Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “arms control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

RCT Continuing Training (Q2 2021) [Slides]

This quarter’s training assignment is split into two sections. Section one will review the fundamental elements of removing items from controlled areas. This section discusses each decision point and the required actions to determine if an item is suitable for release. Section two briefly reviews Area Radiation Monitors, commonly referred to as ‘ARMs’, and discusses the required actions to take in the event of an ARM alarm.” Report includes slides and transcript.

61 RADIATION PROTECTION AND DOSIMETRY↗

Convective Parameters Derived from Radiosonde Data (SONDEPARAM) Value-Added Product Report

Radiosondes provide fundamental observations of the vertical profile of atmospheric state (pressure, temperature, humidity, and winds), with important implications for subsequent studies on environmental controls on cloud conditions. Within convective cloud environments, there is an increasing demand for additional value-added products (VAPs) to facilitate the use of U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility radiosonde data sets. Such VAPs should provide quick and reliable estimates for several standard radiosonde parameters or quantities of interest using common assumptions, as well as open, flexible code for visualization and user interaction. The Convective Parameters Derived from Radiosonde Data (SONDEPARAM) VAP will apply several robust algorithms used in Wang et al. (2020) for the calculation of useful radiosonde convective cloud parameters, including the convective available potential energy (CAPE), convective inhibition (CIN), and other convective parameters, for several different assumptions regarding the initial parcel characteristics (i.e., surface-based, most unstable, mixed layer). These ARM VAP codes are developed in open, flexible Python formats, with the intention that these parameters/calculations will be incorporated into traditional ARM quick-look radiosonde plotting, yet associated with user-available codes for ease in user reproduction and assumption modification.

54 ENVIRONMENTAL SCIENCES↗

Sequentially deployable maneuverable tetrahedral beam

A tetrahedral beam that can be compactly stowed, sequentially deployed, and widely manipulated to provide a structurally sound yet highly maneuverable truss structure is comprised of a number of repeating units of tandem tetralhedral sharing common sides. Fixed length battens are jointed into equilateral triangles called batten frames. Apexes of adjacent triangles are interconnected by longerons having a mid-point folding hinge. Joints, comprised of gussets pivotabley connected by links, permit two independent degrees of rotational freedom between joined adjacent batten frames, and provide a stable structure from packaged configuration to complete deployment. The longerons and joints can be actuated in any sequence, independently of one another. The beam is suited to remote actuation. Longerons may be provided with powered mid-point hinges enabling beam erection and packaging under remote control. Providing one or more longerons with powered telescoping segments permits the shape of the beam central axis to be remotely manipulated so that the beam may function as a remote manipulator arm.

Mikulas, M. M., Jr.↗

Telerobotic assembly of space station truss structure

Discussed are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRNS); (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, Grahme↗

Proposed studies of a 30 meter imaging interferometer concept

An imaging interferometer in space based on the use of 15 m sections of graphite-epoxy truss structure to form the basic mechanical support system is suggested. One simple design is a Y-shaped array of 3 coplanar arms, each 15 m long and 1.5 m in diameter, together with a perpendicualr mast of similar length. Roughly 15 observing telescopes of 0.5 m diameter would be used, with laser interferometers controlling the optical pathlengths. The total mass of the imaging interferometer is 3000 kg. With this design, the entire interferometer can be carried to orbit with a single STS launch and then deployed. The interferometer could be operated either in a fully illuminated Sun-synchronous orbit at 1400 km altitude or loosely attached to the Space Station.

Stebbins, R. T.↗

Lunar drill footplate and casing

To prevent hole collapse during lunar drilling operations, a casing has been devised of a graphite reinforced polyimide composite which will be able to withstand the lunar environment. Additionally, this casing will be inserted into the ground in segments two meters long which will penetrate the regolith simultaneously with the auger. The vertical action of the mobile platform will provide a downward force to the casing string through a special adaptor, giving the casing the needed impetus to sink the anticipated depth of ten meters. Casing segments will be connected with a simple snap arrangement. Excess casing will be cut off by a cylindrical cutting tool which will also transport the excess casing away from the hole. A footplate will be incorporated to grasp the auger rod string during rod segment additions or removals. The footplate grasping mechanism will consist of a set of vice-like arms, one end of each bearing threaded to a common power screw. The power screw will be threaded such that one end's thread pitch opposes that of the other end. The weight of the auger and rod string will be transmitted through the arms to the power screw and absorbed by a set of three ball bearing assemblies. The power screw will be driven by a one-half horsepower brushless motor actuated by radio control. The footplate will rest on four short legs and be anchored with pins that are an integral part of each leg.

Maassen, Erik C.↗

Design of a pressurized lunar rover

A pressurized lunar rover is necessary for future long-term habitation of the moon. The rover must be able to safely perform many tasks, ranging from transportation and reconnaissance to exploration and rescue missions. Numerous designs were considered in an effort to maintain a low overall mass and good mobility characteristics. The configuration adopted consists of two cylindrical pressure hulls passively connected by a pressurized flexible passageway. The vehicle has an overall length of 11 meters and a total mass of seven metric tons. The rover is driven by eight independently powered two meter diameter wheels. The dual-cylinder concept allows a combination of articulated frame and double Ackermann steering for executing turns. In an emergency, the individual drive motors allow the option of skid steering as well. Two wheels are connected to either side of each cylinder through a pinned bar which allows constant ground contact. Together, these systems allow the rover to easily meet its mobility requirements. A dynamic isotope power system (DIPS), in conjunction with a closed Brayton cycle, supplied the rover with a continuous supply of 8.5 kW. The occupants are all protected from the DIPS system's radiation by a shield of tantalum. The large amount of heat produced by the DIPS and other rover systems is rejected by thermal radiators. The thermal radiators and solar collectors are located on the top of the rear cylinder. The solar collectors are used to recharge batteries for peak power periods. The rover's shell is made of graphite-epoxy coated with multi-layer insulation (MLI). The graphite-epoxy provides strength while the thermally resistant MLI gives protection from the lunar environment. An elastomer separates the two materials to compensate for the thermal mismatch. The communications system allows for communication with the lunar base with an option for direct communication with earth via a lunar satellite link. The various links are combined into one signal broadcast in the S-band at 2.3 GHz. The rover is fitted with a parabolic reflector disk for S-band transmission, and an omnidirectional antenna for local extravehicular activity (EVA) communication. The rover's guidance, navigation, and control subsystem consists of an inertial guidance system, an orbiting lunar satellite, and an obstacle avoidance system. In addition, the rover is equipped with a number of external fixtures including two telerobotic arms, lights, cameras, EVA storage, manlocks, a docking fixture, solar panels, thermal radiators, and a scientific airlock. In conclusion, this rover meets all of the design requirements and clearly surpasses them in the areas of mobility and maneuverability.

Bhardwaj, Manoj↗

Lunar surface operations. Volume 3: Robotic arm for lunar surface vehicle

A robotic arm for a lunar surface vehicle that can help in handling cargo and equipment, and remove obstacles from the path of the vehicle is defined as a support to NASA's intention to establish a lunar based colony by the year 2010. Its mission would include, but not limited to the following: exploration, lunar sampling, replace and remove equipment, and setup equipment (e.g. microwave repeater stations). Performance objectives for the robotic arm include a reach of 3 m, accuracy of 1 cm, arm mass of 100 kg, and lifting capability of 50 kg. The end effectors must grip various sizes and shapes of cargo; push, pull, turn, lift, or lower various types of equipment; and clear a path on the lunar surface by shoveling, sweeping aside, or gripping the obstacle present in the desired path. The arm can safely complete a task within a reasonable amount of time; the actual time is dependent upon the task to be performed. The positioning of the arm includes a manual backup system such that the arm can be safely stored in case of failure. Remote viewing and proximity and positioning sensors are incorporated in the design of the arm. The following specific topic are addressed in this report: mission and requirements, system design and integration, mechanical structure, modified wrist, structure-to-end-effector interface, end-effectors, and system controls.

Shields, William↗

STS-78 Flight Day 1

On this first day of the STS-78 mission, the flight crew, Cmdr. Terence T. Henricks, Pilot Kevin R. Kregel, Payload Cmdr. Susan J. Helms, Mission Specialists Richard M. Linnehan, Charles E. Brady, Jr., and Payload Specialists Jean-Jacques Favier, Ph.D. and Robert B. Thirsk, M.D., can be seen preforming pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Henricks shares a unique view of Columbia's climb to orbit with flight controllers from a small camera that was mounted on the flight deck. The video follows Columbia's flight from just before main engine start through main engine cutoff, showing the force of main engine and solid booster ignition as experienced by the astronauts.

Source record↗

Neural Development Under Conditions of Spaceflight

One of the key tasks the developing brain must learn is how to navigate within the environment. This skill depends on the brain's ability to establish memories of places and things in the environment so that it can form cognitive maps. Earth's gravity defines the plane of orientation of the spatial environment in which animals navigate, and cognitive maps are based on this plane of orientation. Given that experience during early development plays a key role in the development of other aspects of brain function, experience in a gravitational environment is likely to be essential for the proper organization of brain regions mediating learning and memory of spatial information. Since the hippocampus is the brain region responsible for cognitive mapping abilities, this study evaluated the development of hippocampal structure and function in rats that spent part of their early development in microgravity. Litters of male and female Sprague-Dawley rats were launched into space aboard the Space Shuttle Columbia on either postnatal day eight (P8) or 14 (P14) and remained in space for 16 days. Upon return to Earth, the rats were tested for their ability to remember spatial information and navigate using a variety of tests (the Morris water maze, a modified radial arm maze, and an open field apparatus). These rats were then tested physiologically to determine whether they exhibited normal synaptic plasticity in the hippocampus. In a separate group of rats (flight and controls), the hippocampus was analyzed using anatomical, molecular biological, and biochemical techniques immediately postlanding. There were remarkably few differences between the flight groups and their Earth-bound controls in either the navigation and spatial memory tasks or activity-induced synaptic plasticity. Microscopic and immunocytochemical analyses of the brain also did not reveal differences between flight animals and ground-based controls. These data suggest that, within the developmental window studied, microgravity has minimal long-term impact on cognitive mapping function and cellular substrates important for this function. Any differences due to development in microgravity were transient and returned to normal soon after return to Earth.

Kosik, Kenneth S.↗

How to Build a Rover: An Overview of the Mars 2020 Mission’s Vehicle System Testbed

While NASA’s Mars rover Perseverance continues to make groundbreaking achievements on the Red Planet, its twin is hard at work here on Earth. The Operational Perseverance Twin for the Integration of Mechanisms and Instruments Sent to Mars, or OPTIMISM, is the Mars 2020 Vehicle System Testbed (VSTB) rover operated by NASA Jet Propulsion Laboratory (JPL) in Pasadena, California. OPTIMISM’s home is the JPL Mars Yard; an outdoor field with red soil that simulates the terrain encountered by Perseverance. The VSTB is a full-scale engineering model of the flight rover, serving a number of functions to ensure mission operations can continue smoothly and on schedule. The VSTB possesses instrumentation, computers, mechanisms, cameras, and a Mobility subsystem that are nearly identical to its extraterrestrial twin. Its high fidelity allows the rover to be a highly effective tool to fully test system functionality and performance prior to commanding the flight rover. The early stages of building OPTIMISM began a few months prior to Perseverance departing JPL for Cape Canaveral, FL in early 2020. Electrical integration of the flight system avionics, and compatibility checkouts of the electrical ground support equipment ensured that the foundation of the electrical system was operational and in place. Next, the internal harnessing was installed and compatibility checks of the rover instrumentation and mechanisms were performed to confirm the system was prepared for full buildup. Finally, mechanical assembly of the rover chassis with its external components completed the integration of the system before it was moved to the Mars Yard for its initial phase of testing to perform verification & validation (V&V) of the Mobility subsystem requirements. By the time Perseverance landed at Jezero Crater in February 2021, the first phase of VSTB operations was underway. Surface guidance, navigation, and control (SGNC) testing for the Mobility subsystem ensured functionality and performance requirements were met for various capabilities such as visual odometry (VO), mapping, and automatic navigation (AutoNav). Subsequent integration of the robotic arm (RA) onto the VSTB enabled the V&V campaign for surface sampling operations (SSO) to commence. As the mission’s engineering operations (EO) have gotten underway, the VSTB has been utilized for an array of purposes including troubleshooting software anomalies, and performing dry-runs for first time activities (FTAs) prior to sending the commands to Perseverance. OPTIMISM will continue to serve mission critical functions as long as Perseverance is roving the Red Planet.

Rojas, Jose Trujillo↗

Recent Improvements in Interface Management for Hanford's Waste Treatment and Immobilization Plant - 13263

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for management and completion of the River Protection Project (RPP) mission, which includes the Hanford Site tank farms operations and the Waste Treatment and Immobilization Plant (WTP). The RPP mission is to store, retrieve and treat Hanford's tank waste; store and dispose of treated wastes; and close the tank farm waste management areas and treatment facilities by 2047. The WTP is currently being designed and constructed by Bechtel National Inc. (BNI) for DOE-ORP. BNI relies on a number of technical services from other Hanford contractors for WTP's construction and commissioning. These same services will be required of the future WTP operations contractor. Partly in response to a DNFSB recommendation, the WTP interface management process managing these technical services has recently been improved through changes in organization and issue management. The changes are documented in an Interface Management Plan. The organizational improvement is embodied in the One System Integrated Project Team that was formed by integrating WTP and tank farms staff representing interfacing functional areas into a single organization. A number of improvements were made to the issue management process but most notable was the formal appointment of technical, regulatory and safety subject matter experts to ensure accurate identification of issues and open items. Ten of the thirteen active WTP Interface Control Documents have been revised in 2012 using the improved process with the remaining three in progress. The value of the process improvements is reflected by the ability to issue these documents on schedule and accurately identify technical, regulatory and safety issues and open items. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural load control during construction

In the absence of gravitational pull, the major design considerations for large space structures are stiffness for controllability, and transient dynamic loadings (as opposed to the traditional static load associated with earth-based structures). Because of the absence of gravitational loading, space structures can be designed to be significantly lighter than their counterparts on Earth. For example, the Space Shuttle manipulator arm is capable of moving and positioning a 60,000 lb payload, yet weighs less than 1,000 lbs. A recent design for the Space Station which had a total weight of about 500,000 lbs. used a primary loadcarrying keel beam which weighed less than 10,000 lbs. For many large space structures designs it is quite common for the load-carrying structure to have a mass fraction on the order of one or two percent of the total spacecraft mass. This significant weight reduction for large space structures is commonly accompanied by very low natural frequencies. These low frequencies cause an unprecedented level of operational complexity for mission applications which require a high level of positioning and control accuracy. This control problem is currently the subject of considerable research directed towards reducing the flexibility problem. In addition, however, the small mass fraction typically results in structures which are quite unforgiving to inadvertent high loadings. In other words, the structures are 'fragile.' In order to deal with the fragility issue CSC developed a load-limiting concept for space truss structures. This concept is aimed at limiting the levels of load which can occur in a large space structure during the construction process as well as during subsequent operations. Currently, the approach for dealing with large loadings is to make the structure larger. The impact this has on construction is significant. The larger structures are more difficult to package in the launch vehicle, and in fact in some instances the concept must be changed from a deployable truss to an erectable truss to permit packaging. The new load-limiting concept is aimed at permitting the use in large space structures of smaller trusses with a high level of strength robustness, in order to simplify the construction process. To date several analyses conducted on the concept have demonstrated its feasibility, and an experiment is currently being designed to demonstrate its operation.

Mikulas, Martin M., Jr.↗

Telerobotic assembly of space station truss structures

Discussed here are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRMS); and (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, G.↗

Force-velocity and power characteristics of rat soleus muscle fibers after hindlimb suspension

The effects of 1, 2, and 3 wk of hindlimb suspension (HS) on force-velocity and power characteristics of single rat soleus fibers were determined. After 1, 2, or 3 wk of HA, small fiber bundles were isolated, placed in skinning solution, and stored at -20 C until studied. Single fibers were isolated and placed between a motor arm and force transducer, functional properties were studied, and fiber protein content was subsequently analyzed by sodium dodecyl sulfate-polyacrylamide gel electrophoresis (SDS-PAGE). Additional fibers were isolated from soleus of control after 1 and 3 wk of HS, and fiber type distribution and myosin light chain stoichiometry were determined from SDS-PAGE analysis. After 1 wk of HS, percent type I fibers declined from 82 to 74%, whereas hybrid fibers increased from 10 to 18%. Percent fast type II fibers increased from 8% in control and 1 wk of HS to 26% by 3 wk of HS. Most fibers showed an increased unloaded maximal shortening velocity (V sub O)), but myosin heavy chain remained entirely slow type I. The mechanism for increased V(sub O) is unknown. There was a progressive decrease in fiber diameter and peak force after 1, 2, and 3 wk of HS, respectively. One week of HS resulted in a shift of the force-velocity curve, and between 2 and 3 wk of HS the curve shifted further such that V(sub O) was higher than control at all relative loads less than 45% peak isometric force. Peak absolute power output of soleus fibers progressively decreased through 2 wk of HS but showed no further change at 3 wk. The results suggest that between 2 and 3 wk the HS-induced alterations in the force-velocity relationship act to maintain the power output of single soleus fibers despite a continued reduction in fiber force.

Mcdonald, K. S.↗

Force-Velocity and Power Characteristics of Rat Soleus Muscle Fibers after Hindlimb Suspension

The effects of 1, 2, and 3 wk of Hindlimb Suspension (HS) on force-velocity and power characteristics of single rat soleus fibers were determined. After 1, 2, or 3 wk of HS, small fiber bundles were isolated, placed in skinning solution, and stored at -20 C until studied. Single fibers were isolated and placed between a motor arm and force transducer, functional properties were studied, and fiber protein content was subsequently analyzed by sodium dodecyl sulfate-polyacrylamide gel electrophoresis (SDS-PAGE). Additional fibers were isolated from soleus of control and after 1 and 3 wk of HS, and fiber type distribution and myosin light chain stoichiometry were determined from SDS-PAGE analysis. After 1 wk of HS, percent type I fibers declined from 82 to 74%, whereas hybrid fibers increased from 10 to 18%. Percent fast type 11 fibers increased from 8% in control and 1 wk of HS to 26% by 3 wk of HS. Most fibers showed an increased unloaded maximal shortening velocity (V(sub 0)), but myosin heavy chain remained entirely slow type I. The mechanism for increased V(sub 0) is unknown. There was a progressive decrease in fiber diameter (14, 30, and 38%) and peak force (38, 56, and 63%) after 1, 2, and 3 wk of HS, respectively. One week of HS resulted in a shift of the force-velocity curve, and between 2 and 3 wk of HS the curve shifted further such that V(sub 0) was higher than control at all relative loads less than 45% peak isometric force. Peak absolute power output of soleus fibers progressively decreased through 2 wk of HS but showed no further change at 3 wk. The results suggest that between 2 and 3 wk the HS-induced alterations in the force-velocity relationship act to maintain the power output of single soleus fibers despite a continued reduction in fiber force.

McDonald, K. S.↗

EVALUATING NUCLEAR SECURITY IMPLICATIONS OF THE SPLINTERNET

The internet, which for years has been viewed as a global online commons with standardized protocols but few regulations is, according to some experts, starting to mirror the contentious political and commercial contours of the physical world. Contributing to this is the rise in data breaches, cyber-enabled attacks on critical infrastructure, government surveillance operations, theft of intellectual property, manipulation of electoral processes, and perceived erosion of privacy, all of which are resulting in a growing skepticism that an open internet will naturally serve the best interests of users, communities, countries, and the global economy. In addition, the rapidly emerging and increasingly lucrative power of data has global superpowers scrambling to protect their informational sovereignty as an urgent matter of national security. Underscoring this urgency is the fact that, despite its global reach and cosmopolitan contributor base, internet infrastructure and governance of the World Wide Web remain largely under U.S. corporate auspices, which reinforces the perception of U.S. control. Whether fragmentation is politically, economically, or socially motivated, there appears to be a growing appetite for an internet that is partitioned and controlled at the national level. From “the Great Firewall of China” to the “Halal” internet of Iran, the trend towards a “Splinternet” has courts and governments embarking on what some call a "legal arms race" to impose a maze of national or regional rules, often conflicting, in the digital realm. The paper explores the emerging Splinternet phenomenon, analyses the implications of this trend on nuclear security, and identifies questions that present opportunities for future research.

Internet, Data Security, Cyber Security, Nuclear S↗

Analysis of Factors Affecting Successful Clinical Trial Enrollment in the Context of Three Prospective, Randomized, Controlled Trials

Purpose: Challenges can arise when attempting to maximize patient enrollment in clinical trials. There have been limited studies focusing on the barriers to enrollment and the efficacy of alternative study design to improve accrual. We analyzed barriers to clinical trial enrollment, particularly the influence of timing, in context of three prospective, randomized oncology trials where one arm was considered more aggressive than the other. Methods and Materials: From June 2011 to March 2015, patients who were enrolled on 3 prospective institutional protocols (an oligometastatic non-small cell lung cancer [NSCLC] trial and 2 proton vs intensity modulated radiation therapy trials in NSCLC and esophageal cancer) were screened for protocol eligibility. Eligible candidates were approached about trial participation, and patient characteristics (age, sex, T/N categorization) were recorded along with details surrounding trial presentation (appointment number). Fisher's exact test, Student's t tests, and multivariate analysis were performed to assess differences between enrolled and refusal patients. Results: A total of 309 eligible patients were approached about trial enrollment. The enrollment success rate during this time span was 52% (n=160 patients). Enrolled patients were more likely to be presented trial information at an earlier appointment (oligometastatic protocol: 5 vs 3 appointments [P<.001]; NSCLC protocol: 4 vs 3 appointments [P=.0018]; esophageal protocol: 3 vs 2 appointments [P=.0086]). No other factors or patient characteristics significantly affected enrollment success rate. Conclusion: Improvement in enrollment rates for randomized control trials is possible, even in difficult accrual settings. Earlier presentation of trial information to patients is the most influential factor for success and may help overcome accrual barriers without compromising trial design.

62 RADIOLOGY AND NUCLEAR MEDICINE↗