NASA Autonomous Systems and Operations (ASO) Project: Autonomous Task Planning for In-Space Robotics
Three minute video presentation demonstrating new features added to ASO robotics software for 2019.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Three minute video presentation demonstrating new features added to ASO robotics software for 2019.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Automated planning and scheduling, including automated path planning, has been integrated with an internet-based distributed operations system for planetary rover operations.
Explore the source record for details and available documents.
No abstract provided
In order to enable long term habitation on planetary surfaces, a means of sustainable food production must be developed. Addressing this need for surface habitats on Mars, the MarsOASIS team has developed a concept for a Martian surface greenhouse for unmanned crop production research as a proof of concept for larger scale food production facilities for manned surface missions. Utilizing in-situ resources such as the Martian atmosphere, sunlight, and UV-C radiation, the greenhouse aims to provide a sustainable method of long-term food production requiring minimal consumable resources. The MarsOASIS system is capable of growing a full life cycle of Outredgeous lettuce with its autonomous control system designed for a unmanned environment, only requiring teleoperation in extreme circumstances. A reduced-scope prototype of MarsOASIS is being developed to test technologies such as a natural/artificial hybrid lighting system, a closed water recycling system, remote teleoperation, and fully autonomous monitoring and control of the greenhouse. The prototype is currently in the final stages of design, with a full demonstration of plant life cycle testing set to occur in summer 2015. Results from this prototype demonstration will help quantify the feasibility of the innovative approaches seen in the MarsOASIS design.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
We present novel stochastic optimization models to improve power systems resilience to extreme weather events. We consider proactive redispatch, transmission line hardening, and transmission line capacity increases as alternatives for mitigating expected load shed due to extreme weather. Our model is based on linearized or "DC" optimal power flow, similar to models in widespread use by independent system operators (ISOs) and regional transmission operators (RTOs). Our computational experiments indicate that proactive redispatch alone can reduce the expected load shed by as much as 25% relative to standard economic dispatch. This resiliency enhancement strategy requires no capital investments and is implementable by ISOs and RTOs solely through operational adjustments. We additionally demonstrate that transmission line hardening and increases in transmission capacity can, in limited quantities, be effective strategies to further enhance power grid resiliency, although at significant capital investment cost. We perform a cross validation analysis to demonstrate the robustness of proposed recommendations. Our proposed model can be augmented to incorporate a variety of other operational and investment resilience strategies, or combination of such strategies.
Explore the source record for details and available documents.
Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.
Operating a gaseous hydrogen fuel engine includes controlling an injection timing of a gaseous hydrogen fuel injected into a flow of pressurized intake air so as to produce a leading cooling flow of pressurized intake air into a cylinder in an engine, a trailing purging flow through an intake conduit, and a middle flow of both pressurized intake air and gaseous hydrogen fuel into the cylinder. Undesired combustion such as preignition and/or backfire can be limited. Related apparatus and control logic is also disclosed.
A system is provided for the high-speed and high-fidelity collection of network traffic. The system can collect traffic at gigabit-per-second (Gbps) speeds, scale to terabit-per-second (Tbps) speeds, and support additional functions such as real-time network intrusion detection. The present system uses a dedicated operating system for traffic collection to maximize efficiency, scalability, and performance. A scalable infrastructure and apparatus for the present system is provided by splitting the work performed on one host onto multiple hosts. The present system simultaneously addresses the issues of scalability, performance, cost, and adaptability with respect to network monitoring, collection, and other network tasks. In addition to high-speed and high-fidelity network collection, the present system provides a flexible infrastructure to perform virtually any function at high speeds such as real-time network intrusion detection and wide-area network emulation for research purposes.
Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.
A brief introduction is given to an automated system called the Spacecraft Health Automated Reasoning Prototype (SHARP). SHARP is designed to demonstrate automated health and status analysis for multi-mission spacecraft and ground data systems operations. The SHARP system combines conventional computer science methodologies with artificial intelligence techniques to produce an effective method for detecting and analyzing potential spacecraft and ground systems problems. The system performs real-time analysis of spacecraft and other related telemetry, and is also capable of examining data in historical context. Telecommunications link analysis of the Voyager II spacecraft is the initial focus for evaluation of the prototype in a real-time operations setting during the Voyager spacecraft encounter with Neptune in August, 1989. The preliminary results of the SHARP project and plans for future application of the technology are discussed.