for backup. The boiler would use an estimated 125 bone dry tons, equivalent to 100 cords, woody biomass feedstock obtained from local lands per year. Project would use local labor as described in the Port Graham Biomass Project, report completed by Chena Power, Inc. and Winters and Associates as part of the in-kind support to the U. S. Department of Energy (DOE) project for work on a project for State of Alaska’s Alaska Energy Authority (AEA). NVPG will likely initiate operations of the biomass boiler system even though several operational variations were studied. Obtaining the fuel source could be done by contractors, PGVC employees, or NVPG employees. Feeding the system would likely be done by NVPG employees. A majority of the buildings heated would be owned by NVPG. The PGVC office would be heated as well as the Old Fire Hall used as a workshop and storage area for North Pacific Rim Housing Authority. One methodology studied to charge for cost of utilizing the community building biomass system would use a percentage of use of hot water generated by the biomass hot water system based on past heating oil usage in relation to all buildings heated by biomass hot water. The method is better described in the Port Graham Biomass Project report. Fuel source agreements have been drafted to enter into agreements with area landowners. One Native allotment owner has asked Chugachmiut Forestry to begin a timber sale process to sell timber off her lands, specifically wind thrown timber that was determined to be of sufficient quantity to supply to the proposed biomass heating system for approximately 5-years. On NVPG’s behalf, Chugachmiut has presented to PGVC three different documents, attached, that could lead to a sale of woody biomass fuel for the project for up to 25-years, the expected life of the project. PGVC has signed a letter of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry has conducted two different field forest measurements of Native allotment lands and PGVC forest and timber lands. Lands deemed road accessible for biomass harvest were analyzed for this project. Forestry then conducted three different analyses and developed two reports to determine forest biomass on a tons per acre basis in addition to timber volume measurements taken for forest management purposes. Permits required were limited. For the biomass building, the Kenai Peninsula Borough did not require a permit. State of Alaska, Department of Public Safety, Division of Fire and Life Safety requires a plan review for fire and life safety requirements called an application for Fire and Life Safety Plan Review that would require a registered design professional to sign the document. State of Alaska State Forest Practices Act is required to be followed for any timber sale or harvest. This Act also requires consultation with Alaska Department of Fish and Game when operations are in close proximity or cross anadromous waters. Native allotment lands require following U. S. Bureau of Indian Affairs timber sale contracting process and approval.

09 BIOMASS FUELS↗

Radiological Performance Modeling: Platform Comparison

Zapadnoe Uranium Mill Tailings Site, Pridneprovsky Chemical Plant Ukraine: Two exposure scenarios were utilized to develop performance assessment models in GoldSim and NORMALYSA. The first scenario is an onsite worker exposed to radioactivity through external ground irradiation as well as radon and radioactive dust inhalation. The second being an offsite Resident 300 years after institutional control exposed through the ingestion of garden vegetables irrigated by contaminated ground water, ingestion of fish from Konoplyanka River, and agricultural activities in contaminated garden. NORMALYSA utilizes a modular interface to connect extensive pre-created modules to develop contaminant transport and risk assessment models for safety assessments and performance assessments at NORM and legacy sites. Developed by Facilia AB, the program was tested with the creation of the Zapadnoe model under the International Atomic Energy Agency MODARIA Il Working Group 1 (WG1). Default values are provided for input parameters where site specific data and distributions lack. Probabilistic simulations and inputs are limited to parameters with assigned Gaussian probability functions. Similar results for transient worker inhalation dose were found in comparison with the Zapadnoe GoldSim model. However, the NORMALYSA model has results larger by an order of magnitude for external radiation in the transient worker and for aquatic food ingestion, inhalation, and garden food ingestion to the resident. Performance Assessment Modeling: Radiological performance models promote good management and support in remediation and environmental decision making by optimizing radioactive waste disposal site performance. a performance assessment model of the Zapadnoe uranium mill tailings site and a model for calculating authorized limits at Los Alamos National Laboratory are created to demonstrate and highlight the respective capabilities of three modeling platforms: GoldSim, NORMALYSA, and RESRAD-Onsite. GoldSim is a general-purpose modeling platform with the ability to simulate site-specific FT radionuclide transport and risk assessment using a graphical interface to create and link elements that act as indivisible building blocks of the model. The Zapadnoe performance assessment model created in GoldSim is composed of input parameters collected from site specific parameters from WG1 as well as standard assumptions seen in the Generic PA Model from Neptune and Company. The multivariate Zapadnoe simulation contains both deterministic and probabilistic simulation capabilities with the ability to quantitatively represent the uncertainty and associated risks of the site via the Monte Carlo simulation method. Model parameters, documentation, and assumptions are built directly into the model creating a transparent, reproducible, and more purposeful site specific model. To demonstrate this, an ingestion of water pathway was included in addition to the exposure pathways included in the NORMALYSA model. GoldSim offers a wide variety of probability distributions to choose from as well as many tools to visualize the uncertainty of the models and explore which pathways and radionuclides dominate dose. In contrast to the NORMALYSA model, the GoldSim model uses dynamic simulation to calculate tritium concentrations. Authorized limits support the evaluation of radiological health effects from radionuclides present in bulk contaminated soil in order to assist in the process of clearing land for release under different uses. Calculations of authorized limits in RESRAD-Onsite and GoldSim models support the evaluation for 15 radionuclides using a residential exposure scenario, indoor and outdoor inhalation of dust and vapor phase radionuclides (tritium), incidental soil ingestion, and ingestion grown fruits and Vegetables. RESRAD-Onsite, developed by Argonne National Laboratory is a dedicated computer code for calculating radiation doses and cancer risks to an individual located on top of radioactively contaminated soils. It can also be used to provide guidelines for deriving radionuclide soil levels corresponding to a specific dose criterion. The menu driven user interface facilitates selection of radionuclides and soil concentrations, as well as defines parameter values related to materials, environmental factors, and exposure pathways. The program contains radionuclide-specific data such as dose conversion factors and risk coefficients, as well as soil-water partition coefficients and transfer factors for biotic media. The GoldSim model successfully emulates the RESRAD-Onsite code using identical radiological decay and ingrowth factors, radiation dose conversion factors, and other input parameters. DE EEDE ETS Each model supports dynamic modeling of radionuclide ingrowth and decay over time, and integrate this capability with the transport of radionuclides in the environment via processes such as advection and/or diffusion in fluids, or within porous solid media, The applicability of each program is heavily dependent on project context. In the context of developing Authorized Limits, RESRAD-Onsite may be a more desirable option as it was developed for this particular application. For simple disposal or legacy sites or sites that do not need site-specific model structure, NORMALYSA may be a desirable modeling platform, GoldSim can be used to model any problem for which RESRAD or NORMALYSA is applicable, but its strength lies in its flexibility, analytical, and probabilistic capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Bayesian estimation of HIV acquisition dates for prevention trials

Accurate timing estimates of when participants acquire HIV in HIV prevention trials are necessary for determining antibody levels at acquisition. The Antibody-Mediated Prevention (AMP) Studies showed that a passively administered broadly neutralizing antibody can prevent the acquisition of HIV from a neutralization-sensitive virus. We developed a pipeline for estimating the date of detectable HIV acquisition (DDA) in AMP Study participants using diagnostic and viral sequence data. Using a Bayesian strategy that combines three streams of data (REN [rev/vpu/env/Δnef] sequence, GP [gag/Δpol] sequence, and diagnostic) where their 95% credible intervals overlap based on pre-specified criteria and decision rules. We evaluated the performance of our AMP pipeline using PacBio viral sequence data from 41 participants across two prospective acute HIV acquisition cohort studies, FRESH and RV217, with twice-weekly sampling. These cohort studies enrolled young women in South Africa and men and women in Kenya and Thailand, respectively, with a high likelihood of HIV acquisition. In evaluating performance, “true DDA” was the center of bounds between last-negative and first-positive RNA diagnostic tests (median time 4 days, range 2–7 days); bias was the mean difference between estimated and true DDA. Using diagnostic data alone yielded timing estimates with a bias of 2.4 days and root mean square error (RMSE) of 7.9 days. These results were improved using sequence + diagnostic data (bias 1.5 days, RMSE 6.9 days), as well as by restricting sequence-based estimation to samples from ≤5 weeks post-DDA (bias 0.2 days, RMSE 7.8 days).

59 BASIC BIOLOGICAL SCIENCES↗