Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “River”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Tracer Testing to Characterize Hydraulic Stimulation Experiments at the Raft River EGS Demonstration Site

A series of three tracer tests was conducted over a 3.5-year period as part of the Raft River EGS Demonstration Project in order to characterize the evolution of fluid flow processes resulting from the hydraulic stimulation of the target injection well RRG-9. Injectivity increased very little in RRG-9 as the result of hydraulic stimulation experiments over a 300-day period but increased significantly as brine was injected continuously over the subsequent three years. Here, the tracer tests revealed that fluid flow patterns evolved over time along the injection/production pathway with tracer breaking through progressively earlier and to more wells over the duration of the testing.

EGS↗

Report on Mowry Shale Thermal Maturity Mapping in the Powder River Basin, Wyoming

The Enhanced Oil Recovery Institute (EORI) has completed a map of thermal maturity of the Mowry Shale in the Powder River Basin (PRB). Thermal maturity, the degree to which the total organic carbon in a formation has been transformed from kerogen to producible hydrocarbons due to heat and pressure, is an important measure for not just the quality of a source rock, but also helps for delineating areas more favorable for unconventional drilling. There is a dearth of published Mowry maturity maps available for the PRB and this publication endeavors to provide a detailed map based on a large, public data set covering the Wyoming portion of the PRB. Additional data, currently held confidential by operators in the basin, would be of benefit to future iterations of this map.

58 GEOSCIENCES↗

Experiences from Field Testing for Black Start of a Run-of-the-river Hydropower Plant in Idaho Falls Power Distribution Grid

Idaho Falls Power (IFP) utility has local generation portfolio comprising of 56.3MVA of run-of-the-river (ROR) hydropower that can serve typically 25%-30% of the total load demand. The remaining load is served by importing power from Bonneville Power Administration through two Pacificorp transmission interconnections. In case of emergencies (power disruption or directed load reduction), the capability to island from transmission grid and stably serve critical loads in the IFP distribution grid can be a huge advantage. In this direction, the capability to black start with ROR is an essential requirement, and a challenge due to limited dispatchability and requires re-tuning of hydro-governor and excitation system controls. This paper presents the field experience from the testing done for black start of 8.9 MW ROR hydro plant in the IFP distribution grid using an adjustable load bank in December 2017. The lessons from the successful black start testing is presented along with test results to establish the potential value and requirements to develop black start capability with a ROR hydro plant.

13 HYDRO ENERGY↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Mercury oxidation promoted by a selective catalytic reduction catalyst under simulated Powder River Basin coal combustion conditions

A bench-scale reactor consisting of a natural gas burner and an electrically heated reactor housing a selective catalytic reduction (SCR) catalyst was constructed for studying elemental mercury (Hg{sup 0}) oxidation under SCR conditions. A low sulfur Powder River Basin (PRB) subbituminous coal combustion fly ash was injected into the entrained-flow reactor along with sulfur dioxide (SO{sub 2}), nitrogen oxides (NOx), hydrogen chloride (HCl), and trace Hg{sup 0}. Concentrations of Hg{sup 0} and total mercury (Hg) upstream and downstream of the SCR catalyst were measured using a Hg monitor. The effects of HCl concentration, SCR operating temperature, catalyst space velocity, and feed rate of PRB fly ash on Hg0 oxidation were evaluated. It was observed that HCl provides the source of chlorine for Hg{sup 0} oxidation under simulated PRB coal-fired SCR conditions. The decrease in Hg mass balance closure across the catalyst with decreasing HCl concentration suggests that transient Hg capture on the SCR catalyst occurred during the short test exposure periods and that the outlet speciation observed may not be representative of steady-state operation at longer exposure times. Increasing the space velocity and operating temperature of the SCR led to less Hg{sup 0} oxidized. Introduction of PRB coal fly ash resulted in slightly decreased outlet oxidized mercury (Hg{sup 2+}) as a percentage of total inlet Hg and correspondingly resulted in an incremental increase in Hg capture. The injection of ammonia (NH{sub 3}) for NOx reduction by SCR was found to have a strong effect to decrease Hg oxidation. The observations suggest that Hg{sup 0} oxidation may occur near the exit region of commercial SCR reactors. Passage of flue gas through SCR systems without NH{sub 3} injection, such as during the low-ozone season, may also impact Hg speciation and capture in the flue gas. 18 refs., 7 figs., 3 tabs.

01 COAL, LIGNITE, AND PEAT↗

Infiltration from an impoundment for coal-bed natural gas, Powder River Basin, Wyoming: Evolution of water and sediment chemistry - article no. W06424

Development of coal-bed natural gas (CBNG) in the Powder River Basin, Wyoming, has increased substantially in recent years. Among environmental concerns associated with this development is the fate of groundwater removed with the gas. A preferred water-management option is storage in surface impoundments. A study was conducted on changes in water and sediment chemistry as water from an impoundment infiltrated the subsurface. Sediment cores were collected prior to operation of the impoundment and after its closure and reclamation. Suction lysimeters were used to collect water samples from beneath the impoundment. Large amounts of chloride (12,300 kg) and nitrate (13,500 kg as N), most of which accumulated naturally in the sediments over thousands of years, were released into groundwater by infiltrating water. Nitrate was more readily flushed from the sediments than chloride. If sediments at other impoundment locations contain similar amounts of chloride and nitrate, impoundments already permitted could release over 48 x 10{sup 6} kg of chloride and 52 x 10{sup 6} kg of nitrate into groundwater in the basin. A solute plume with total dissolved solid (TDS) concentrations at times exceeding 100,000 mg/L was created in the subsurface. TDS concentrations in the plume were substantially greater than those in the CBNG water (about 2300 mg/L) and in the ambient shallow groundwater (about 8000 mg/L). Sulfate, sodium, and magnesium are the dominant ions in the plume. The elevated concentrations are attributed to cation-exchange-enhanced gypsum dissolution. As gypsum dissolves, calcium goes into solution and is exchanged for sodium and magnesium on clays. Removal of calcium from solution allows further gypsum dissolution.

01 COAL, LIGNITE, AND PEAT↗

Demolitions of the Savannah River Site's concentrator and finishing facilities

The Savannah River Site (SRS) has produced Special Nuclear Materials (SNMs) starting in the early 1950's to the mid 1970's for the Atomic Energy Commission (AEC) and from the mid 1970's to the present for the Department of Energy (DOE). In that time, over 1,000 facilities have been built in the sixteen operational areas of the eight hundred square kilometer site. Over the years, many of the facilities have been dispositioned by the DOE as inactive. In FY-03, DOE identified two hundred and forty-seven (inactive or soon to be inactive) facilities that required demolition. Demolition work was scheduled to start in FY-04 and be completed in the first quarter of FY-07. Two-hundred and thirty-nine of these facilities have been demolished employing Routine demolition techniques. This presentation reviews and discusses two of the eight Non-Routine demolitions Facilities, 420-D 'The Concentrator Facility', and 421-D 'The Finishing Facility'. Facilities 420-D and 421-D were toppled by attaching rigging from the structural steel building frame to bulldozers and toppling the facilities over. The greatest advantage of this method is that it employs equipment that is on hand at SRS, saving time on locating and leasing offsite equipment as well as operator training. In addition, although the toppled structure does not land in the original facilities footprint, it does land in a contained area that is easily barricaded to prevent access during the operation. There are several disadvantages. First, there must be adequate area for the structure to topple into. Also if the wire rope size required to topple the structure is larger than two in., the ropes become extremely difficult to work with. Lastly, the yield strength of steel members is guaranteed by the manufacturer as a minimum strength, so its ultimate strength is unknown. This requires extremely conservative specifications sizing the bulldozers and any rigging equipment employed. Two hundred and forty-seven facilities have been successfully demolished at SRS utilizing five different demolition techniques. The routine method employed on the vast majority of facilities has been extremely successful and should be applied whenever possible. Because of their height, the 420-D and 421-D facilities required developing a new (to SRS) demolition method. This technique of toppling the structures with a bulldozer and implementing additional safety measures provided a successful, safe, and cost efficient demolition method. This method should be employed in the future on any steel or wood framed structures that are over forty ft. high that have ample space around them.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Area Completion Strategies at Savannah River Site: Characterization for Closure and Beyond

During the first four decades of its 56 year existence, the Savannah River Site (SRS) was a key supplier of nuclear material for national defense. During the 1990's, the site's primary missions became waste site closure, environmental restoration, and deactivation and decommissioning (D and D) of remnant cold war apparatus. Since 1989, with the approval of State and Federal regulatory agencies and with the participation of interested stakeholders, SRS has implemented a final remedy for a majority of the more than 500 individual waste sites at the former nuclear materials complex. These waste sites range from small, inert rubble pits to large, heavy industrial areas and radioactive waste disposal grounds. The closure and final remediation of these waste sites mark significant progress toward achieving SRS's overarching goal of reducing or eliminating future environmental damage and human health threats. However, larger challenges remain. For example, what are appropriate and achievable end-states for decommissioned nuclear facilities? What environmental and human health risks are associated with these end-states? To answer these questions within the strictures of smaller budgets and accelerated schedules, SRS is implementing an 'area completion' strategy that: - unites several discrete waste units into one conceptual model, - integrates historically disparate environmental characterization and D and D activities - reduces the number of required regulatory documents, - and, in some cases, compresses schedules for achieving a stakeholder-approved end-state. The area completion approaches being implemented at SRS reflect an evolution of the traditional RCRA/ CERCLA remedial process. Area completion strategies: - group waste units and/or D and D facilities together for characterization, remediation, and possible reuse; - identify data needs and integrate data collection activities for D and D, characterization, and remediation; - identify problems that require action and match areas of concern with appropriate likely responses based on anticipated land use and end-states; - streamline the regulatory process and reduce the number of required regulatory documents; - and accelerate remedial and D and D decisions and reduce project costs versus the traditional 'piecemeal' approach. These strategies are achieving faster, more responsible, and less expensive solutions to managing the Cold War legacy while assuring protection of human and ecological receptors and future industrial workers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High-Level Waste Mechanical Sludge Removal at the Savannah River Site - F Tank Farm Closure Project

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intra-area transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long Term Stability Testing Results for Savannah River Site Organic and Aqueous Waste streams

The U.S. Department of Energy (DOE) has tasked MSE Technology Applications, Inc. (MSE) with evaluating the long-term stability of various commercially available sorbent materials to solidify two organic surrogate waste streams (both volatile and nonvolatile), a volatile organic waste stream with a residual aqueous phase, an aqueous waste stream, and an aqueous waste stream with a residual organic phase. The Savannah River Site (SRS) legacy plutonium/uranium extraction (PUREX) process waste and the F-Canyon PUREX waste constituted the volatile organic wastes and various oils constituted the nonvolatile organic waste stream. The aqueous waste streams included a rainwater waste stream and an aqueous organic waste stream. MSE also evaluated the PUREX waste stream with a residual aqueous component with and without aqueous-type sorbent materials. Based on testing performed at MSE, the rainwater waste stream was successfully solidified by SRS personnel using two different sorbents. Several small oil wastes were also successfully solidified by SRS personnel using granular clay sorbents based on information provided by MSE from the oils waste stream testing and 75,706 Liters (L) [20,000 gallons (gal)] of the F-Canyon PUREX waste was solidified at Waste Consolidation Specialists (WCS). Solidification of the various surrogate waste streams listed above was performed from 2004 to 2006 at the MSE testing and evaluation facility located at the Mike Mansfield Advanced Technology Center in Butte, Montana. This paper summarizes the comparison of the initial liquid release testing (LRT) values with LRT results obtained over three years later in an attempt to understand the long-term stability characteristics of the solidified waste streams. The paper also includes solidification results for B-25 box samples generated late in 2005. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of a Stochastic Model to Evaluate Uncertainty in a Performance Assessment at the Savannah River Site

A significant effort has recently been initiated to address probabilistic issues within radiological Performance Assessments (PA's) conducted at the Savannah River Site (SRS). This effort is considered to be part of a continual process, as is the program of PA analysis and maintenance across the Department of Energy (DOE) complex. At SRS, findings in the initial probabilistic analysis of the Slit Trenches in the E-Area PA were built upon and improved in the later development of the probabilistic model for the F-Area Tank Farm. Within the PA studies conducted at SRS, the initial effort of the uncertainty analyses was focused on the Slit Trenches as part of the E-Area PA. Specifically, a probabilistic model was developed for Slit Trench 5 within the E-Area. This model was utilized in deterministic mode to compare its results against the 2- and 3-D model results of the deterministic models. Then, utilizing the PDFs, the model was used to perform multiple realizations and produce probabilistic results. Later, a second probabilistic sensitivity and uncertainty analysis was undertaken for the F-Area Tank Farm PA. This effort is currently underway. Many improvements were made in how the flow and transport processes were incorporated within this model. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Feasibility Evaluation and Retrofit Plan for Cold Crucible Induction Melter Deployment in the Defense Waste Processing Facility at Savannah River Site

Cold crucible induction melters (CCIM) have been proposed as an alternative technology for waste glass melting at the Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS) as well as for other waste vitrification facilities. Proponents of this technology cite high temperature operation, high tolerance for noble metals and aluminum, high waste loading, high throughput capacity, and low equipment cost as the advantages over existing Joule Heated Melter (JHM) technology. The CCIM uses induction heating to maintain molten glass at high temperature. A water-cooled helical induction coil is connected to an AC current supply, typically operating at frequencies from 100 kHz to 5 MHz. The oscillating magnetic field generated by the oscillating current flow through the coil induces eddy currents in conductive materials within the coil. Those oscillating eddy currents, in turn, generate heat in the material. In the CCIM, the induction coil surrounds a 'Cold Crucible' which is formed by metal tubes, typically copper or stainless steel. The tubes are constructed such that the magnetic field does not couple with the crucible. Therefore, the field generated by the induction coil couples primarily with the conductive medium (hot glass) within. The crucible tubes are water cooled to maintain their temperature between 100 deg. C to 200 deg. C so that a protective layer of molten glass and/or batch material, referred to as a 'skull', forms between them and the hot, corrosive melt. Because the protective skull is the only material directly in contact with the molten glass, the CCIM doesn't have the temperature limitations of traditional refractory lined JHM. It can be operated at melt temperatures in excess of 2000 deg. C, allowing processing of high waste loading batches and difficult-to-melt compounds. The CCIM is poured through a bottom drain, typically through a water-cooled slide valve that starts and stops the pour stream. To promote uniform temperature distribution and increase heat transfer to the slurry fed High Level Waste (HLW) sludge, the CCIM may be equipped with bubblers and/or water cooled mechanical agitators. The DWPF could benefit from use of CCIM technology, especially in light of our latest projections of waste volume to be vitrified. Increased waste loading and increased throughput could result in substantial life cycle cost reduction. In order to significantly surpass the waste throughput capability of the currently installed JHM, it may be necessary to install two 950 mm CCIMs in the DWPF Melt Cell. A cursory evaluation of system design requirements and modifications to the facility that may be required to support installation and operation of two 950 mm CCIMs was performed. Based on this evaluation, it appears technically feasible to position two CCIMs in the Melt Cell of the DWPF within the existing footprint of the current melter. Interfaces with support systems and controls including Melter Feed, Power, Melter Cooling Water, Melter Off-gas, and Canister Operations must be designed to support dual CCIM operations. This paper describes the CCIM technology and identifies technical challenges that must be addressed in order to implement CCIMs in the DWPF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Sludge Heel Removal At The Savannah River Site F-Tank Farm Closure Project

Chemical Sludge Removal (CSR) is the final waste removal activity planned for some of the oldest nuclear waste tanks located at the Savannah River Site (SRS) in Aiken, SC. In 2008, CSR will be used to empty two of these waste tanks in preparation for final closure. The two waste tanks chosen to undergo this process have previously leaked small amounts of nuclear waste from the primary tank into an underground secondary containment pan. CSR involves adding aqueous oxalic acid to the waste tank in order to dissolve the remaining sludge heel. The resultant acidic waste solution is then pumped to another waste tank where it will be neutralized and then stored awaiting further processing. The waste tanks to be cleaned have a storage capacity of 2.84 E+06 liters (750,000 gallons) and a target sludge heel volume of 1.89 E+04 liters (5,000 gallons) or less for the initiation of CSR. The purpose of this paper is to describe the CSR process and to discuss the most significant technical issues associated with the development of CSR. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an improved sodium titanate for the pretreatment of nuclear waste at the Savannah River Site

High-level nuclear waste produced from fuel reprocessing operations at the Savannah River Site (SRS) requires pretreatment to remove Cs-137, Sr-90 and alpha-emitting radionuclides (i.e., actinides) prior to disposal onsite as low level waste. Separation processes planned at SRS include sorption of Sr-90 and alpha-emitting radionuclides onto monosodium titanate (MST) and caustic side solvent extraction, for Cs-137 removal. The MST and separated Cs-137 will be encapsulated into a borosilicate glass wasteform for eventual entombment at the federal repository. The predominant alpha-emitting radionuclides in the highly alkaline waste solutions include plutonium isotopes Pu-238, Pu-239 and Pu-240. This paper describes recent results to produce an improved sodium titanate material that exhibits increased removal kinetics and capacity for Sr-90 and alpha-emitting radionuclides compared to the baseline MST material. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Overview of the Integrated Crate Interrogation System (ICIS) for use at the Savannah River Site

The Integrated Crate Interrogation System (ICIS) was developed for use at the Savannah River Site to assay transuranic waste in large containers. The system comprises a Box Segmented Gamma Scanner (BSGS) providing high resolution gamma spectroscopy, and a Box Neutron Assay System (BNAS) providing passive neutron counting capability. The multi-modality approach is taken where the assay results from the gamma and neutron systems are combined to complement each other in satisfying Waste Isolation Pilot Plant (WIPP) criteria. This paper gives an overview of the system that has been built, factory calibrated, and delivered to the site. The BSGS is similar to a standard Canberra Segmented Gamma Box Counter, but with the addition of a transmission option for ascertaining density and rudimentary fill-height information. This supplements the Multi-Curve approach based on efficiency in energy and density. The BSGS has a moving trolley which travels on rails through a passive emission counting station using large BEGe detectors, and a transmission counting station using NaI detectors in conjunction with high- and low-beam transmission stages. The assay result provides information on the Pu, Am and/or U isotopic ratios using standard isotopic analysis codes, quantitative measurement of Pu and U for low and medium density matrices, and direct measurement of other gamma emitters in the waste that are not identified in the isotopic measurement. It also provides basic positional information to improve the accuracy of both the gamma and the neutron measurement. The BNAS is a passive neutron coincidence counter intended for use with multiplicity counting of items of various geometries. The counter utilizes 320 {sup 3}He filled proportional counters arranged in a 4 {pi} geometry about the assay cavity and divided into 80 counting channels. The assay result provides the {sup 240}Pu-effective mass with which the gamma isotopic measurement is combined to provide reliable reporting of Pu and other isotopes. It also provides the total alpha activity that must be reported as part of the characterization requirements for WIPP (or bounds on the alpha activity based on the chemical form of the alpha-emitter). The neutron assay also complements the gamma results where matrix effects, self shielding or self absorption effects, and the presence of high-Z material, severely limits accuracy. Matrix moderator corrections for the neutron assay are based on a multi-position Add-A-Source correction augmented by a Modified Hydrogen Correction. The data acquisition also incorporates a Local Coincidence Veto circuit. Following the calibration of the system at the factory, confirmatory measurements were performed to demonstrate the validity of the calibrations, and to verify that the measurement system meets the Waste Acceptance Criteria established by DOE/WIPP. (authors)

54 ENVIRONMENTAL SCIENCES↗

Effect of Wind Gusts on Local Run-of-River Hydro Plants

In this work, we focus on the integration of wind farms in a hydro dominated power system, and analyze the challenges and solutions associated with this integration. Due to sudden increase in wind power, the system frequency can increase, causing excessive reduction in the run-of-river (ROR) system’s power. This can result in damage to the physical structure due to water level violations and cause issues for downstream customers. To prevent excessive and prolonged ROR power deviations, and to prevent tie-line deviations, we are proposing a wind-hydro centralized coordination scheme, which is not existing currently. The controller showed promising results by reducing the system frequency extrema by 0.8Hz.

13 HYDRO ENERGY↗

Development and Implementation of a Scaled Saltstone Facility at Savannah River National Laboratory - 13346

The Savannah River National Laboratory (SRNL) has supported the Saltstone Production Facility (SPF) since its conception. However, bench scaled tests have not always provided process or performance data related to the mixing, transfer, and other operations utilized in the SPF. A need was identified to better understand the SPF processes and to have the capabilities at SRNL to simulate the SPF unit operations to support an active low-level radioactive waste (LLW) processing facility. At the SPF, the dry premix is weighed, mixed and transferred to the Readco '10-inch' continuous mixer where it is mixed with the LLW salt solution from the Salt Feed Tank (SFT) to produce fresh Saltstone slurry. The slurry is discharged from the mixer into a hopper. The hopper feeds the grout pump that transfers the slurry through at least 457.2 meters of piping and discharges it into the Saltstone Disposal Units (SDU) for permanent disposal. In conjunction with testing individual SPF processes over several years, SRNL has designed and fabricated a scaled Saltstone Facility. Scaling of the system is primarily based on the volume capacity of the mixer and maintaining the same shear rate and total shear at the wall of the transfer line. At present, SRNL is utilizing the modular capabilities of the scaled Saltstone Facility to investigate the erosion issues related to the augers and paddles inside the SPF mixer. Full implementation of the scaled Saltstone Facility is still ongoing, but it is proving to be a valuable resource for testing alternate Saltstone formulations, cleaning sequences, the effect of pumping Saltstone to farther SDU's, optimization of the SPF mixer, and other operational variables before they are implemented in the SPF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Assessment of Critical Radionuclides and Associated Environmental Media at the Savannah River Site - 13038

During the operational history of the Savannah River Site (SRS), many different radionuclides have been released from site facilities. However, only a relatively small number of the released radionuclides have been significant contributors to doses and risks to the public. At SRS dose and risk assessments indicate tritium oxide in air and surface water, and Cs-137 in fish and deer have been, and continue to be, the critical radionuclides and pathways. In this assessment, statistical analyses of the long-term trends of tritium oxide in atmospheric and surface water releases and Cs-137 concentrations in fish and deer are provided. Correlations also are provided with 1) operational changes and improvements, 2) geopolitical events (Cold War cessation), and 3) recent environmental remediation projects and decommissioning of excess facilities. For example, environmental remediation of the F- and H-Area Seepage Basins and the Solid Waste Disposal Facility have resulted in a measurable impact on the tritium oxide flux to the onsite Fourmile Branch stream. Airborne releases of tritium oxide have been greatly affected by operational improvements and the end of the Cold War in 1991. However, the effects of SRS environmental remediation activities and ongoing tritium operations on tritium concentrations in the environment are measurable and documented in this assessment. Controlled hunts of deer and feral hogs are conducted at SRS for approximately six weeks each year. Before any harvested animal is released to a hunter, SRS personnel perform a field analysis for Cs-137 concentrations to ensure the Hunter's dose does not exceed the SRS administrative game limit of 0.22 milli-sievert (22 mrem). However, most of the Cs-137 found in SRS onsite deer is not from site operations but is from nuclear weapons testing fallout from the 1950's and early 1960's. This legacy source term is trended in the SRS deer, and an assessment of the 'effective' half-life of Cs-137 in deer (including the physical decay half-life and the environmental dispersion half-life) is provided. The 'creek mouth' fisherman is the next most critical pathway at SRS. On an annual basis, three species of fish (panfish, catfish, and bass) are sampled from the mouths of the five SRS streams. Three composites of up to five fish of each species are analyzed from each sampling location. Long-term trending of the Cs-137 concentrations in fish and the subsequent doses from consumption of SRS fish is provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗